Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Mars Rover Testing Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Testing Mars Exploration Rover-Inspired Operational Strategies for Semi-Autonomous Rovers on the Moon Ii: the GeoHeuristic Operational Strategies Test in Alaska

We used MER-derived semi-autonomous rover science operations strategies to determine best practices suitable for remote semi-autonomous lunar rover geology. Two field teams studied two glacial moraines as analogs for potential ice-bearing lunar regolith. At each site a Rover Team commanded a human rover to execute observations based on common MER sequences; the resulting data were used to identify and characterize targets of interest. A Tiger Team followed the Rover Team using traditional terrestrial field methods, and the results of the two teams were compared. Narrowly defined goals that can be addressed using cm-scale or coarser resolution may be met sufficiently by the operational strategies adapted from MER survey mode. When reconnaissance is the primary goal, the strategies tested are necessary but not sufficient. Further, there may be a set of optimal observations for such narrowly defined, hypothesis-driven science goals, such that collecting further data would result in diminishing returns. We confirm results of previous tests that indicated systematic observations might improve efficiency during strategic planning, and improve science output during data analysis. This strategy does not markedly improve the rate at which a science team can ingest data to feed back into tactical decision-making. Other methods should be tested to separate the strategic and tactical processes, and to build in time for data analysis.

MER

Assemby, test, and launch operations for the Mars Exploration Rovers

In January of 2004, NASA's twin Mars rovers, Spirit and Opportunity, successfully landed on opposite sides of the Red Planet after a seven month Earth to Mars cruise period. Both vehicles have operated well beyond their 90 day primary mission design life requirements. The Assembly, Test, and Launch Operations (ATLO) program for these missions presented unique technical and schedule challenges to the team at the Jet Propulsion Laboratory (JPL). Among these challenges were a highly compressed schedule and late deliveries leading to extended double shift staffing, dual spacecraft operations requiring test program diversification and resource arbitration, multiple atypical test configurations for airbag/rocket landings and surface mobility testing, and verification of an exceptionally large number of separations, deployments, and mechanisms. This paper discusses the flight system test philosophies and approach, and presents lessons learned.

Assembly, Test, and Launch Operations (ATLO)

Mars 2020 Perseverance Rover Surface Operations Commissioning Phase Overview

This paper presents work done by the Mars 2020 Project to plan, test, and execute the Mars 2020 Perseverance Rover surface operations commissioning phase. Immediately after the successful landing of Mars 2020 Perseverance rover at Jezero Crater on February 18, 2021, the rover autonomously initiated mission critical commanding necessary to transition the vehicle from a Cruise/EDL to Surface operations configuration. This began the surface operations commissioning phase, referred to as Surface Operations Transition (SOX). The objective of SOX phase is to establish vehicle health and safety and to verify that the operational characteristics of the vehicle, now operating in the Martian environment, are as-expected and safe to proceed into nominal operations. The SOX commissioning phase is organized into six logical sub-phases occurring in the following chronological order; (1) SOX1a, (2) FSW Transition, (3) SOX1b, (4) SOX2a, (5) Heli, (6) SOX2b. In total, the SOX commissioning phase was expected to take up-to 111 sols (Martian days). The Perseverance rover is an extremely complex, highly-integrated, robotic system-of-systems that requires numerous activities to incrementally and methodically verify their safe operations. This paper will discuss the development process used to plan, test, and execute the SOX commissioning phase for Mars 2020 Perseverance rover surface operations. We will discuss key challenges associated with SOX development as well as actual operations execution experience.

Koch, Justin

Software for Displaying Data from Planetary Rovers

Science Activity Planner (SAP) DownlinkBrowser is a computer program that assists in the visualization of processed telemetric data [principally images, image cubes (that is, multispectral images), and spectra] that have been transmitted to Earth from exploratory robotic vehicles (rovers) on remote planets. It is undergoing adaptation to (1) the Field Integrated Design and Operations (FIDO) rover (a prototype Mars-exploration rover operated on Earth as a test bed) and (2) the Mars Exploration Rover (MER) mission. This program has evolved from its predecessor - the Web Interface for Telescience (WITS) software - and surpasses WITS in the processing, organization, and plotting of data. SAP DownlinkBrowser creates Extensible Markup Language (XML) files that organize data files, on the basis of content, into a sortable, searchable product database, without the overhead of a relational database. The data-display components of SAP DownlinkBrowser (descriptively named ImageView, 3DView, OrbitalView, PanoramaView, ImageCubeView, and SpectrumView) are designed to run in a memory footprint of at least 256MB on computers that utilize the Windows, Linux, and Solaris operating systems.

