Operational Modal Analysis of the Space Launch System Mobile Launcher on the Crawler Transporter ISVV-010 Rollout

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation between the Vehicle Assembly Building and launch pad 39B by the Crawler Transporter, and provides the launch platform at the launch pad. As part of the Verification and Validation of the Mobile Launcher and Crawler Transporter, two rollouts of the Mobile Launcher transported by the Crawler Transporter, Integrated System Verification and Validation (ISVV) 005 and 010, have been performed to demonstrate the Crawler Transporter’s ability to transport the Mobile Launcher. ISVV-005 occurred in September 2018 and ISVV-010 occurred in late June 2019. ISVV-005 and ISVV-010 also provided the opportunity to gather data that can be used identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics and refine the estimates of the Artemis I integrated launch vehicle rollout forcing functions. While the rollout environment has historically produced relatively small launch vehicle structural loads for the Saturn/Apollo and Space Shuttle programs in comparison to launch and ascent loads, these relatively small structural loads are inputs to structural fatigue analyses. The same holds true for the Space Launch System. Because the rollout forces acting on the Mobile Launcher and the Crawler Transporter are not directly measurable, Operational Modal Analysis techniques, instead of traditional Experimental Modal Analysis techniques, provide an empirical means to identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics. The ISVV-010 rollout modal characteristics provide important supplemental modal information, which along with the Mobile Launcher modal test that was performed in June 2019 immediately prior to ISVV-010 rollout, combine to reduce uncertainty in the test correlated Mobile Launcher on the Crawler Transporter finite element model. A well test correlated finite element model will play a key role in the Building Block approach the Space Launch System program has implemented as part of its certification process for the Artemis I flight and in refining the Artemis I rollout forcing functions. At the time of the ISVV-005 rollout in September 2018, the Mobile Launcher was still undergoing construction, and therefore its modal characteristics are not directly comparable to those of the Mobile Launcher during the June 2019 Mobile Launcher modal test and subsequent ISVV-010 rollout. Hence the ISVV-005 rollout modal characteristics will not be looked at in this paper. This paper will briefly describe the Mobile Launcher and Crawler Transporter physical characteristics, ISVV-010 rollout data collection, the challenges in implementing Operational Modal Analysis techniques due in part to the Crawler Transporter harmonics, and how these challenges were overcome to obtain the ISVV-010 Mobile Launcher on the Crawler Transporter rollout modal characteristics.

Apollo

Operational Modal Analysis of the Space Launch System Mobile Launcher on the Crawler Transporter ISVV-010 Rollout

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation between the Vehicle Assembly Building and launch pad 39B by the Crawler Transporter, and provides the launch platform at the launch pad. As part of the Verification and Validation of the Mobile Launcher and Crawler Transporter, two rollouts of the Mobile Launcher transported by the Crawler Transporter, Integrated System Verification and Validation (ISVV) 005 and 010, have been performed to demonstrate the Crawler Transporter’s ability to transport the Mobile Launcher. ISVV-005 occurred in September 2018 and ISVV-010 occurred in late June 2019. ISVV-005 and ISVV-010 also provided the opportunity to gather data that can be used identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics and refine the estimates of the Artemis I integrated launch vehicle rollout forcing functions. While the rollout environment has historically produced relatively small launch vehicle structural loads for the Saturn/Apollo and Space Shuttle programs in comparison to launch and ascent loads, these relatively small structural loads are inputs to structural fatigue analyses. The same holds true for the Space Launch System. Because the rollout forces acting on the Mobile Launcher and the Crawler Transporter are not directly measurable, Operational Modal Analysis techniques, instead of traditional Experimental Modal Analysis techniques, provide an empirical means to identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics. The ISVV-010 rollout modal characteristics provide important supplemental modal information, which along with the Mobile Launcher modal test that was performed in June 2019 immediately prior to ISVV-010 rollout, combine to reduce uncertainty in the test correlated Mobile Launcher on the Crawler Transporter finite element model. A well test correlated finite element model will play a key role in the Building Block approach the Space Launch System program has implemented as part of its certification process for the Artemis I flight and in refining the Artemis I rollout forcing functions. At the time of the ISVV-005 rollout in September 2018, the Mobile Launcher was still undergoing construction, and therefore its modal characteristics are not directly comparable to those of the Mobile Launcher during the June 2019 Mobile Launcher modal test and subsequent ISVV-010 rollout. Hence the ISVV-005 rollout modal characteristics will not be looked at in this paper. This paper will briefly describe the Mobile Launcher and Crawler Transporter physical characteristics, ISVV-010 rollout data collection, the challenges in implementing Operational Modal Analysis techniques due in part to the Crawler Transporter harmonics, and how these challenges were overcome to obtain the ISVV-010 Mobile Launcher on the Crawler Transporter rollout modal characteristics.

