At least 19 records

One-dimensional cold cap model for melters with bubblers

The rate of glass production during vitrification in an all-electrical melter greatly impacts the cost and schedule of nuclear waste treatment and immobilization. The feed is charged to the melter on the top of the molten glass, where it forms a layer of reacting and melting material, called the cold cap. During the final stages of the batch-to-glass conversion process, gases evolved from reactions produce primary foam, the growth and collapse of which controls the glass production rate. The mathematical model of the cold cap was revised to include functional representation of primary foam behavior and to account for the dry cold cap surface. The melting rate is computed as a response to the dependence of the primary foam collapse temperature on the heating rate and melter operating conditions, including the effect of bubbling on the cold cap bottom and top surface temperatures. The simulation results are in good agreement with experimental data from laboratory-scale and pilot-scale melter studies. Lastly, the cold cap model will become part of the full three-dimensional mathematical model of the waste glass melter.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Defense Waste Processing Facility Process Enhancements

Jonathan Bricker provides an overview of process enhancements currently being done at the Defense Waste Processing Facility (DWPF) at SRS. Some of these enhancements include: melter bubblers; reduction in water use, and alternate reductant.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Design and Testing of Candidate Coating Materials Applied to Inconel Bubblers for Improved Corrosion Resistance

The US Department of Energy (DOE) Office of Environmental Management Technology Development (EM-TD) has requested Savannah River National Laboratory (SRNL) evaluate ceramic coating materials that can extend the service life of Hanford melter bubblers. The proposed Task will focus on the development of ceramic coating materials for Inconel bubblers to reduce corrosion and increase the service life of the bubblers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of DWPF Sludge Batch 7a (Macrobatch 8) Pour Stream Samples

The Defense Waste Processing Facility (DWPF) began processing Sludge Batch 7a (SB7a), also referred to as Macrobatch 8 (MB8), in June 2011. SB7a is a blend of the heel of Tank 40 from Sludge Batch 6 (SB6) and the SB7a material that was transferred to Tank 40 from Tank 51. SB7a was processed using Frit 418. During processing of each sludge batch, the DWPF is required to take at least one glass sample to meet the objectives of the Glass Product Control Program (GPCP), which is governed by the DWPF Waste Compliance Plan, and to complete the necessary Production Records so that the final glass product may be disposed of at a Federal Repository. Three pour stream glass samples and two Melter Feed Tank (MFT) slurry samples were collected while processing SB7a. These additional samples were taken during SB7a to understand the impact of antifoam and the melter bubblers on glass redox chemistry. The samples were transferred to the Savannah River National Laboratory (SRNL) where they were analyzed. The following conclusions were drawn from the analytical results provided in this report: (1) The sum of oxides for the official SB7a pour stream glass is within the Product Composition Control System (PCCS) limits (95-105 wt%). (2) The average calculated Waste Dilution Factor (WDF) for SB7a is 2.3. In general, the measured radionuclide content of the official SB7a pour stream glass is in good agreement with the calculated values from the Tank 40 dried sludge results from the SB7a Waste Acceptance Program Specification (WAPS) sample. (3) As in previous pour stream samples, ruthenium and rhodium inclusions were detected by Scanning Electron Microscopy-Electron Dispersive Spectroscopy (SEM-EDS) in the official SB7a pour stream sample. (4) The Product Consistency Test (PCT) results indicate that the official SB7a pour stream glass meets the waste acceptance criteria for durability with a normalized boron release of 0.64 g/L, which is an order of magnitude less than the Environmental Assessment (EA) glass. (5) The measured density of the SB7a pour stream glass was 2.7 g/cm 3 . (6) The Fe 2+ ΣFe ratios of the SB7a pour stream samples were in the range of 0.04-0.13, while the MFT sample glasses prepared by SRNL were in the range of 0.02-0.04.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis Of DWPF Sludge Batch 7a (Macrobatch 8) Pour Stream Samples

