Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Mooring Load Monitoring of a Wave Energy Converter Using a Self-Synchronizing Underwater Acoustic Network

A self-synchronizing underwater acoustic network, designed for remote monitoring of mooring loads in Wave Energy Converters (WEC), has been developed and tested. This network uses Time Division Multiple Access and operates self-contained with the ability for users to remotely transmit commands to the network as needed. Each node is a self-contained unit, consisting of a protocol adaptor board, an underwater acoustic modem and a battery pack. A node can be connected to a load cell, to a topside user or to the WEC. Every node is swapable. The protocol adaptor board, named Protocol Adaptor for Digital LOad Cell (PADLOC) supports a variety of digital load cell message formats (CAN, MODBUS, custom ASCII) and underwater acoustic modem serial formats. PADLOC enables topside users to connect to separate load cells through a user-specific command.

acoustic↗

Laboratory investigation of hydraulic fracturing in granitic rocks using active and passive seismic monitoring

SUMMARY Knowledge of the fracturing processes can be important for the optimization of pressurized fluid injection operations in the deep underground rock mass. Active and passive seismic monitoring techniques have been used in the field for tracking or mapping the propagating hydraulic fracture. Although both these monitoring techniques provide valuable information about the generated fracture network, it is difficult for either technique to comprehensibly identify the different processes associated with hydraulic fracturing. The combined active and passive monitoring has the potential for better characterization of the complex hydraulic fracturing phenomena. In this study, laboratory hydraulic fracturing experiments with combined active and passive seismic monitoring were conducted on true triaxially loaded Barre granite cubes with different fluid injection rates. The seismic inelastic fracturing was detected by 16 passive acoustic emission sensors, where 3678 and 2370 seismic source events were detected for the high and low injection rate experiments, respectively. For active monitoring, strong variations in the attributes of signals were observed which were transmitted through four source–receiver pairs, placed both perpendicular and parallel to the generated hydraulic fracture. Positive velocity changes were observed for active sensor pairs with ray paths passing through the generated hydraulic fracture indicating fluid permeation, whereas isolated dry deformation was characterized by a slight but permanent velocity decrease. Compared to velocity, the energy of the active signals was 1–2 orders of magnitude more sensitive to different hydraulic fracturing processes. However, the sensitivity and signatures of the active signal attributes were found to be dependent on the frequency range and direction of ray path with respect to the location of the generated fracture network. Using the coupled evaluation of the active and passive signals we were able to systematically identify various hydraulic fracturing processes including: (1) aseismic deformation, (2) fracture initiation and fluid permeation, (3) pressure build-up, (4) fracture propagation and (5) pressure release and leak-off. The results of this study showed that combining the respective advantages of active and passive seismic techniques and using both of them to monitor the failure processes can facilitate a more comprehensive understanding and better control of the hydraulic stimulations in subsurface operations.

Geochemistry & Geophysics↗

Performance Evaluation of Comparative Vacuum Monitoring and Piezoelectric Sensors for Structural Health Monitoring of Rotorcraft Components

