Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Land Use Control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

The Continuously Evolving Land Use Control Climate in FUSRAP - 12285

In recent years the topic of Land Use Controls (LUCs) has become much more prevalent in the Formerly Utilized Sites Remedial Action Program (FUSRAP) for a number of reasons. Some regulatory agencies have been placing much more emphasis on this topic than they historically did. Also as the FUSRAP has matured, more sites are approaching a point in the project lifecycle that LUCs are needed to be implemented. There are many issues, some site specific, some agency specific, and some programmatic, that may arise when addressing LUCs on a FUSRAP site. These issues can span the life of a project from planning to implementation. As the emphasis on LUCs increases at a fast pace, USACE is faced with the task of developing consistency in how we respond, and at the same time leaving enough latitude for projects to accomplish their individual missions while taking into consideration the site specific concerns. The Land Use Controls arena encompasses a large number of tools to address the matter at hand. There are numerous mechanisms that can accomplish Land Use Control goals, some of which include administrative controls and engineering controls. This paper will discuss some of the mechanisms being utilized by USACE at our FUSRAP projects. Having a better understanding of how LUCs are currently being handled in the FUSRAP will be beneficial to project delivery teams in order to make the best decisions moving through the project lifecycle. Being aware of LUC requirements and options at an early stage in a project will help a team effectively plan for and execute the chosen alternative for remedial action. There are a number of guidance tools from various other agencies that exist for consideration during Land Use Control planning and implementation. The USACE is currently evaluating these guidance tools to determine applicability and impact to FUSRAP projects. Some of these tools are under review at Army and the Department of Defense. Critical to this evaluation is internal team coordination as well as coordination and input from stakeholders. With guidance on LUCs available from a number of entities, the USACE now has the opportunity to develop consistency in determining how LUCs are handled on FUSRAP projects. The FUSRAP ER, ER 200-1-4, is currently being revised and will broadly touch on LUCs. This broad approach was a result of recognizing the magnitude of variances and site specific components that come into play when applying LUCs to our FUSRAP sites. As land use controls scenarios continue to arise on our FUSRAP sites, the methods for how our project teams address those will continue to evolve. The Program is continuing to develop guidance on how to address LUCs. In the interim, our FUSRAP projects can share lessons learned on the LUCs they are implementing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Success of the Melton Valley Watershed Remediation at the ORNL - 12351

The source remediation of the Melton Valley (MV) Watershed at the U.S. Department of Energy's (DOE's) Oak Ridge National Laboratory was completed 5 years ago (September 2006). Historic operations at the laboratory had resulted in chemical and radionuclide contaminant releases and potential risks or hazards within 175 contaminated units scattered across an area of 430 hectares (1062 acres) within the watershed. Contaminated areas included burial grounds, landfills, underground tanks, surface impoundments, liquid disposal pit/trenches, hydrofracture wells, leak and spill spites, inactive surface structures, and contaminated soil and sediments. The remediation of the watershed was detailed in the MV Interim Action Record of Decision (ROD) and included a combination of actions encompassing containment, isolation, stabilization, removal, and treatment of sources within the watershed and established the monitoring and land use controls that would result in protection of human health. The actions would take place over 5 years with an expenditure of over $340 M. The MV remedial actions left hazardous wastes in-place (e.g., buried wastes beneath hydraulic isolation caps) and cleanup at levels that do not allow for unrestricted access and unlimited exposure. The cleanup with the resultant land use would result in a comprehensive monitoring plan for groundwater, surface water, and biological media, as well as the tracking of the land use controls to assure their completion. This paper includes an overview of select performance measures and monitoring results, as detailed in the annual Remediation Effectiveness Report and the Five-Year Report. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk-Based Remediation Approach for Cs-137 Contaminated Sediment/Soils at the Savannah River Site (SRS) Lower Three Runs Tail (U) - 13348 - SRNS-RP-2012-00546

