Operation of helium sub-atmospheric multistage cryogenic centrifugal compressor trains: Part 1 – Steady state modeling and speed ratio selection

Helium cryogenic systems which can provide cooling below the normal boiling point of helium (approximately 4.2 K) are often required by superconducting radio-frequency niobium resonators utilized in modern high-energy particle accelerators. Achieving temperatures below 4.2 K generally involves operating a cryogenic vessel with liquid helium under sub-atmospheric conditions, thereby lowering the saturation pressure and corresponding saturation temperature. Over the last several decades, multi-stage cryogenic centrifugal compressor trains (CC’s) have been operated efficiently and reliably within large-scale cryogenic systems to continuously evacuate helium vapor generated by a device within the vessel, maintaining sub-atmospheric conditions in the vessel while pressurizing the return vapor to above atmospheric conditions. Traditionally, these CC systems have been operated using empirically derived control philosophies and insight gathered from previous operational experience. Recent efforts at the Facility for Rare Isotope Beams (FRIB) have been aimed at the development of a theoretical basis to characterize the operation of multi-stage cryogenic centrifugal compressor train and utilizing predictive model results to generate control parameters. The objective of this research was identifying operational points which adequately balance cryogenic system efficiency, stability, and overall ease of operation. Furthermore, this manuscript provides an overview of the predictive model development, characterization of the FRIB cryogenic centrifugal compressors and implementation of the predicted performance results during steady-state system operation.

Compressor train control

Operation of helium sub-atmospheric multistage cryogenic centrifugal compressor trains: Part 2 – Transient modeling and pump-down path selection

Low-pressure conditions required for operation of helium cryogenic systems below the normal boiling point (i.e. 4.2 K) are established through a transient process, commonly referred to as ‘pump-down’. This process is defined as the transition from pressures above atmospheric conditions to the saturation pressure which corresponds to a specified operational temperature. The FRIB 2 K system consists of five cryogenic centrifugal compressors which are operated in series. Historically, the pump-down process path has been established through empirical methods and system operator experience. Investigation into the pump-down process at FRIB aimed to develop a pump-down methodology which relies on theoretical model predictions rather than empirically developed process paths. Ensuring stable operation during the pump-down process involved application of a centrifugal compressor performance prediction model, which is described in Part 1 of this paper. Compressor performance maps can be directly used to evaluate the stability of a selected pump-down path and anticipate the overall reliability of the selected path. In conjunction with the compressor performance maps, a system pressure model was developed to estimate the transient pressure response during the pump-down process. Lastly, an explicit equation was developed to establish a mass flow rate profile for the pump-down process. Implementation of the presented methodology (including the developed models) allows for the system operator to determine a continuous pump-down path which maintains compressor stability while conforming to overall system capabilities. Altogether, the methodology presented has resulted in simplification of transient pump-down operations and increased the reliability, stability and efficiency of the pump-down process.

Compressor train control

System and Machine Learning-Guided Materials Design for High-Pressure Hydrogen Compression

Cost-effective and reliable hydrogen compression remains a challenging barrier in the widespread adoption of hydrogen as an energy carrier. The prevailing technology of mechanical compression suffers from several drawbacks, some of which can be addressed by nonmechanical compression strategies (e.g., electrochemical or metal hydride-based thermal compression). Thermally driven metal hydride compression strategies typically rely on multistage metal hydride-based compressors; however, discovering or optimizing low-stability metal hydrides that can pressurize hydrogen upward of 1000 bar is difficult, both with respect to computational predictions and experimental validation. Here, in this study, we (1) demonstrate that simple machine learning-derived design rules can inform the rational design of alloying strategies yielding low-stability hydrides, (2) validate their experimental pressure–composition–temperature (PCT) isotherms up to 875 bar, and (3) utilize a dynamic system-level model of a metal hydride compressor design to evaluate their performance under realistic operating conditions. Importantly, this analysis yields predicted operational efficiencies of both 2-stage (90–875 bar) and 3-stage (20–875 bar) metal hydride compressors to enable further evaluation of this technology and its techno-economic outlook.

alloy optimization

One Earth Energy FEED Process Design Basis

This report establishes the process design basis for the front-end engineering design (FEED) of a carbon capture and injection facility at One Earth Energy's (OEE) ethanol production plant in Gibson City, Illinois, developed as part of the Illinois Storage Corridor CarbonSAFE Phase III project. The facility is designed to compress and dehydrate up to approximately 458,000 metric tonnes of CO 2 per year, sourced directly from OEE's ethanol fermenters, for permanent injection into a saline aquifer approximately four miles from the plant. At normal operating conditions, the system will process 1,290 metric tonnes of CO 2 per day, assuming 355 operating days per year and an ethanol production rate of 160 million gallons per year. The proposed process trains a multistage centrifugal blower with a five-stage reciprocating compressor, delivering CO 2 to the injection wellhead at up to 1,500 psig. Triethylene glycol (TEG) dehydration, applied after the fourth compression stage, reduces water content to a target of 10 lb/MMscf, well within the 30 lb/MMscf injection limit. Beyond dehydration, no additional treatment is required; trace impurities including oxygen and nitrogen will remain in the injected stream. Key design considerations include the absence of spare cooling tower capacity at the site, necessitating new cooling infrastructure, and the need for a new electrical substation to support large motor loads. The facility is designed for continuous, largely unattended operation, monitored around the clock by existing OEE operations staff. This document serves as the foundational reference for all subsequent detailed engineering activities associated with the OEE CO 2 injection facility.