Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Assessment of geophysical monitoring methods for detection of brine and CO 2 leakage in drinking water aquifers

Here, we evaluated and compared the effectiveness of four surface-based geophysical monitoring methods to downhole pressure and chemical methods to detect brine and CO 2 leakage in underground sources of drinking water overlying a CO 2 storage reservoir. This assessment uses synthetic monitoring data generated from 400 simulated aquifer impact data sets. Here, the six monitoring techniques can detect impacted groundwater once 20,000 tonnes of CO 2 have leaked into the drinking water resource. Geophysical methods are most effective at detecting shallow plumes. Although downhole monitoring methods outperform geophysical methods in detecting deep plumes, geophysical methods may help reduce the false negative during the post injection site care because they detect impacted groundwater where downhole sensors may be absent.

58 GEOSCIENCES↗

Progress in Monitoring Strategies for Risk Reduction in Geologic CO2 Storage

Abstract: This geophysical monitoring review is intended to lay the ground work for an approach to integrating monitoring strategies with risk assessment and risk reduction and to summarize work conducted by U.S. Department of Energy's National Risk Assessment Partnership (NRAP) participants that addresses key questions related to monitoring strategies. Commercial, demonstration and pilot geologic CO2 storage (GCS) projects have provided a wealth of practical experience in monitoring technologies. In this manuscript we review a few key projects, specific geophysical methods, well-based methods, geophysical workflows and some suggested best practices. These practices are often driven and governed by regulatory requirements (e.g. U.S. Environmental Protection Agency [US-EPA] Class VI underground injection regulation) and the need for effective reservoir management of pressures and volumes as well as the site-specific risks to containment, plume migration, and underground sources of drinking water. Reducing uncertainty in monitoring is likely to lead to reducing uncertainty in risk. One of our conclusions is the need for field experiment testing that is risk-driven. It is notable that GCS pilot projects have been designed for safe storage, and to date they have been successful. Technical challenges at all geologic CO2 storage sites include assuring injectivity and capacity predictions are reliable, the fate and subsurface topology of the CO2 plume is acceptable, regulatory permitting and compliance are accomplished in a timely manner, needed business assurances are supported by quantitative technical data, and the storage operation is acceptable to stakeholders. There is risk associated with all of these challenges necessitating a monitoring program utilizing both direct and indirect monitoring methods. Because of the direct association of risk and monitoring in GCS, geophysical monitoring is viewed as a key component in approaching risk assessment. To address monitoring in the context of risk assessment the U.S. Department of Energy's National Risk Assessment Partnership (NRAP) has undertaken a review of work related to monitoring storage sites. In this review we provide a framework for monitoring and then present some specific monitoring tools that may be useful for regulatory compliance, as well as technologies that are applicable to leakage detection.

Harbert, William↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

A method for simultaneous linear optics and coupling correction for storage rings with turn-by-turn beam position monitor data

We propose a method to simultaneously correct linear optics errors and linear coupling for storage rings using turn-by-turn (TbT) beam position monitor (BPM) data. The independent component analysis (ICA) method is used to isolate the betatron normal modes from the measured TbT BPM data. The betatron amplitudes and phase advances of the projections of the normal modes on the horizontal and vertical planes are then extracted, which, combined with dispersion measurement, are used to fit the lattice model. The fitting results are used for lattice correction. The method has been successfully demonstrated on the NSLS-II storage ring.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Mooring Load Monitoring of a Wave Energy Converter Using a Self-Synchronizing Underwater Acoustic Network

A self-synchronizing underwater acoustic network, designed for remote monitoring of mooring loads in Wave Energy Converters (WEC), has been developed and tested. This network uses Time Division Multiple Access and operates self-contained with the ability for users to remotely transmit commands to the network as needed. Each node is a self-contained unit, consisting of a protocol adaptor board, an underwater acoustic modem and a battery pack. A node can be connected to a load cell, to a topside user or to the WEC. Every node is swapable. The protocol adaptor board, named Protocol Adaptor for Digital LOad Cell (PADLOC) supports a variety of digital load cell message formats (CAN, MODBUS, custom ASCII) and underwater acoustic modem serial formats. PADLOC enables topside users to connect to separate load cells through a user-specific command.

acoustic↗

FutureGen 2.0 Monitoring Program: An Overview of the Monitoring Approach and Technologies Selected for Implementation

