Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Mars rover EDL operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Mars Exploration Rover: surface operations

This paper will provide an overview of the planned mission, and also focus on the different operations challenges inherent in operating these two very off road vehicles, and the solutions adopted to enable the best utilization of their capabilities for high science return and responsiveness to scientific discovery.

Mars rover EDL operations

Navigation and EDL for the Mars Exploration Rovers

A viewgraph presentation on Deep Space Navigation, and Entry, Decent, and Landing (EDL) for Mars Exploration Rovers is shown. The contents include: 1) JPL Spacecraft Operating across the Solar System; 2) 2003 - 2004: The Busiest Period in JPL's History; 3) Deep Space Navigation Will Enable Many of the New NASA Missions; 4) What Exactly is Navigation vs. GNC for Deep Space?; 5) Cruise and Approach: Why is Deep Space Navigation So Difficult?; 6) Project Importance of GNC: Landing Site Selection; 7) Planetary Communications and Tracking; 8) Tracking Data Types; 9) Delta Differential One-Way Range (deltaDOR); 10) All Solutions Leading up to TCM-4 Design; 11) Entry Flight Path Sensitivities; 12) MER Navigation Results; 13) Atmospheric Entry Targeting and Delivery; 14) Landing Ellipse Orientation; 15) MER Landing Site Trade Example; 16) Entry, Descent and Landing: Entry Guidance or What Things Do We NOT do for MER Landings (but we will later...); 17) Entering Martian Space 8:29 p.m. PST (ERT); 18) Entry, Descent and Landing; 19) Entry, Descent and Landing: Terminal Guidance; 20) The Challenge Going from 12,000 mph to Zero in Less Than Six Minutes; 21) Spirit Landing Location; 22) Entry, Descent and Landing: The Future; 23) Powered Descent Time-Line; and 24) Updated Sky Crane Maneuver Description. A short summary is also given on planetary guidance, navigation and control as it pertains to EDL systems

Mars Exploration Rover (MER)

An Update of the Ground Testing of the Li-ion Batteries in Support of JPL's 2003 Mars Exploration Rover Mission

In early 2004, JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling > 300 million miles over a 6-7 month period. In order to operate for extended duration (>9 months), both Rovers are equipped with rechargeable Lithium-ion batteries, which have enabled operation for over 854 and 834 Sols of operation, respectively, to date. Given that the batteries were required to support the mission for 90 Sols of operation by design, it is significant that the batteries have demonstrated over a nine fold increase in life over mission objectives. In addition to supporting the surface operations in conjunction with a triple-junction deployable solar arrays, the batteries were designed to aid in the launch and the EDL pyros, and allow for anomalies during cruise. In summary, the requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20 C to +30 C), withstand long storage periods (e.g., cruise period), operate in an inverted orientation, and support high current pulses (e.g., firing pyro events). In order to determine the viability of meeting these requirements, ground testing was performed on a Rover Battery Assembly Unit (RBAU), consisting of two 8-cell 10 Ah lithium-ion batteries connected in parallel. The RBAU upon which the performance testing was performed is nearly identical to the batteries incorporated into the two Rovers currently on Mars. The testing includes, (a) performing initial characterization tests (discharge capacity at different temperatures), (b) simulating the launch conditions, (c) simulating the cruise phase conditions (including trajectory correction maneuvers), (d) simulating the entry, decent, and landing (EDL) pulse load profile (required to support the pyros) (e) simulating the Mars surface operation mission simulation conditions, as well as, (f) assessing capacity loss and impedance characteristics as a function of temperature and life. This paper provides further detail to previously reported results1 of the RBAU testing program, especially with regard to the life characteristics. To date, the lithium-ion batteries (fabricated by Lithion/Yardney, Inc.) have been demonstrated to far exceed the requirements defined by the mission, both on Mars and on the ground, and are projected to support an extended mission (> 4 years).

