Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “March 2007”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

RXTE Monitoring of the Anomalous X-ray Pulsar 1E 1048.1-5937: Long-Term Variability and the 2007 March Event

After three years of no unusual activity, Anomalous X-ray Pulsar 1E 1048.1-5937 reactivated in 2007 March. We report on the detection of a large glitch (deltav/v = 1.63(2) x 10(exp -5)) on 2007 March 26 (MJD 54185.9), contemporaneous with the onset of a pulsed-flux flare, the third flare observed from this source in 10 years of monitoring with the Rossi X-ray Timing Explorer. Additionally, we report on a detailed study of the evolution of the timing properties, the pulsed flux, and the pulse profile of this source as measured by RXTE from 1996 July to 2008 January. In our timing study, we attempted phase coherent timing of all available observations. We show that in 2001, a timing anomaly of uncertain nature occurred near the rise of the first pulsed flux flare; we show that a likely glitch (deltav/v = 2.91(9) x 10(exp -6)) occurred in 2002, near the rise of the second flare, and we present a detailed description of the variations in the spin-down. In our pulsed flux study, we compare the decays of the three flares and discuss changes in the hardness ratio. In our pulse profile study, we show that the profile exhibited large variations near the peak of the first two flares, and several small short-term profile variations during the most recent flare. Finally, we report on the discovery of a small burst 27 days after the peak of the last flare, the fourth burst discovered from this source. We discuss the relationships between the observed properties in the framework of the magnetar model.

Dib, Rim↗

NASA Tech Briefs, March 2007

Topics include: Advanced Systems for Monitoring Underwater Sounds; Wireless Data-Acquisition System for Testing Rocket Engines; Processing Raw HST Data With Up-to-Date Calibration Data; Mobile Collection and Automated Interpretation of EEG Data; System for Secure Integration of Aviation Data; Servomotor and Controller Having Large Dynamic Range; Digital Multicasting of Multiple Audio Streams; Translator for Optimizing Fluid-Handling Components; AIRSAR Web-Based Data Processing; Pattern Matcher for Trees Constructed From Lists; Reducing a Knowledge-Base Search Space When Data Are Missing; Ground-Based Correction of Remote-Sensing Spectral Imagery; State-Chart Autocoder; Pointing History Engine for the Spitzer Space Telescope; Low-Friction, High-Stiffness Joint for Uniaxial Load Cell; Magnet-Based System for Docking of Miniature Spacecraft; Electromechanically Actuated Valve for Controlling Flow Rate; Plumbing Fixture for a Microfluidic Cartridge; Camera Mount for a Head-Up Display; Core-Cutoff Tool; Recirculation of Laser Power in an Atomic Fountain; Simplified Generation of High-Angular-Momentum Light Beams; Imaging Spectrometer on a Chip; Interferometric Quantum-Nondemolition Single-Photon Detectors; Ring-Down Spectroscopy for Characterizing a CW Raman Laser; Complex Type-II Interband Cascade MQW Photodetectors; Single-Point Access to Data Distributed on Many Processors; Estimating Dust and Water Ice Content of the Martian Atmosphere From THEMIS Data; Computing a Stability Spectrum by Use of the HHT; Theoretical Studies of Routes to Synthesis of Tetrahedral N4; Estimation Filter for Alignment of the Spitzer Space Telescope; Antenna for Measuring Electric Fields Within the Inner Heliosphere; Improved High-Voltage Gas Isolator for Ion Thruster; and Hybrid Mobile Communication Networks for Planetary Exploration.

Source record↗

High Spatial Resolution Mid-IR Imaging of V838 Monocerotis: Evidence of New Circumstellar Dust Creation