Lower Three Runs is a large blackwater stream that runs through the eastern and southern portion of the Savannah River Site. The Lower Three Runs watershed includes two SRS facility areas: P Area (P Reactor) and R Area (R Reactor) that provided effluent discharges to Lower Three Runs. During reactor operations, effluent discharges were well above natural (pre-industrial) or present day stream discharges. The watershed contains a 2,500-acre mainstream impoundment (PAR Pond), several smaller pre-cooler ponds, and a canal system that connects the pre-cooler ponds and discharges surface water to PAR Pond. From the PAR Pond dam, Lower Three Runs flows approximately 36 kilometers braiding through bottom-land/flood-plain forests before it enters the Savannah River. About eight kilometers downstream from the PAR Pond dam, the SRS boundary narrows (termed the Lower Three Runs tail) providing a limited buffer of DOE property for the Lower Three Runs stream and associated flood-plain. Previous screening characterization efforts revealed Cs-137 contamination in the sediment/soils of the flood-plain. As a part of the American Recovery and Reinvestment Act stimulus package, a comprehensive characterization effort was executed on the sediment/soils of the Lower Three Runs tail flood-plain providing a comprehensive look at the contaminant signature of the area. As a follow-up to that characterization, a regulatory decision Core Team, comprised of members of the South Carolina Department of Health and Environmental Control, Environmental Protection Agency - Region IV, and DOE, conducted negotiations on a risk-based approach to address the level of contamination found in the tail flood-plain as an early action that provided a long-term solution to exposure scenarios. For evaluation purposes, the adolescent trespasser was selected as the most likely human receptor for the Lower Three Runs tail portion because of the natural attractiveness of the area for recreational activities (i.e., hunting, fishing, hiking etc.) and access from public property. Exposure of the adolescent trespasser to Cs-137 contaminated sediment/soil at concentrations greater than 23.7 pico curies per gram have been calculated to result in an unacceptable cancer risk (> 1 x 10{sup -4}). Comparing the characterization sampling results conducted in 2009 with the benchmark concentration of 23.7 pCi/g, identified elevated risk levels along three sampling areas in the Lower Three Runs tail portion. On January 5, 2012, it was agreed by the core team that a Removal Action in the Lower Three Runs tail was to be conducted for the identified soil/sediment locations in the three identified areas that exceed the 1 x 10{sup -4} risk (23.7 pCi/g) for the adolescent trespasser receptor. The addition of Land Use Controls following the Removal Action was appropriate to protect human health and the environment. A systematic screening matrix was initiated at the identified hot spots (i.e., sampling points with Cs-137 activities greater than 23.7 pCi/g) to identify the limits of the excavation area. Sediment/soil within the defined removal areas would be excavated to the depth necessary to achieve the cleanup goal and disposed of in a CERCLA Off-Site Rule approved disposal facility. It was agreed that this removal action would adequately reduce the volume of available Cs-137 in the Lower Three Runs tail and consequently residual activities of the Cs-137 would decay over time reducing the amount of Cs-137 available in the tail which would curtail risk. The Land Use Controls consist of installation of an additional seven miles of fencing at major road crossings, utility easements, and at areas that showed a higher probability of access. In addition, signs were placed along the entire SRS perimeter of the Lower Three Runs tail approximately every 200 feet. Sign posts included both a No Trespassing sign and a Contaminant Warning sign. The project initiated a subcontract for both the removal action and the installation of fencing and signs on May 1, 2012. All field activities were completed by July 26, 2012. The project excavated and disposed of over 2700 cubic yards of contaminated sediment/soil, erected approximately seven miles of fence and placed over 2,000 signs demonstrating DOE's commitment to protect human health and act as a good neighbor to residents in the area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation and evaluation of a radiological field investigation for real property interests associated with the FUSRAP Maywood Site - 15611

Public streets, easements, and rights-of-way, collectively referred to as Real Property Interests (RPI), pose challenging and complex problems for the FUSRAP Maywood Project Team. RPIs are components of a multi-faceted objective to evaluate all remaining sources of contamination for which the Government is responsible under the Maywood Record of Decision. USACE designed and implemented a MARSSIM-based radiological investigation within sixteen potentially impacted RPIs. These RPIs were not completely addressed on their own or in conjunction with nearby property investigations or remediations. However, these RPIs were investigated based on the potential for or known impact of FMSS contamination as determined through both a historic data review of the transport mechanism (downstream waste deposition) and process knowledge obtained during Final Status Survey of proximal properties. The primary objectives of this investigation were to confirm the presence or absence of FUSRAP contamination within a given RPI, provide sufficient data to release an RPI if contamination was not encountered, and provide sufficient data for either design of an appropriate remedial solution or implementation of Land Use Controls when contamination was encountered. Of additional value, knowledge gained during the RPI investigations will allow the team to share useful radiological data with local officials and utility service providers. This information will support better, more informed decisions by all parties involved in situations such as emergency subsurface utility repairs, roadway improvement planning, or even natural disaster response. Finally, certain unexpected outcomes learned during the final data analysis may lead to refinement of the conceptual site model. Logistical lessons learned and challenges encountered during the Maywood investigation may also be helpful to stakeholders, planners, and managers of similar projects wishing to identify their own potential liability within public streets, easements, rights-of-way, and other types of RPIs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sustainable Transactions - The Fine Art of the Forever Deal - 19569

