Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LuTe”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

LUTE primary mirror materials and design study report

The major objective of the Lunar Ultraviolet Telescope Experiment (LUTE) Primary Mirror Materials and Design Study is to investigate the feasibility of the LUTE telescope primary mirror. A systematic approach to accomplish this key goal was taken by first understanding the optical, thermal, and structural requirements and then deriving the critical primary mirror-level requirements for ground testing, launch, and lunar operations. After summarizing the results in those requirements which drove the selection of material and the design for the primary mirror are discussed. Most important of these are the optical design which was assumed to be the MSFC baseline (i.e. 3 mirror optical system), telescope wavefront error (WFE) allocations, the telescope weight budget, and the LUTE operational temperature ranges. Mechanical load levels, reflectance and microroughness issues, and options for the LUTE metering structure were discussed and an outline for the LUTE telescope sub-system design specification was initiated. The primary mirror analysis and results are presented. The six material substrate candidates are discussed and four distinct mirror geometries which are considered are shown. With these materials and configurations together with varying the location of the mirror support points, a total of 42 possible primary mirror designs resulted. The polishability of each substrate candidate was investigated and a usage history of 0.5 meter and larger precision cryogenic mirrors (the operational low end LUTE temperature of 60 K is the reason we feel a survey of cryogenic mirrors is appropriate) that were flown or tested are presented.

Ruthven, Greg↗

LUTE telescope structural design

The major objective of the Lunar Ultraviolet Transit Experiment (LUTE) Telescope Structural Design Study was to investigate the feasibility of designing an ultralightweight 1-m aperture system within optical performance requirements and mass budget constraints. This study uses the results from our previous studies on LUTE as a basis for further developing the LUTE structural architecture. After summarizing our results in Section 2, Section 3 begins with the overall logic we used to determine which telescope 'structural form' should be adopted for further analysis and weight estimates. Specific telescope component analysis showing calculated fundamental frequencies and how they compare with our derived requirements are included. 'First-order' component stress analyses to ensure telescope optical and structural component (i.e. mirrors & main bulkhead) weights are realistic are presented. Layouts of both the primary and tertiary mirrors showing dimensions that are consistent with both our weight and frequency calculations also form part of Section 3. Section 4 presents our calculated values for the predicted thermally induced primary-to-secondary mirror despace motion due to the large temperature range over which LUTE must operate. Two different telescope design approaches (one which utilizes fused quartz metering rods and one which assumes the entire telescope is fabricated from beryllium) are considered in this analysis. We bound the secondary mirror focus mechanism range (in despace) based on these two telescope configurations. In Section 5 we show our overall design of the UVTA (Ultraviolet Telescope Assembly) via an 'exploded view' of the sub-system. The 'exploded view' is annotated to help aid in the understanding of each sub-assembly. We also include a two view layout of the UVTA from which telescope and telescope component dimensions can be measured. We conclude our study with a set of recommendations not only with respect to the LUTE structural architecture but also on other topics related to the overall feasibility of the LUTE telescope sub-system.

Ruthven, Gregory↗

Lunar Ultraviolet Telescope Experiment (LUTE), phase A

The Lunar Ultraviolet Telescope Experiment (LUTE) is a 1-meter telescope for imaging from the lunar surface the ultraviolet spectrum between 1,000 and 3,500 angstroms. There have been several endorsements of the scientific value of a LUTE. In addition to the scientific value of LUTE, its educational value and the information it can provide on the design of operating hardware for long-term exposure in the lunar environment are important considerations. This report provides the results of the LUTE phase A activity begun at the George C. Marshall Space Flight Center in early 1992. It describes the objective of LUTE (science, engineering, and education), a feasible reference design concept that has evolved, and the subsystem trades that were accomplished during the phase A.

Mcbrayer, Robert O.↗

The Lunar Ultraviolet Telescope Experiment (LUTE): Enabling technology for an early lunar surface payload

The Lunar Ultraviolet Telescope Experiment (LUTE) is a 1-m aperture, fixed declination, optical telescope to be operated on the surface of the Moon. This autonomous science payload will provide an unprecedented ultraviolet stellar survey even before manned lunar missions are resumed. This paper very briefly summarizes the LUTE concept analyzed by the LUTE Task Team of NASA's Marshall Space Flight Center (MSFC). Scientific capabilities and the Reference Design Concept are identified, and the expected system characteristics are summarized. Technologies which will be required to enable the early development, deployment, and operation of the LUTE are identified, and the principle goals and approaches for their advancement are described.

Nein, M. E.↗

Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan

A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.

