Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mixed integer linear programming”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Optimal sizing of battery energy storage systems for peak shaving and demand response using a degradation-aware Bayesian Optimization-Mixed-Integer Linear Programming framework

The increasing integration of renewable energy and rising electricity demand highlight the importance of battery energy storage systems for peak shaving and demand response. Unlike prior approaches that overlook operational impacts on degradation, this study proposes a Bayesian Optimization–Mixed Integer Linear Programming framework for optimal battery energy storage system sizing. In this framework, Mixed Integer Linear Programming determines short-term scheduling while a calibrated electrochemical model iteratively evaluates degradation. The central hypothesis is that the framework can efficiently identify optimal sizes that yield realistic and economically robust outcomes. The method is tested across three scenarios: peak shaving, peak shaving with energy-reduction demand response, and peak shaving with power-reduction demand response. Results show that the framework converge to the optimum within 20 iterations out of 150 possible sizes. Under baseline conditions, the framework consistently selects the smallest feasible system, minimizing unnecessary degradation costs from oversized storage. Sensitivity analyses reveal that larger systems are favored as demand rates or incentives increase. Comparisons of demand response programs indicate that power-reduction demand response offers greater economic benefits than energy-reduction demand response, although demand savings from peak shaving remain the dominant contributor to overall performance. This study demonstrates that the proposed framework balances computational tractability with degradation fidelity, identifies critical economic thresholds for investment, and offers a practical, flexible tool to guide industrial stakeholders in cost-effective battery energy storage system deployment.

Batteries↗

Alternative mixed integer linear programming optimization for joint job scheduling and data allocation in grid computing

This paper presents a novel approach to the joint optimization of job scheduling and data allocation in grid computing environments. We formulate this joint optimization problem as a mixed integer quadratically constrained program. To tackle the nonlinearity in the constraint, we alternatively fix a subset of decision variables and optimize the remaining ones via Mixed Integer Linear Programming (MILP). We solve the MILP problem at each iteration via an off-the-shelf MILP solver. Our experimental results show that our method significantly outperforms existing heuristic methods, employing either independent optimization or joint optimization strategies. We have also verified the generalization ability of our method over grid environments with various sizes and its high robustness to the algorithm setting.

97 MATHEMATICS AND COMPUTING↗

Multi-parametric analysis for mixed integer linear programming: An application to transmission upgrade and congestion management

Upgrading the capacity of existing transmission lines is essential for meeting the growing energy demands, facilitating the integration of renewable energy, and ensuring the security of the transmission system. This study focuses on the selection of lines whose capacities and by how much should be expanded from the perspective of the Independent System Operators (ISOs) to minimize the total system cost. We employ advanced multi-parametric programming and an enhanced branch-and-bound algorithm to address complex mixed-integer linear programming (MILP) problems, considering multi-period time constraints and physical limitations of generators and transmission lines. To characterize the various decisions in transmission expansion, we model the increased capacity of existing lines as parameters within a specified range. This study first relaxes the binary variables to continuous variables and applies the Lagrange method and Karush-Kuhn-Tucker (KKT) conditions to obtain optimal solutions and identify critical regions associated with active and inactive constraints. Moreover, we extend the traditional branch-and-bound (B&B) method by determining the problem’s upper and lower bounds at each node of the B&B decision tree, helping to manage computational challenges in large-scale MILP problems. Here, we compare the difference between the upper and lower bounds to obtain an approximate optimal solution within the decision-makers’ tolerable error range. In addition, the first derivative of the objective function on the parameters of each line is used to inform the selection of lines for easing congestion and maximizing social welfare. Finally, the capacity upgrades are selected by weighing the reductions in system costs against the expense of upgrading line capacities. The findings are supported by numerical simulations and provide transmission-line planners with decision-making guidance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimizing district energy systems by integrating Borehole Thermal Energy Storage Using a Mixed-Integer Linear Programming g-function framework with a Multi-Timescale Rolling Horizon method