The eruptive variable V838 Monocerotis experienced three dramatic outbursts in early 2002. Its unexpectedly erratic photometric behavior wes matched by strong spectroscopic variability, in which the srar transitioned through the F, K, G spectral type s in 2002 February, reseabled a M5 supergiant by 2002 Aprll, and had a L-type super qiant spectram in 2002 October. The star is also infamous for producisg e spectacu lar light echo whose evolction has beer traced by HST/ACS. We report high sFatial resolution 11.2 and 18.1 micron imagicq of V838 Nonoceroris obrained with Genini Ob servatory's Klchelle in 2007 March. The 2007 flux density of the unresclved stellar core of is rouqhly 2 tixes brighter than zhaz observed in 2C04. We interpret tkese aata as evidecce t-at V838 Mon has experienced a new circums~ellar dust creatioc evezt. We suggest that this newly c reated dust is Likely clumpy, and speculate that one (or ore) of Ekese clumps migh t have passed through the line-cf-sight in late 2036, prodccing the brief rnalti-wav elength pkotonetric event reported by Bond (2006) and Yunari ez a1 (2007). A gap o f spatially exzended therrrzl (18 micron) emission is present over radial distances of 1860 - 93000 AU from che central source. Assuming ejecta material expands at a constant velocity of 300-500 km/s, this gap suggests that no prior significanz circ unstellar dust production events have occurred withiin the past approx. 900-1500 years.

Winsiewski, John P.↗

CEDAR Electrodynamics Thermosphere Ionosphere (ETI) Challenge for Systematic Assessment of Ionosphere/Thermosphere Models: NmF2, hmF2, and Vertical Drift Using Ground-Based Observations

Objective quantification of model performance based on metrics helps us evaluate the current state of space physics modeling capability, address differences among various modeling approaches, and track model improvements over time. The Coupling, Energetics, and Dynamics of Atmospheric Regions (CEDAR) Electrodynamics Thermosphere Ionosphere (ETI) Challenge was initiated in 2009 to assess accuracy of various ionosphere/thermosphere models in reproducing ionosphere and thermosphere parameters. A total of nine events and five physical parameters were selected to compare between model outputs and observations. The nine events included two strong and one moderate geomagnetic storm events from GEM Challenge events and three moderate storms and three quiet periods from the first half of the International Polar Year (IPY) campaign, which lasted for 2 years, from March 2007 to March 2009. The five physical parameters selected were NmF2 and hmF2 from ISRs and LEO satellites such as CHAMP and COSMIC, vertical drifts at Jicamarca, and electron and neutral densities along the track of the CHAMP satellite. For this study, four different metrics and up to 10 models were used. In this paper, we focus on preliminary results of the study using ground-based measurements, which include NmF2 and hmF2 from Incoherent Scatter Radars (ISRs), and vertical drifts at Jicamarca. The results show that the model performance strongly depends on the type of metrics used, and thus no model is ranked top for all used metrics. The analysis further indicates that performance of the model also varies with latitude and geomagnetic activity level.

Shim, J. S.↗

Applied Meteorology Unit (AMU)

This report summarizes the Applied Meteorology Unit (AMU) activities for the second quarter of Fiscal Year 2007 (January - March 2007). Tasks reported on are: Obiective Lightning Probability Tool, Peak Wind Tool for General Forecasting, Situational Lightning Climatologies for Central Florida, Anvil Threat Corridor Forecast Tool in AWIPS, Volume Averaqed Heiqht lnteq rated Radar Reflectivity (VAHIRR), Tower Data Skew-t Tool, and Weather Research and Forecastini (WRF) Model Sensitivity Study

Bauman, William↗

Applied Meteorology Unit (AMU)

This report summarizes the Applied Meteorology Unit (AMU) activities for the second quarter of Fiscal Year 2007 (January - March 2007). A detailed project schedule is included in the Appendix.