The Defense Waste Processing Facility (DWPF) began processing Sludge Batch 7a (SB7a), also referred to as Macrobatch 8 (MB8), in June 2011. SB7a is a blend of the heel of Tank 40 from Sludge Batch 6 (SB6) and the SB7a material that was transferred to Tank 40 from Tank 51. SB7a was processed using Frit 418. During processing of each sludge batch, the DWPF is required to take at least one glass sample to meet the objectives of the Glass Product Control Program (GPCP), which is governed by the DWPF Waste Compliance Plan, and to complete the necessary Production Records so that the final glass product may be disposed of at a Federal Repository. Three pour stream glass samples and two Melter Feed Tank (MFT) slurry samples were collected while processing SB7a. These additional samples were taken during SB7a to understand the impact of antifoam and the melter bubblers on glass redox chemistry. The samples were transferred to the Savannah River National Laboratory (SRNL) where they were analyzed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Report Integrated DM1200 Melter Testing of Bubbler Configurations Using HLW AZ-101 Simulants

This report documents melter and off-gas performance results obtained on the DM1200 HLW Pilot Melter during processing of AZ-101 HLW simulants. The tests reported herein are a subset of six tests from a larger series of tests described in the Test Plan for the work; results from the other tests have been reported separately. The solids contents of the melter feeds were based on the WTP baseline value for the solids content of the feeds from pretreatment which changed during these tests from 20% to 15% undissolved solids resulting in tests conducted at two feed solids contents.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing of Optimized Bubbler Configuration for HLW Melter

The principal objective of this work was to determine the glass production rate increase and ancillary effects of adding more bubbler outlets to the current WTP HLW melter baseline. This was accomplished through testing on the HLW Pilot Melter (DM1200) at VSL. The DM1200 unit was selected for these tests since it was used previously with several HLW waste streams including the four tank wastes proposed for initial processing at Hanford. This melter system was also used for the development and optimization of the present baseline WTP HLW bubbler configuration for the WTP HLW melter, as well as for MACT testing for both HLW and LAW. Specific objectives of these tests were to: Conduct DM1200 melter testing with the baseline WTP bubbling configuration and as augmented with additional bubblers. Conduct DM1200 melter testing to differentiate the effects of total bubbler air flow and bubbler distribution on glass production rate and cold cap formation. Collect melter operating data including processing rate, temperatures at a variety of locations within the melter plenum space, melt pool temperature, glass melt density, and melter pressure with the baseline WTP bubbling configuration and as augmented with additional bubblers. Collect melter exhaust samples to compare particulate carryover for different bubbler configurations. Analyze all collected data to determine the effects of adding more bubblers to the WTP HLW melter to inform decisions regarding future lid re-designs. The work used a high aluminum HLW stream composition defined by ORP, for which an appropriate simulant and high waste loading glass formulation were developed and have been previously processed on the DM1200.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

INSTALLATION OF BUBBLERS IN THE SAVANNAH RIVER SITED DEFENSE WASTE PROCESSING FACILITY MELTER

Savannah River Remediation (SRR) LLC assumed the liquid waste contract at the Savannah River Site (SRS) in the summer of 2009. The main contractual agreement was to close 22 High Level Waste (HLW) tanks in eight years. To achieve this aggressive commitment, faster waste processing throughout the SRS liquid waste facilities will be required. Part of the approach to achieve faster waste processing is to increase the canister production rate of the Defense Waste Processing Facility (DWPF) from approximately 200 canisters filled with radioactive waste glass per year to 400 canisters per year. To reach this rate for melter throughput, four bubblers were installed in the DWPF Melter in the late summer of 2010. This effort required collaboration between SRR, SRR critical subcontractor EnergySolutions, and Savannah River Nuclear Solutions, including the Savannah River National Laboratory (SRNL). The tasks included design and fabrication of the bubblers and related equipment, testing of the bubblers for various technical issues, the actual installation of the bubblers and related equipment, and the initial successful operation of the bubblers in the DWPF Melter.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated DM1200 Melter Testing of HLW C-106/AY-102 Composition Using Bubblers

This report documents melter and off-gas performance results obtained on the DM1200 HLW Pilot Melter during processing of simulated HLW C-106/AY-102 feed. The principal objectives of the DM1200 melter testing were to determine the achievable glass production rates for simulated HLW C-106/AY-102 feed; determine the effect of bubbling rate on production rate; characterize melter off-gas emissions; characterize the performance of the prototypical off-gas system components as well as their integrated performance; characterize the feed, glass product, and off-gas effluents; and to perform pre- and post test inspections of system components.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated DM1200 Melter Testing of HLW AZ-102 Composition Using Bubblers (Final Report)