Shallow geothermal has gained increasing attention in recent years; however, a reliable framework for its accurate incorporation into large-scale energy system optimization remains lacking. This study proposes a Mixed-Integer Linear Programming (MILP) framework combined with the g-function approach to integrate Borehole Thermal Energy Storage (BTES) technology into energy system optimization. Validation against a Modelica-based reservoir network simulation demonstrates that the proposed framework effectively captures the ground thermal response under varying energy loads and accurately estimates the borefield energy supply. To enhance scalability, a Rolling Horizon with Multi-Timescale (RH-MTS) method is further introduced, reducing computational time by 73 % for the 1-year optimization model with only minor loss of optimality. The framework is demonstrated through the case study of the UC Berkeley campus. Results indicate that BTES is a cost-effective and low-carbon solution: two borefields comprising 382 boreholes can meet 8.0 % and 6.6 % of the total campus heating and cooling demand, respectively, at an average energy rate of 0.70–0.77 USD/kWh and carbon intensity of 0.54 kg-CO2/kWh. Short-term analysis reveals a 35%–65% decline in BTES energy flow after 3–6 months of continuous heating/cooling operation, while long-term simulation shows that annual energy production of BTES can vary by up to 12.0 % after four years before stabilizing. Overall, this study develops a novel optimization framework that couples physics-based g-function method with MILP optimization framework, thereby advancing methodological development for shallow-geothermal integration and providing actionable guidance for BTES deployment in district-energy systems.

Yang, Jiahui↗

Optimal Electrification Using Renewable Energies: Microgrid Installation Model with Combined Mixture k-Means Clustering Algorithm, Mixed Integer Linear Programming, and Onsset Method

Optimal planning and design of microgrids are priorities in the electrification of off-grid areas. Indeed, in one of the Sustainable Development Goals (SDG 7), the UN recommends universal access to electricity for all at the lowest cost. Several optimization methods with different strategies have been proposed in the literature as ways to achieve this goal. This paper proposes a microgrid installation and planning model based on a combination of several techniques. The programming language Python 3.10 was used in conjunction with machine learning techniques such as unsupervised learning based on K-means clustering and deterministic optimization methods based on mixed linear programming. These methods were complemented by the open-source spatial method for optimal electrification planning: onsset. Four levels of study were carried out. The first level consisted of simulating the model obtained with a cluster, which is considered based on the elbow and k-means clustering method as a case study. The second level involved sizing the microgrid with a capacity of 40 kW and optimizing all the resources available on site. The example of the different resources in the Togo case was considered. At the third level, the work consisted of proposing an optimal connection model for the microgrid based on voltage stability constraints and considering, above all, the capacity limit of the source substation. Finally, the fourth level involved a planning study of electrification strategies based mainly on microgrids according to the study scenario. The results of the first level of study enabled us to obtain an optimal location for the centroid of the cluster under consideration, according to the different load positions of this cluster. Then, the results of the second level of study were used to highlight the optimal resources obtained and proposed by the optimization model formulated based on the various technology costs, such as investment, maintenance, and operating costs, which were based on the technical limits of the various technologies. In these results, solar systems account for 80% of the maximum load considered, compared to 7.5% for wind systems and 12.5% for battery systems. Next, an optimal microgrid connection model was proposed based on the constraints of a voltage stability limit estimated to be 10% of the maximum voltage drop. The results obtained for the third level of study enabled us to present selective results for load nodes in relation to the source station node. Finally, the last results made it possible to plan electrification using different network technologies and systems in the short and long term. The case study of Togo was taken into account. The various results obtained from the different techniques provide the necessary leads for a feasibility study for optimal electrification of off-grid areas using microgrid systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mixed-Integer Linear Programming Formulation with Embedded Machine Learning Surrogates for the Design of Chemical Process Families

In previous work, we introduced process family design. The main idea is to design a platform of common elements, and, allowing us to capture additional cost savings, simultaneously design a family of processes, and reducing both engineering and deployment timelines. We formulate this as an optimization problem, specifically a nonlinear generalized disjunctive program (GDP). We have proposed two approaches for reformulating and solving this problem: one based on full-discretization of the design space and one that uses Machine Learning (ML) surrogates to replace the nonlinear process models. Using ML surrogates to predict required system costs and performance indicators allows us to reformulate the nonlinearities in the GDP generate an efficient MILP formulation. In this work, we apply the ML surrogate approach to two case studies. One case study involves designing a family of carbon capture systems to cover a set of different flue gas flow rates and inlet CO 2 concentrations, where we consider the absorber and stripper as common unit module types. The second case study focuses on a water-desalination process, where we design a family of these processes for a variety of salt concentrations and flow rates. In both of these case studies, we demonstrate a scalable optimization approach that enables the design of multiple processes simultaneously, reducing the time-to-market and overall costs by maximizing the cost savings due to both economies of scale and economies of numbers.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Flexible dynamic boundary microgrid operation considering network and load unbalances