Bauman, William↗

Peak Wind Tool for General Forecasting

The expected peak wind speed of the day is an important forecast element in the 45th Weather Squadron's (45 WS) daily 24-Hour and Weekly Planning Forecasts. The forecasts are used for ground and space launch operations at the Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS). The 45 WS also issues wind advisories for KSC/CCAFS when they expect wind gusts to meet or exceed 25 kt, 35 kt and 50 kt thresholds at any level from the surface to 300 ft. The 45 WS forecasters have indicated peak wind speeds are challenging to forecast, particularly in the cool season months of October - April. In Phase I of this task, the Applied Meteorology Unit (AMU) developed a tool to help the 45 WS forecast non-convective winds at KSC/CCAFS for the 24-hour period of 0800 to 0800 local time. The tool was delivered as a Microsoft Excel graphical user interface (GUI). The GUI displayed the forecast of peak wind speed, 5-minute average wind speed at the time of the peak wind, timing of the peak wind and probability the peak speed would meet or exceed 25 kt, 35 kt and 50 kt. For the current task (Phase II ), the 45 WS requested additional observations be used for the creation of the forecast equations by expanding the period of record (POR). Additional parameters were evaluated as predictors, including wind speeds between 500 ft and 3000 ft, static stability classification, Bulk Richardson Number, mixing depth, vertical wind shear, temperature inversion strength and depth and wind direction. Using a verification data set, the AMU compared the performance of the Phase I and II prediction methods. Just as in Phase I, the tool was delivered as a Microsoft Excel GUI. The 45 WS requested the tool also be available in the Meteorological Interactive Data Display System (MIDDS). The AMU first expanded the POR by two years by adding tower observations, surface observations and CCAFS (XMR) soundings for the cool season months of March 2007 to April 2009. The POR was expanded again by six years, from October 1996 to April 2002, by interpolating 1000-ft sounding data to 100-ft increments. The Phase II developmental data set included observations for the cool season months of October 1996 to February 2007. The AMU calculated 68 candidate predictors from the XMR soundings, to include 19 stability parameters, 48 wind speed parameters and one wind shear parameter. Each day in the data set was stratified by synoptic weather pattern, low-level wind direction, precipitation and Richardson Number, for a total of 60 stratification methods. Linear regression equations, using the 68 predictors and 60 stratification methods, were created for the tool's three forecast parameters: the highest peak wind speed of the day (PWSD), 5-minute average speed at the same time (A WSD), and timing of the PWSD. For PWSD and A WSD, 30 Phase II methods were selected for evaluation in the verification data set. For timing of the PWSD, 12 Phase\I methods were selected for evaluation. The verification data set contained observations for the cool season months of March 2007 to April 2009. The data set was used to compare the Phase I and II forecast methods to climatology, model forecast winds and wind advisories issued by the 45 WS. The model forecast winds were derived from the 0000 and 1200 UTC runs of the 12-km North American Mesoscale (MesoNAM) model. The forecast methods that performed the best in the verification data set were selected for the Phase II version of the tool. For PWSD and A WSD, linear regression equations based on MesoNAM forecasts performed significantly better than the Phase I and II methods. For timing of the PWSD, none of the methods performed significantly bener than climatology. The AMU then developed the Microsoft Excel and MIDDS GUls. The GUIs display the forecasts for PWSD, AWSD and the probability the PWSD will meet or exceed 25 kt, 35 kt and 50 kt. Since none of the prediction methods for timing of the PWSD performed significantly better thanlimatology, the tool no longer displays this predictand. The Excel and MIDDS GUIs display forecasts for Day-I to Day-3 and Day-I to Day-5, respectively. The Excel GUI uses MesoNAM forecasts as input, while the MIDDS GUI uses input from the MesoNAM and Global Forecast System model. Based on feedback from the 45 WS, the AMU added the daily average wind speed from 30 ft to 60 ft to the tool, which is one of the parameters in the 24-Hour and Weekly Planning Forecasts issued by the 45 WS. In addition, the AMU expanded the MIDDS GUI to include forecasts out to Day-7.

Barrett, Joe H., III↗

Recent Observations of the Early Stage of Solar Eruptions

We examine the onset of two solar eruptions, using data from Hinode STEREO, TRACE, and SOHO, and other sources. One eruption occurred on 2007 March 2, and the other occurred on 2007 May 20. The first eruption involves a filament that erupts, and motions of the filament begin at least 20 min prior to onset of the main eruption; magnetic cancellation occurs beneath the filament among opposite polarity magnetic elements for at least six hours prior to the eruption.. In the second case, a surge-like filament is ejected from a location north of the main erupting magnetic neutral line; in this case magnetic cancellation occurs both along the main neutral line and also at the sight of the surge source north of the main neutral line. Thus in both cases, magnetic cancellation prior to eruption plays a crucial role in releasing the magnetic energy responsible for the respective eruptions.