The U.S. Department of Energy Office of Legacy Management (LM) has various real property interests at the 92 sites within its current portfolio. Because of its unique mission, LM does not own most of the sites for which it has responsibility for long-term surveillance and maintenance (LTS and M). In addition to the sites it does own, LM works with various federal, state, local, and private entities to execute its obligations. Each site has its own narrative with respect to the real property assets: how they were acquired, how they are sustained, and how they were or will be dispositioned. Since the regulatory time frame for LTS and M activities at some sites can be in perpetuity, durable and effective instruments and documentation are necessary to support LM's mission as a federal land manager and steward. In addition, more than half of the sites currently in LM's inventory do not allow unrestricted use because of residual contamination from historical activities, and institutional controls are required to limit human and environmental exposures to residual contamination by controlling land use, restricting access to potential hazards, and making the public aware of potential dangers from the residual contamination. Thus, the overall real property interests and transactions associated with these sites not only have to address the environmental concerns associated with protection of human health and the environment but also how best to position LM's real property assets to support the mission for future generations. These types of transactions are often complex, requiring the negotiation of numerous documents to achieve and sustain protection of human health and the environment while allowing for future use. Such planning needs to be flexible enough to envision that the original transaction will likely change over time due to changing regulations, communities, stakeholders, and site conditions as operation and maintenance activities are performed. Planning for the integration of these requirements with the needs of the end users, stakeholders, and communities is paramount to a successful project, and various transactional considerations impact how best to achieve this goal. As such, these transactions have to be sustainable. Real property interests change over time, with new owners, operators, regulators, and stakeholders. Determining the sustainability of these real property interests, therefore, calculates the sustainability of each asset's physical attributes and also the sustainability of the various legal instruments and arrangements that are put in place at each site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preparing the FUSRAP Colonie Interim Storage Site for Transfer Back to the US Department of Energy Office of Legacy Management - 19215

The Formerly Utilized Sites Remedial Action Program (FUSRAP) Colonie Interim Storage Site was transferred from the US Department of Energy (US DOE) to the US Army Corps of Engineers (USACE) in 1997. The USACE initiated remediation efforts at the Site under FUSRAP. The Site was separated into three distinct operable units (OU) to more efficiently manage the remedial process: 1) Groundwater OU, 2) Main Site Soils OU, and 3) Vicinity Property OU. The USACE has completed remedial actions at each of these three OUs and has advanced the OU remedies at the Site to the long-term stewardship stage to be executed by the US DOE Office of Legacy Management (LM). The US DOE LM is the current real property owner of record of the Colonie Main Site. A summary of each OU and the activities needed to prepare for site transfer follows: OU 1 - USACE issued the Colonie Groundwater OU Record of Decision (ROD) (USACE 2010a) on April 9, 2010. The Groundwater ROD remedy is monitored natural attenuation (MNA) and long-term monitoring (LTM) of groundwater after source removal completion. Results of groundwater monitoring indicate reductions in concentrations of contaminants of concern (COC). Based on the marked progress to date, USACE has optimized the groundwater LTM program (USACE, 2014) by reducing the well network, sampling frequency, and analytical parameters, and by abandoning wells that are no longer needed. A Groundwater ROD Five-Year Review report was submitted to the New York State Department of Environmental Conservation (NYSDEC) for review in 2018. NYSDEC agreed that MNA is still an appropriate remedial method although it is progressing at a slower rate than predicted. OU 2 - From 1999 to 2007, USACE completed the large-scale removal of soil at the Main Site, which included the adjacent Town of Colonie Vicinity Property. Radioactively contaminated soil along with accessible metals-contaminated soil and soil containing volatile organic compounds (VOC) were removed during this effort. A total of 103,402 cubic meters (m{sup 3}) of soil was excavated and disposed offsite. On March 26, 2015, USACE signed the Main Site Soils OU ROD (USACE, 2015a). The ROD remedy included provisions for Land Use Controls (LUC) consisting of institutional controls (IC) through an Environmental Easement for management of three small and discrete inaccessible locations within three of the 27 Final Status Survey units of the Main Site. The Environmental Easement provides a means of protection based on both current and future land use by placing restrictions on soil excavation and reuse. The easement and a supporting Site Management Plan (SMP) will be finalized by LM in coordination with NYSDEC. OU 3 - the Vicinity Property OU ROD was signed on 20 September 2017. This ROD declared No Action (NA) for dust and No Further Action (NFA) for soil and other media for the Vicinity Properties. Prior to the ROD, USACE performed dust sampling and other characterization activities at representative commercial and residential Vicinity Property locations. These efforts were reported in the Colonie FUSRAP Site Vicinity Property Operable Unit Remedial Investigation Summary Report (USACE, 2016). A Site Closeout Report (SCOR) was issued to NYSDEC and approved in 2018. The approval of this report starts the transfer process back to the LM. Ongoing and future transfer activities include records retention and management, preparation and filing of real estate records, physical site management (fencing, landscape maintenance, well abandonment) and coordination with state regulators and LM staff. This presentation is intended to make all stakeholders aware of the necessary steps for site transfer from the USACE back to the LM. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oil and Natural Gas Development near and beneath Uranium Tailings Cells and Other Remediated Sites - 20358