Flexible microgrids with dynamic boundaries have recently been introduced in the literature. With the ability to reconfigure the topology of the microgrids dynamically through remotely controlled switches, flexible microgrids with dynamic boundaries can further improve the resiliency and energy efficiency of microgrids with distributed energy resources (DERs). This paper focuses on the optimal operation considering one of the predominant characteristics of microgrids and distribution systems – unbalanced networks and loads. In existing literature, balanced modeling of microgrids is more common due to its attractive simplicity. The three-phase power unbalance has not been considered as a constraint on the generation units in a microgrid. Further, negative sequence constraints have also been neglected. In this article, we propose a set of constraints that is specifically related to the capabilities of inverter interfaced resources to supply unbalanced current/power when the microgrid is islanded from the main distribution grid. We incorporate the new set of constraints into two optimization formulations leveraging two convex relaxations of the three-phase power flow equations: mixed-integer linear programming (MILP) and mixed-integer semidefinite programming (MISDP) that optimize the dispatch of controllable switches and DERs in the microgrid. The algorithms are then extended to networked microgrids with grid-forming sources. We test the algorithms on a realistic community microgrid model in Puerto Rico as well as standardized IEEE distribution test feeders. The testing results demonstrate the performance of the proposed algorithms. The MILP is fast and scalable, and the MISDP enforces the negative sequence voltage constraints.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cooperative Transmission Expansion Planning Experiment Data and Results

GO WEST is an open-source power grid modeling framework for U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BA) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of U.S. Western Interconnection created by Texas A&M University. Users can try and select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within GO WEST framework. In this sense, TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. TEP minimizes the total cost of the system which comprises the operational cost of satisfying electricity demand (i.e., generation cost), cost of loss of load (i.e., unserved energy), cost of power flow, and cost of new transmission capacity additions (i.e., investment cost). In order to use TEP model, users need to create scenarios with GO WEST framework. In this analysis, outputs from several models are used to create future inputs to GO WEST and TEP models, including GCAM-USA, TELL, CERF and reV. This dataset includes experiment inputs and outputs from three different transmission expansion scenarios (cooperative, intermediate, and individual) for 2019 and 2059. For 2019, a base scenario to illustrate the default (i.e., historical) power grid operations is also included. This study utilizes rcp45hotter_ssp3 scenario from a previous version of GCAM-USA simulations. Sources of the shapefiles in supplementary data are HIFLD Open and U.S. Energy Atlas. Please see the README file for a detailed description of the main and supplementary data.

Capacity Expansion Model↗

IM3 Projected U.S. Western Interconnection Grid Stress Dataset

This dataset provides projected grid stress and reliability results (including all model inputs and outputs from GO WEST and TEP) for Integrated Multisector, Multiscale Modeling (IM3) Phase 2 simulations across eight different scenarios for the U.S. Western Interconnection through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States from a set of Thermodynamic Global Warming (TGW) simulations. These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 GO WEST is an open-source power grid modeling framework for the U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BAs) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of the U.S. Western Interconnection (ACTIVSg10k). Users can select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on the GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within the GO WEST framework. The TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. In order to use TEP model, users need to create scenarios with the GO WEST framework. Please refer to README file for a detailed description of the dataset including individual files and references.

Capacity Expansion Model↗

Planning Amidst Uncertainty: Identifying Core CCS Infrastructure Robust to Storage Uncertainty

Carbon Capture and Storage (CCS) is a critical technology for reducing anthropogenic CO2 emissions, but its large-scale deployment is complicated by uncertainties in geological storage performance. These uncertainties pose significant financial and operational risks, as underperforming storage sites can lead to costly infrastructure modifications, inefficient pipeline routing, and economic shortfalls. To address this challenge, we propose a novel optimization workflow that is based on mixed-integer linear programming and explicitly integrates probabilistic modeling of storage uncertainty into CCS infrastructure design. This workflow generates multiple infrastructure scenarios by sampling storage capacity distributions, optimally solving each scenario using a mixed-integer linear programming model, and aggregating results into a heatmap to identify core infrastructure components that have a low likelihood of underperforming. A risk index parameter is introduced to balance trade-offs between cost, CO2 processing capacity, and risk of underperformance, allowing stakeholders to quantify and mitigate uncertainty in CCS planning. Applying this workflow to a CCS dataset from the US Department of Energy’s Carbon Utilization and Storage Partnership project reveals key insights into infrastructure resilience. Reducing the risk index from 15% to 0% is observed to lead to an 83.7% reduction in CO2 processing capacity and a 77.1% decrease in project profit, quantifying the trade-off between risk tolerance and project performance. Furthermore, our results highlight critical breakpoints, where small adjustments in the risk index produce disproportionate shifts in infrastructure performance, providing actionable guidance for decision-makers. Unlike prior approaches that aimed to cheaply repair underperforming infrastructure, our workflow constructs robust CCS networks from the ground up, ensuring cost-effective infrastructure under storage uncertainty. These findings demonstrate the practical relevance of incorporating uncertainty-aware optimization into CCS planning, equipping decision-makers with a tool to make informed project planning decisions.

