Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MODULE CONSTRUCTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

GNET2: an R package for constructing gene regulatory networks from transcriptomic data

Abstract Motivation The Gene Network Estimation Tool (GNET) is designed to build gene regulatory networks (GRNs) from transcriptomic gene expression data with a probabilistic graphical model. The data preprocessing, model construction and visualization modules of the original GNET software were developed on different programming platforms, which were inconvenient for users to deploy and use. Results Here, we present GNET2, an improved implementation of GNET as an integrated R package. GNET2 provides more flexibility for parameter initialization and regulatory module construction based on the core iterative modeling process of the original algorithm. The data exchange interface of GNET2 is handled within an R session automatically. Given the growing demand for regulatory network reconstruction from transcriptomic data, GNET2 offers a convenient option for GRN inference on large datasets. Availability and implementation The source code of GNET2 is available at https://github.com/jianlin-cheng/GNET2. Supplementary information Supplementary data are available at Bioinformatics online.

59 BASIC BIOLOGICAL SCIENCES↗

Thermally Conductive Backsheets (TCB) for Reduced Operating Temperatures

The performance of photovoltaic (PV) modules is primarily influenced by the plane of array (POA) irradiance and their operating temperature. The lower the module operating temperature, the higher is its performance. Increasing a module’s operating temperature reduces its power output due to an increase in the semiconductor’s intrinsic carrier density, leading to a reduction in the open-circuit voltage and, subsequently, reducing the maximum power point voltage. Reducing the operating temperature lowers the levelized cost of energy (LCOE) via increased energy production (i.e., more kilowatt hour over the life of the asset) and increased service lifetime (years in the field). The module operating temperature is dictated by the weather parameters and the thermal properties of module construction materials. The primary weather parameters influencing the PV module temperature are: the ambient temperature (directly related), irradiance (directly related), and wind speed (inversely related). The primary thermal properties of module construction materials influencing the PV module temperature are: the optical transmissivity and thermal conductivity of superstrate, the thermal conductivity of substrate, the thermal conductivity of encapsulant and the efficiency of the encapsulated solar cells. The primary goal of this study is to reduce the operating temperature of PV modules using thermally conductive backsheet (TCB) substrates developed by the industry. The temperature of PV modules installed in a large multi-MW plant can also be influenced by their physical locations in the plants due to the influence of wind direction. A thermal mapping of PV plants has also been investigated and presented in this study. The most commonly used PV backsheet material has been polyvinyl fluoride (DuPont trade name “Tedlar”)-based backsheet, which typically has three layers: Tedlar–polyethylene terephthalate (PET)–Tedlar (TPT). The primary goal of this project is to reduce the module operating temperature below the benchmark TPT backsheet temperature using newly developed TCBs by the industry. The overall approach of this project involves six focus areas: i) select and procure one TPT and thirteen promising TCBs available in the industry; ii) construct a large number of 1-cell and 9-cell modules using benchmark TPT and selected TCBs [all other construction materials are fixed and they are: glass superstrate, EVA encapsulant, mono-Si cell and junction box]; iii) to identify best performing TCBs, monitor the long-term field operating temperatures of the constructed modules which are installed in three climatic conditions (hot-low wind [Mesa, AZ], hot-high wind [Maricopa County, AZ] and temperate [Cumberland County, NC]; iv) to identify the most durable TCB, perform extended accelerated reliability testing of modules constructed with best three TCBs and benchmark TPT; v) to predict module temperature, develop physical and empirical thermal models with and without thermal properties of all construction materials in the modules, respectively; and vi) to determine the influence of wind speed and direction on the module operating temperature in a plant, and perform thermal mapping of PV modules in two large PV plants [Maricopa County, AZ and Cumberland County, NC]. The key achievements of this project are listed below: Backsheet selection: 14 backsheets were procured after an extensive literature and industry search. Finally, based on the thermal and other selection criteria, 1 TPT and 4 thermally conductive backsheets were selected for this project. Fabrication of mini modules: 50 one-cell modules were fabricated in year 1 for thermal performance evaluation. The module design was changed to nine-cell module at start of year 2 to mimic commercial design. 20 nine-cell modules were fabricated in year 2 for thermal performance evaluation. 28 four-cell modules were fabricated in year 3 for accelerated stress-testing. Thermal conductivity of backsheets: Year 1 TCBs showed at least 8% higher thermal conductivities than TPT. Year 2 and 3 TCBs showed at least 20% higher thermal conductivities than TPT. Installation of mini PV modules at three sites: 6 one-cell modules and 8 nine-cell modules were installed at AZ-1 site [Mesa, AZ]. 12 one-cell modules and 6 nine-cell modules were installed at each of two powerplants (AZ-2 [Maricopa County, AZ] and NC sites). Nominal operating cell temperatures (NOCT) of mini PV modules: NOCT of TCBs were observed to be lower than TPT with differences as high as 2°C. Comparison of thermal performance: The median operating temperature of one-cell modules was found to be reduced by 2°C by using TCB_A modules compared to TPT modules on several days in a month for few months in a year. The median temperature improvement of 4oC was achieved at several instances on a few days, but not all days, in a year using multiple TCBs compared to TPT. The final project milestone of achieving median temperature improvement of 5oC was achieved at several instances on a few days, but not all days, in a year using TCB_A compared to TPT. Empirical thermal model (without the need of construction material properties): Empirical thermal model for one-cell module was developed based on the input data of irradiance, wind speed and ambient temperatures. The primary input data differentiator for temperature differences between TPT and TCBs appears to be the irradiance level (solar gain). Accelerated durability testing: 20 four-cell modules using 4 backsheets (1 TPT and 3 TCBs) were exposed to Damp Heat 1000 hours (8 modules), UV/Thermal cycling (50 cycles)/Humidity freeze (10 cycles) test sequence (8 modules) and UV Weathering for qualification (8 modules). All the modules with four selected backsheets passed the stress tests per the retest guidelines of IEC 61215 standard for the backsheet change. Simplified comparative LCOE analysis: Using backsheet-specific power degradation levels in the accelerated tests (for TCB_A and TPT only), efficiency, service lifetime and assuming same cost for all backsheets, the LCOE of modules using TCB_A is determined to be lower than TPT. Due to lower operating temperature of TCB_A-based modules compared to TPT-based modules, the operating efficiency and service life of TCB_A-based modules are calculated to be higher than TPT-based modules. Temperature mapping of PV power plants: A distinct temperature difference (as high as 4°C) has been observed between the modules located in various parts of a single PV plant.