DOE LM is responsible for maintaining remedies at more than 50 remediated sites that require active long-term surveillance and maintenance (LTS and M). Institutional controls (ICs) were established to limit human and environmental exposures to residual contamination by controlling land use, restricting access to potential hazards, and making the public aware of potential dangers from the residual contamination. ICs for each site were developed based on current and foreseeable conditions; however, these controls should evolve to mitigate potential human health and other environmental risks from unanticipated changes in activities or site conditions. Activities conducted beyond the DOE long-term care boundaries by non-DOE parties may impact the effectiveness of ICs or even the long-term stability of disposal cells and groundwater remedies. Several sites that LM manages or that will transfer to LM for LTS and M are in active oil and gas production basins. The sites are associated with uranium ore milling or nuclear test sites and have been remediated or are in the process of remediation and have no ongoing DOE mission. Particularly since 2005, hydraulic fracturing ('fracking') combined with directional drilling has dramatically increased oil and natural gas (oil/gas) production in the United States, now making it the number one hydrocarbon-producing country. Fracking has allowed production from shale and other rocks of low natural permeability that were historically not considered viable oil/gas resources. Also, because wellbores can now be drilled as many as 5 kilometers or more horizontally, hydrocarbons can be recovered from zones without having access to the surface above them. Drilling activity near Rulison, Colorado, the location of an underground nuclear detonation managed by LM, has raised public concerns that remnant radioactivity in the detonation zone could migrate to producing wells and enter the natural gas distribution system. At sites like the Falls City, Texas, Disposal site, transitioned to LM with a split estate, increased production in the region has resulted in wellbores beneath the long-term care boundary of the site. While the DOE license for Falls City was approved by the NRC in 1997 without the acquisition of the subsurface rights, NRC has raised concerns on whether this activity impacts the integrity of the cell and/or groundwater remedies. In Wyoming, LM is anticipating receiving the license for the Bear Creek site and manages the Spook site, both locations of uranium mill tailings disposal cells. These Wyoming sites are in an active region of major oil and gas development. This change in surrounding land use will require LM to work collaboratively with NRC to address these concerns. At several DOE sites radioactive waste, and often intermixed nonradioactive constituents, is permanently isolated in engineered disposal cells. At other sites, residual contamination can be present in groundwater, blast cavities, and infinite amounts within soil. Areas targeted for oil and gas development at the Texas and Wyoming sites range from depths of 2440 to 3350 meters (8000-11000 feet) below ground surface. When most site remedies were designed, oil and gas development was not considered to be an issue within the site boundary. With the more recent uses of directional drilling, fracking, and associated wastewater injections, the evaluative criteria for incoming sites and ICs for managing long-term protectiveness and regulatory compliance are changing. Although DOE surface ownership was previously thought to be a robust IC to prevent surface and subsurface development, particularly at disposal sites, that may no longer be the case. Whereas the subsurface development at Texas and Wyoming sites is currently occurring at thousands of meters beneath the surface, shallower and direct onsite development would be more of a concern for LM. The energy introduced when a well is hydraulically fractured causes microseismic events (magnitude -2 to 1.0) as the fractures propagate but does not directly cause seismic events (earthquakes) of sufficient magnitude to damage surface structures. Additionally, the extent of the hydraulic fractures is limited to the targeted depths, which are far below the surface. However, earthquakes of sufficient magnitude to damage surface structures have been attributed to the injection of wastewater into disposal wells. States that have experienced these effects have enacted regulations that limit the rate and pressures that wastewater can be injected into disposal wells. Items LM may consider are the need for monitoring the volume of water injected into nearby disposal wells and possibly installing seismic stations at sites most susceptible to damage. While the need to demonstrate that no impact from oil and gas extraction activities on a site groundwater remedy or disposal cells will vary from site to site, LM is assessing risk criteria for this activity. Though LM has not experienced an issue yet at a uranium tailings disposal site, it cannot assume that there will be none, and must address NRC concerns. LM is building on past experiences at other sites and beginning to form new processes with the hope that these concepts can be applied for other future sites. (authors)