The costs associated with the increasing maintenance and surveillance needs of aging structures are rising at an unexpected rate. Multi-site fatigue damage, hidden cracks in hard-to-reach locations, disbonded joints, erosion, impact, and corrosion are among the major flaws encountered in today’s extensive fleet of aging aircraft and space vehicles. Aircraft maintenance and repairs represent about a quarter of a commercial fleet’s operating costs. The application of Structural Health Monitoring (SHM) systems using distributed sensor networks can reduce these costs by facilitating rapid and global assessments of structural integrity. The use of in-situ sensors for real-time health monitoring can overcome inspection impediments stemming from accessibility limitations, complex geometries, and the location and depth of hidden damage. Reliable, structural health monitoring systems can automatically process data, assess structural condition, and signal the need for human intervention. The ease of monitoring an entire on-board network of distributed sensors means that structural health assessments can occur more often, allowing operators to be even more vigilant with respect to flaw onset. SHM systems also allow for condition-based maintenance practices to be substituted for the current time-based or cycle-based maintenance approach thus optimizing maintenance labor. The Federal Aviation Administration has conducted a series of SHM validation and certification programs intended to comprehensively support the evolution and adoption of SHM practices into routine aircraft maintenance practices. This report presents one of those programs involving a Sandia Labs-aviation industry effort to move SHM into routine use for aircraft maintenance. The Airworthiness Assurance NDI Validation Center (AANC) at Sandia Labs, in conjunction with Sikorsky, Structural Monitoring Systems Ltd., Anodyne Electronics Manufacturing Corp., Acellent Technologies Inc., and the Federal Aviation Administration (FAA) carried out a trial validation and certification program to evaluate Comparative Vacuum Monitoring (CVM) and Piezoelectric Transducers (PZT) as a structural health monitoring solution to specific rotorcraft applications. Validation tasks were designed to address the SHM equipment, the health monitoring task, the resolution required, the sensor interrogation procedures, the conditions under which the monitoring will occur, the potential inspector population, adoption of CVM and PZT systems into rotorcraft maintenance programs and the document revisions necessary to allow for their routine use as an alternate means of performing periodic structural inspections. This program addressed formal SHM technology validation and certification issues so that the full spectrum of concerns, including design, deployment, performance and certification were appropriately considered. Sandia Labs designed, implemented, and analyzed the results from a focused and statistically relevant experimental effort to quantify the reliability of a CVM system applied to Sikorsky S-92 fuselage frame application and a PZT system applied to an S-92 main gearbox mount beam application. The applications included both local and global damage detection assessments. All factors that affect SHM sensitivity were included in this program: flaw size, shape, orientation and location relative to the sensors, as well as operational and environmental variables. Statistical methods were applied to performance data to derive Probability of Detection (POD) values for SHM sensors in a manner that agrees with current nondestructive inspection (NDI) validation requirements and is acceptable to both the aviation industry and regulatory bodies. The validation work completed in this program demonstrated the ability of both CVM and PZT SHM systems to detect cracks in rotorcraft components. It proved the ability to use final system response parameters to provide a Green Light/Red Light (“GO” – “NO GO”) decision on the presence of damage. In additional to quantifying the performance of each SHM system for the trial applications on the S-92 platform, this study also identified specific methods that can be used to optimize damage detection, guidance on deployment scenarios that can affect performance and considerations that must be made to properly apply CVM and PZT sensors. These results support the main goal of safely integrating SHM sensors into rotorcraft maintenance programs. Additional benefits from deploying rotorcraft Health and Usage Monitoring Systems (HUMS) may be realized when structural assessment data, collected by an SHM system, is also used to detect structural damage to compliment the operational environment monitoring. The use of in-situ sensors for health monitoring of rotorcraft structures can be a viable option for both flaw detection and maintenance planning activities. This formal SHM validation will allow aircraft manufacturers and airlines to confidently make informed decisions about the proper utilization of CVM and PZT technology. It will also streamline future regulatory actions and formal certification measures needed to assure the safe application of SHM solutions.

42 ENGINEERING↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Paint and Oil Locker SWMU 067 Southern Treatment Area Air Sparge System Year 2 Performance Monitoring and Paint and Oil Locker Northern Area (SWMU 067) and Supply Warehouse #3, SWMU 088 Long-Term Monitoring Kennedy Space Center, Florida

This Year 2 Air Sparge (AS) System Performance Monitoring (PM) Report for Paint and Oil Locker (POL) Solid Waste Management Unit (SWMU) 067 Southern Treatment Area and Long- Term Monitoring (LTM) Report for POL Northern Area (SWMU 067) and Supply Warehouse #3 (SW3) SWMU 088 documents ongoing remedial efforts at the POL and SW3 sites at Kennedy Space Center (KSC), Florida. The overall goal for these sites is to reduce concentrations of groundwater contaminants of concern (COCs), specifically trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE) and vinyl chloride (VC), to below the State of Florida Groundwater Cleanup Target Levels (GCTLs). Remediation and reporting of POL and SW3 have been streamlined over the years due to the proximity of the two sites. The scope for these sites currently includes two main components: (1) LTM at SW3 and the POL Northern Area, where an AS system began operation in May 2009 (with expansion in December 2012) and June 2013, respectively, and subsequently turned off for both sites in March 2018 (NASA, 2019a); and (2) Active AS operations and PM in the POL Southern Treatment Area where an AS system was installed and began operation in 2021. The timeframe for activities covered under this report is from September 2022 to July 2023. Based on Year 2 system operation and PM results, the AS system at POL operated as designed and successfully met the performance objective of reducing VOCs to concentrations that support transition of the site from active remediation to long-term monitoring. The results from the samples collected from performance monitoring wells within the AS system ROI showed a significant decrease in COC concentrations since the baseline sampling event conducted in April 2020. Based on the Year 2 OM&M and monitoring results obtained from the POL Southern Treatment Area, the IM objective to reduce concentrations to below the LTM transition target concentrations for TCE, cDCE, tDCE, and VC has been achieved. LTM sampling events at SW3 were conducted in October 2022 and July 2023. LTM sampling was conducted at the POL Northern Area in October 2022, December 2022, March 2023, and July 2023. Analytical results from October 2022 and July 2023 generally indicate that concentrations of COCs have been stable or decreasing compared to the previous year. TCE remains greater than the NADC in one monitoring well (POL-MW0034S) and greater than the GCTL in one monitoring well (POL-MW0009S). Concentrations of cDCE were greater than the GCTL in one monitoring well (POL-MW0026S), and tDCE was non-detect or less than the GCTL in all monitoring wells sampled. VC was greater than the GCTL in four monitoring wells (MW0024, MW0025, MW0027, and MW0028) at SW3 and one monitoring well (MW0026S) at the POL Northern Area.

