Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LANSCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

The status of the LANSCE refurbishment project (LANSCE-R)

The Los Alamos Neutron Science Center (LANSCE) accelerator is an 800-MeV proton linac that drives user facilities for isotope production, proton radiography, ultra-cold neutrons, weapons neutron research and various sciences using neutron scattering. The LANSCE Refurbishment Project (LANSCE-R) is an ambitious project to refurbish key elements of the LANSCE accelerator that are becoming obsolete or nearing end-of-life. The conceptual design phase for the project is funded and underway. The 5 year, $170M (US) project will enable future decades of reliable, high-performance operation. It will replace a substantial fraction of the radio-frequency power systems (gridded tubes and klystrons) with modern systems, completely refurbish the original accelerator control and timing systems, replace obsolete diagnostic devices, and modernize other ancillary systems. An overview of the LANSCE-R project will be presented. The functional and operating requirements will be discussed, the proposed technical solutions presented, and the plan for successful project execution while meeting annual customer expectations for beam delivery will be reviewed.

43 PARTICLE ACCELERATORS↗

Uncertainty Quantification in Fission Cross Section Measurements at LANSCE

Neutron-induced fission cross sections have been measured for several isotopes of uranium and plutonium at the Los Alamos Neutron Science Center (LANSCE) over a wide range of incident neutron energies. The total uncertainties in these measurements are in the range 3–5% above 100 keV of incident neutron energy, which results from uncertainties in the target, neutron source, and detector system. The individual sources of uncertainties are assumed to be uncorrelated, however correlation in the cross section across neutron energy bins are considered. The quantification of the uncertainty contributions will be described here.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Cross section measurements at LANSCE for defense, science and applications

The Los Alamos Neutron Science Center (LANSCE) has three neutron sources that are used for nuclear science measurements. These sources are driven by an 800 MeV proton linear accelerator and cover an energy range from sub-thermal to hundreds of MeV. Research at the facilities is performed under the auspices of a US DOE user program under which research proposals are rated for merit by a program advisory committee and are scheduled based on merit and availability of beam time. A wide variety of instruments is operated at the neutron flight paths at LANSCE including neutron detector arrays, gamma-ray detector arrays, fission fragment detectors, and charged particle detectors. These instruments provide nuclear data for multiple uses that range from increasing knowledge in fundamental science to satisfying data needs for diverse applications such as nuclear energy, global security, and industrial applications. In addition, highlights of recent research related to cross sections measurements are presented, and future research initiatives are discussed.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Actinide Neutron-Induced Fission Cross Section Measurements At LANSCE

Fission cross sections of a range of actinides have been measured at the Los Alamos Neutron Science Center (LANSCE) in support of nuclear energy applications in a wide energy range from sub thermal energies up to 200 MeV. Parallel-plate ionization chambers are used to measure fission cross sections ratios relative to the {sup 235}U standard while incident neutron energies are determined using the time-of-flight method. Recent measurements include the {sup 233,238}U, {sup 239-242}Pu and {sup 243}Am neutron-induced fission cross sections. Obtained data are presented in comparison with existing evaluations and previous data.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

The 235 U prompt fission neutron spectrum measured by the Chi-Nu project at LANSCE

The Chi-Nu experiment aims to accurately measure the prompt fission neutron spectrum for the major actinides. At the Los Alamos Neutron Science Center (LANSCE), fission can be induced with neutrons ranging from 0.7 MeV and above. Using a two arm time-of-flight (TOF) technique, the fission neutrons are measured in one of two arrays: a 22- 6 Li glass array for lower energies, or a 54-liquid scintillator array for outgoing energies of 0.5 MeV and greater. Presented here are the collaboration's preliminary efforts at measuring the 235 U PFNS.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

LANSCE beam instrumentation and the LANSCE refurbishment project

The heart of the LANSCE accelerator complex consists of Cockroft-Walton-type injectors, a drift-tube linac (DTL) and a side-coupled linac (CCL). These systems are approaching 40 years of age and a project to re-establish high-power capability and to extend the lifetime is underway. Many of the present beam diagnostic systems are difficult to maintain, and the original beam position monitors don't provide any data at all. These deficiencies hamper beam tuning and trouble-shooting efforts. One thrust of the refurbishment project is to restore reliable operation of the diagnostic systems. This paper describes the present diagnostics systems and their limitations and the envisaged next-generation systems. The emphasis will be on the uses and requirements for the systems rather than the solutions and engineering aspects of the refurbishment.