Apollo

Space Launch System Mobile Launcher Modal Pretest Analysis

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation from the Vehicle Assembly Building out to the launch pad, and provides the launch platform at the launch pad. The previous Saturn/Apollo and Space Shuttle programs had integrated vehicle ground vibration tests of their integrated launch vehicles performed with simulated free-free boundary conditions to experimentally anchor and validate structural and flight controls analysis models. For the Space Launch System program, the Mobile Launcher will be used as the modal test fixture for the ground vibration test of the first Space Launch System flight vehicle, Exploration Mission ? 1( now referred to as Artemis 1), programmatically referred to as the Integrated vehicle modal test. The Integrated vehicle modal test of the Exploration Mission - 1 integrated launch vehicle will have its core and second stages unfueled while mounted to the ML while inside the Vehicle Assembly Building, which is currently scheduled for the late spring or early summer of 2020. The Space Launch System program has implemented a building block approach for dynamic model validation. The modal test of the Mobile Launcher is an important part of this building block approach in supporting the integrated vehicle modal test since the Mobile Launcher will serve as a structurally dynamic test fixture whose modes will couple with the modes of the Exploration Mission ? 1 test vehicle. The Mobile Launcher modal test will further support understanding the structural dynamics of the Mobile Launcher and SLS during rollout to the launch pad, which will play a key role in better understanding and prediction of the rollout forces acting on the launch vehicle. The Mobile Launcher modal test is currently scheduled for the summer of 2019. Due to a very tight modal testing schedule, this Mobile Launcher modal pretest analysis has been performed to ensure there is a high likelihood of being able to successfully complete the modal test (i.e. identify the primary target modes) using the planned instrumentation, shakers, and excitation types. This paper will discuss this Mobile Launcher modal pretest analysis and the unique challenges faced due to the Mobile Launcher's size and weight, which are typically not faced when modal testing aerospace structures.

Akers, James C.

Space Launch System Mobile Launcher Modal Pretest Analysis

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation from the Vehicle Assembly Building out to the launch pad, and provides the launch platform at the launch pad. The previous Saturn/Apollo and Space Shuttle programs had integrated vehicle ground vibration tests of their integrated launch vehicles performed with simulated free-free boundary conditions to experimentally anchor and validate structural and flight controls analysis models. For the Space Launch System program, the Mobile Launcher will be used as the modal test fixture for the ground vibration test of the first Space Launch System flight vehicle, Artemis 1, programmatically referred to as the integrated vehicle modal test. The integrated vehicle modal test of the Artemis 1 integrated launch vehicle will have its core and second stages unfueled while mounted to the Mobile Launcher while inside the Vehicle Assembly Building, which is currently scheduled for the summer of 2020. The Space Launch System program has implemented a building block approach for dynamic model validation. The modal test of the Mobile Launcher is an important part of this building block approach in supporting the integrated vehicle modal test since the Mobile Launcher will serve as a structurally dynamic test fixture whose modes will couple with the modes of the Artemis 1 integrated vehicle. The Mobile Launcher modal test will further support understanding the structural dynamics of the Mobile Launcher and Space Launch System during rollout to the launch pad, which will play a key role in better understanding and prediction of the rollout forces acting on the launch vehicle. The Mobile Launcher modal test is currently scheduled for the summer of 2019. Due to a very tight modal testing schedule, this independent Mobile Launcher modal pretest analysis has been performed to ensure there is a high likelihood of successfully completing the modal test (i.e. identify the primary target modes) using the planned instrumentation, shakers, and excitation types. This paper will discuss this Mobile Launcher modal pretest analysis for its three test configurations and the unique challenges faced due to the Mobile Launcher’s size and weight, which are typically not faced when modal testing aerospace structures.