Mars Exploration Rovers (MER) Mission

Preparing the Mars Relay Network for the Arrival of the Perseverance Rover at Mars

The Perseverance rover represents NASA’s latest achievement in Mars exploration. Landing successfully on 18 Feb 2021, the rover’s transmitted data during its entry, descent, and landing (EDL) were captured by the Mars Reconnaissance Orbiter (MRO) and the Mars Atmosphere and Volatile Evolution (MAVEN) orbiter. This data, broadcast in near-realtime to the world, allowed everyone to share in the excitement (and “terror”) of the day. The images returned thereafter included the first images of the new landing site, video of the landing itself taken from a variety of vantage points, and eventually the historic images of the first powered flight on another planet. Behind the scenes, the return of that data to Earth was accomplished via Mars orbiters operated by NASA and ESA, using three different ground tracking networks. Considered together, this Mars Relay Network (MRN) enabled the successful, timely, and unobtrusive return of the rover’s data. This paper describes the preparations taken by the participants of the MRN in anticipation of the arrival of Perseverance at Mars. These were not only focused on successfully acquiring the rover’s critical event telemetry during its EDL, but also on readying the network to return the rover’s data on an ongoing basis as it pursued its mission objectives. Included is a brief description of the MRN, which represents a highly successful international collaboration and continues as critical infrastructure for NASA’s and ESA’s ongoing Mars exploration. Also summarized are the activities performed prior to EDL, including landing site reconnaissance and mission test and training activities; those activities performed on EDL day, especially the recording, return, and processing of the rover’s critical event telemetry; and those activities that are now being performed on an ongoing basis during the rover’s surface operations, including an outline of the planning processes that enable relay services. Finally, a description of the performance of the network to-date on behalf of the Perseverance rover is given, summarizing the success of the network to provide support to both it and other spacecraft on the surface of Mars.

Srnka, Evan

Tracking capability for entry, descent and landing and its support to NASA Mars Exploration Rovers

This paper described a new capability recently deployed in the NASA Deep Space Network to support the entry, descent and landing of the two Mars Exploration Rovers - Spirit and Opportunity. This final segment of a 7-month journey was critical step in enabling successful mission operation. The EDL Data Analysis (EDA) equipment processed the open loop recording samples from the existing radio science receivers, extracted the MFSK-modulated tones, and provided information on the occurrence of associated events happened onboard spacecraft. The EDA software supported real-time as well as post pass processing. The design flexibility allowed the track to be divided into different segments, each could be processed with a configuration optimized for its signal conditions and uncertainties. The use of dynamic lock state concept enabled signal detection be done with minimum required computing power - less was spent when signal was steadily detected and more when signal fluctuated. With the server-client design, the EDA supported connections to different remote operation centers for monitor purpose. The paper also presented the field results from both Spirit and Opportunity landings. The detection were much better than anticipated. All critical event tones were seen in real time. Surprising detection of LCP signal was found with Spirit landing, resulted in a reconfiguration for Opportunity landing to maximize signal detection.

tracking

Radio science receiver support of the Mars Exploration Rover Landings

The low power levels of the communication signals during the Entry Descent and Landing (EDL) sequences of the Mars rovers prevented the transmission of telemetry at X-band signal to inform the mission operations center of the health and progress of the spacecraft. As an altemative, a series of tones were sent to indicate basic spacecraft conditions and execution of critical events. An open-loop receiver designed for Radio Science experiments was used to acquire the signal during this time. The receiver recorded over a 100 Khz bandwidth to identify the presence of the carrier and tones. The data were fed in real-time to a processing unit which detected the carrier and the frequency separation of the tones from the carrier, in order to determine which event has occurred. Up to 256 different tones were possible. During the actual events, all tones were identified, and the carrier was tracked down to the surface, and for the second rover, through the bouncing which followed, and finally, while stopped on the surface, found the carrier and tones which indicated the spacecraft was alive. In order to identify the tones, the ground receivers had to be able to respond to the bevy of events occurring in the relatively short timespan of EDL.

Deep Space Network (DSN)

Approach and Entry, Descent, and Landing Operations for the Mars Science Laboratory Mission

On August 5th, 2012, at 10:31 PM PDT, the Mars Science Laboratory (MSL) rover Curiosity landed safely within Gale Crater. Her successful landing de-pended not only upon the flawless execution of the numerous critical activities during the seven minute entry, descent, and landing (EDL), but also upon the operational preparations and decisions made by the flight team during approach, the final weeks, days, and hours prior to landing. During this period, decisions made by the flight team balanced operational risk to the spacecraft in flight with any resulting risks incurred during EDL as a result of those decisions. This pa-per summarizes the operations plans made in preparation for Approach and EDL and the as flown decisions and actions executed that balanced the operational and EDL risks and prepared the vehicle for a successful landing.