This report documents melter and off-gas performance results obtained on the DM1200 HLW Pilot Melter during processing of simulated HLW AZ-102 feed. The principal objectives of the DM1200 melter testing were to determine the achievable glass production rates for simulated HLW AZ-102 feed; determine the effect of bubbling rate on production rate; characterize melter off-gas emissions; characterize the performance of the prototypical off-gas system components as well as their integrated performance; characterize the feed, glass product, and off-gas effluents; and to perform pre- and post test inspections of system components.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Heat transfer enhancement due to cold cap motion from bubbling in a waste glass melter

In this study, a computational fluid dynamics (CFD) model was developed to model the motion of a solid cold cap in a waste glass melter. Forced convection bubblers at the base of the melter release air into the molten glass, which forms large bubbles that travel upwards to the cold cap and augment heat transfer from the glass to the cold cap. The CFD model employs the Navier- Stokes equations to solve for the fluctuating flowfield using a rigid body motion dynamic fluid body interaction module. This allows for movement of the floating body in response to the bubbling forces calculated at each time step. Further, the heat flux delivered to the cold cap by the convective bubbling is studied as a function of the bubbling rate. Results for the moving cold cap are compared with the computed heat flux trends for a stationary cold cap. The heat flux delivered to the cold cap from the glass is 25% higher for the case with the moving cold cap. The heat flux was found to be proportional to v0.6 as opposed to v0.9 (where v is the normalized bubbling rate) for the stationary cold cap.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operation of Bubblers in the Savannah River Site Defense Waste Processing Facility Melter - 12166

Savannah River Remediation (SRR) LLC acquired the liquid waste contract at the Savannah River Site (SRS) in the summer of 2009. In order to achieve the main goal of the contract, closing of High Level Waste (HLW) tanks, it was necessary to process more waste throughout the SRS liquid waste facilities. The Defense Waste Processing Facility (DWPF) would need to increase its production rate of radioactive waste glass filled canisters as a part of the plan to achieve this commitment. To attain the increased production rate, four bubblers were installed in the DWPF Melter in September 2010 to agitate the DWPF Melter glass pool. The four bubblers were designed to be installed in existing nozzles on the top-head of the DWPF Melter. The design and fabrication of the four (4) bubblers was accomplished through SRR critical subcontractor EnergySolutions LLC. In addition to the existing bubbler design, a new design concept has been approved and is in the process of fabrication. The new design will allow for the lower end (inside melter) of the bubbler to be replaced while the upper end (outside melter) of the bubbler is reused to minimize cost and waste at the DWPF. The bubblers have been operating in the DWPF Melter for approximately 1 year. The originally installed bubbler set was replaced in January 2011. The bubblers were visually examined once removed from the melter and showed minimal signs of wear. Material testing of the Inconel 690 is being performed to determine if the bubblers operational life can be extended. The use of the bubblers has changed the dynamics within the melter glass pool. This is shown through indications that the bubblers have increased the glass pool circulation. Overall, performance of the bubblers has been encouraging and the DWPF Melter has seen a significant improvement in its ability to process waste since the bubbler installation. The installation of the bubblers accomplished the goal of increasing the glass production capability of DWPF Melter. Currently the DWPF Melter is producing glass at a rate of 91 to 93 kg of glass/hour (200 to 205 lbs of glass/hour). As a result of this increased glass production rate the DWPF has been able to produce the most canisters since radioactive operations began in 1996. These accomplishments can be directly attributed to the bubblers ability to increase mixing/convection within the glass melt pool thereby improving the heat transfer from melt pool to the cold cap. Further, this has helped SRR take a significant step forward toward closing the HLW tanks at the aggressive pace set forth in the most recent liquid waste contract at the SRS. As a path forward, the DWPF is continuing work with SRNL to complete the final metallurgical examination of the bubbler samples to help determine methods to increase the design life of the bubblers beyond the current 6-month restriction. Also, the DWPF is continuing work with EnergySolutions on a new bubbler design concept to minimize cost and waste at the DWPF. The new design will allow for the lower end (inside melter) of the bubbler to be replaced while the upper end (outside melter) of the bubbler is reused. This new design is currently in the final design approval phase and EnergySolutions will be selecting a fabricator to begin the work to build bubbler sets 5 and 6 using the new design. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improvements in design and operation of bubblers in the Savannah river site defense waste processing facility melter - 15163