Akers, James C.

Historic and Current Launcher Success Rates

This presentation reviews historic and current space launcher success rates from all nations with a mature launcher industry. Data from the 1950's through present day is reviewed for possible trends such as when in the launch timeline a failure occurred, which stages had the highest failure rate, overall launcher reliability, a decade by decade look at launcher reliability, when in a launchers history did failures occur, and the reliability of United States human-rated launchers. This information is useful in determining where launcher reliability can be improved and where additional measures for crew survival (i.e., Crew Escape systems) will have the greatest emphasis

Rust, Randy

The DSI small satellite launcher

A new launcher has been developed by DSI, that is compatible with the GAS canisters. It has the proven capability to deploy a satellite from an orbiting Shuttle that is 18 inches in diameter, 31 inches long, and weighing 190 pounds. These DSI Launchers were used aboard the Discovery (STS-39) in May 1991 as part of the Infrared Background Signature Survey (IBSS) to deploy three small satellites known as Chemical Release Observation (CRO) satellites A, B, and C. Because the satellites contained hazardous liquids (MMH, UDMH, and MON-10) and were launched from GAS Cylinders without motorized doors, the launchers were required to pass NASA Shuttle Payload safety and verification requirements. Some of the more interesting components of the design were the V-band retention and separation mechanism, the separation springs, and the launcher electronics which provided a properly inhibited release sequence operated through the Small Payload Accommodations Switch Panel (SPASP) on board the Orbiter. The original plan for this launcher was to use a motorized door. The launcher electronics, therefore has the capability to be modified to accommodate the door, if desired.

Nichols, S.

Launcher Systems Development Cost: Behavior, Uncertainty, Influences, Barriers and Strategies for Reduction

This paper will report on the activities of the IAA Launcher Systems Economics Working Group in preparations for its Launcher Systems Development Cost Behavior Study. The Study goals include: improve launcher system and other space system parametric cost analysis accuracy; improve launcher system and other space system cost analysis credibility; and provide launcher system and technology development program managers and other decisionmakers with useful information on development cost impacts of their decisions. The Working Group plans to explore at least the following five areas in the Study: define and explain development cost behavior terms and concepts for use in the Study; identify and quantify sources of development cost and cost estimating uncertainty; identify and quantify significant influences on development cost behavior; identify common barriers to development cost understanding and reduction; and recommend practical, realistic strategies to accomplish reductions in launcher system development cost.

Shaw, Eric J.

Explosively driven hypervelocity launcher: Second-stage augmentation techniques

The results are described of a continuing study aimed at developing a two-stage explosively driven hypervelocity launcher capable of achieving projectile velocities between 15 and 20 km/sec. The testing and evaluation of a new cylindrical impact technique for collapsing the barrel of two-stage launcher are reported. Previous two-stage launchers have been limited in ultimate performance by incomplete barrel collapse behind the projectile. The cylindrical impact technique explosively collapses a steel tube concentric with and surrounding the barrel of the launcher. The impact of the tube on the barrel produces extremely high stresses which cause the barrel to collapse. The collapse rate can be adjusted by appropriate variation of the explosive charge and tubing parameters. Launcher experiments demonstrated that the technique did achieve complete barrel collapse and form a second-stage piston. However, jetting occurred in the barrel collapse process and was responsible for severe projectile damage.

Baum, D. W.