14 SOLAR ENERGY↗

Constructive polarization modulation for coherent population trapping clock

We propose a constructive polarization modulation scheme for atomic clocks based on coherent population trapping (CPT). In this scheme, the polarization of a bichromatic laser beam is modulated between two opposite circular polarizations to avoid trapping the atomic populations in the extreme Zeeman sublevels. We show that if an appropriate phase modulation between the two optical components of the bichromatic laser is applied synchronously, the two CPT dark states which are produced successively by the alternate polarizations add constructively. Measured CPT resonance contrasts up to 20% in one-pulse CPT and 12% in two-pulse Ramsey-CPT experiments are reported, demonstrating the potential of this scheme for applications to high performance atomic clocks.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Glass/glass photovoltaic module reliability and degradation: a review

Glass/glass (G/G) photovoltaic (PV) module construction is quickly rising in popularity due to increased demand for bifacial PV modules, with additional applications for thin-film and building-integrated PV technologies. G/G modules are expected to withstand harsh environmental conditions and extend the installed module lifespan to greater than 30 years compared to conventional glass/backsheet (G/B) modules. With the rapid growth of G/G deployment, understanding the outdoor performance, degradation, and reliability of this PV module construction becomes highly valuable. In this review, we present the history of G/G modules that have existed in the field for the past 20 years, their subsequent reliability issues under different climates, and methods for accelerated testing and characterization of both cells and packaging materials. We highlight some general trends of G/G modules, such as greater degradation when using poly(ethylene-co-vinyl acetate) (EVA) encapsulants, causing the industry to move toward polyolefin-based encapsulants. Transparent backsheets have also been introduced as an alternative to the rear glass for decreasing the module weight and aiding the effusion of trapped gaseous degradation products in the laminate. New amendments to IEC 61215 standard protocols for G/G bifacial modules have also been proposed so that the rear side power generation and UV exposure will be standardized. We further summarize a suite of destructive and non-destructive characterization techniques, such as current-voltage scans, module electro-optical imaging, adhesion tests, nanoscale structural/chemical investigation, and forensic analysis, to provide deeper insights into the fundamental properties of the module materials degradation and how it can be monitored in the G/G construction. This will set the groundwork for future research and product development.