remediation↗

Pre-commissioning of the wide-dynamic range halo monitor to be installed in the Fermilab MI-8 line

The beam halo can contribute to beam losses in accelerators and is very difficult to measure. With an increase in beam intensity following the PIP-II upgrade at Fermilab, the beam losses are expected to be higher with some coming from beam halo. Therefore, it is important to measure the sources of beam halo to minimize the beam losses. A modified Halo Monitor developed by J-PARC will be installed in Fermilab MI-8 transfer line to measure the beam halo. In this paper, an update on the beam profile monitor fabrication is covered. The updates include the location selection for the Halo Monitor in the MI-8 transfer line, shielding options for instrumentation, initial testing of equipment, and ray tracing simulations for the Offner optics and the targets used in the monitor.

Babacan, Betiay [IIT, Chicago; Fermilab]↗

Paint and Oil Locker, SWMU 067 Southern Treatment Area Air Sparge System Construction Completion and Performance Monitoring and Paint and Oil Locker, Northern Area (SWMU 067) and Supply Warehouse #3, SWMU 088 Long-Term Monitoring Report Kennedy Space Center, Florida

This Air Sparge (AS) System Construction Completion, Performance Monitoring, and Long-Term Monitoring (LTM) Report presents activities conducted at the Paint and Oil Locker (POL) (Solid Waste Management Unit [SWMU] 067) and Supply Warehouse #3 (SW3) (SWMU 088) sites located at the Kennedy Space Center (KSC), Florida. Activities include implementation and Year 1 (Quarters [Q] 1 through 4) and Q5 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) in the POL Southern Treatment Area, LTM results for the POL Northern Area and SW3, and supplemental direct push technology (DPT) sampling at both sites to support the LTM and performance monitoring programs. The timeframe for activities included in this report extends from August 2019 to August 2022. The scope for these sites currently includes two main components, which are documented within this report: (1) LTM at SW3 and POL Northern Area where an AS system began operation at these sites in May 2009 and June 2013, respectively, and subsequently turned off for both sites in March 2018 (during the previous reporting period); and (2) Active AS operations and performance monitoring in the POL Southern Treatment Area where an AS system was installed and began operation in 2021. The AS IM in the POL Southern Treatment Area was implemented between 2019 and 2021 to treat a chlorinated solvent groundwater plume that resulted from historic operations supporting the National Aeronautics and Space Administration’s (NASA) Space Program. The objective of the AS IM is to remediate groundwater within the treatment zone to support transition to monitored natural attenuation (MNA). The overall Corrective Action objective is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2- dichloroethene (tDCE), and vinyl chloride (VC) present in groundwater to levels below their respective State of Florida Groundwater Cleanup Target Levels (GCTLs). The AS IM was installed in the POL Southern Treatment Area to target the high concentration plume (HCP), which includes a source zone (SZ) area where TCE was found to exceed 11,000 micrograms per liter (µg/L), and extend to a depth of 30 feet below land surface (bls).