The FutureGen 2.0 Project will design and build a first-of-its-kind, near-zero emissions coal-fueled power plant with carbon capture and storage (CCS). To assess storage site performance and meet the regulatory requirements of the Class VI Underground Injection Control (UIC) Program for CO2 Geologic Sequestration, the FutureGen 2.0 project will implement a suite of monitoring technologies designed to 1) evaluate CO2 mass balance and 2) detect any unforeseen loss in CO2 containment. The monitoring program will include direct monitoring of the injection stream and reservoir, and early-leak-detection monitoring directly above the primary confining zone. It will also implement an adaptive monitoring strategy whereby monitoring results are continually evaluated and the monitoring network is modified as required, including the option to drill additional wells in out-years. Wells will be monitored for changes in CO2 concentration and formation pressure, and other geochemical/isotopic signatures that provide indication of CO2 or brine leakage. Indirect geophysical monitoring technologies that were selected for implementation include passive seismic, integrated surface deformation, time-lapse gravity, and pulsed neutron capture logging. Near-surface monitoring approaches that have been initiated include surficial aquifer and surface- water monitoring, soil-gas monitoring, atmospheric monitoring, and hyperspectral data acquisition for assessment of vegetation conditions. Initially, only the collection of baseline data sets is planned; the need for additional near- surface monitoring will be continually evaluated throughout the design and operational phases of the project, and selected approaches may be reinstituted if conditions warrant. Given the current conceptual understanding of the subsurface environment, early and appreciable impacts to near-surface environments are not expected.

54 ENVIRONMENTAL SCIENCES↗

Laboratory investigation of hydraulic fracturing in granitic rocks using active and passive seismic monitoring

SUMMARY Knowledge of the fracturing processes can be important for the optimization of pressurized fluid injection operations in the deep underground rock mass. Active and passive seismic monitoring techniques have been used in the field for tracking or mapping the propagating hydraulic fracture. Although both these monitoring techniques provide valuable information about the generated fracture network, it is difficult for either technique to comprehensibly identify the different processes associated with hydraulic fracturing. The combined active and passive monitoring has the potential for better characterization of the complex hydraulic fracturing phenomena. In this study, laboratory hydraulic fracturing experiments with combined active and passive seismic monitoring were conducted on true triaxially loaded Barre granite cubes with different fluid injection rates. The seismic inelastic fracturing was detected by 16 passive acoustic emission sensors, where 3678 and 2370 seismic source events were detected for the high and low injection rate experiments, respectively. For active monitoring, strong variations in the attributes of signals were observed which were transmitted through four source–receiver pairs, placed both perpendicular and parallel to the generated hydraulic fracture. Positive velocity changes were observed for active sensor pairs with ray paths passing through the generated hydraulic fracture indicating fluid permeation, whereas isolated dry deformation was characterized by a slight but permanent velocity decrease. Compared to velocity, the energy of the active signals was 1–2 orders of magnitude more sensitive to different hydraulic fracturing processes. However, the sensitivity and signatures of the active signal attributes were found to be dependent on the frequency range and direction of ray path with respect to the location of the generated fracture network. Using the coupled evaluation of the active and passive signals we were able to systematically identify various hydraulic fracturing processes including: (1) aseismic deformation, (2) fracture initiation and fluid permeation, (3) pressure build-up, (4) fracture propagation and (5) pressure release and leak-off. The results of this study showed that combining the respective advantages of active and passive seismic techniques and using both of them to monitor the failure processes can facilitate a more comprehensive understanding and better control of the hydraulic stimulations in subsurface operations.

Geochemistry & Geophysics↗

Performance Evaluation of Comparative Vacuum Monitoring and Piezoelectric Sensors for Structural Health Monitoring of Rotorcraft Components