In order to accelerate the closing of High Level Waste (HLW) tanks at the Savannah River Site (SRS), it was necessary to process more waste throughout the SRS liquid waste facilities. Therefore the Defense Waste Processing Facility (DWPF) needed to increase its production rate of radioactive waste glass filled canisters. To attain the increased production rate, four bubblers were installed in the DWPF Melter in September 2010 to agitate the DWPF Melter glass pool. The four bubblers were designed to be installed in existing nozzles on the top-head of the DWPF Melter. After a few years of successful operation with the original design, several changes have been made to the bubblers. The main change allows for the lower end (inside melter) of the bubbler to be replaced while the top end (outside melter) of the bubbler can be reused. This minimizes cost and waste at the DWPF. Material testing of the Inconel 690 bubbler pipes of used lower bubblers has been performed. Based on the material testing and issue with the integrity of some lower bubbler pipes used in the melter, a protective sleeve at the melt line was also added. Other changes for operational improvement or cost savings have also been made. Overall, performance of the bubblers continues to be excellent as canister production records have been achieved at the DWPF due in large part to the use of bubblers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SRS Defense Waste Processing Facility - the Nation's Only Operating Vitrification Facility - Completes 20 Years of Radioactive Operations - 17407

Savannah River Remediation (SRR) is the current Liquid Waste contractor at the U.S. Department of Energy's (DOE) Savannah River Site (SRS), located near Aiken, South Carolina, and operates the Defense Waste Processing Facility (DWPF), along with the other SRS liquid waste facilities. The DWPF, the nation's only operating vitrification facility, completed 20 years of radioactive operations in 2016. During this period, DWPF has safely treated the high-level liquid waste at this DOE facility since radioactive operations began with the first transfer of sludge waste feed to DWPF on March 12, 1996. A little over a month later, on April 29, 1996, the first radioactive canister was poured. DWPF poured its 4,000. canister of vitrified waste on December 31, 2015. As of September 30, 2016, DWPF has removed approximately 59.9 million curies from the liquid waste system at SRS and placed them in 4,106 canisters. SRS has operationally closed 8 high-level waste tanks. The DWPF melter has poured nearly 7.14 million kg of molten glass, and the facility has used only two melters in its lifetime. Melter 1 poured 1,339 canisters (1996-2002), while melter 2 to date (September 30, 2016) has poured 2,767 canisters (2003-present). Melter 2 continues to safely and efficiently operate. In order to achieve these accomplishments, the facility has chronicled a history of continued operational improvements such as the installation of bubblers in the melter to increase production, incorporation of glass compositions to achieve higher waste loadings, and improvements to melter design to extend melter life. As SRR moves forward to the next 20 years, continued improvements as well as maintaining the aging infrastructure through a proactive system health program are key priorities. This paper chronicles 20 years of challenges, improvements and accomplishments, and discusses future operations and infrastructure upgrades including implementation of a key flowsheet change to significantly reduce hydrogen generation in the Chemical Process Cell. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IMPROVED ANTIFOAM AGENT STUDY END OF YEAR REPORT, EM PROJECT 3.2.3