TCE↗

Scalable Hybrid Classification-Regression Solution for High-Frequency Nonintrusive Load Monitoring

Residential buildings with the ability to monitor and control their net-load (sum of load and generation) can provide valuable flexibility to power grid operators. We present a novel multiclass nonintrusive load monitoring (NILM) approach that enables effective net-load monitoring capabilities at high-frequency with minimal additional equipment and cost. The proposed machine learning based solution provides accurate multiclass state predictions while operating at a faster timescale (able to provide a prediction for each 60- Hz ac cycle used in US power grid) without relying on event-detection techniques. We also introduce an innovative hybrid classification-regression method that allows for the prediction of not only load on/off states but also individual load operating power levels. A test bed with eight residential appliances is used for validating the NILM approach. Results show that the overall method has high accuracy, good scaling and generalization properties.

feature extraction↗

Spectral induced polarization monitoring of induced calcite precipitation in subsurface sediments

Co-precipitation of contaminants within the crystalline structure of calcite is a promising natural attenuation or remedial technology being considered at contaminated sites. We explore the sensitivity of the spectral induced polarization (SIP) method to induced calcite precipitation in natural sediments as a path forward to non-invasively monitor these sites. We performed time-lapse column experiments using phased (I-IV) injections over 40 days on natural sediments from the Hanford Site (Washington State, USA). In the phased injections, abiotic calcite precipitation was induced and confirmed to have occurred. Previous work in glass beads and homogeneous sand was limited to high frequency detection of calcite, however in this work we observed the development of two polarization mechanisms, one at high frequency (>100 Hz) and one at low frequency (< 100 Hz). Based on the characteristic frequencies from the SIP high and low frequency regimes, characteristic length scales (L) were computed where the adsorption mode of Na+ versus Ca2+ was compared by using diffusion coefficients corresponding to Na+ versus an arithmetically averaged value for Na+ and Ca2+. Using the diffusion coefficient of Na+, the high frequency L was found to correlate well with the size of the calcite crystals. The low frequency L correlated well with the individual natural sediment grain sizes within the columns. During late experimental times (day 36 and 40), the characteristic low frequency in two of the experimental columns shifted to lower frequencies (<0.001 Hz) which may signify SIP sensitivity of the formed calcite with the sediment grains. In field applications, the development of a low frequency polarization length scale to monitor calcite precipitation is promising for field monitoring applications, however further laboratory work needs to be performed to examine the SIP sensitivity of calcite formation in the presence of to natural sediments

calcium carbonate, calcite, precipitation, spectra↗

Power and Communications Hardware-in-the-Loop CPS Architecture and Platform for DER Monitoring and Control Applications: Preprint

The rapid growth of distributed energy resources (DERs) has prompted increasing interest in the monitoring and control of DERs through hybrid smart grid communications. The deployment of communications and computation has transformed the traditional physical power grid into a smart cyber-physical system (CPS). To fully understand the interdependency between physical grid and cyber netowrks, this study designed a power and communications hardware-in-the-loop (PCommHIL) CPS architecture, which enables the flexible verification of DER monitoring and control with hybrid communications architectures and Internet protocols. Design, development and case study of a PCommHIL testbed for the DER coordination are discussed in detail, and the proposed platform integrates DER devices, Advanced Metering Infrastructures (AMIs), and a suite of hybrid communications networks for distribution automation applications. Case study on DER situational awareness and Volt-Var control validates the efficacy of this proposed PCommHIL platform with hybrid communications designs. Results show that the HAN communication technologies play a critical role in hybrid designs and it is the bottleneck for DER applications. High performance communication technologies are highly recommended to be applied in the HAN for enhanced monitoring and real-time control of DERs.

AMIs↗

Condition monitoring and anomaly detection in cyber-physical systems

The modern industrial environment is equipping myriads of smart manufacturing machines where the state of each device can be monitored continuously. Such monitoring can help identify possible future failures and develop a cost-effective maintenance plan. However, it is a daunting task to perform early detection with low false positives and negatives from the huge volume of collected data. This requires developing a holistic machine learning framework to address the issues in condition monitoring of high priority components and develop efficient techniques to detect anomalies that can detect and possibly localize the faulty components. This paper presents a comparative analysis of recent machine learning approaches for robust, cost-effective anomaly detection in cyber-physical systems. While detection has been extensively studied, very few researchers have analyzed the localization of the anomalies. We show that supervised learning outperforms unsupervised algorithms. For supervised cases, we achieve near-perfect accuracy of 98% (specifically for tree-based algorithms). In contrast, the best-case accuracy in the unsupervised cases was 63%—the area under the receiver operating characteristic curve (AUC) exhibits similar outcomes as an additional metric.

