Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MANAGEMENT PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Underground Test Area Activity Waste Management Plan; and Attachment 1 Fluid Management Plan for the Underground Test Area Activity

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office initiated the Underground Test Area Activity to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the Nevada National Security Site. The UGTA Activity is now administered by the DOE Environmental Management Nevada Program. This document is a revision to NNSA/NSO (2009). The new document and revision number reflect EM Nevada Program as the current UGTA Activity administrator.

54 ENVIRONMENTAL SCIENCES↗

Space station human productivity study. Volume 5: Management plans

The 67 Management Plans represent recommended study approaches for resolving 108 of the 305 Issues which were identified. Each study Management Plan is prepared in three formats: Management Plan Overview (lists the subsumed Issues, study background, and related overview information); Study Plan (details the study approach by tasks, lists special needs, and describes expected study products); Schedule-Task Flow (provides a time-lined schedule for the study tasks and resource requirements). The Management Relationships Matrix, included in this volume, shows the data input-output relationships among all recommended studies. A listing is also included which cross-references the unresolved requirements to Issues to management plans. A glossary of all abbreviations utilized is provided.

Source record↗

Space Transportation System Cargo projects: inertial stage/spacecraft integration plan. Volume 1: Management plan

The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.

Source record↗

Tank Farm Safety Programmable System Software Management Plan

This Software Management Plan (SMP) applies to the configurable programmable logic controller (PLC) software configured as the Tank Farms Safety Programmable System (TFSPS). The TFSPS is identified as a safety-significant (SS) system to prevent loss of the safety function of SS structures, systems, and components (SSC). The TFSPS software is classified as grade level A configurable safety software. The TFSPS consists of safety instrumented systems (SIS) and safety instrumented alarm (SIA) systems.The purpose of this management plan is to describe how Washington River Protection Solutions (WRPS) will configure and manage the TFSPS software and the associated software life cycle (SLC). TFSPS software shall be configured by Process and Control Systems Engineering (P&CSE) as grade level A safety software for use by Production Operations as the primary stakeholders.

97 MATHEMATICS AND COMPUTING↗

Space shuttle program: Shuttle Avionics Integration Laboratory. Volume 7: Logistics management plan

The logistics management plan for the shuttle avionics integration laboratory defines the organization, disciplines, and methodology for managing and controlling logistics support. Those elements requiring management include maintainability and reliability, maintenance planning, support and test equipment, supply support, transportation and handling, technical data, facilities, personnel and training, funding, and management data.

Source record↗

Y-12 Groundwater Protection Program Data Management Plan

This Data Management Plan (DMP) describes the processes in place to ensure the integrity of groundwater monitoring information collected by the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), Y-12 National Security Complex (Y-12), Groundwater Protection Program (GWPP). This information includes program plans, reports, and computer systems used to capture monitoring station information and analytical data. The primary computer system used by the GWPP is the Groundwater Information Management System (GIMS). Procedures used to ensure the integrity of the data are included in this document by reference.

54 ENVIRONMENTAL SCIENCES↗

EMP, Attachment 2: Data Management Plan

This Data Management Plan (DMP) is an attachment to the Pacific Northwest National Laboratory Environmental Radiological Air Monitoring Plan (EMP). PNNL is a U.S. Department of Energy Office of Science national laboratory. Radioactive effluent monitoring and environmental surveillance for PNNL operations in Washington State are the responsibility of the PNNL Environmental Protection and Regulatory Programs division and are conducted by the Environmental Radiation Task staff. This DMP describes the data management processes for PNNL radioactive air emissions (stack) monitoring and environmental radiological ambient air surveillance activities.

40 CFR 61 Subpart H↗

Natural Resource Management Plan

This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

54 ENVIRONMENTAL SCIENCES↗

Federal Facility Agreement and Consent Order Nevada National Security Site Use Restriction Management Plan

This Use Restriction Management Plan (URMP) provides the information needed to create, modify, and manage use restrictions (URs) for sites on the Nevada National Security Site (NNSS), and sites accessed through the NNSS main gate, that were closed using the corrective action alternative (CAA) of closure in place under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended).