14 SOLAR ENERGY↗

Glass/Glass Photovoltaic Module Reliability and Degradation: A Review - Figures

Glass/glass (G/G) photovoltaic (PV) module construction is quickly rising in popularity due to increased demand for bifacial PV modules, with additional applications for thin-film and building-integrated PV technologies. G/G modules are expected to withstand harsh environmental conditions and extend the installed module lifespan to greater than 30 years compared to conventional glass/backsheet (G/B) modules. With the rapid growth of G/G deployment, understanding the outdoor performance, degradation, and reliability of this PV module construction becomes highly valuable. In this review, we present the history of G/G modules that have existed in the field for the past 20 years, their subsequent reliability issues under different climates, and methods for accelerated testing and characterization of both cells and packaging materials. We highlight some general trends of G/G modules, such as greater degradation when using poly(ethylene-co-vinyl acetate) (EVA) encapsulants, causing the industry to move toward polyolefin-based encapsulants. Transparent backsheets have also been introduced as an alternative to the rear glass for decreasing the module weight and aiding the effusion of trapped gaseous degradation products in the laminate. New amendments to IEC 61215 standard protocols for G/G bifacial modules have also been proposed so that the rear side power generation and UV exposure will be standardized. We further summarize a suite of destructive and non-destructive characterization techniques, such as current-voltage scans, module electro-optical imaging, adhesion tests, nanoscale structural/chemical investigation, and forensic analysis, to provide deeper insights into the fundamental properties of the module materials degradation and how it can be monitored in the G/G construction. This will set the groundwork for future research and product development.

transparent backsheet↗

Polarization Type Potential Induced Degradation under Positive Bias in a Commercial PERC Module: Preprint

Potential induced degradation of the polarization type (PID-p) can reduce module performance in a relatively short period of time. PID-p can occur at both voltage polarities, but most studies are focused on degradation under a negative bias. This paper uses commercial bifacial passivated emitter and rear contact (PERC) cells within a monofacial glass-backsheet module construction to evaluate the impact of PID-p under a positive bias on the front side. Using the aluminum-foil (Al-foil) method, the module was stressed for PID in an environmental chamber. After the stress, the maximum power (Pmax) showed a decline of 3.1% at 1000 W/m2 and 6.2% at 200 W/m2. Recovery under light was also investigated. Complete recovery was observed at high irradiance, while a partial recovery was seen at lower irradiance. The outcomes of this study can help in understanding PID-p degradation under a positive bias and its recovery under the light.

PERC↗

Module Technology: Current Practice and Issues (Presentation)

PV modules must provide mechanical support for the cells, protect the world from the voltages inside, protect the cells, diodes and interconnects from the weather outside, couple as much light as possible into the PV cells and minimize the temperature increase of the cells. The package must continue to serve these functions for at least 25 years as that is the typical module warranty period today. Furthermore the package must do all this for as low a cost as possible since the key to large scale PV growth is a reduction in cost while retaining excellent module reliability and durability. This paper will review current module construction practices for both crystalline silicon and thin film PV with emphasis on explaining why the present designs and materials have been selected. Possiblelong term issues with today's designs and materials will be discussed. Several proposed solutions to these issues will be presented, highlighting the research efforts that will be necessary in order to verify that they can cost effectively solve the identified issues.

14 SOLAR ENERGY↗

Test-to-Failure of Crystalline Silicon Modules: Preprint

Accelerated lifetime testing of five crystalline silicon module designs was carried out according to the Terrestrial Photovoltaic Module Accelerated Test-to-Failure Protocol. This protocol compares the reliability of various module constructions on a quantitative basis. The modules under test are subdivided into three accelerated lifetime testing paths: 85..deg..C/85% relative humidity withsystem bias, thermal cycling between 40..deg..C and 85..deg..C, and a path that alternates between damp heat and thermal cycling. The most severe stressor is damp heat with system bias applied to simulate the voltages that modules experience when connected in an array. Positive 600 V applied to the active layer with respect to the grounded module frame accelerates corrosion of the silver gridfingers and degrades the silicon nitride antireflective coating on the cells. Dark I-V curve fitting indicates increased series resistance and saturation current around the maximum power point; however, an improvement in junction recombination characteristics is obtained. Shunt paths and cell-metallization interface failures are seen developing in the silicon cells as determined byelectroluminescence, thermal imaging, and I-V curves in the case of negative 600 V bias applied to the active layer. Ability to withstand electrolytic corrosion, moisture ingress, and ion drift under system voltage bias are differentiated.