43 PARTICLE ACCELERATORS↗

The LANL/LLNL Prompt Fission Neutron Spectrum Program at LANSCE and Approach to Uncertainties

New data on the prompt fission neutron spectra (PFNS) from neutron-induced fission with higher accuracies are needed to resolve discrepancies in the literature and to address gaps in the experimental data. The Chi-Nu project, conducted jointly by LANL and LLNL, aims to measure the shape of the PFNS for fission of {sup 239}Pu induced by neutrons from 0.5 to 20 MeV with accuracies of 3–5% in the outgoing energy from 0.1 to 9 MeV and 15% from 9 to 12 MeV and to provide detailed experimental uncertainties. Neutrons from the WNR/LANSCE neutron source are being used to induce fission in a Parallel-Plate Avalanche Counter (PPAC). Two arrays of neutron detectors are used to cover the energy range of neutrons emitted promptly in the fission process. Challenges for the present experiment include background reduction, use of {sup 239}Pu in a PPAC, and understanding neutron detector response. Achieving the target accuracies requires the understanding of many systematic uncertainties. The status and plans for the future will be presented.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Report for LANSCE Futures Spring 2021 Workshop Series

The Los Alamos Neutron Science Center (LANSCE) has a long and successful history of delivering high-impact science for NNSA missions. The breadth of science LANSCE delivers is enabled by a unique combination of beam power, flexibility, and authorization basis. Though LANSCE is entering its 50th year of operations, current plans for the stockpile require LANSCE capabilities beyond 2050. These requirements demand a technical conversation about the accelerator and the long-term scientific vision for the facility, so we convened a set of workshops to initiate that conversation. The LANSCE Futures workshops spanned three capability areas of LANSCE: dynamic radiography, scattering science, and nuclear science. Participants included the relevant experts from the programs sponsoring LANSCE, the experimentalists utilizing the end-stations, and accelerator systems experts. A final workshop combined the three focus areas to begin the conversation about capabilities that could meet future mission needs.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Upgrading the LANSCE accelerator with a SNS RF-driven H− ion source

The LANSCE accelerator is currently powered by a filament-driven, biased converter-type H− ion source that operates at 10%, the highest plasma duty factor for this type of source, using only ∼2.2 SCCM of H2. The ion source needs to be replaced every 4 weeks, which takes up to 4 days. The measured negative beam current of 12–16 mA falls below the desired 24 mA acceptance of the LANCSE accelerator. The SNS (Spallation Neutron Source) RF-driven, H− ion source injects ∼50 mA of H− beam into the SNS accelerator at 60 Hz with a 6% duty factor and an availability of >99.5% but requires ∼30 SCCM of H2. Up to 7 A h of H− have been produced during the 14-weeks-long source service cycles, which is unprecedented for small emittance, high-current, pulsed H− ion sources. The emittance of the SNS source is slightly smaller than the emittance of the LANSCE source. The SNS source also features unrivaled low Cs consumption and can be installed and started up in <12 h. LANSCE and SNS are working toward the use of SNS H− ion sources on the LANSCE accelerator because they could (a) fill the LANSCE accelerator to its capacity, (b) decrease the source replacement time by a factor of up to 7, and (c) increase source lifetime by a factor of about 4. This paper discusses some of the challenges that emerge when trying to match a different H− source into an existing injector with significantly different characteristics and operating regimes.

Stockli, Martin P.↗

The Future of LANSCE [Slides]

LANSCE is a NNSA Center for Materials and Nuclear Research. An aging stockpile presents unique challenges in materials and nuclear science. The grand challenge of a predictive materials capability includes design to manufacture and born certified. This requires capability to study manufacture to structure relationships and capability to study structure to performance relationships. LANSCE has the capabilities needed for this mission. We leverage our capability to provide broader benefit to the Nation including production of medical isotopes, industrial irradiation facility for electronics certification, and fundamental materials and physics research. The LANSCE linear accelerator is nearly 50 years old. The severity of maintenance issues is increasing. We must reinvest in LANSCE to ensure mission delivery into the future. We must develop new capability to be responsive to changing mission needs. Ultimately this will require a Dynamic Mesoscale Materials Science Capability. Now we must develop a pathway to MaRIE that ensures continued operation of LANSCE.

43 PARTICLE ACCELERATORS↗

First Examination of Irradiated Fuel with Pulsed Neutrons at LANSCE (Preliminary Results)