The costs associated with the increasing maintenance and surveillance needs of aging structures are rising at an unexpected rate. Multi-site fatigue damage, hidden cracks in hard-to-reach locations, disbonded joints, erosion, impact, and corrosion are among the major flaws encountered in today’s extensive fleet of aging aircraft and space vehicles. Aircraft maintenance and repairs represent about a quarter of a commercial fleet’s operating costs. The application of Structural Health Monitoring (SHM) systems using distributed sensor networks can reduce these costs by facilitating rapid and global assessments of structural integrity. The use of in-situ sensors for real-time health monitoring can overcome inspection impediments stemming from accessibility limitations, complex geometries, and the location and depth of hidden damage. Reliable, structural health monitoring systems can automatically process data, assess structural condition, and signal the need for human intervention. The ease of monitoring an entire on-board network of distributed sensors means that structural health assessments can occur more often, allowing operators to be even more vigilant with respect to flaw onset. SHM systems also allow for condition-based maintenance practices to be substituted for the current time-based or cycle-based maintenance approach thus optimizing maintenance labor. The Federal Aviation Administration has conducted a series of SHM validation and certification programs intended to comprehensively support the evolution and adoption of SHM practices into routine aircraft maintenance practices. This report presents one of those programs involving a Sandia Labs-aviation industry effort to move SHM into routine use for aircraft maintenance. The Airworthiness Assurance NDI Validation Center (AANC) at Sandia Labs, in conjunction with Sikorsky, Structural Monitoring Systems Ltd., Anodyne Electronics Manufacturing Corp., Acellent Technologies Inc., and the Federal Aviation Administration (FAA) carried out a trial validation and certification program to evaluate Comparative Vacuum Monitoring (CVM) and Piezoelectric Transducers (PZT) as a structural health monitoring solution to specific rotorcraft applications. Validation tasks were designed to address the SHM equipment, the health monitoring task, the resolution required, the sensor interrogation procedures, the conditions under which the monitoring will occur, the potential inspector population, adoption of CVM and PZT systems into rotorcraft maintenance programs and the document revisions necessary to allow for their routine use as an alternate means of performing periodic structural inspections. This program addressed formal SHM technology validation and certification issues so that the full spectrum of concerns, including design, deployment, performance and certification were appropriately considered. Sandia Labs designed, implemented, and analyzed the results from a focused and statistically relevant experimental effort to quantify the reliability of a CVM system applied to Sikorsky S-92 fuselage frame application and a PZT system applied to an S-92 main gearbox mount beam application. The applications included both local and global damage detection assessments. All factors that affect SHM sensitivity were included in this program: flaw size, shape, orientation and location relative to the sensors, as well as operational and environmental variables. Statistical methods were applied to performance data to derive Probability of Detection (POD) values for SHM sensors in a manner that agrees with current nondestructive inspection (NDI) validation requirements and is acceptable to both the aviation industry and regulatory bodies. The validation work completed in this program demonstrated the ability of both CVM and PZT SHM systems to detect cracks in rotorcraft components. It proved the ability to use final system response parameters to provide a Green Light/Red Light (“GO” – “NO GO”) decision on the presence of damage. In additional to quantifying the performance of each SHM system for the trial applications on the S-92 platform, this study also identified specific methods that can be used to optimize damage detection, guidance on deployment scenarios that can affect performance and considerations that must be made to properly apply CVM and PZT sensors. These results support the main goal of safely integrating SHM sensors into rotorcraft maintenance programs. Additional benefits from deploying rotorcraft Health and Usage Monitoring Systems (HUMS) may be realized when structural assessment data, collected by an SHM system, is also used to detect structural damage to compliment the operational environment monitoring. The use of in-situ sensors for health monitoring of rotorcraft structures can be a viable option for both flaw detection and maintenance planning activities. This formal SHM validation will allow aircraft manufacturers and airlines to confidently make informed decisions about the proper utilization of CVM and PZT technology. It will also streamline future regulatory actions and formal certification measures needed to assure the safe application of SHM solutions.

42 ENGINEERING↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Paint and Oil Locker SWMU 067 Southern Treatment Area Air Sparge System Year 2 Performance Monitoring and Paint and Oil Locker Northern Area (SWMU 067) and Supply Warehouse #3, SWMU 088 Long-Term Monitoring Kennedy Space Center, Florida