14 SOLAR ENERGY↗

Search for neutrinoless double- β decay in Ge 76 with 26 kg yr of exposure from the Majorana Demonstrator

The MAJORANA Collaboration is operating an array of high purity Ge detectors to search for the neutrinoless double-beta decay of $^{76}$Ge. The MAJORANA DEMONSTRATOR consists of 44.1 kg of Ge detectors (29.7 kg enriched to 88% in $^{76}$Ge) split between two modules constructed from ultra-clean materials. Both modules are contained in a low-background shield at the Sanford Underground Research Facility in Lead, South Dakota. We present updated results on the search for neutrinoless double-beta decay in $^{76}$Ge with $26.0\pm0.5$ kg-yr of enriched exposure. With the DEMONSTRATOR's unprecedented energy resolution of 2.53 keV FWHM at $Q_{\beta\beta}$, we observe one event in the region of interest with 0.65 events expected from the estimated background, resulting in a lower limit on the $^{76}$Ge neutrinoless double-beta decay half-life of $2.7\times10^{25}$ yr (90% CL) with a median sensitivity of $4.8\times10^{25}$ yr (90% CL). Depending on the matrix elements used, a 90% CL upper limit on the effective Majorana neutrino mass in the range of 200-433 meV is obtained. The measured background in the low-background configurations is $11.9\pm2.0$ counts/(FWHM t yr).

59 ≤ A ≤ 89↗

Susceptibility to polarization type potential induced degradation in commercial bifacial p-PERC PV modules

Potential induced degradation (PID) is a reliability issue affecting photovoltaic (PV) modules, mainly when PV strings operate under high voltages in hot/humid conditions. Polarization-type PID (PID-p) has been known to decrease module performance quickly. PID-p can be reduced or recovered under the light in some cases, but this effect, as expected, would be less pronounced on the rear side of bifacial PV modules receiving lower irradiance. As bifacial PV modules are projected to dominate the PV market within the next 10 years, it is crucial to understand the PID-p issue in bifacial modules better. In this study, we performed indoor PID testing to induce PID-p on 14 commercial bifacial p-PERC modules with three different module constructions from three manufacturers. Here, four rounds (+ve and –ve polarities for front and rear sides) of PID testing are done at 25°C, 54% relative humidity (RH) for 168 h using the aluminum foil method. Each module side (front cell side and back cell side) is tested individually under both negative and positive voltage bias. The results show that the highest degradation of 32% in maximum power (Pmax) at standard test conditions (1000 W/m 2 ) and 51% at low irradiance (200 W/m 2 ) has been observed in some cases. Recovery under sunlight is also done, and outcomes show a near-complete recovery in Pmax. This study presents an extensive experimental methodology and a detailed analysis to systematically and simultaneously/sequentially evaluate multiple construction types of bifacial modules to the PID-p susceptibility and recovery.

14 SOLAR ENERGY↗

Automatic Lane-Level Road Network Extraction from Aerial Imagery for Transportation Digital Twins

Accurate road networks are essential for credible traffic microsimulation and transportation digital twins, yet high-definition maps are often difficult to obtain due to limited availability, high cost, or proprietary restrictions. Some build networks from crowdsourced data, such as OpenStreetMap, but these sources often contain geometric and semantic inconsistencies. Others create networks manually, a process that is labor-intensive and difficult to scale. To address these limitations, this work presents an end-to-end pipeline that automatically extracts georeferenced, lane-level road networks from publicly available high-resolution satellite imagery and converts them into simulation-ready assets. The developed end-to-end pipeline has three primary modules: (1) A computer-vision-based module first detects directed lane geometries and intersection layouts. (2) A heuristic-based topology construction module then identifies approach and exit legs and establishes conflict-free lane-to-lane connections. (3) Finally, an automatic simulation-building module converts the extracted network into standard formats, e.g., OpenDRIVE, and generates routable SUMO networks. The framework supports both complete network construction from scratch and local-scale refinement of existing networks through lane-count correction, transition recovery, and geometric regularization. The proposed pipeline provides a practical pathway to generate traffic simulation networks from satellite imagery, significantly reducing manual reconstruction effort and enabling scalable, continuously updated transportation digital twins.