Sterling, Alphonse↗

Scientific Goals and Objectives for the Human Exploration of Mars: 1. Biology and Atmosphere/Climate

To prepare for the exploration of Mars by humans, as outlined in the new national vision for Space Exploration (VSE), the Mars Exploration Program Analysis Group (MEPAG), chartered by NASA's Mars Exploration Program (MEP), formed a Human Exploration of Mars Science Analysis Group (HEM-SAG), in March 2007. HEM-SAG was chartered to develop the scientific goals and objectives for the human exploration of Mars based on the Mars Scientific Goals, Objectives, Investigations, and Priorities.1 The HEM-SAG is one of several humans to Mars scientific, engineering and mission architecture studies chartered in 2007 to support NASA s plans for the human exploration of Mars. The HEM-SAG is composed of about 30 Mars scientists representing the disciplines of Mars biology, climate/atmosphere, geology and geophysics from the U.S., Canada, England, France, Italy and Spain. MEPAG selected Drs. James B. Garvin (NASA Goddard Space Flight Center) and Joel S. Levine (NASA Langley Research Center) to serve as HEMSAG co-chairs. The HEM-SAG team conducted 20 telecons and convened three face-to-face meetings from March through October 2007. The management of MEP and MEPAG were briefed on the HEM-SAG interim findings in May. The HEM-SAG final report was presented on-line to the full MEPAG membership and was presented at the MEPAG meeting on February 20-21, 2008. This presentation will outline the HEM-SAG biology and climate/atmosphere goals and objectives. A companion paper will outline the HEM-SAG geology and geophysics goals and objectives.

Levine, Joel S.↗

Optical Studies of Orbital Debris at GEO Using Two Telescopes

Beginning in March, 2007, optical observations of debris at geosynchronous orbit (GEO) were commenced using two telescopes simultaneously at the Cerro Tololo Inter-American Observatory (CTIO) in Chile. The University of Michigan's 0.6/0.9-m Schmidt telescope MODEST (for Michigan Orbital DEbris Survey Telescope) was used in survey mode to find objects that potentially could be at GEO. Because GEO objects only appear in this telescope's field of view for an average of 5 minutes, a full six-parameter orbit can not be determined. Interrupting the survey for follow-up observations leads to incompleteness in the survey results. Instead, as objects are detected on MODEST, initial predictions assuming a circular orbit are done for where the object will be for the next hour, and the objects are reacquired as quickly as possible on the CTIO 0.9-m telescope. This second telescope then follows-up during the first night and, if possible, over several more nights to obtain the maximum time arc possible, and the best six parameter orbit. Our goal is to obtain an initial orbit for all detected objects fainter than R = 15th in order to estimate the orbital distribution of objects selected on the basis of two observational criteria: magnitude and angular rate. Objects fainter than 15th are largely uncataloged and have a completely different angular rate distribution than brighter objects. Combining the information obtained for both faint and bright objects yields a more complete picture of the debris environment rather than just concentrating on the faint debris. One objective is to estimate what fraction of objects selected on the basis of angular rate are not at GEO. A second objective is to obtain magnitudes and colors in standard astronomical filters (BVRI) for comparison with reflectance spectra of likely spacecraft materials. This paper reports on results from two 14 night runs with both telescopes: in March and November 2007: (1) A significant fraction of objects fainter than R = 15th have eccentric orbits (e > 0.1) (2) Virtually all objects selected on the basis of angular rate are in the GEO and GTO regimes. (3) Calibrated magnitudes and colors in BVRI were obtained for many objects fainter than R = 15th magnitude. This work is supported by NASA's Orbital Debris Program Office, Johnson Space Center, Houston, Texas, USA.

Seitzer, P.↗

High Spatial Resolution Mid-IR Imaging of V838 Monocerotis: Evidence of New Circumstellar Dust Creation

We report high spatial resolution 11.2 and 18.1 mm imaging of V838 Monocerotis obtained with Gemini Observatory's Michelle instrument in 2007 March. Strong emission is observed from the unresolved stellar core of V838 Mon in our Gemini imagery and is confirmed by Spitzer MIPS 24 micron imaging obtained in 2007 April. The 2007 flux density of the unresolved mid-infrared emission component is approx.2 times brighter than that observed in 2004. No clear change in the net amount of 24 mm extended emission is observed between the 2004 and 2007 epoch Spitzer imagery. We interpret these data as evidence that V838 Mon has experienced a new circumstellar dust creation event. We suggest that this newly created dust has condensed from the expanding ejecta produced from V838 Mon's 2002 outburst events and is most likely clumpy. We speculate that one (or more) of these clumps might have passed through the line of sight in late 2006, producing the brief multiwavelength photometric event reported by H. Bond in 2006 and U. Munari et al. in 2007b. We detect no evidence of extended emission above a level of approx.1 mJy at 11.2 microns and approx.7 mJy at 18.1 microns over radial distances of 1860-93,000 AU (0.3" - 15.0") from the central source. Using the simple assumption that ejecta material expands at a constant velocity of 300-500 km/s, this gap of thermal emission suggests that no significant prior circumstellar dust production events have occurred within the past approx.900-1500 yr.