The ESA activities on future launchers

A future launcher development scenario depends on many assumptions, such as the impetus provided by the probability of future missions, and the political willingness of member states to undertake future developments. Because of the long timescale implied by a coherent launcher development, a step-wise approach within an overall future launcher development plan appears essential. The definition of development steps allows the launcher developments to be adapted to the driving external forces, so that no possible opportunity to Europe in the space launch business is missed out because of improper planning on the absence of a long term goal. The launcher senario, to be presented in 1985, forms part of Europe's overall STS plan for the future. This overall STS plan is one product of the complete STS LTPP, a first draft of which should exist by 1985, and which will be updated regularly to take into account the changing political and economic perspectives.

Pfeffer, H.

RL-10 Based Combined Cycle For A Small Reusable Single-Stage-To-Orbit Launcher

This paper discusses a new application of the combined propulsion known as the KLIN(TM) cycle, consisting of a thermally integrated deeply cooled turbojet (DCTJ) and liquid rocket engine (LRE). If based on the RL10 rocket engine family, the KLIN (TM) cycle makes a small single-stage-to-orbit (SSTO) reusable launcher feasible and economically very attractive. Considered in this paper are the concept and parameters of a small SSTO reusable launch vehicle (RLV) powered by the KLIN (TM) cycle (sSSTO(TM)) launcher. Also discussed are the benefits of the small launcher, the reusability, and the combined cycle application. This paper shows the significant reduction of the gross take off weight (GTOW) and dry weight of the KLIN(TM) cycle-powered launcher compared to an all-rocket launcher.

Balepin, Vladimir

High Velocity Linear Induction Launcher with Exit-Edge Compensation for Testing of Aerospace Components

Advances in ultra high speed linear induction electromagnetic launchers over the past decade have focused on magnetic compensation of the exit and entry-edge transient flux wave to produce efficient and compact linear electric machinery. The paper discusses two approaches to edge compensation in long-stator induction catapults with typical end speeds of 150 to 1,500 m/s. In classical linear induction machines, the exit-edge effect is manifest as two auxiliary traveling waves that produce a magnetic drag on the projectile and a loss of magnetic flux over the main surface of the machine. In the new design for the Stator Compensated Induction Machine (SCIM) high velocity launcher, the exit-edge effect is nulled by a dual wavelength machine or alternately the airgap flux is peaked at a location prior to the exit edge. A four (4) stage LIM catapult is presently being constructed for 180 m/s end speed operation using double-sided longitudinal flux machines. Advanced exit and entry edge compensation is being used to maximize system efficiency, and minimize stray heating of the reaction armature. Each stage will output approximately 60 kN of force and produce over 500 G s of acceleration on the armature. The advantage of this design is there is no ablation to the projectile and no sliding contacts, allowing repeated firing of the launcher without maintenance of any sort. The paper shows results of a parametric study for 500 m/s and 1,500 m/s linear induction launchers incorporating two of the latest compensation techniques for an air-core stator primary and an iron-core primary winding. Typical thrust densities for these machines are in the range of 150 kN/sq.m. to 225 kN/sq.m. and these compete favorably with permanent magnet linear synchronous machines. The operational advantages of the high speed SCIM launcher are shown by eliminating the need for pole-angle position sensors as would be required by synchronous systems. The stator power factor is also improved.

Kuznetsov, Stephen

Preliminary feasibility assessment for Earth-to-space electromagnetic (Railgun) launchers

An Earth to space electromagnetic (railgun) launcher (ESRL) for launching material into space was studied. Potential ESRL applications were identified and initially assessed to formulate preliminary system requirements. The potential applications included nuclear waste disposal in space, Earth orbital applications, deep space probe launchers, atmospheric research, and boost of chemical rockets. The ESRL system concept consisted of two separate railgun launcher tubes (one at 20 deg from the horizontal for Earth orbital missions, the other vertical for solar system escape disposal missions) powered by a common power plant. Each 2040 m launcher tube is surrounded by 10,200 homopolar generator/inductor units to transmit the power to the walls. Projectile masses are 6500 kg for Earth orbital missions and 2055 kg for nuclear waste disposal missions. For the Earth orbital missions, the projectile requires a propulsion system, leaving an estimated payload mass of 650 kg. For the nuclear waste disposal in space mission, the high level waste mass was estimated at 250 kg. This preliminary assessment included technical, environmental, and economic analyses.