Guo, Hetian [University of Georgia, Athens] (ORCID↗

Characterization of Multicrystalline Silicon Modules with System Bias Voltage Applied in Damp Heat

As it is considered economically favorable to serially connect modules to build arrays with high system voltage, it is necessary to explore potential long-term degradation mechanisms the modules may incur under such electrical potential. We performed accelerated lifetime testing of multicrystalline silicon PV modules in 85 degrees C/ 85% relative humidity and 45 degrees C/ 30% relative humiditywhile placing the active layer in either positive or negative 600 V bias with respect to the grounded module frame. Negative bias applied to the active layer in some cases leads to more rapid and catastrophic module power degradation. This is associated with significant shunting of individual cells as indicated by electroluminescence, thermal imaging, and I-V curves. Mass spectroscopy resultssupport ion migration as one of the causes. Electrolytic corrosion is seen occurring with the silicon nitride antireflective coating and silver gridlines, and there is ionic transport of metallization at the encapsulant interface observed with damp heat and applied bias. Leakage current and module degradation is found to be highly dependent upon the module construction, with factors such asencapsulant and front glass resistivity affecting performance. Measured leakage currents range from about the same seen in published reports of modules deployed in Florida (USA) and is accelerated to up to 100 times higher in the environmental chamber testing.

14 SOLAR ENERGY↗

Laser Welded Edge Seals for Glass/Glass Modules

Polymers used in module construction are often involved in degradation mechanisms and hamper recycling. This project explores femtosecond (fs) laser welding of glass/glass modules to enable polymer-free modules. We are utilizing the knowledge base of the industrial laser community to apply glass/glass fs laser welding technology to solar modules. Experimentally measured stress intensity factors for glass welds are input into a COMSOL model of a full-size module to test weld failure under static loading. If successful, fs laser welding could enable modules that are polymer-free that will extend module warrantees, allow hermetically sealed glass/glass modules for moisture-sensitive semiconductors, and improve module recyclability.

COMSOL finite element model↗

Development Status of The ILC Marx Modulator

The ILC Marx Modulator is under development as a lower cost alternative to the 'Baseline Conceptual Design' (BCD) klystron modulator. Construction of a prototype Marx is complete and testing is underway at SLAC. The Marx employs solid state elements, IGBTs and diodes, to control the charge, discharge and isolation of the modules. The prototype is based on a stack of sixteen modules, each initially charged to {approx}11 kV, which are arranged in a Marx topology. Initially, eleven modules combine to produce the 120 kV output pulse. The remaining modules are switched in after appropriate delays to compensate for the voltage droop that results from the discharge of the energy storage capacitors. Additional elements will further regulate the output voltage to {+-}0.5%. The Marx presents several advantages over the conventional klystron modulator designs. It is physically smaller; there is no pulse transformer (quite massive at these parameters) and the energy storage capacitor bank is quite small, owing to the active droop compensation. It is oil-free; voltage hold-off is achieved using air insulation. It is air cooled; the secondary air-water heat exchanger is physically isolated from the electronic components. This paper outlines the current developmental status of the prototype Marx. It presents a detailed electrical and mechanical description of the modulator and operational test results. It will discuss electrical efficiency measurements, fault testing, and output voltage regulation.

43 PARTICLE ACCELERATORS↗

A Combined Computational and Mathematical Analysis of Interconnect Fatigue Potential in Photovoltaic Modules

A finite element model of a 60-cell monocrystalline silicon glass-polymer photovoltaic module was simulated with ±1.0 kPa and ±2.4 kPa loads applied to the glass to calculate the deformation under load. Cell-to-cell displacements were used to approximate interconnect strain and stress. A mathematical fatigue cycle life relation was fitted to data for the interconnect material (copper), to generate a life prediction at each interconnect location based on the local stress means, reversal extents, and amplitudes. Interconnect stress was found to be significantly asymmetric about zero despite symmetric positive and negative module loads due to laminate thickness offsets about the neutral plane and the effects of module framing. Cycle life results indicated that interconnect fatigue failure was unlikely to occur over a 30-year lifetime of conservative wind and snow load cycles since the typical cell design feature of leaving some unconstrained length between the cell edge and first solder pad increases the effective gauge length and decreases the stress levels below the material endurance limit. Follow-up analyses found that 3.6 mm and 6.4 mm were the minimum unconstrained lengths required to survive the assumed lifetime of wind and snow cycles, respectively, confirming that typical industrial module constructions with 8–15 mm unconstrained lengths should survive conservatively. Notably, large magnitude, low-cycle snow loading was consistently the limiting factor requiring a longer unconstrained interconnect length. Finally, insights and workflows from this study inform module interconnection design limits for survival against mechanical fatigue in deployment environments.