04 OIL SHALES AND TAR SANDS↗

Results of the OECD-NEA Initiative 'Preservation of RK and M Across Generations' - 18084

The OECD Nuclear Energy Agency (NEA) has co-ordinated an international initiative to develop understanding and guidelines related to the long-term preservation of records, knowledge and memory (RK and M) for radioactive waste repositories. The initiative will come to a close in April 2018. Currently, a number of deliverables are in the process of publication and a preview and overview is presented in this paper. Central is the 'Final Report of the RK and M Initiative', which sets out the RK and M fundamentals, including basic principles of RK and M preservation, the concept of oversight and the relevant time frames, the mediated and non-mediated transmission of messages, and ultimately the need for a systemic strategy. Furthermore, it presents a menu of approaches and mechanisms of RK and M preservation, such as markers, time capsules, archives, the Key Information File (KIF), education, art, land use control, and monitoring. Finally, the main report provides suggestions on how to develop a systemic strategy. A bibliography and a regulatory catalogue on RK and M preservation, and concept reports describing the KIF and the Set of Essential Records (SER), will complement the set of deliverables of the RK and M Initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical/ administrative options for managing tritium MCL exceedances in P-area groundwater and Steel Creek

This white paper was requested by the Core Team (United States Department of Energy [USDOE], United States Environmental Protection Agency [USEPA], and South Carolina Department of Health and Environmental Control [SCDHEC]) at the P-Area Groundwater (PAGW) Operable Unit (OU) Scoping Meeting held in January 2017 to discuss recent data and potential alternatives in support of a focused Corrective Measures Study/Feasibility Study (CMS/FS). This white paper presents an overview of the problem, and a range of technical and administrative options for addressing the tritium contamination in groundwater and Steel Creek. As tritium cannot be treated practicably, alternatives are limited to media transfer, containment and natural attenuation principally relying on radioactive decay. Using other groundwater OU decisions involving tritium as precedent, Savannah River Nuclear Solutions (SRNS) recommends that final tritium alternatives be evaluated in a CMS/FS, understanding that the likely preferred remedy will include natural attenuation with land use controls (LUCs). This is based on the inability to significantly reduce tritium impact to Steel Creek using an engineered solution as compared to natural attenuation. The timing of this evaluation could be conducted concurrently with the final remedy evaluation for volatile organic compounds (VOCs).

54 ENVIRONMENTAL SCIENCES↗

Colonie, New York, FUSRAP Site: Pathway from Remediation to Redevelopment - 19465

The Colonie, New York, Formerly Utilized Sites Remedial Action Program (FUSRAP) Site consists of a 4.5-hectare (11.2-acre) US Department of Energy (DOE)-owned vacant property (Main Site) and 56 commercial and residential vicinity properties (VPs). The site was owned and operated by National Lead Industries (NL) from 1937 to 1984. The Main Site was used for manufacturing fuel and weapons components using uranium and thorium. Depleted uranium dust was emitted from exhaust stacks that contaminated the site and the VPs. NL also filled in portions of the site with industrial waste and released contaminants to groundwater. The state court shut the plant down in 1984. The site was acquired by DOE in 1985, which remediated the VPs and began to remediate the Main Site up to 1997. The US Army Corps of Engineers (USACE) undertook remedial actions beginning in 1997. The site has three Operable Units (Main Site, Groundwater, and VPs). The Main Site soil was remediated to residential standards except for three small easement areas. The soils in the easement areas are safe for exposure to workers. There is a groundwater plume beneath the site that will require the use of monitoring and temporary land use controls until cleanup standards are met. The VPs require no further action. A 2-year transition period from USACE to the DOE Office of Legacy Management (LM) began on June 18, 2018, with the receipt of the Site Closeout Report from USACE. LM has determined that the 4.5-hectare site is excess to its mission needs and intends to pursue sale of the property for redevelopment. There are several processes required before the disposal can occur. Organizations with similar sites that are federally owned and ready for private redevelopment may benefit from reviewing the Colonie site disposition processes. This paper will discuss (1) Determining disposal alternatives for the Colonie, New York, site. (2) Describing the federal requirements for the disposal of excess real property. (3) Communicating to stakeholders that the site is ready for disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Changes in Cleanup Strategies and Long-Term Monitoring Costs for DOE FUSRAP Sites - 17241