Mars Science Laboratory (MSL)

Atmosphere Assessment for MARS Science Laboratory Entry, Descent and Landing Operations

On August 6, 2012, the Mars Science Laboratory rover, Curiosity, successfully landed on the surface of Mars. The Entry, Descent and Landing (EDL) sequence was designed using atmospheric conditions estimated from mesoscale numerical models. The models, developed by two independent organizations (Oregon State University and the Southwest Research Institute), were validated against observations at Mars from three prior years. In the weeks and days before entry, the MSL "Council of Atmospheres" (CoA), a group of atmospheric scientists and modelers, instrument experts and EDL simulation engineers, evaluated the latest Mars data from orbiting assets including the Mars Reconnaissance Orbiter's Mars Color Imager (MARCI) and Mars Climate Sounder (MCS), as well as Mars Odyssey's Thermal Emission Imaging System (THEMIS). The observations were compared to the mesoscale models developed for EDL performance simulation to determine if a spacecraft parameter update was necessary prior to entry. This paper summarizes the daily atmosphere observations and comparison to the performance simulation atmosphere models. Options to modify the atmosphere model in the simulation to compensate for atmosphere effects are also presented. Finally, a summary of the CoA decisions and recommendations to the MSL project in the days leading up to EDL is provided.

Cianciolo, Alicia D.

MARS Science Laboratory Post-Landing Location Estimation Using Post2 Trajectory Simulation

The Mars Science Laboratory (MSL) Curiosity rover landed safely on Mars August 5th, 2012 at 10:32 PDT, Earth Received Time. Immediately following touchdown confirmation, best estimates of position were calculated to assist in determining official MSL locations during entry, descent and landing (EDL). Additionally, estimated balance mass impact locations were provided and used to assess how predicted locations compared to actual locations. For MSL, the Program to Optimize Simulated Trajectories II (POST2) was the primary trajectory simulation tool used to predict and assess EDL performance from cruise stage separation through rover touchdown and descent stage impact. This POST2 simulation was used during MSL operations for EDL trajectory analyses in support of maneuver decisions and imaging MSL during EDL. This paper presents the simulation methodology used and results of pre/post-landing MSL location estimates and associated imagery from Mars Reconnaissance Orbiter s (MRO) High Resolution Imaging Science Experiment (HiRISE) camera. To generate these estimates, the MSL POST2 simulation nominal and Monte Carlo data, flight telemetry from onboard navigation, relay orbiter positions from MRO and Mars Odyssey and HiRISE generated digital elevation models (DEM) were utilized. A comparison of predicted rover and balance mass location estimations against actual locations are also presented.

Davis, J. L.

Mars 2020 Perseverance Entry Descent and Landing Simulation Statistical Analysis and Operations

On February 18, 2021, the Perseverance rover and Ingenuity helicopter demonstra- tion landed at Jezero Crater. The Entry, Descent, and Landing (EDL) architecture, largely the same used to land Curiosity at Gale Crater on August 6, 2012, required high-fidelity flight dynamics simulation with two independent tools to verify per- formance. The process for creating the EDL simulation using the Dynamics Sim- ulator for Entry, Descent and Surface landing (DSENDS) tool will be discussed, along with its use for for independent verification of the EDL statistical analy- sis results and reference trajectory simulation. Analysis and usage details both in development and cruise, along with post-landing assessment of the prediction performance of the simulation, will also be discussed.

"O'Farrell, Clara"

Mars Exploration Rover Entry, Descent, and Landing: A Thermal Perspective

Perhaps the most challenging mission phase for the Mars Exploration Rovers was the Entry, Descent, and Landing (EDL). During this phase, the entry vehicle attached to its cruise stage was transformed into a stowed tetrahedral Lander that was surrounded by inflated airbags through a series of complex events. There was only one opportunity to successfully execute an automated command sequence without any possible ground intervention. The success of EDL was reliant upon the system thermal design: 1) to thermally condition EDL hardware from cruise storage temperatures to operating temperature ranges; 2) to maintain the Rover electronics within operating temperature ranges without the benefit of the cruise single phase cooling loop, which had been evacuated in preparation for EDL; and 3) to maintain the cruise stage propulsion components for the critical turn to entry attitude. Since the EDL architecture was inherited from Mars Pathfinder (MPF), the initial EDL thermal design would be inherited from MPF. However, hardware and implementation differences from MPF ultimately changed the MPF inheritance approach for the EDL thermal design. With the lack of full inheritance, the verification and validation of the EDL thermal design took on increased significance. This paper will summarize the verification and validation approach for the EDL thermal design along with applicable system level thermal testing results as well as appropriate thermal analyses. In addition, the lessons learned during the system-level testing will be discussed. Finally, the in-flight EDL experiences of both MER-A and -B missions (Spirit and Opportunity, respectively) will be presented, demonstrated how lessons learned from Spirit were applied to Opportunity.