14 SOLAR ENERGY↗

A fast method for optical simulation of flood maps of light-sharing detector modules

Optical simulation of the detector module level is highly desired for Position Emission Tomography (PET) system design. Commonly used simulation toolkits such as GATE are not efficient in the optical simulation of detector modules with complicated light-sharing configurations, where a vast amount of photons need to be tracked. Here, we present a fast approach based on a simplified specular reflectance model and a structured light-tracking algorithm to speed up the photon tracking in detector modules constructed with polished finish and specular reflector materials. We also simulated conventional block detector designs with different slotted light guide patterns using the new approach and compared the outcomes with those from GATE simulations. And while the two approaches generated comparable flood maps, the new approach was more than 200–600 times faster. The new approach has also been validated by constructing a prototype detector and comparing the simulated flood map with the experimental flood map. The experimental flood map has nearly uniformly distributed spots similar to those in the simulated flood map. In conclusion, the new approach provides a fast and reliable simulation tool for assisting in the development of light-sharing-based detector modules with a polished surface finish and using specular reflector materials.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Advancing reliability assessments of photovoltaic modules and materials using combined-accelerated stress testing

Previously undiscovered failure modes in photovoltaic (PV) modules continue to emerge in field installations despite passing protocols for design qualification and quality assurance. Failure to detect these modes prior to widespread use could be attributed to the limitations of present-day standard accelerated stress tests (ASTs), which are primarily designed to identify known degradation or failure modes at the time of development by applying simultaneous or sequential stress factors (usually two at most). Here, we introduce an accelerated testing method known as the combined-accelerated stress test (C-AST), which simultaneously combines multiple stress factors of the natural environment. Simultaneous combination of multiple stress factors allows for improved identification of failure modes with better ability to detect modes not known a priori. A demonstration experiment was conducted that reproduced the field-observed cracking of polyamide- (PA-) and polyvinylidene fluoride (PVDF)–based backsheet films, a failure mode that was not detected by current design qualification and quality assurance testing requirements. In this work, a two-phase testing protocol was implemented. The first cycle (“Tropical”) is a predominantly high-humidity and high-temperature test designed to replicate harsh tropical climates. The second cycle (“Multi-season”) was designed to replicate drier and more temperate conditions found in continental or desert climates. Testing was conducted on 2 × 2-cell crystalline-silicon cell miniature modules constructed with both ultraviolet (UV)–transmitting and UV-blocking encapsulants. Cracking failures were observed within a cumulative 120 days of the Tropical condition for one of the PA-based backsheets and after 84 days of Tropical cycle followed by 42 days of the Multi-season cycle for the PVDF-based backsheet, which are both consistent with failures seen in fielded modules. In addition to backsheet cracking, degradation modes were observed including solder/interconnect fatigue, various light-induced degradation modes, backsheet delamination, discoloration, corrosion, and cell cracking. The ability to simultaneously apply multiple stress factors may allow many of the test sequences within the standardized design qualification procedure to be performed using a single test setup.

14 SOLAR ENERGY↗

Ultra Barrier Topsheet Film for Flexible Photovoltaics with 3M Company

In this DOE sponsored program, 3M achieved the critical UBT features to enable durable flexible high efficiency modules to be produced by a range of customers who have now certified the 3M UBT and are actively developing said flexible modules. The specific objectives and accomplishments of the work under this program were; Scale-up the current Generation-1 UBT from 12” width, as made on 3M’s pilot line, to 1+meter width full-scale manufacturing, while maintaining baseline performance metrics (see table below); This objective was fully met; Validate service life of Generation-1 UBT for the 25+ year lifetime demanded by the photovoltaic market; Aggressive testing revealed potential failure modes in the Gen 1 UBT. Deficiencies were identified and corrective action taken in the Gen 2 UBT; Develop a Generation-2 UBT on the pilot line, targeting improved performance relative to baseline, including higher %T (percent transmission), lower water vapor transmission rate (WVTR) with targets based on what the technology needs for 25 year lifetime, proven lifetime of 25 years in solar module construction in the field, and lower cost; Testing of UBT Gen 2 under a wide range of conditions presented in this report failed to reveal any failure mode. Therefore UBT Gen 2 is known to be highly durable. 3M will continue to test towards statistically validating a 25 year lifetime under 3M funding; Transfer Generation-2 UBT from the pilot line to the full-scale manufacturing line within three years; and This objective was fully met.

14 SOLAR ENERGY↗