Powell, Mark

Mars Mission Surface Operation Simulation Testing of Lithium-Ion Batteries

The objectives of this program are to 1) Assess viability of using lithium-ion technology for future NASA applications, with emphasis upon Mars landers and rovers which will operate on the planetary surface; 2) Support the JPL 2003 Mars Exploration Rover program to assist in the delivery and testing of a 8 AHr Lithium-Ion battery (Lithion/Yardney) which will power the rover; 3) Demonstrate applicability of using lithium-ion technologyfor future Mars applications: Mars 09 Science Laboratory (Smart Lander) and Future Mars Surface Operations (General). Mission simulation testing was carried out for cells and batteries on the Mars Surveyor 2001 Lander and the 2003 Mars Exploration Rover.

Smart, M. C.

NASA's Desert RATS Science Backroom: Remotely Supporting Planetary Exploration

NASA's Desert Research and Technology Studies (Desert RATS) is a multi-year series of tests designed to exercise planetary surface hardware and operations in conditions where long-distance, multi-day roving is achievable. In recent years, a D-RATS science backroom has conducted science operations and tested specific operational approaches. Approaches from the Apollo, Mars Exploration Rovers and Phoenix missions were merged to become the baseline for these tests. In 2010, six days of lunar-analog traverse operations were conducted during each week of the 2-week test, with three traverse days each week conducted with voice and data communications continuously available, and three traverse days conducted with only two 1-hour communications periods per day. In 2011, a variety of exploration science scenarios that tested operations for a near-earth asteroid using several small exploration vehicles and a single habitat. Communications between the ground and the crew in the field used a 50-second one-way delay, while communications between crewmembers in the exploration vehicles and the habitat were instantaneous. Within these frameworks, the team evaluated integrated science operations management using real-time science operations to oversee daily crew activities, and strategic level evaluations of science data and daily traverse results. Exploration scenarios for Mars may include architectural similarities such as crew in a habitat communicating with crew in a vehicle, but significantly more autonomy will have to be given to the crew rather than step-by-step interaction with a science backroom on Earth.

Cohen, Barbara A.

Electrical Ground Support Equipment for the Sampling Caching System of the Mars 2020 Rover

In this work we describe in detail the architecture, design, testing and operation of the Electrical Ground Support Equipment (EGSE) “Blue Box” used to test and validate the Sampling Caching System (SCS) of the Mars 2020 Perseverance rover. The Blue Box architecture is centered around COTS motor controllers and COTS input-output modules communicating over an EtherCAT bus. A custom, low-level safety subsystem ensures no harm can be done to the flight articles. The modular architecture of the EGSE reduces cost and complexity while expediting assembly time. The Blue Box drives the 19 actuators of the SCS which span the main robotic arm, the corer system, the internal sample handling arm, the sample tube sealing system and the gas dust removal tool; mimicking the Rover Motor Control Assembly (RMCA). Due to the limited availability of RMCA’s, the EGSE enabled and performed the bulk of testing activities for SCS. The majority of the SCS actuators are composed of a 3-phase DC brushless motors, hall sensors for commutation, dual resolvers for output angular measurement, brakes, heaters and platinum thermistors. Additionally, the EGSE read 12 strain gauges forming part of a force torque sensor, and switches used for external positioning references. Over the 3-year span of the V&V campaign for the SCS, over 32 EGSE systems were built, tested and deployed to test venues at JPL and externally. The EGSE tested several families of the SCS subsystem, ranging from engineering units, life test units and two flight units. Test venues that this EGSE supported included lab benches, ultra-clean cleanrooms, ATLO facilities, and thermal vacuum chambers. Together with the test software systems, SSDEV and SSDEV-ECAT, the Blue Box EGSE enabled the team to efficiently test flight hardware and flight software together. We go over the safety features and fault management techniques employed to protect flight hardware. The effects of the long, 50-feet, EGSE harnesses on motor performance, EMI, electrical noise, and motor control performance are explained. Mitigations to these unwanted effects, including shielding strategy and inductance compensation, are summarized. We go over an excerpt of notable anomalies that this EGSE suffered through its operation, along with investigations and resolutions. Lessons learned, areas of improvement as part of future work, and recommendations for future implementations for similar EGSE’s, are shared.