This Year 2 Air Sparge (AS) System Performance Monitoring (PM) Report for Paint and Oil Locker (POL) Solid Waste Management Unit (SWMU) 067 Southern Treatment Area and Long- Term Monitoring (LTM) Report for POL Northern Area (SWMU 067) and Supply Warehouse #3 (SW3) SWMU 088 documents ongoing remedial efforts at the POL and SW3 sites at Kennedy Space Center (KSC), Florida. The overall goal for these sites is to reduce concentrations of groundwater contaminants of concern (COCs), specifically trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE) and vinyl chloride (VC), to below the State of Florida Groundwater Cleanup Target Levels (GCTLs). Remediation and reporting of POL and SW3 have been streamlined over the years due to the proximity of the two sites. The scope for these sites currently includes two main components: (1) LTM at SW3 and the POL Northern Area, where an AS system began operation in May 2009 (with expansion in December 2012) and June 2013, respectively, and subsequently turned off for both sites in March 2018 (NASA, 2019a); and (2) Active AS operations and PM in the POL Southern Treatment Area where an AS system was installed and began operation in 2021. The timeframe for activities covered under this report is from September 2022 to July 2023. Based on Year 2 system operation and PM results, the AS system at POL operated as designed and successfully met the performance objective of reducing VOCs to concentrations that support transition of the site from active remediation to long-term monitoring. The results from the samples collected from performance monitoring wells within the AS system ROI showed a significant decrease in COC concentrations since the baseline sampling event conducted in April 2020. Based on the Year 2 OM&M and monitoring results obtained from the POL Southern Treatment Area, the IM objective to reduce concentrations to below the LTM transition target concentrations for TCE, cDCE, tDCE, and VC has been achieved. LTM sampling events at SW3 were conducted in October 2022 and July 2023. LTM sampling was conducted at the POL Northern Area in October 2022, December 2022, March 2023, and July 2023. Analytical results from October 2022 and July 2023 generally indicate that concentrations of COCs have been stable or decreasing compared to the previous year. TCE remains greater than the NADC in one monitoring well (POL-MW0034S) and greater than the GCTL in one monitoring well (POL-MW0009S). Concentrations of cDCE were greater than the GCTL in one monitoring well (POL-MW0026S), and tDCE was non-detect or less than the GCTL in all monitoring wells sampled. VC was greater than the GCTL in four monitoring wells (MW0024, MW0025, MW0027, and MW0028) at SW3 and one monitoring well (MW0026S) at the POL Northern Area.

remediation↗

Monitoring Aqueous Reprocessing Systems for Detection of Facility Misuse

Traditional approaches to material control and accounting at used nuclear fuel reprocessing facilities relies in large part on laboratory-based destructive assay of periodic samples taken from key stages. These techniques are highly accurate, but limited inspection frequency may limit the size and operation of a reprocessing facility. Online monitoring techniques using inline detectors can be applied to fuel reprocessing systems to improve the situational awareness as the facility is operating to provide additional indicators of the evolving state of the facility between normal inspection periods, potentially alerting regulators to the need for additional inspection. The Multi-Isotope Process (MIP) Monitor combines medium-resolution gamma detectors with statistical data analysis techniques to monitor reprocessing systems for anomalous conditions resulting from process control issues or malfeasance. Gamma spectra collected from the H-Canyon reprocessing facility were modeled using principal component analysis to demonstrate the efficacy of the MIP Monitor for detecting notional diversion scenarios.

safeguards, nuclear fuel reprocessing, gamma spect↗

The Modular Borehole Monitoring Program. A research program to optimize well-based monitoring for geologic carbon sequestration

Understanding the impacts caused by injection of large volumes of CO 2 in the deep subsurface necessitates a comprehensive monitoring strategy. While surface-based and other remote geophysical methods can provide information on the general morphology of a CO 2 plume, verification of the geochemical conditions and validation of the remote sensing data requires measurements from boreholes that penetrate the storage formation. Unfortunately, the high cost of drilling deep wellbores and deploying instrumentation systems constrains the number of dedicated monitoring borings as well as limits the technologies that can be incorporated in a borehole completion. The objective of the Modular Borehole Monitoring (MBM) Program was to develop a robust suite of well-based tools optimized for subsurface monitoring of CO 2 that could meet the needs of a comprehensive well-based monitoring program. It should have enough flexibility to be easily reconfigured for various reservoir geometries and geologies. The MBM Program sought to provide storage operators with a turn-key fully engineered design that incorporated key technologies, function over the decades long time-span necessary for post-closure reservoir monitoring, and meet industry acceptable risk profiles for deep-well installations. While still within the conceptual design phase of the MBM program, the SECARB Anthropogenic Test in Citronelle, Alabama, USA was identified as a deployment site for our engineered monitoring systems. The initial step in designing the Citronelle MBM system was to down-select from the various monitoring tools available to include technologies that we considered essential to any program. Monitoring methods selected included U-tube geochemical sampling, discrete quartz pressure and temperature gauges, an integrated fibre-optic bundle consisting of distributed temperature and heat-pulse sensing, and a sparse string of conventional 3C-geophones. While not originally planned within the initial MBM work scope, the fibre-optic cable was able to also be used for the emergent technology of distributed acoustic sensing. The MBM monitoring string was installed in March, 2012. To date, the Citronelle MBM instruments continue to operate reliably. Results and lessons learned from the Citronelle MBM deployment are addressed along with examples of data being collected.