The Department of Energy (DOE) Office of Legacy Management (LM) is responsible for the post-closure management of remediated DOE sites. LM's objective for Formerly Utilized Sites Remedial Action Program (FUSRAP) includes the long-term surveillance and maintenance (LTSM) of sites that have been remediated by the US Army Corps of Engineers (USACE). FUSRAP was initiated in 1974 by the US Atomic Energy Commission, a predecessor agency of DOE. FUSRAP was managed by DOE from 1981 to 1997. Through a congressional act, the scope to remediate FUSRAP sites was transferred to USACE in 1997. By 1997, DOE had completed the cleanup of 25 of the 46 sites that were active within the program, and had begun cleanups at 13 additional sites. USACE assumed responsibility for the cleanup of the 21 remaining FUSRAP sites, and 8 additional sites that have been recommended for cleanup. Presently, LM provides long-term stewardship for 30 completed FUSRAP sites while USACE is actively remediating 23 sites. FUSRAP sites are typically privately-owned factories or research facilities. However, there are four DOE owned FUSRAP sites. These sites are Maywood and Middlesex in New Jersey, and Colonie and Niagara Falls in New York. In support of LM's Beneficial Reuse strategic mission, the site in Wayne, New Jersey has been transferred to a municipality and the site in New Brunswick, New Jersey has been sold. Historically, most sites in FUSRAP were remediated to 'unlimited exposure and unrestricted use' cleanup levels consistent with residential use. Some sites were remediated using supplemental limits due to inaccessible areas while remaining sites have been remediated to other-than residential standards based on site-specific long-term land use assumptions. Of the 31 completed FUSRAP sites under LM stewardship, one site requires land-use controls and no site requires groundwater monitoring. Over the next 10 years USACE plans to transfer 11 sites to LM. Several of these sites will have additional long-term monitoring requirements as per their Records of Decisions (RODs). These transitioning sites include the Colonie, New York site, the Maywood and Deepwater, New Jersey, sites and the St. Louis, Missouri site. The additional stewardship requirements will include groundwater monitoring, enforcement of institutional and engineered controls, and five-year reviews. In addition to these sites, more than 100 vicinity properties will also be transferred to LM for stewardship. Given the increase in long-term stewardship activities for these sites and their associated vicinity properties, initiatives are under way to incorporate the additional LTSM requirements into the program's out-year planning. LM will be evaluating several methods to customize LTSM cost and liability estimates for all of the completed FUSRAP sites, planning to address the sites not yet transferred and those that are in LM's custody. Where necessary, LM will use remedial process optimization techniques and evaluate monitored natural attenuation protocols to reduced long-term monitoring costs. Methods for identifying costs include the cost estimates provided in RODs, cost estimates refined during remediation, operation and maintenance costs provided by USACE prior to transition, and presumptive remedies using USACE and Environmental Management / LM historic costs at similar sites. On the basis of this evaluation, a strategy for estimating site-specific LTSM costs will be selected. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Machine learning enables national assessment of wind plant controls with implications for land use

Summary As deployment of wind energy continues to expand, computationally efficient tools for predicting wind plant performance over a wide range of layout designs, technology innovations, and spatial locations are increasingly important for policy and investment decisions. We demonstrate two approaches to training a surrogate model to predict annual energy production (AEP) of parameterized wind plant layouts: one using a Gaussian process (GP) and the other using a fully convolutional neural network (FCNN). We leverage the powerful FCNN architecture by encoding wind plant design parameters and output response surface as an image. The FCNN produces more accurate results than the GP with mean absolute errors equivalent to 1% and 1.9% of plant rated power, respectively, although the GP performs well under limited training data and provides useful uncertainty information. We also evaluate a surrogate model for wake steering, enabling a nationwide assessment of the impact of plant control strategies and plant layout decisions. Across two million locations, we find that wake steering strategies boost AEP with relative gains upwards of 3%. Gains are most pronounced at sites without a dominant wind direction and where layout optimization is less fruitful. Additionally, we perform a nationwide sensitivity analysis showing that wake steering can mitigate wake losses from higher density plant layouts. Our results suggest that regions which have not been previously viable for wind deployment due to moderate wind resources are especially well enhanced by wake steering strategies that could help overcome land constraints and inflexible layout options, potentially identifying new deployment opportunities.