We present preliminary results on the characterization of an irradiated U-lOZr-lPd fuel sample that was prepared from the irradiated AFC-3A-R5A sample. U-lOZr metallic fuels are researched as host materials for potential transmutation fuels and the addition of palladium strives to bind lanthanides, thus preventing fuel-cladding chemical interactions (FCCI). These interactions limit the lifetime of metallic fuels and are caused by migration of lanthanide fission products to the periphery of the fuel slug, where they start to interact with the D9 or HT9 steel cladding, ultimately leading to failure of the mechanical integrity of the cladding. Neutrons offer bulk characterization of irradiated materials for which X-ray tomography methods are not suitable due to the immense gamma background emitted from the samples. In particular pulsed neutrons provide information from the ability to resolve the neutron energy using their time-of-flight and thus the potential to utilize neutron absorption resonance to characterize the spatial distribution of isotopes. This, in turn, may allow to characterize the distribution of fission and neutron capture products non-destructively and may ultimately be applied to the bulk of an irradiation capsule prior to destructive post-irradiation examination to identify regions of interest. To allow the characterization of entire irradiation capsules, a cask is under development in the advanced post-irradiation work package at LANL and progress on this development was reported elsewhere. In parallel, an irradiated U-lOZr-lPd sample cut from the AFC-3AR5A irradiation was shipped to LANL and will be fully characterized with an NSUF funded rapid turnaround experiment (RTE) in the 2020 LANSCE run cycle. The sample emits at a dose rate of ~3R/hr on contact and is therefore manageable with remote handling, without requiring a cask. The disk-shaped material is larger than samples prepared for analysis using electron or X-ray methods and is therefore an intermediate step towards characterization of bulk samples at LANSCE. However, since it covers the full diameter of the irradiated fuel slug, some insight on redistribution of elements, spatially resolved information on microstructure, e.g. phase composition and texture, will be possible using the pulsed neutron-based methods developed for fuel characterization at LANSCE. This report describes the development of procedures to handle the sample at LANSCE as well as preliminary data and results from tests conducted in December 2019 on the energy-resolved neutron imaging (ERNI) beam line at flight path 5 and the high pressure-preferred orientation diffractometer (HIPPO) at LANSCE. This effort is a collaboration between LANL, INL, and ORNL. To compare our capabilities with prior work, we present an overview of previously reported bulk characterization of irradiated or spent fuels. The overview addresses neutron diffraction and neutron absorption resonance spectroscopy, both of which have only few reported applications on irradiated or spent nuclear fuel, as well as neutron radiography. This literature review was already described in a previous report but is repeated here to put our current efforts in context of previous work.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Looking back at 50 years of cutting-edge capabilities: LANSCE ‘underpins Los Alamos as a world-class scientific institution’

What started with an idea and a memo has since grown into a one-of-a-kind, world-renowned facility that contributes to the nation’s advancement of science and technology. First known as LAMPF (Los Alamos Meson Physics Facility) until the 1990s when it became LANSCE (Los Alamos Neutron Science Center), the facility is celebrating the 50th anniversary of its first full-capacity proton beam on June 9, 1972. Since then, LANSCE has contributed to a range of national security goals, such as supporting the Lab’s stockpile stewardship program, helping to advance the science of medical radioisotopes, improving the understanding of hydrodynamics, and more. “LANSCE has served the nation through its near-unique capabilities,” said Alan Carr, Senior Historian at the National Security Research Center, which houses the facility’s evolution through decades of documents, photos and other materials. “Since 1972, LANSCE has been the Lab’s major experimental science facility and underpins Los Alamos as a world-class scientific institution. This was true 50 years ago and is still true today.” In commemoration of this anniversary, we’re taking a look back at LANSCE’s historic five decades, including its first director, earliest milestones and important contributions to national security.

43 PARTICLE ACCELERATORS↗

LANSCE Accelerator Modernization Project (LAMP) Overview [Slides]

LANSCE is based on a high-current 800 MeV proton accelerator capable of delivering 1 MW of beam power to the central target area. The LANSCE accelerator provides beam simultaneously to 5 separate experimental areas. LANSCE operates with 650 µs RF macro pulses at 120 Hz. Within this macro pulse several different beam timing patterns are utilized. LANSCE also accelerates H + and H – simultaneously. LANSCE celebrated 50 years of beam delivery in 2022.

43 PARTICLE ACCELERATORS↗

Leveraging the LEDA high voltage power supply systems for the LANSCE refurbishment project

The LANSCE Refurbishment Project (LANSCE-R) will revitalize the LANSCE accelerator infrastructure. Much of the equipment has been in use for over 39 years and is approaching the end of its design lifetime. As obsolescence issues make like-for-like replacements increasingly more expensive, modern systems with lower costs become a reasonable alternative. As part of the LANSCE-R project, four of the seven HV power supplies for the 805 MHz RF klystrons will be replaced. The present and future requirements for these power supplies influence the selection of replacement options. Details of the HV power supply replacement requirements and the different replacement options will be discussed. One option is to use four 95 kV, 21 A DC power supplies originally installed nearby as part of the Low Energy Demonstration Accelerator (LEDA) project. Significant material and labor cost savings can be achieved by leaving these supplies installed where they are and building a HV transport system to bring high voltage power from the existing LEDA facility to the LANSCE facility. The different replacement options will be compared based on material and labor costs as offset by long-term energy savings.

43 PARTICLE ACCELERATORS↗

Status of the LANSCE refurbishment project

The Los Alamos Neutron Science Center (LANSCE) accelerator is an 800-MeV proton linac that drives user facilities for isotope production, proton radiography, ultra-cold neutrons, weapons neutron research and various sciences using neutron scattering. The LANSCE Refurbishment Project (LANSCE-R) is an ambitious project to refurbish key elements of the LANSCE accelerator that are becoming obsolete or nearing end-of-life. The preliminary design phase for the project is funded and underway. The 6 year, $150M (US) project will enable future decades of reliable, high-performance operation. It will replace a substantial fraction of the radio-frequency power systems (gridded tubes and klystrons) with modern systems, completely refurbish the original accelerator control and timing systems, replace obsolete diagnostic devices, and modernize other ancillary systems. An overview of the LANSCE-R project will be presented. The project requirements will be discussed, the preliminary technical solutions presented, and the plan for successful project execution while meeting annual customer expectations for beam delivery will be reviewed.

43 PARTICLE ACCELERATORS↗