Wisniewski, John P.↗

Status of the Landsat Data Continuity Mission

Efforts to begin implementing a successor mission to Landsat 7, called the Landsat Data Continuity Mission (LDCM), suffered a set back in 2003. NASA and the Department of Interior (DOI)/U.S. Geological Survey (USGS) currently manage the Landsat Program as an interagency partnership. The two agencies had planned to purchase data meeting LDCM specifications from a privately owned and commercially operated satellite system beginning in March, 2007. This approach represented a departure from the traditional procurement of a government owned and operated satellite system. NASA, however, cancelled a Request-for-Proposals (RFP) for providing the required data after an evaluation of proposals received from private industry. NASA concluded that the proposals failed to meet a key objective and expectation of the RFP, namely, to form a fair and equitable partnership between the Government and private industry. Alternative strategies for implementing an LDCM are now under consideration. The Executive Office of the President formed an interagency working group on the LDCM following the RFP cancellation. The working group is considering other options for implementing a successor system to Landsat 7 consistent with the Land Remote Sensing Policy Act of 1992 (Public Law 102-555). This Act lists four management options for consideration: 1) private sector funding and management; 2) an international consortium; 3) funding and management by the U.S. Government; and 4) a cooperative effort between the US. Government and the private sector. The working group is currently attempting to minimize the risk of a Landsat data gap through development of a strategy that leads to a Landsat 7 successor mission. The selected strategy and the status of the mission will be presented at the Symposium.

Irons, James R.↗

Optical Studies of Space Debris at GEO: Survey and Follow-up with Two Telescopes

For 14 nights in March 2007, we used two telescopes at the Cerro Tololo Inter-American Observatory (CTIO) in Chile to study the nature of space debris at Geosynchronous Earth Orbit (GEO). In this project one telescope was dedicated to survey operations, while a second telescope was used for follow-up observations for orbits and colors. The goal was to obtain orbital and photometric information on every faint object found with the survey telescope. Thus we concentrate on objects fainter than R = 15th magnitude.

Seitzer, P.↗

Applied Astronomy: An Optical Survey for Space Debris at GEO

A viewgraph is presented to discuss space debris at Geosynchronous Earth Orbit (GEO). The topics include: 1) Syncom1 launched February 14, 1963 Failed on orbit insertion 1st piece of GEO debris!; 2) Example of recent GEO payload: XM-2 Rock satellite for direct broadcast radio; 3) MODEST Michigan Orbital DEbrisSurvey Telescope the telescope formerly known as the Curtis-Schmidt; 4) GEO Debris Survey; 5) Examples of Detections; 6) Brightness Variations Common; 7) Observed Angular Rates; 8) Two Populations at GEO; 9) High Area-to-Mass Ratio Material (A/M); 10) Examples of MLI; 11) Examples of MLI Release in LEO; 12) Liou & Weaver (2005) models; 13) ESA 1-m Telescope Survey; 14) Two Telescopes March 2007 Survey and Follow-up; 15) Final Eccentricity; and 16) How control Space Debris?

Seitzer, Patrick↗

Combined Hinode, STEREO, and TRACE Observations of a Solar Filament Eruption: Evidence for Destabilization by Flux-Cancelation Tether Cutting

We present observations from Hinode, STEREO, and TRACE of a solar filament eruption and flare that occurred on 2007 March 2. Data from the two new satellites, combined with the TRACE observations, give us fresh insights into the eruption onset process. HINODE/XRT shows soft X-ray (SXR) activity beginning approximately 30 minutes prior to ignition of bright flare loops. STEREO andTRACE images show that the filament underwent relatively slow motions coinciding with the pre-eruption SXR brightenings, and it underwent rapid eruptive motions beginning near the time of flare onset. Concurrent HINODE/SOT magnetograms showed substantial flux cancelation under the filament at the site of the pre-eruption SXR activity. From these observations we infer that progressive tether-cutting reconnection driven by photospheric convection caused the slow rise of the filament and led to its eruption. NASA supported this work through a NASA Heliosphysics GI grant.