Olson, Daniel↗

Data-Driven Energy Resilience Assessment and Enhancement in Urban Communities: A Case Study in Detroit

This paper presents a data-driven framework for assessing and enhancing energy resilience in urban communities. The resilience assessment is based on two datasets: 1) annual aggregated power outage data and 2) 15-minute interval outage data. High-impact, low-probability (HILP) events are identified within these datasets to evaluate community resilience under extreme conditions. To enhance resilience, an optimization framework utilizing mixed integer linear programming is developed to determine the optimal sizing and placement of solar photovoltaic (PV) systems and battery energy storage systems (BESS). This method offers a cost-effective and practical solution for improving energy resilience in vulnerable communities. Furthermore, a case study of the City of Detroit in Michigan demonstrates the effectiveness of the framework through simulation and validation.

Energy resilience assessment↗

A Fast Dynamic Internal Predictive Power Scheduling Approach for Power Management in Microgrids: Preprint

This paper presents a Dynamic Internal Predictive Power Scheduling (DIPPS) approach for optimizing power management in microgrids, particularly focusing on external power exchanges among diverse prosumers. DIPPS utilizes a dynamic objective function with a time-varying binary parameter to control the timing of power transfers to the external grid, facilitated by efficient usage of energy storage for surplus renewable power. The microgrid power scheduling problem is modeled as a mixed-integer nonlinear programming (MINLP-PS) and subsequently transformed into a mixed-integer linear programming (MILPPS) optimization through McCormick's relaxation to reduce computational complexity. A predictive window window with 6 data points is solved at an average of 0.92s, a 97.6% improvement over the 38.27s required for the MINLP-PS formulation, implying the numerical feasibility of the DIPPS approach for real-time implementation. Finally, the approach is validated against a static objective using real-world load data across three case studies with different time-varying parameters, demonstrating the ability of DIPPS to optimize power exchanges and efficiently utilize distributed resources while shifting the external power transfers to specified time durations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid-Aware Charging and Operational Optimization for Mixed-Fleet Public Transit

The rapid growth of urban populations and the increasing need for sustainable transportation solutions have prompted a shift towards electric buses in public transit systems. However, the effective management of mixed fleets consisting of both electric and diesel buses poses significant operational challenges. One major challenge is coping with dynamic electricity pricing, where charging costs vary throughout the day. Transit agencies must optimize charging assignments in response to such dynamism while accounting for secondary considerations such as seating constraints. This paper presents a comprehensive mixed-integer linear programming (MILP) model to address these challenges by jointly optimizing charging schedules and trip assignments for mixed (electric and diesel bus) fleets while considering factors such as dynamic electricity pricing, vehicle capacity, and route constraints. We address the potential computational intractability of the MILP formulation, which can arise even with relatively small fleets, by employing a hierarchical approach tailored to the fleet composition. By using real-world data from the city of Chattanooga, Tennessee, USA, we show that our approach can result in significant savings in the operating costs of the mixed transit fleets.

Sen, Rishav↗

Decomposing a renewable energy design and dispatch model

We address a mixed-integer linear programming model which selects a cost-minimizing set of available technologies with which to design a renewable energy system and prescribe their associated dispatch decisions. Realistically sized instances of such models pose computational challenges. To this end, we develop a Lagrangian heuristic based on a decomposition methodology which partitions the model into blocks and optimizes these more manageable, smaller subproblems. It also provides a lower bound to assess solution quality. In conclusion, we apply this methodology to the National Renewable Energy Laboratory's Renewable Energy Integration and Optimization (REopt TM ) model to generate near-optimal solutions to realistic instances containing, on average, approximately 300,000 variables and at least as many constraints, with a mean 30% optimality gap improvement using a five-minute solution time limit, compared to directly solving the original monolith.

97 MATHEMATICS AND COMPUTING↗

Capacitated p -hub approach for park-and-ride facility location problem under nested logit demand function: polyhedral approaches

By generalizing the unconstrained p-hub approach for the park-and-ride (P&R) facility location problem under the multinomial logit demand function, the capacitated p-hub approach for the problem under the nested logit demand function captures a broader range of real-world cases. To solve this problem optimally, we introduce a mixed-integer linear program and accelerate its solution by enhancing the branch-and-cut procedure. To address the problem at a large scale, we introduce two other polyhedral approaches: variable neighborhood search (VNS) and adaptive randomized rounding (ARR). Downtown areas in Seoul have a high modal share of public transportation and congested road traffic, yet P&R has not been widely implemented. Therefore, we apply the ARR procedure to solve a real-world problem using traffic and geographic data from the Seoul metropolitan area. ARR performs better than VNS and addresses real-world cases. The solutions obtained by ARR present a phased expansion plan that encourages policymakers to start installing a small number of P&Rs immediately.