Rice, E. E.

A hypervelocity launcher for simulated large fragment space debris impacts at 10 km/s

The background, design, and testing of two explosive launchers for simulating large fragment space debris impacts are presented. The objective was to develop a launcher capable of launching one gram aluminum fragments at velocities of 10 km/s. The two launchers developed are based on modified versions of an explosive shaped charge, common in many military weapons. One launcher design has yielded a stable fragment launch of approximately one gram of aluminum at 8.93 km/s velocity. The other design yielded velocities in excess of 10 km/s, but failed to produce a cohesive fragment launch. This work is ongoing, and future plans are given.

Tullos, R. J.

An electomagnetic lunar launcher utilizing superconductivity technology

The application of superconductivity technology to the lunar launcher problem was considered, and a quenchgun concept was formulated to reduce the mass of the launcher system by incorporating the energy storage in the launcher itself and using the efficiency of the quenchgun to reduce the power requirements. A conceptual design for the quenchgun launcher is presented, and the integration of the system into a lunar base logistics model for evaluation is addressed. The results of these evaluations under the NASA Office of Exploration lunar base scenarios are reported.

Bilby, Curt

Feasibility study of superconducting LSM rocket launcher system

A feasibility study is presented concerning an application of a superconducting linear synchronous motor (LSM) to a large-scale rocket launcher, whose acceleration guide tube of LSM armature windings is constructed 1,500 meters under the ground. The rocket is released from the linear launcher just after it gets to a peak speed of about 900 kilometers per hour, and it flies out of the guide tube to obtain the speed of 700 kilometers per hour at the height of 100 meters above ground. The linear launcher is brought to a stop at the ground surface for a very short time of 5 seconds by a quick control of deceleration. Very large current variations in the single-layer windings of the LSM armature, which are produced at the higher speed region of 600 to 900 kilometers per hour, are controlled successfully by adopting the double-layer windings. The proposed control method makes the rocket launcher ascend stably in the superconducting LSM system, controlling the Coriolis force.

Yoshida, Kinjiro

Electromechanical Dynamics Simulations of Superconducting LSM Rocket Launcher System in Attractive-Mode

Further feasibility study on a superconducting linear synchronous motor (LSM) rocket launcher system is presented on the basis of dynamic simulations of electric power, efficiency and power factor as well as the ascending motions of the launcher and rocket. The advantages of attractive-mode operation are found from comparison with repulsive-mode operation. It is made clear that the LSM rocket launcher system, of which the long-stator is divided optimally into 60 sections according to launcher speeds, can obtain high efficiency and power factor.

Yoshida, Kinjiro

Air-Powered Projectile Launcher

Air-powered launcher fires plastic projectiles without using explosive propellants. Does not generate high temperatures. Launcher developed for combat training for U.S. Army. With reservoir pressurized, air launcher ready to fire. When pilot valve opened, sleeve (main valve) moves to rear. Projectile rapidly propelled through barrel, pushed by air from reservoir. Potential applications in seismic measurements, avalanche control, and testing impact resistance of windshields on vehicles.

Andrews, T.

Traveling-wave induction launchers

An analysis of traveling-wave induction launchers shows that induction is a feasible method of producing armature current and that efficient accelerators can be built without sliding contacts or arcs. In a traveling-wave induction launcher the armature current is induced by a slip speed between the armature and a traveling magnetic field. At 9 m/s slip speed a 9 kg projectile with an aluminum armature weighing 25 percent of the total mass can be accelerated to 3000 m/s in a 5 m-long barrel with a total ohmic loss in the barrel coils and armature of 4 percent of the launch kinetic energy and with an average armature temperature rise of 220 deg C, but a peak excitation frequency of 8600 Hz is required. With a 2 kg launch mass the ohmic loss is 7 percent. A launcher system optimized for rotating generators would have a peak frequency of 4850 Hz; with an aluminum armature weighing 33 percent of the launch mass and a slip speed of 30 m/s the total ohmic loss in the generators, cables, and accelerator would be 43 percent of the launch kinetic energy, and the average armature temperature rise would be 510 deg C.