thermal

Implementing the Mars Science Laboratory Terminal Descent Sensor Field Test Campaign

The Mars Science Laboratory (MSL) will deliver a 900 kg rover to the surface of Mars in August 2012. MSL will utilize a new pulse-Doppler landing radar, the Terminal Descent Sensor (TDS). The TDS employs six narrow-beam antennas to provide unprecedented slant range and velocity performance at Mars to enable soft touchdown of the MSL rover using a unique sky crane Entry, De-scent, and Landing (EDL) technique. Prior to use on MSL, the TDS was put through a rigorous verification and validation (V&V) process. A key element of this V&V was operating the TDS over a series of field tests, using flight-like profiles expected during the descent and landing of MSL over Mars-like terrain on Earth. Limits of TDS performance were characterized with additional testing meant to stress operational modes outside of the expected EDL flight profiles. The flight envelope over which the TDS must operate on Mars encompasses such a large range of altitudes and velocities that a variety of venues were neces-sary to cover the test space. These venues included an F/A-18 high performance aircraft, a Eurocopter AS350 AStar helicopter and 100-meter tall Echo Towers at the China Lake Naval Air Warfare Center. Testing was carried out over a five year period from July 2006 to June 2011. TDS performance was shown, in gen-eral, to be excellent over all venues. This paper describes the planning, design, and implementation of the field test campaign plus results and lessons learned.

Mars Science Laboratory (MSL)

Combined EDL-Mobility Planning for Planetary Missions

This paper presents an analysis framework for planetary missions that have coupled mobility and EDL (Entry-Descent-Landing) systems. Traditional systems engineering approaches to mobility missions such as MERs (Mars Exploration Rovers) and MSL (Mars Science Laboratory) independently study the EDL system and the mobility system, and does not perform explicit trade-off between them or risk minimization of the overall system. A major challenge is that EDL operation is inherently uncertain and its analysis results such as landing footprint are described using PDF (Probability Density Function). The proposed approach first builds a mobility cost-to-go map that encodes the driving cost of any point on the map to a science target location. The cost could include variety of metrics such as traverse distance, time, wheel rotation on soft soil, and closeness to hazards. It then convolves the mobility cost-to-go map with the landing PDF given by the EDL system, which provides a histogram of driving cost, which can be used to evaluate the overall risk of the mission. By capturing the coupling between EDL and mobility explicitly, this analysis framework enables quantitative tradeoff between EDL and mobility system performance, as well as the characterization of risks in a statistical way. The simulation results are presented with a realistic Mars terrain data

mission analysis

Enabling International Data Relay at Mars

The most commonly used mode of communications be-tween Earth and a Mars surface mission is ultra-high fre-quency (UHF) radio relay via a Mars orbiter. There are four orbiters and two surface rovers operating at Mars and by October there should be five orbiters and three landers or rovers. There has been some collaboration between ESA’s Mars Express orbiter and NASA’s rovers, but 2016 is when Mars relay becomes fully international. In October, ESA will deliver the ExoMars Trace Gas Orbiter (TGO) and En-try, Descent, and Landing (EDL) Demonstrator Module (EDM) lander to Mars. The ExoMars program includes both ESA and ROSCOSMOS, with NASA participation (the Electra UHF transceiver on TGO). NASA orbiters will pro-vide relay for EDM and future ESA Mars landers and rov-ers. TGO will provide relay for NASA's current and future surface assets (as Mars Express will continue to do). Inter-national collaboration is enabled in several steps. At the in-struction of the space agencies, the Mars mission projects negotiate and write a “Service Agreement.” This describes at a high level how a new Mars orbiter would operate with its corresponding surface missions or how a new surface mis-sion would operate with its corresponding orbiters. It in-cludes the roles of the different projects, how the new mis-sion would communicate with existing or planned missions, the general flow of data and commands, and the capabilities or requirements of the new mission. After completing the Service Agreement, the projects write Interface Control Doc-uments (ICDs), each of which describes data and command flow in greater detail and quantitative aspects of the relay link and operations timeline between an orbiter and a cor-responding lander/rover. Interfaces and operations are test-ed before a new mission arrives at Mars. Once at Mars, a new orbiter performs some “practice” relay contacts with its partners. For a new lander (e.g. EDM), relay operations gen-erally begin before atmospheric entry at Mars, with record-ing of the UHF relay signal from the lander (including open-loop wide-bandwidth recording) as it enters and traverses Mars’s atmosphere and lands on its surface. After Mars EDL or orbit injection, each relay contact is negotiat-ed and scheduled using the Mars Relay Operations Service (MaROS). This paper describes the international approach to develop inter-agency agreements, inter-project interfaces, and specifics of how MaROS is used in actual relay opera-tions between international partners.