17 WIND ENERGY↗

Land Use Manager Application Ensures Protectiveness Following Remediation on the Oak Ridge Reservation - 13355

Long-term stewardship is the set of activities necessary to return contaminated land to safe and beneficial use. The activities include physical and legal controls to prevent inappropriate exposure to contamination left in place at a site. It is the longest phase of the Department of Energy's Environmental Management Program and ensures the protection of human health and the environment for varied end uses. At the Department of Energy's Oak Ridge Reservation an automated program has been developed and implemented that tracks the multitude of long-term stewardship activities. The Oak Ridge Reservation is a large site that currently has over 50 actions requiring long-term stewardship activities. The Oak Ridge Reservation consists primarily of three plant sites, and long-term stewardship will enable these sites to be leased to private entities (East Tennessee Technology Park), modernized for an evolving national security mission (Y-12 National Security Complex), and revitalized to continue multi-disciplinary research (Oak Ridge National Laboratory). The varied site end uses of the individual plant sites coupled with the multitude of controls required by leaving waste in place presents challenges. A single remedial action may include surveillance and maintenance activities, media monitoring, property record notices as well as physical controls such as fences and signs. Thus, the array of long-term stewardship activities is complex and intermingled (over 200 inspections each year at various frequencies are required currently) and requires an effective tracking program, termed the Land Use Manager. The Land Use Manager is a web-based data management application for use by personnel responsible for implementing, maintaining, and verifying engineering and land use controls on the Oak Ridge Reservation. The program is a data entry and tracking tool, as well as a notification tool. The status and performance of engineering and land use controls are checked annually for evaluation in the required Remediation Effectiveness Report, and the automated Land Use Manager collects, maintains, tracks, notifies, monitors, and manages the information necessary to perform this evaluation. Land Use Manager tracks site information including type of contamination, regulatory requirements, locates land use controls; provides information on inspections, certification, and reporting; and provides reports. Most data access features, e.g., view, print, query, and download, are available to all users; however, data input, updating, and editing are restricted to the personnel directly responsible for monitoring and inspection. The Land Use Manager application was developed for the Department of Energy Oak Ridge Office by URS - CH2M Oak Ridge LLC, Restoration Services Incorporated, and MIJARA Corporation to meet the specific needs of long-term stewardship tracking on the Oak Ridge Reservation. The successful implementation of long-term stewardship enables the future government and private activities being planned on the Oak Ridge Reservation to proceed. (authors)

54 ENVIRONMENTAL SCIENCES↗

Special Analysis for the Disposal of the Consolidated Edison Uranium Solidification Project Waste Stream at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

The purpose of this Special Analysis (SA) is to determine if the Oak Ridge (OR) Consolidated Edison Uranium Solidification Project (CEUSP) uranium-233( 233 U) waste stream (DRTK000000050, Revision 0) is acceptable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). The CEUSP 233 U waste stream requires a special analysis because the concentrations of thorium- 229 ( 229 Th), 230 Th, 232 U, 233 U, and 234 U exceeded their NNSS Waste Acceptance Criteria action levels. The acceptability of the waste stream is evaluated by determining if performance assessment (PA) modeling provides a reasonable expectation that SLB disposal is protective of human health and the environment. The CEUSP 233 U waste stream is a long-lived waste with unique radiological hazards. The SA evaluates the long-term acceptability of the CEUSP 233 U waste stream for near-surface disposal as a two tier process. The first tier, which is the usual SA process, uses the approved probabilistic PA model to determine if there is a reasonable expectation that disposal of the CEUSP 233 U waste stream can meet the performance objectives of U.S. Department of Energy Manual DOE M 435.1-1, “Radioactive Waste Management,” for a period of 1,000 years (y) after closure. The second tier addresses the acceptability of the OR CEUSP 233 U waste stream for near-surface disposal by evaluating long-term site stability and security, by performing extended (i.e., 10,000 and 60,000 y) modeling analyses, and by evaluating the effect of containers and the depth of burial on performance. Tier I results indicate that there is a reasonable expectation of compliance with all performance objectives if the OR CEUSP 233 U waste stream is disposed in the Area 5 RWMS SLB disposal units. The maximum mean and 95 th percentile PA results are all less than the performance objective for 1,000 y. Monte Carlo uncertainty analysis indicates that there is a high likelihood of compliance with all performance objectives. Tier II results indicate that the long-term performance of the OR CEUSP 233 U waste stream is protective of human health and the environment. The Area 5 RWMS is located in one of the least populated and most arid regions of the U.S. Site characterization data indicate that infiltration of precipitation below the plant root zone at 2.5 meters (8.2 feet) ceased 10,000 to 15,000 y ago. The site is not expected to have a groundwater pathway as long as the current arid climate persists. The national security mission of the NNSS and the location of the Area 5 RWMS within the Frenchman Flat Corrective Action Unit require that access controls and land use restrictions be maintained indefinitely. PA modeling results for 10,000 to 60,000 y also indicate that the OR CEUSP 233 U waste stream is acceptable for near-surface disposal. The mean resident air pathway annual total effective dose (TED), the resident all-pathways annual TED, and the acute drilling TED are less than their performance objectives for 10,000 y after closure. The mean radon-222 (222Rn) flux density exceeds the performance objective at 4,200 y, but this is due to waste already disposed at the Area 5 RWMS and is only slightly affected by disposal of the CEUSP 233 U. The peak resident all-pathways annual TED from CEUSP key radionuclides occurs at 48,000 y and is less than the 0.25 millisievert performance objective. Disposal of the OR CEUSP 233 U waste stream in a typical SLB trench slightly increases PA results. Increasing the depth was found to eliminate any impacts of the OR CEUSP 233 U waste stream. Containers could not be shown to have any significant impact on performance due to the long half-life of the waste stream and a lack of data for pitting corrosion rates of stainless steel in soil. The results of the SA indicate that all performance objectives can be met with disposal of the OR CEUSP 233 U waste stream in the SLB units at the Area 5 RWMS. The long-term performance of the OR CEUSP 233 U waste stream disposed in the near surface is protective of human health and the environment. The waste stream is recommended for disposal without conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Scientific Opportunities for Monitoring of Environmental Remediation Sites (SOMERS) - 12224