Smith, Janice F.↗

Materials Data on LuTe by Materials Project

LuTe is Halite, Rock Salt structured and crystallizes in the cubic Fm-3m space group. The structure is three-dimensional. Lu is bonded to six equivalent Te atoms to form a mixture of edge and corner-sharing LuTe6 octahedra. The corner-sharing octahedral tilt angles are 0°. All Lu–Te bond lengths are 3.02 Å. Te is bonded to six equivalent Lu atoms to form a mixture of edge and corner-sharing TeLu6 octahedra. The corner-sharing octahedral tilt angles are 0°.

36 MATERIALS SCIENCE↗

A study of the Lute Metering Structure

Two Metering Structure configurations were investigated. The first case was the traditional style metering structure which is larger than the outside diameter of the primary mirror. The second case investigated was the center support concept in which the outside diameter of the structure is less than the inside diameter of the primary mirror. Beryllium was used as the baseline material for this study. Four other materials were considered as candidates for the metering structure. These materials are: Graphite Epoxy, Aluminum, Titanium, and Invar. The loading conditions used for this study were estimated to be: Quasi Static: 6.0 G (all three directions); and Random Vibration: 30.0 G (applied 1 axis at a time). Taking advantage of symmetry, it was necessary to apply the lateral loading to only one axis. These loads were applied to both concepts and to all material configurations. The loadings as described above were based on the best available information and is felt to be adequate for this study since it was consistently used for all configurations. A load factor 2.00 was applied to both quasi static and random vibration loads. The allowable stresses are conservatively based yield strength of the material, except for the struts which are controlled by elastic stability. The stresses determined from each individual loading direction were conservatively combined by the absolute sum method.

Foreman, James W.↗

Lunar-based optical telescopes: Planning astronomical tools of the twenty-first century

A succession of optical telescopes, ranging in aperture from 1 to 16 m or more, can be deployed and operated on the lunar surface over the next half-century. These candidates to succeed NASA's Great Observatories would capitalize on the unique observational advantages offered by the Moon. The Lunar Telescope Working Group and the LUTE Task Team of the George C. Marshall Space Flight Center (MSFC) have assessed the feasibility of developing and deploying these facilities. Studies include the 16-m Large Lunar Telescope (LLT); the Lunar Cluster Telescope Experiment (LCTE), a 4-m precursor to the LLT; the 2-m Lunar Transit Telescope (LTT); and its precursor, the 1-m Lunar Ultraviolet Telescope Experiment (LUTE). The feasibility of developing and deploying each telescope was assessed and system requirements and options for supporting technologies, subsystems, transportation, and operations were detailed. Influences of lunar environment factors and site selection on telescope design and operation were evaluated, and design approaches and key tradeoffs were established. This paper provides an overview of the study results. Design concepts and brief system descriptions are provided, including subsystem and mission options selected for the concepts.

Hilchey, J. D.↗

Industry survey of space system cost benefits from New Ways Of Doing Business

The cost of designing, building and operating space system hardware has always been expensive. Small quantities of specialty parts escalate engineering design, production and operations cost. Funding cutbacks and shrinking revenues dictate aggressive cost saving programs. NASA's highest priority is providing economical transportation to and from space. Over the past three decades NASA has seen technological advances that provide grater efficiencies in designing, building, and operating of space system hardware. As future programs such as NLS, LUTE and SEI begin, these greater efficiencies and cost savings should be reflected in the cost models. There are several New Ways Of Doing Business (NWODB) which, when fully implemented will reduce space system costs. These philosophies and/or culture changes are integrated in five areas: (1) More Extensive Pre-Phase C/D & E, (2) Multi Year Funding Stability, (3) Improved Quality, Management and Procurement Processes, (4) Advanced Design Methods, and (5) Advanced Production Methods. Following is an overview of NWODB and the Cost Quantification Analysis results using an industry survey, one of the four quantification techniques used in the study. The NWODB Cost Quantification Analysis is a study performed at Marshall Space Flight Center by the Engineering Cost Group, Applied Research Incorporated and Pittsburg State University. This study took place over a period of four months in mid 1992. The purpose of the study was to identify potential NWODB which could lead to improved cost effectiveness within NASA and to quantify potential cost benefits that might accrue if these NWODB were implemented.

Rosmait, Russell L.↗

MSFC orbital spacecraft development emphases for this decade

Historically, the Marshall Space Flight Center (MSFC) has been responsible for significant accomplishments in the area of developing both manned and unmanned spacecraft. MSFC is presently involved in many of NASA's largest and most prominent programs, with some operational, others being readied for flight, and still others in various stages of design and development. Examples of MSFC programs being designed or developed are Space Station Freedom (S.S. Freedom), the Advanced X-Ray Astrophysics Facility (AXAF) which includes imaging and spectroscopy facilities, the Laser Atmospheric Wind Sounder (LAWS), and the Lunar Ultraviolet Telescope Experiment (LUTE), with Spacelab and Tethered Satellite System (TSS) as examples of current operational MSFC spacecraft. The information obtained from the Long Duration Exposure Facility (LDEF) will aid the design process and life predictions for these and all future spacecraft. A second LDEF is presently being considered. All of these projects will be briefly described in this paper.