54 ENVIRONMENTAL SCIENCES↗

Low-Level Waste Minimization and Management Planning at the Western Waste Management Facility, Ontario Power Generation - 19235

The purpose of this study was to examine the strategies intended to mitigate the temporary storage restrictions for Low-Level radioactive waste at the Western Waste Management Facility to enable continued accommodation of waste generation rates, and to recover storage capacity from 2018-2023 to optimize long-term sustainability for radioactive waste management. The management options considered were based on existing waste processing technologies and programs available at the Western Waste Management Facility, in combination with third party volume-reduction services. Completed analysis measured the consumption of Low-Level Waste storage space as influenced by the projected volumes from nuclear generating stations, and the various processing scenarios developed; such as reducing the volume of surplus processable waste on-site, and the reduction of specific waste streams previously considered to be non-processable. Results from the quantitative analysis indicated which strategies will be most effective for minimizing waste volumes for long-term storage and for recovering low-level storage space at the Western Waste Management Facility. The strategic path forward is presented in short- to long-term management objectives. Results from this study will contribute to the waste stream planning and management of major reactor refurbishment projects and to the technological advancements and innovation of radioactive waste processing and minimization. With further understanding of the refurbishment-specific waste types and volumes, it is expected that Nuclear Waste Management and the nuclear generating stations will achieve increasingly improved minimization results with the progression of each refurbished reactor. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wildland Fire Management Plan

The Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) is written to comply with Department of Energy (DOE) Integrated Safety Management Policy; Federal Wildland Fire Management Policy and Program Review; and Wildland and Prescribed Fire Management Policy and Implementation Procedures Reference Guide. This current plan incorporates changes resulting from new policies on the national level as well as significant changes to available resources and other emerging issues, and replaces BNL's Wildland FMP dated 2014.

54 ENVIRONMENTAL SCIENCES↗

Sewer System Management Plan.

A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HRP Data Management Plan

The purpose of Human Research Program Data Management Plan (DMP) is to define the processes and activities required for the overall management of the research data collected and managed by HRP throughout their life cycle. New updates to the Data Management Plan in 2023 include 1. CAPABILITIES AND SERVICES Data Repositories. Principal Investigators (PIs) funded by HRP may be asked to submit data to one of several NASA data repositories. HRP archives data in the NASA Life Sciences Portal (NLSP) that it considers to be unique and high value. This includes data from human subjects in space flight (ISS and commercial flights) and ground analogs to spaceflight; spaceflight tech demos involving humans; human omics data including the microbiome; parabolic flight studies; and the NASA Space Radiation Laboratory (NSRL). The Open Science Data Repository (OSDR) includes The Ames Life Sciences Data Archive (ALSDA), used to archive non-human biological data (e.g., animal) generated by the Human Research program, and GeneLab, available to HRP PIs to archive non-human omics data. Catalog for search and retrieval. A catalog of non-human HRP life science experiments, with all associated descriptions (mission, payload, hardware, and personnel related information), and biospecimens is provided on the NLSP public web site for search and retrieval. 2. IRB ROLE IN RETURN OF INDIVIDUAL RESEARCH RESULTS The NASA IRB manages the process for incidental findings and for returning results to subjects for studies for which NASA IRB is the IRB of record. Omics data, especially genomics data, may generate information significant to the health of or risk to a research subject. These data potentially hold the keys to understand lifetime risks of chronic diseases, such as cancer, as well as risks associated with exposures common in space flight. 3. UPDATE OF TERMS – IDENTIFIABLE AND ATTRIBUTABLE DATA HRP now follows Federal and NASA policy by using “identifiable” instead of “attributable” for Personally Identifiable Information (PII). 4. POLICY ABOUT INTERNAL NON-RESEARCH USE OF DATA The HRP Chief Scientist grants access to data from HRP-funded research for non-research internal use that includes program management, customer facilitation, strategic planning, and risk research planning. Typical HRP personnel granted access to HRP research data for internal use include the Element Scientist, Subject Matter Experts (SME), and Data/bioinformatics Scientists. If data accessed for Internal Use is provided to an intramural or extramural scientist for hypothesis driven research, all Federal and NASA regulations (e.g., IRB review) regarding human subject research apply.

