Design-informed neutronics assessment of long-lived fission product transmutation in a tokamak fusion reactor blanket
This study presents a neutronics-based assessment of the feasibility and viability of transmuting six major long-lived fission products (LLFPs) from light-water reactors, namely 99 Tc, 129 I, 79 Se, 93 Zr, 126 Sn, and 135 Cs, within the blanket region of a tokamak fusion reactor, using the MIT ARC design as a concrete fusion configuration. Monte Carlo neutronics simulations were performed to evaluate LLFP transmutation and to compare the results with a reference boiling water reactor (BWR). The results indicate that transmutation of all six LLFPs is neutronics-feasible in fusion reactors, with transmutation half-lives significantly shorter than their natural decay half-lives. For elemental targets, transmutation of 135 Cs, 126 Sn, and 93 Zr was found potentially viable, as the net mass transmuted exceeded that achievable in the reference BWR under identical target volume and irradiation time. When isotopically separated targets were considered, transmutation of 126 Sn and 93 Zr appeared potentially viable. A parametric study demonstrated that plasma geometry modifications can enhance local neutron flux, increasing the transmuted 93 Zr mass by approximately 33% and reducing the transmutation half-life from approximately 240 years to 180 years. Repositioning the target and adjusting material layer thickness reduced the transmutation half-life of 93 Zr to 67 years and increased the net mass transmuted by a factor of 50. Furthermore, these results demonstrate that fusion reactors can enable LLFP transmutation beyond the practical limits of thermal fission reactors and highlight the critical role of reactor and blanket design optimization. Engineering and fuel-cycle considerations required for deployment are beyond the scope of this neutronics-focused study.