Schwinghamer, Robert J.↗

SSC Geopositional Assessment of the Advanced Wide Field Sensor

The objective is to provide independent verification of IRS geopositional accuracy claims and of the internal geopositional characterization provided by Lutes (2005). Six sub-scenes (quads) were assessed; Three from each AWiFS camera. Check points were manually matched to digital orthophoto quarter quadrangle (DOQQ) reference (assumed accuracy approx. 5 m, RMSE) Check points were selected to meet or exceed Federal Geographic Data Committee's guidelines. Used ESRI ArcGIS for data collection and SSC-written MATLAB scripts for data analysis.

Ross, Kenton↗

Prevalence of typical operational problems and energy savings opportunities in U.S. commercial buildings

In the United States, as much as 30% of the 19 EJ that commercial buildings consume is considered excess. Much of the excess energy is due to the inability to manage building operations efficiently. Because almost 20% of the total primary energy consumption is associated with commercial buildings, significant energy reductions in this sector are needed to mitigate climate change. Therefore, many cities and states are mandating periodic “tune-ups” of these buildings to eliminate excess energy consumption. Although the benefits of tune-ups and retro-commissioning are clear, focusing these mandates to look for specific opportunities has been a challenge because of the lack of studies that document the prevalence of opportunities. Therefore, we analyzed building automation system data from 151 buildings across the United States to document common operational problems and opportunities to improve building operations. This analysis showed that opportunities to improve building operations exist in almost every building. These opportunities were not strongly correlated with building vintage or size, but were reflective of how the buildings are operated. The prevalence of the top 20 opportunities ranged between 74% and 23%, with 40% of these associated with air-handling units. The rest of the opportunities are associated with schedules, chilled and hot-water distribution, and zone controls. Of the 151 buildings, 69 of them implemented corrective actions of some or all opportunities that were identified. Implementation varied across the Re-tuning categories, with 60% for schedule opportunities, 50% for zone opportunities, over 40% for the air-handling unit and hot-water opportunities, and 35% of the chilled-water opportunities. There was wide variation in whole building energy savings, ranging from 0 to 50% and 0 to 18 $/m2 with median percent annual whole building savings of 12% and median normalized annual cost savings of $1.75/m2. In addition to documenting these key findings, the paper provides a list of opportunities that can be automatically and continuously identified and corrected and offers a list of those opportunities that should be the focus of the mandates.

Katipamula, Srinivas↗

A Novel Photonic Clock and Carrier Recovery Device

As data communication rates climb toward ten Gb/s, clock recovery and synchronization become more difficult, if not impossible, using conventional electronic circuits. We present in this article experimental results of a high speed clock and carrier recovery using a novel device called a photonic oscillator that we recently developed in our laboratory. This device is capable of recovering clock signals up to 70 GHz. To recover the clock, the incoming data is injected into the photonic oscillator either through the optical injection port or the electrical injection port. The free running photonic oscillator is tuned to oscillate at a nominal frequency equal to the clock frequency of the incoming data. With the injection of the data, the photonic oscillator will be quickly locked to clock frequency of the data stream while rejecting other frequency components associated with the data. Consequently, the output of the locked photonic oscillator is a continuous periodical wave synchronized with the incoming data or simply the recovered clock. We have demonstrated a clock to spur ratio of more than 60 dB of the recovered clock using this technique. Similar to the clock recovery, the photonic oscillator can be used to recover a high frequency carrier degraded by noise and an improvement of about 50 dB in signal-to-noise ratio was demonstrated. The photonic oscillator has both electrical and optical inputs and outputs and can be directly interfaced with a photonic system without signal conversion. In addition to clock and carrier recovery, the photonic oscillator can also be used for (1) stable high frequency clock signal generation, (2) frequency multiplication, (3) square wave and comb frequency generation, and (4) photonic phase locked loop.