Sterling, Alphonse C.↗

Geostationary Lightning Mapper for GOES-R

The Geostationary Lightning Mapper (GLM) is a single channel, near-IR optical detector, used to detect, locate and measure total lightning activity over the full-disk as part of a 3-axis stabilized, geostationary weather satellite system. The next generation NOAA Geostationary Operational Environmental Satellite (GOES-R) series with a planned launch in 2014 will carry a GLM that will provide continuous day and night observations of lightning from the west coast of Africa (GOES-E) to New Zealand (GOES-W) when the constellation is fully operational. The mission objectives for the GLM are to 1) provide continuous, full-disk lightning measurements for storm warning and Nowcasting, 2) provide early warning of tornadic activity, and 3) accumulate a long-term database to track decadal changes of lightning. The GLM owes its heritage to the NASA Lightning Imaging Sensor (1997-Present) and the Optical Transient Detector (1995-2000), which were developed for the Earth Observing System and have produced a combined 11 year data record of global lightning activity. Instrument formulation studies begun in January 2006 will be completed in March 2007, with implementation expected to begin in September 2007. Proxy total lightning data from the NASA Lightning Imaging Sensor on the Tropical Rainfall Measuring Mission (TRMM) satellite, airborne science missions (e.g., African Monsoon Multi-disciplinary Analysis, AMMA), and regional test beds (e.g, Lightning Mapping Arrays) are being used to develop the pre-launch algorithms and applications, and also improve our knowledge of thunderstorm initiation and evolution. Real time lightning mapping data now being provided to selected forecast offices will lead to improved understanding of the application of these data in the severe storm warning process and accelerate the development of the pre-launch algorithms and Nowcasting applications. Proxy data combined with MODIS and Meteosat Second Generation SEVERI observations will also lead to new applications (e.g., multi-sensor precipitation algorithms blending the GLM with the Advanced Baseline Imager, convective cloud initiation and identification, early warnings of lightning threat, storm tracking, and data assimilation).

Goodman, Steven↗

Optical Observations of GEO Debris with Two Telescopes

For several years, the Michigan Orbital DEbris Survey Telescope (MODEST), the University of Michigan s 0.6/0.9-m Schmidt telescope on Cerro Tololo Inter-American Observatory in Chile has been used to survey the debris population at GEO in the visible regime. Magnitudes, positions, and angular rates are determined for GEO objects as they move across the telescope s field-of-view (FOV) during a 5-minute window. This short window of time is not long enough to determine a full six parameter orbit so usually a circular orbit is assumed. A longer arc of time is necessary to determine eccentricity and to look for changes in the orbit with time. MODEST can follow objects in real-time, but only at the price of stopping survey operations. A second telescope would allow for longer arcs of orbit to obtain the full six orbital parameters, as well as assess the changes over time. An additional benefit of having a second telescope is the capability of obtaining BVRI colors of the faint targets, aiding efforts to determine the material type of faint debris. For 14 nights in March 2007, two telescopes were used simultaneously to observe the GEO debris field. MODEST was used exclusively in survey mode. As objects were detected, they were handed off in near real-time to the Cerro Tololo 0.9-m telescope for follow-up observations. The goal was to determine orbits and colors for all objects fainter than R = 15th magnitude (corresponds to 1 meter in size assuming a 0.2 albedo) detected by MODEST. The hand-off process was completely functional during the final eight nights and follow-ups for objects from night-to-night were possible. The cutoff magnitude level of 15th was selected on the basis of an abrupt change in the observed angular rate distribution in the MODEST surveys. Objects brighter than 15th magnitude tend to lie on a well defined locus in the angular rate plane (and have orbits in the catalog), while fainter objects fill the plane almost uniformly. We need to determine full six-parameter orbits to investigate what causes this change in observed angular rates. Are these faint objects either the same population of high area-to-mass (A/M) objects on eccentric orbits as discovered by the ESA Space Debris Telescope (Schildknecht, et al. 2004), or are they just normal debris from breakups in GEO?

Seitzer, P.↗