The US Department of Energy (DOE) is responsible for risk reduction and cleanup of its nuclear weapons complex. DOE maintains the largest cleanup program in the world, currently spanning over a million acres in 13 states. The inventory of contaminated materials includes 90 million gallons of radioactive waste, 6.4 trillion liters of groundwater, and 40 million cubic meters of soil and debris. It is not feasible to completely restore many sites to pre-disposal conditions. Any contamination left in place will require monitoring, engineering controls and/or land use restrictions to protect human health and environment. Research and development efforts to date have focused on improving characterization and remediation. Yet, monitoring will result in the largest life-cycle costs and will be critical to improving performance and protection. Through an inter-disciplinary effort, DOE is addressing a need to advance monitoring approaches from sole reliance on cost- and labor-intensive point-source monitoring to integrated systems-based approaches such as flux-based approaches and the use of early indicator parameters. Key objectives include identifying current scientific, technical and implementation opportunities and challenges, prioritizing science and technology strategies to meet current needs within the DOE complex for the most challenging environments, and developing an integrated and risk-informed monitoring framework. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Scientific Opportunities for Monitoring of Environmental Remediation Sites (SOMERS)

The US Department of Energy (DOE) is responsible for risk reduction and cleanup of its nuclear weapons complex. DOE maintains the largest cleanup program in the world, currently spanning over a million acres in 13 states. The inventory of contaminated materials includes 90 million gallons of radioactive waste, 6.4 trillion liters of groundwater, and 40 million cubic meters of soil and debris. It is not feasible to completely restore many sites to predisposal conditions. Any contamination left in place will require monitoring, engineering controls and/or land use restrictions to protect human health and environment. Research and development efforts to date have focused on improving characterization and remediation. Yet, monitoring will result in the largest life-cycle costs and will be critical to improving performance and protection. Through an inter-disciplinary effort, DOE is addressing a need to advance monitoring approaches from sole reliance on cost- and labor-intensive point-source monitoring to integrated systems-based approaches such as flux-based approaches and the use of early indicator parameters. Key objectives include identifying current scientific, technical and implementation opportunities and challenges, prioritizing science and technology strategies to meet current needs within the DOE complex for the most challenging environments, and developing an integrated and risk-informed monitoring framework.

Bunn, Amoret L↗

Scientific Opportunities for Monitoring of Environmental Remediation Sites - (SOMERS)

The US Department of Energy (DOE) is responsible for risk reduction and cleanup of its nuclear weapons complex. DOE maintains the largest cleanup program in the world, currently spanning over a million acres in 13 states. The inventory of contaminated materials includes 90 million gallons of radioactive waste, 6.4 trillion liters of groundwater, and 40 million cubic meters of soil and debris. It is not feasible to completely restore many sites to predisposal conditions. Any contamination left in place will require monitoring, engineering controls and/or land use restrictions to protect human health and environment. Research and development efforts to date have focused on improving characterization and remediation. Yet, monitoring will result in the largest life-cycle costs and will be critical to improving performance and protection. Through an inter-disciplinary effort, DOE is addressing a need to advance monitoring approaches from sole reliance on cost- and labor-intensive point-source monitoring to integrated systems-based approaches such as flux-based approaches and the use of early indicator parameters. Key objectives include identifying current scientific, technical and implementation opportunities and challenges, prioritizing science and technology strategies to meet current needs within the DOE complex for the most challenging environments, and developing an integrated and risk-informed monitoring framework.

environmental restoration↗