Yao, X. Steve↗

Stochastic scheduling for commercial building cooling systems: considering uncertainty in zone temperature prediction

Here, this paper presents the first attempt to address the uncertainty in zone temperature prediction with stochastic optimization. The uncertain zone temperature is a process uncertainty and has not been considered in the existing stochastic optimization for building control. To fill this gap, we proposed a novel formulation of stochastic optimization to handle process uncertainty in building control. Specifically, we first examined the accuracy of a typical linear model for predicting zone temperature. We then formulated the scheduling of the building cooling system as a stochastic optimization problem over a 24-hour look-ahead period to minimize the electricity cost of the studied building cooling system. After that, we applied the proposed stochastic load scheduling (SLS) to a direct expansion (DX) cooling system that serves a medium office building. Through simulation with a detailed building energy simulation software, EnergyPlus, we evaluated the operational cost and the thermal comfort compared with a deterministic load scheduling. The operation cost of scheduling was found to vary with the level of zone temperature prediction uncertainty. The proposed SLS can mitigate the impacts of uncertain zone temperature predictions on both operational cost and thermal comfort. The evaluation results indicate that the proposed SLS works better when the uncertainty level is more significant.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Implementation and validation of optimal start control strategy for air conditioners and heat pumps

Commercial buildings are responsible for approximately 20 % of the total energy consumption and greenhouse gas emissions in the United States. Over 85 % of these buildings lack building automation systems, and many are small (<50,000 square feet), underserved, and use rooftop units (RTUs) for heating, ventilation, and air-conditioning needs. Because these buildings lack proper energy management systems, several operational deficiencies lead to excess energy consumption. Studies have shown that managing the RTUs’ heating and cooling set points, schedules, setbacks, and optimal start can result in a 20 % to 25 % reduction in electricity consumption in small commercial buildings. These buildings typically use fixed schedules to start the RTUs 60 to 120 min before occupancy begins, which results in excess energy consumption. This paper presents research that demonstrates and evaluates the performance of four optimal start methods, which utilize data-based modeling as a key element in facilitating adaptive control in response to time-varying inputs while requiring minimal sensor inputs. The evaluation found energy savings in two commercial buildings equipped with RTUs by periodically alternating four different optimal start models during the cooling and heating season. The resulting energy savings are positive for all models and range from 2 to 5 kWh/day/unit. The units on the east side of the building showed higher savings, while interior units showed greater variability in savings due to the differences in capacities and room sizes. Savings were considerably greater during the heating season compared to the cooling season. The performance of all four models on Mondays was poor; models suggested a shorter optimal start time, which resulted in relatively larger errors. Finally, the future work will look at using a different model for the days after weekends and holidays.

42 ENGINEERING↗

Simulation-based assessment of ASHRAE Guideline 36, considering energy performance, indoor air quality, and control stability

This study assesses American Society of Heating, Refrigerating and Air-Conditioning Engineers Guideline 36 (G36) with a typical medium office building. Specifically, this study employed a Modelica model of a variable air volume (VAV) system that serves this building, which includes components for representing indoor virus transmission and filtration. It then implemented the G36 control sequences for both water-side and air-side equipment in Python. After that, this study conducted the assessment by co-simulating G36 and the Modelica model using the Building Operations Testing Framework. Unlike existing works, this work has three unique features: (1) It considers the interactions between control sequences for water-side and air-side equipment of the studied VAV system. (2) It assesses the performance of G36 from the perspective of IAQ. (3) It examines the short-term behaviors of the studied building under G36 to understand the control stability. This assessment confirms significant energy savings from G36, largely because of the interaction between supply air temperature and hot water controls. It also reveals a trade-off between the ability to slow the spread of virus and the energy performance via demand controlled ventilation. Lastly, it emphasizes the necessity of tuning local feedback control when implementing G36.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Experimental investigation on thermal inertia characterization of commercial buildings for demand response

Characterizing the thermal inertia of commercial buildings is of great importance in quantifying demand flexibility. Experimental tests can be used to investigate the thermal inertia of commercial buildings. However, existing studies tend to be qualitative and have limited scope. In this study, a comprehensive field test has been performed to assess the thermal inertia of commercial buildings. In this field test, six buildings are selected with different sizes, vintages, and types of heating, ventilation, and air conditioning (HVAC) systems to represent the majority of the U.S. commercial building stock. We quantify the thermal inertia with building operation data collected under various thermostat excitation signals. We then studied the relationship between thermal inertia and intrinsic properties, such as floor area, HVAC system, etc., as well as the operation condition indicators such as outdoor air temperature, zone temperature, and occupancy. The testing results indicate that the median values of the normalized charge response time and the normalized discharge response time of the five buildings are 1~5 hr/ °C and -5~-1 hr/ °C, respectively. The results also show that the thermal inertia of commercial buildings may be sensitive to the HVAC system type but not the floor area or location of zones, i.e., core vs. perimeter. Finally, our results suggest that the relationships between the charging/discharging normalized response time and the zone/outdoor temperature may vary among zones and be highly nonlinear.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