54 ENVIRONMENTAL SCIENCES↗

Historical Building Stability Monitoring by Means of a Cosmic Ray Tracking System

Cosmic ray radiation is mostly composed, at sea level, by high energy muons, which are highly penetrating particles capable of crossing kilometers of rock. The ubiquitous and steady presence at the Earth's surface and the high penetration capability have motivated the use of cosmic ray radiation also in fields beyond particle physics, from geology, archaeology, speleology to industrial applications and homeland security. In particular, in recent years, the novel technique of muon tomography has been proposed, with the aim of performing non invasive inspection of large non accessible volumes, material atomic number Z and density discrimination, and three dimension image reconstruction of the inspected volume. In the present paper, after a short recall of the physical principles and mathematical formalism on which muon tomography is based, a number of examples of application of the novel technique in industry and homeland security issues is given. Moreover, a new application of cosmic rays detection techniques in the field of civil engineering is proposed. The aim is the monitoring of the stability of large structures, in particular the static monitoring of historical buildings, where conservation constraints are more severe and the time evolution of the deformation phenomena under study may be of the order of months or years. The new technique may be seen, in some way, as the reverse problem of muon tomography. As a significant case study, the monitoring of the wooden vaulted roof of the Palazzo della Loggia in the town of Brescia, in Italy, has been considered. The feasibility as well as the performances and limitations of a monitoring system based on cosmic ray tracking have been studied by Monte Carlo simulation and discussed in comparison with more traditional monitoring systems. (authors)

42 ENGINEERING↗

Long-term monitoring experiences at the HADES underground lab and its relevance for radwaste repository monitoring

In the frame of its radwaste disposal research programme, SCK-CEN started the construction of the HADES underground research facility in 1980. Including several extensions and a comprehensive experimental programme, it has provided a lot of experience on monitoring. Monitoring is performed for many reasons: construction follow-up, field characterisation, investigation of phenomena, and model validations - in which the underground lab offers the opportunity for up-scaling conventional laboratory set-ups. Construction monitoring has allowed to develop and optimise the underground construction techniques in a previously poorly known environment, resulting in a well-mastered application of mechanised methods for gallery construction with minimal damage to the host formation. Access to this formation also allows its characterisation, both geotechnical, geological and geochemical, and the detailed investigation of phenomena such as fracturing and oxidation. Finally, instrumented set-ups allow to test various numerical models by comparing the observations with the predicted behaviour. The specific conditions of the underground laboratory put particular requirements to the sensors. These conditions include the long-term nature of many set-ups - typically several years to decades, the inaccessibility of many sensors after installation, high mechanical and water pressures, and corrosion. Combined with the fact that many sensors are custom made, obtaining and maintaining a fully functional instrumented set-up can be challenging. A lot of experience has therefore been gained which is very valuable when designing the monitoring of radwaste repositories - and it has allowed us to determine the critical success factors for monitoring. Engineers tend to look at this first from a technical viewpoint - and there are many technical aspects indeed that determine the reliability of monitoring. A first one is the combination of different observations ('redundancy') which can be implemented by the use of several sensors, different sensor principles, different (coupled) parameters, and the combination of point measurements with geophysical techniques. Cabling is also a critical issue as it is often considered as the primary enemy of barrier integrity. Minimal cabling techniques, such as distributed fibre optic monitoring and wireless signal transmission, therefore get increasing attention. Also the interpretation of the monitoring data - in particular those that are perceived as 'wrong' or 'unexpected', needs sufficient attention. The long-term experience has however also shown that the design of a monitoring programme must look beyond the technical part. In particular for long-term applications, issues such as data management and record keeping are vital to guarantee success in this. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