Levine, Dan

Mars mission science operations facilities design

A variety of designs for Mars rover and lander science operations centers are discussed in this paper, beginning with a brief description of the Pathfinder science operations facility and its strengths and limitations. Particular attention is then paid to lessons learned in the design and use of operations facilities for a series of mission-like field tests of the FIDO prototype Mars rover. These lessons are then applied to a proposed science operations facilities design for the 2003 Mars Exploration Rover (MER) mission. Issues discussed include equipment selection, facilities layout, collaborative interfaces, scalability, and dual-purpose environments. The paper concludes with a discussion of advanced concepts for future mission operations centers, including collaborative immersive interfaces and distributed operations. This paper's intended audience includes operations facility and situation room designers and the users of these environments.

Ground Data System (GDC)

Performance Testing of Lithium Li-ion Cells and Batteries in Support of JPL's 2003 Mars Exploration Rover Mission

In early 2004, JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling > 300 million miles over a 6-7 month period. In order to operate for extended duration on the surface of Mars, both Rovers are equipped with rechargeable Lithium-ion batteries, which were designed to aid in the launch, correct anomalies during cruise, and support surface operations in conjunction with a triple-junction deployable solar arrays. The requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20(super 0)C to +40(super 0)C), withstand long storage periods (e.g., including pre-launch and cruise period), operate in an inverted position, and support high currents (e.g., firing pyro events). In order to determine the inability of meeting these requirements, ground testing was performed on a Rover Battery Assembly Unit RBAU), consisting of two 8-cell 8 Ah lithium-ion batteries connected in parallel. The RBAU upon which the performance testing was performed is nearly identical to the batteries incorporated into the two Rovers currently on Mars. The primary focus of this paper is to communicate the latest results regarding Mars surface operation mission simulation testing, as well as, the corresponding performance capacity loss and impedance characteristics as a function of temperature and life. As will be discussed, the lithium-ion batteries (fabricated by Yardney Technical Products, Inc.) have been demonstrated to far exceed the requirements defined by the mission, being able to support the operation of the rovers for over three years, and are projected to support an even further extended mission.

low temperature electrolytes

The Mars Pathfinder Mission

On July 4th, 1997, Mars Pathfinder became the third spacecraft to successfully land on the planet Mars. The mission's primary objective was to demonstrate a low-cost system for delivering a small science payload to the surface of Mars, and to test the operation of a rover.

composition

Telemetry-Enhancing Scripts

Scripts Providing a Cool Kit of Telemetry Enhancing Tools (SPACKLE) is a set of software tools that fill gaps in capabilities of other software used in processing downlinked data in the Mars Exploration Rovers (MER) flight and test-bed operations. SPACKLE tools have helped to accelerate the automatic processing and interpretation of MER mission data, enabling non-experts to understand and/or use MER query and data product command simulation software tools more effectively. SPACKLE has greatly accelerated some operations and provides new capabilities. The tools of SPACKLE are written, variously, in Perl or the C or C++ language. They perform a variety of search and shortcut functions that include the following: Generating text-only, Event Report-annotated, and Web-enhanced views of command sequences; Labeling integer enumerations with their symbolic meanings in text messages and engineering channels; Systematic detecting of corruption within data products; Generating text-only displays of data-product catalogs including downlink status; Validating and labeling of commands related to data products; Performing of convenient searches of detailed engineering data spanning multiple Martian solar days; Generating tables of initial conditions pertaining to engineering, health, and accountability data; Simplified construction and simulation of command sequences; and Fast time format conversions and sorting.

Maimone, Mark W.