Antifoam 747 is added to minimize foam produced by process gases and water vapor during chemical processing of sludge in the Defense Waste Processing Facility (DWPF). This allows DWPF to maximize acid addition and evaporation rates to minimize the cycle time in the Chemical Processing Cell (CPC). Improvements in DWPF melt rate due to the addition of bubblers in the melter have resulted in the need for further reductions in cycle time in the CPC. This can only be accomplished with an effective antifoam agent. DWPF production was suspended on March 22, 2011 as the result of a Flammable Gas New Information/(NI) Potential Inadequacy in the Safety Analysis (PISA). The issue was that the DWPF melter offgas flammability strategy did not take into account the H and C in the antifoam, potentially flammable components, in the melter feed. It was also determined the DWPF was using much more antifoam than anticipated due to a combination of longer processing in the CPC due to high Hg, longer processing due to Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) additions, and adding more antifoam than recommended. The resolution to the PISA involved and assessment of the impact of the antifoam on melter flammability and the implementation of a strategy to control additions within acceptable levels. This led to the need to minimize the use of Antifoam 747 in processing beginning in May 2011. DWPF has had limited success in using Antifoam 747 in caustic processing. Since starting up the ARP facility, the ARP product (similar chemically to caustic sludge) is added to the Sludge Receipt and Adjustment Tank (SRAT) at boiling and evaporated to maintain a constant SRAT volume. Although there is very little offgas generated during caustic boiling, there is a large volume of water vapor produced which can lead to foaming. High additions and more frequent use of antifoam are used to mitigate the foaming during caustic boiling. The result of these three issues above is that DWPF had three antifoam needs in FY2011: (1) Determine the cause of the poor Antifoam 747 performance during caustic boiling; (2) Determine the decomposition products of Antifoam 747 during CPC processing; and (3) Improve the effectiveness of Antifoam 747, in order to minimize the amount used. Testing was completed by Illinois Institute of Technology (IIT) and Savannah River National Laboratory (SRNL) researchers to address these questions. The testing results reported were funded by both DWPF and DOE/EM 31. Both sets of results are reported in this document for completeness. The results of this research are summarized: (1) The cause for the poor Antifoam 747 performance during caustic boiling was the high hydrolysis rate, cleaving the antifoam molecule in two, leading to poor antifoam performance. In testing with pH solutions from 1 to 13, the antifoam degraded quickly at a pH < 4 and pH > 10. As the antifoam decomposed it lost its spreading ability (wetting agent performance), which is crucial to its antifoaming performance. During testing of a caustic sludge simulants, there was more foam in tests with added Antifoam 747 than in tests without added antifoam. (2) Analyses were completed to determine the composition of the two antifoam components and Antifoam 747. In addition, the decomposition products of Antifoam 747 were determined during CPC processing of sludge simulants. The main decomposition products were identified primarily as Long Chain Siloxanes, boiling point > 400 C. Total antifoam recovery was 33% by mass. In a subsequent study, various compounds potentially related to antifoam were found using semi-volatile organic analysis and volatile organic analysis on the hexane extractions and hexane rinses. These included siloxanes, trimethyl silanol, methoxy trimethyl silane, hexamethyl disiloxane, aliphatic hydrocarbons, dioctyl phthalate, and emulsifiers. Cumulatively, these species amounted to less than 3% of the antifoam mass. The majority of the antifoam was identified using carbon analysis of the SRAT product (40-80% by mass) and silicon analysis (23-83% by mass) of the condensate. Both studies recommended a better solvent for antifoam and more specific tests for antifoam degradation products than the Si and C analyses used. (3) The DWPF Antifoam 747 Purchase Specification was revised in Month, 2011 with a goal of increasing the quality of Antifoam 747. The purchase specification was changed to specify the manufacturer and product for both components that are blended by Siovation to produce Antifoam 747 for DWPF. Testing of Antifoam produced using both the old and new antifoam specifications perform very similarly in testing. Since the change in purchase specification has not improved antifoam performance, an improved antifoam agent is required.

36 MATERIALS SCIENCE↗

Glycolic-Nitric Acid Flowsheet Demonstration of the DWPF Chemical Processing Cell with Matrix Simulants and Supernate