Data Management Plan↗

Incorporating adaptation and resilience into an integrated watershed and coral reef management plan

Changing environmental conditions are forcing natural resource managers and communities to adapt their strategies to account for global shifts in precipitation, temperature, sea level and more, all of which are occurring in addition to local human impacts. Adapting to threats from climate change requires a fundamental shift in the practice of natural resource management through the development of forward-looking “climate-smart” goals and strategies. Here we present a proof-of-concept application of a decision-support tool to help design climate-smart management actions for the watershed and coral reef management plan for Guánica Bay watershed in southwest Puerto Rico. We also explore the connection between adaptation planning and coral reef resilience, using a recently developed Puerto Rico-wide reef resilience assessment. In the first phase of the study, we used the publicly available Adaptation Design Tool to draft initial climate-smart versions of twelve proposed management actions. In the second phase, two actions (dirt road management on steep slopes, and coral reef restoration) were further refined through consultations with local experts to make more detailed design adjustments; this included the option to use information from the coral reef resilience assessment to inform design improvements. The first phase resulted in moderately detailed assessments that broadly accounted for anticipated direct and indirect effects of climate change on the planned management actions. The second phase resulted in more site-specific technical assessments and additional important design details. The expert panel charged with discussing climate-smart reef restoration around Guánica used the reef resilience assessment to guide discussion of reef restoration, highlighting the importance of having such information available for adaptation planning. This study demonstrates how climate change impacts can be effectively incorporated into a management plan at the most granular level of planning and how a structured, formalized process can be as valuable as the resulting adaptation information.

Gibbs, David A. (ORCID:0000000173898569)↗

Cultural Resource Management Plan for Brookhaven National Laboratory

The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references the facets and interrelationships of cultural resources at BNL. Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a “living document.” Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation. The current (2023) update incorporates new findings and/or updated text based on completed or ongoing projects related to cultural resources at BNL since inception of the last updated CRMP in 2013. Historically, Brookhaven National Laboratory had little need for cultural resource management because many of its buildings were less than 50 years old. Most of the features that are potentially eligible for inclusion in the National Register of Historic Places were protected simply by avoiding the features. Compliance with cultural resource laws and regulations has included archeological surveys, such as those associated with the 1977 Final Environmental Impact Statement for Brookhaven National Laboratory and the 1978 Final Environmental Impact Statement for the Proton-Proton Storage Accelerator Facility (ISABELLE). In 1979, World War I trenches associated with the former Camp Upton and located near ISABELLE were determined to be eligible for inclusion in the National Register of Historic Places; however, many of these trenches had been destroyed by construction work. In 1991, the NYSHPO provided BNL with a letter indicating that only three structures and features were likely to be eligible for inclusion in the National Register of Historic Places. Between 1991 and 1999, little work associated with cultural resource management was accomplished. Beginning in 1999, awareness for the need of a program to manage cultural resources grew out of the realization that over half of the buildings at BNL were either 50 years old or were reaching that age and were, therefore, subject to the requirements in Section 106 of the National Historic Preservation Act. This fact, concomitant with the decontamination and decommissioning of the Brookhaven Graphite Research Reactor (BGRR) and the subsequent determination of BGRR’s eligibility for listing as an historical site, fueled the need for developing and implementing a more structured program for managing cultural resources at BNL.

54 ENVIRONMENTAL SCIENCES↗

Earth Observing System (EOS)/Advanced Microwave Sounding Unit-A (AMSU-A): Calibration management plan

This is the Calibration Management Plan for the Earth Observing System/Advanced Microwave Sounding Unit-A (AMSU-A). The plan defines calibration requirements, calibration equipment, and calibration methods for the AMSU-A, a 15 channel passive microwave radiometer that will be used for measuring global atmospheric temperature profiles from the EOS polar orbiting observatory. The AMSU-A system will also provide data to verify and augment that of the Atmospheric Infrared Sounder.

Source record↗