Marfo, William↗

Installation of Lysimeters and Monitoring Wells in Support of the Revised Approach to E-Area Performance Monitoring

Savannah River Site (SRS) has developed a revised approach to performance monitoring of the E Area Low Level Waste Facility (ELLWF) that adds a saturated zone component to the existing vadose zone monitoring program (Kubilius, 2019). The revised approach specifies modifications to the vadose zone monitoring program, the addition of new lysimeters at Engineered Trench 3 (ET3), and the installation of water table monitoring wells to complement the existing well network surrounding the ELLWF. This project summary report is intended to provide the final construction details and layout for the new vadose zone lysimeters at ET3 and the water table monitoring wells installed as part of the new saturated zone component of the revised performance monitoring program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reservoir Sediment Management and Monitoring Database

Overview This dataset compiles dam sediment management and monitoring information from surveys, case studies, and journal articles. Additionally, features described by the National Inventory of Dams (i.e., presence of sluice gates) are included to indicate known infrastructure features that may address sediment releases. The location and description of records from downstream monitoring gages are catalogued in order to help with tracking conditions over time (e.g., before and after management actions, as operations change, etc.). The data help address national scale understanding of challenges and solutions related to the accumulation of sediment behind a dam as well as downstream passage. Sediment trapping causes problems as it reduces storage capacity, disrupts dam and reservoir function, impedes access for recreation, alters water quality/habitat conditions, and contributes to riverbank and coastal erosion within the reservoir. Data compilation from a variety of sources is a first step towards assessing system-wide efficacy of management solutions. This dataset was developed under the Water Power Technologies Office funded effort which began as a Seedling on Reservoir Sedimentation Data, and was supported by the Reservoir Sedimentation Modeling Framework and Data Analysis project. These projects have addressed challenges in describing sediment transport, trapping, and management at dams throughout the US. Methodology An outer join on dams/reservoirs with surveys and survey reports (documented in the RESSED database, USBR or USACE databases, project websites, etc.) with the National Inventory of Dams, based on the NIDID to determine dams with documented management and/or sluice gates. Additional dams with documented management activity were identified through review of technical articles from the past 25 years in Journal of Hydrology, Journal of Water Resources Planning and Management, Geomorphology, Journal of Hydraulic Engineering, Water, Journal of Cleaner Production, International Journal of Sediment Research, Nature Scientific Reports, Earth Surface Processes and Landforms, and Environmental Science and Pollution Research. Individual records were created for each survey or management activity documented. To evaluate downstream sediment monitoring records, the nhdPlusTools and dataRetrieval packages in R were used to find gages within 10km of each dam in the management database. Length of record and location of matched gages were retrieved for those parameters relevant to sediment concentration or total sediment discharge.

Hansen, Carly [ORNL] (ORCID:0000000193280838)↗

Atmospheric analyzer, carbon monoxide monitor and toluene diisocyanate monitor

The purpose of the atmospheric analyzer and the carbon monoxide and toluene diisocyanate monitors is to analyze the atmospheric volatiles and to monitor carbon monoxide and toluene diisocyanate levels in the cabin atmosphere of Skylab. The carbon monoxide monitor was used on Skylab 2, 3, and 4 to detect any carbon monoxide levels above 25 ppm. Air samples were taken once each week. The toluene diisocyanate monitor was used only on Skylab 2. The loss of a micrometeoroid shield following the launch of Skylab 1 resulted in overheating of the interior walls of the Orbital Workshop. A potential hazard existed from outgassing of an isocyanate derivative resulting from heat-decomposition of the rigid polyurethane wall insulation. The toluene diisocyanate monitor was used to detect any polymer decomposition. The atmospheric analyzer was used on Skylab 4 because of a suspected leak in the Skylab cabin. An air sample was taken at the beginning, middle, and the end of the mission.

Shannon, A. V.↗

Space shuttle main engine monitoring experience and advanced monitoring systems development

Advanced space transportation systems must provide improved availability, reliability, safety, and reduced cost in order to make a new, more vigorous level of space activity economically feasible. Earth-to-Orbit (ETO) propulsion monitoring systems are a major factor in progress toward these improvements, and in the success of current systems. Operational experience with the Space Shuttle Main Engine (SSME), the first reusable ETO rocket engine, is valuable for examining current rocket engine monitoring capability and technology developments. Here, Space Shuttle Main Engine (SSME) monitoring practice and experience are surveyed. Unique aspects of rocket engine mission requirements are highlighted to provide improved understanding of engine monitoring practices and technology needs. Current ETO engine transportation systems mission needs are outlined. With this foundation, the techniques and components addressed within current technology programs are discussed to complete a picture of ETO propulsion monitoring status and development.

Cikanek, Harry A.↗