Winton, Alistair J.

The F1 Multi-Mission Radioisotope Thermoelectric Generator (MMRTG) : a Power Subsystem Enabler for the Mars Science Laboratory (MSL) Mission

The Mars Science Laboratory (MSL) spacecraft carrying the Curiosity rover launched from Cape Canaveral Air Force Station (CCAFS) on November 26, 2011. Following an 8.5-month cruise and after a successful Entry, Descent and Landing (EDL) phase, the Curiosity rover arrived at the surface of Mars on August 6, 2012 UTC. At the core of the Curiosity rover power subsystem is the F1 Multi-Mission Radioisotope Thermoelectric Generator (MMRTG) supplied by the Department of Energy. Integration of the F1 MMRTG into the MSL spacecraft has provided the first opportunity to architect a power subsystem that also included a Solar Array (during the cruise phase of the mission and up to the initial stage of the EDL phase) and secondary Li-ion batteries for operation during the planned one Martian year surface phase of the mission. This paper describes the F1 MMRTG functional features as an enabler of the MSL mission and as a novel component of the MSL power subsystem architecture.

Curiosity rover

Assessment of a Surface Water Transportation System for ISRU Operations on Mars

NASA is working to define the architecture needed for a Mars exploration campaign. Initial analysis assumptions allow for pre-deployment of essential cargo and equipment to support a crew landing, including the pre-positioning of a Mars Ascent Vehicle (MAV). This MAV is likely to represent the largest single payload that must be landed on the Mars surface. Its size would be influenced by the amount of mass that state-of-the-art Entry, Descent, and Landing (EDL) systems would be capable of placing on Mars. One possible method of increasing the usable size of the MAV without exceeding available EDL capabilities is to land the MAV without ascent propellant on board. Following such a method may necessitate a strategy to acquire sufficient ascent propellant to allow a crew to safely depart the Martian surface. This paper describes a conceptual return propellant strategy that uses a liquid transportation skid, or pallet, to be used in conjunction with a rover mobility system to transfer water across the Martian surface from a source point to an in-situ resource utilization (ISRU) plant that would use this water as a feedstock to generate oxygen and methane to enable launch of the MAV. Design considerations, concept of operations, and rover energetics will be discussed in this paper.

Fluid Structure Interface

Assessment of a Surface Propellant Transportation System Concept for Operations on Mars

NASA is working to define the architecture needed for a Mars exploration campaign. One potential architecture option allows for pre-deployment of essential cargo and equipment to support a crew landing, including the pre-positioning of a Mars Ascent Vehicle (MAV). This MAV is likely to represent the largest single payload that must be landed on the Martian surface. Its size would be influenced by the amount of mass that state-of-the-art Entry, Descent, and Landing (EDL) systems would be capable of placing on Mars. One possible method of increasing the usable size of the MAV without exceeding available EDL capabilities is to land the MAV without its ascent propellant on board. Following such a method may necessitate a strategy to acquire sufficient ascent propellant to allow a crew to safely depart the Martian surface. This presentation describes a conceptual return propellant strategy that uses a liquid transportation skid, or pallet, to be used in conjunction with a rover mobility system to transfer cryogenic propellant, consisting of oxygen and methane, across the Martian surface from a delivery lander to the MAV to enable its launch. Design considerations, concept of operations, and rover energetics will be discussed in this presentation.

Surface