Capacitated p-hub approach↗

Multi-objective sizing and dispatch for building thermal and battery storage towards economic and environmental synergy

The role of building thermal and battery storage is pivotal in advancing smart cities and achieving sustainability goals through effective energy management. Despite their significance, there are several limitations in the sizing approach and value stream analysis with various objectives for their widespread adoption in buildings. This work proposes a flexible and scalable multi-objective optimization framework for optimal sizing and dispatch of building thermal and battery storage, addressing conflicting objectives simultaneously using mixed-integer linear programming. The weighted-sum method is adapted, combining multiple objectives into a single function. The two-stage procedure iterates over different weights, generating optimal solutions and forming the Pareto front. Case studies are performed to assess the energy, economic, and environmental benefits of building energy storage systems for a large office building in three climate locations. The results demonstrate that the proposed framework efficiently determines optimal sizing and dispatch strategies, addressing the balance between economic viability and emission reduction. The dynamic relationship between time-of-use energy charges and emission factors leads to significantly different strategies based on whether economic or environmental concerns are prioritized. This research enhances our understanding of the benefits of TES and BES systems in buildings, providing valuable guidance to stakeholders.

25 ENERGY STORAGE↗

A Vehicle-to-Grid planning framework incorporating electric vehicle user equilibrium and distribution network flexibility enhancement

The rapid surge in electric vehicle (EV) adoption, coupled with advancements in charging technologies, emphasizes the critical necessity for expanding EV recharging infrastructure. Simultaneously, the Distribution Network (DN) encounters escalating challenges in meeting charging demand during peak traffic periods. Consequently, there is a mounting demand for the deployment of innovative Vehicle-to-Grid (V2G) technologies to augment the DN’s flexibility in power dispatch and alleviate travel costs for EV users. Hence, this paper proposes an EV-user-equilibrium-(UE)-constrained V2G planning framework that enhances flexibility in the DN. The framework aims to ascertain the optimal placement and capacity of EV charging stations (EVCSs) and V2G charging piles within the Transportation Network (TN). It takes into account the equilibrium condition stemming from competitive EV charging and routing behaviors alongside the optimal expansion of DN energy resources to accommodate the electricity supplied by the V2G piles. This study commences by analyzing EV drivers’ travel decisions, considering the influence of charging and V2G pile locations and sizes. Subsequently, we tackle the Traffic Assignment Problem with User Equilibrium (TAP-UE) model to characterize the steady-state traffic flow distribution of EVs. Following this, we formulate the optimization model for the Coordinated Power and Transportation Network (CPTN), which encompasses the optimal expansion of DN facilities and traffic flow regulation under UE conditions. To mitigate the computational complexity associated with the V2G planning model, we introduce a series of linearization methods to obtain a manageable Mixed-Integer Linear Programming (MILP) solution. Finally, to validate the efficacy of our proposed planning framework, we apply it to two test systems, including a real-world case study. Through these case studies, we explore the necessity and potential benefits of V2G technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An analysis of physics limited dispatch of nuclear renewable integrated energy systems using deep reinforcement learning and dynamic modeling

Previous approaches to dispatching nuclear integrated energy systems (NIES) have focused on the profitability and flexibility of these systems to operate on energy grids with highly variable pricing. However, due to the complexity involved in modeling and designing these systems, there has been less emphasis on ensuring that these dispatch strategies are physically achievable. It is imperative to develop methods that allow the system to remain within the desired NIES operating conditions and perform this based on realistic limited forecasted information. This research employs next generation artificial intelligence, namely deep reinforcement learning (DRL), and a dynamic system model written in Modelica to find a safe and profitable dispatch strategy for a solar nuclear hybrid design. The DRL agent is shown to find a novel dispatch strategy that manages both power ramping and power levels while respecting operational limits. This DRL-based dispatch is compared to other dispatching strategies including an optimal design solution from mixed integer linear programming (MILP). It is found that incorporating the physics of such a tightly coupled NIES limits the profitability of the MILP-based dispatch strategy. As a result, the MILP solution overestimates the design’s generated revenue. In contrast, DRL significantly reduces the number of breaches of safe operational conditions during energy arbitrage while maintaining profitability. Furthermore, this work paves the way for a more detailed assessment of NIES profitability and could be used to aid operator decisions on future NIES projects.

14 - SOLAR ENERGY↗