Savannah River Remediation (SRR) is evaluating changes to its current DWPF flowsheet to improve processing cycle times. This will enable the facility to support higher canister production while maximizing waste loading. Higher throughput is needed in the CPC since the installation of the bubblers into the melter has increased melt rate. Due to the significant maintenance required for the DWPF gas chromatographs (GC) and the potential for production of flammable quantities of hydrogen, reducing or eliminating the amount of formic acid used in the CPC is being developed. Earlier work at Savannah River National Laboratory has shown that replacing formic acid with an 80:20 molar blend of glycolic and formic acids has the potential to remove mercury in the SRAT without any significant catalytic hydrogen generation. This report summarizes the research completed to determine the feasibility of processing without formic acid. In earlier development of the glycolic-formic acid flowsheet, one run (GF8) was completed without formic acid. It is of particular interest that mercury was successfully removed in GF8, no formic acid at 125% stoichiometry. Glycolic acid did not show the ability to reduce mercury to elemental mercury in initial screening studies, which is why previous testing focused on using the formic/glycolic blend. The objective of the testing detailed in this document is to determine the viability of the nitric-glycolic acid flowsheet in processing sludge over a wide compositional range as requested by DWPF. This work was performed under the guidance of Task Technical and Quality Assurance Plan (TT and QAP). The details regarding the simulant preparation and analysis have been documented previously.

08 HYDROGEN↗

Glycolic-Nitric Acid Flowsheet Demonstration of the DWPF Chemical Process Cell with Sludge and Supernate Simulants

Savannah River Remediation (SRR) is evaluating changes to its current Defense Waste Processing Facility (DWPF) flowsheet to improve processing cycle times. This will enable the facility to support higher canister production while maximizing waste loading. Higher throughput is needed in the Chemical Process Cell (CPC) since the installation of the bubblers into the melter has increased melt rate. Due to the significant maintenance required for the DWPF gas chromatographs (GC) and the potential for production of flammable quantities of hydrogen, reducing or eliminating the amount of formic acid used in the CPC is being developed. Earlier work at Savannah River National Laboratory has shown that replacing formic acid with an 80:20 molar blend of glycolic and formic acids has the potential to remove mercury in the SRAT without any significant catalytic hydrogen generation. This report summarizes the research completed to determine the feasibility of processing without formic acid. In earlier development of the glycolic-formic acid flowsheet, one run (GF8) was completed without formic acid. It is of particular interest that mercury was successfully removed in GF8, no formic acid at 125% stoichiometry. Glycolic acid did not show the ability to reduce mercury to elemental mercury in initial screening studies, which is why previous testing focused on using the formic/glycolic blend. The objective of the testing detailed in this document is to determine the viability of the nitric-glycolic acid flowsheet in processing sludge over a wide compositional range as requested by DWPF. This work was performed under the guidance of Task Technical and Quality Assurance Plan (TT&QAP). The details regarding the simulant preparation and analysis have been documented previously.

08 HYDROGEN↗

FY13 Glycolic-Nitric Acid Flowsheet Demonstrations of the DWPF Chemical Process Cell with Simulants

Savannah River Remediation is evaluating changes to its current Defense Waste Processing Facility flowsheet to replace formic acid with glycolic acid in order to improve processing cycle times and decrease by approximately 100x the production of hydrogen, a potentially flammable gas. Higher throughput is needed in the Chemical Processing Cell since the installation of the bubblers into the melter has increased melt rate. Due to the significant maintenance required for the safety significant gas chromatographs and the potential for production of flammable quantities of hydrogen, eliminating the use of formic acid is highly desirable. Previous testing at the Savannah River National Laboratory has shown that replacing formic acid with glycolic acid allows the reduction and removal of mercury without significant catalytic hydrogen generation. Five back-to-back Sludge Receipt and Adjustment Tank (SRAT) cycles and four back-to-back Slurry Mix Evaporator (SME) cycles were successful in demonstrating the viability of the nitric/glycolic acid flowsheet. The testing was completed in FY13 to determine the impact of process heels (approximately 25% of the material is left behind after transfers). In addition, back-to-back experiments might identify longer-term processing problems. The testing was designed to be prototypic by including sludge simulant, Actinide Removal Product simulant, nitric acid, glycolic acid, and Strip Effluent simulant containing Next Generation Solvent in the SRAT processing and SRAT product simulant, decontamination frit slurry, and process frit slurry in the SME processing. A heel was produced in the first cycle and each subsequent cycle utilized the remaining heel from the previous cycle. Lower SRAT purges were utilized due to the low hydrogen generation. Design basis addition rates and boilup rates were used so the processing time was shorter than current processing rates.