Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LANL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

With Whom Does LANL Publish? – A look at LANL collaborations from 1990 -2015 using the Web of Science

Collaborations are critical to the science, technology, and engineering achievements at Los Alamos National Laboratory (LANL). This report analyzed the collaborations as measured through peer-reviewed publications from the Web of Science (WoS) database for LANL for the 1990 – 2015 period. Both a cumulative analysis over the entire time period and annual analyses were performed. The results found that the Department of Energy national laboratories, University of California campuses, and other academic institutions collaborate with LANL on regular basis. Results provide insights into trends in peer-reviewed papers collaborations for LANL.

99 GENERAL AND MISCELLANEOUS↗

Advanced Laser Particle Accelerator Development at LANL: From Fast Ignition to Radiation Oncology

Laser-plasma accelerated ion and electron beam sources are an emerging field with vast prospects, and promise many superior applications in a variety of fields such as hadron cancer therapy, compact radioisotope generation, table-top nuclear physics, laboratory astrophysics, nuclear forensics, waste transmutation, Special Nuclear Material (SNM) detection, and inertial fusion energy. LANL is engaged in several projects seeking to develop compact high-current and high-energy ion and electron sources. We are especially interested in two specific applications: ion fast ignition/capsule perturbation and radiation oncology. Laser-to-beam conversion efficiencies of over 10% are needed for practical applications, and we have already shown inherent efficiencies of >5% from flat foils, on Trident using only a 5th of the intensity and energy of the Nova Petawatt laser. With clever target designs, like structured curved cone targets, we have also been able to achieve major ion energy gains, leading to the highest energy laser-accelerated proton beams in the world [3]. These new target designs promise to help usher in the next generation of particle sources realizing the potential of laser-accelerated beams.

43 PARTICLE ACCELERATORS↗

SEE LANL: Student Educational Experience at LANL [PowerPoint]

SEE LANL is designed to provide university students a hands-on nuclear safeguards training course based on the courses given to all IAEA inspectors. It aims to encourage networking and collaborations between university students/professors and laboratory staff, introduce students to the variety of safeguards-related technical work at LANL and provides early-career technical staff an opportunity to teach. Further details on the program are provided.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

MPACT LSDS Progress Report: LANL and LANL-Funded Activities in Support of Spent Fuel Measurements Using a Lead Slowing Down Spectrometer in FY 2012

During FY 2012, Lead Slowing Down Spectrometer (LSDS) measurement campaigns took place at the Los Alamos Neutron Science Center, and the Rensselaer Polytechnic Institute. At Los Alamos, we measured the response of a thorium fission chamber to a 25 gram plutonium sample, and evaluated the performance of a 4 He-filled proportional counter. At RPI, the effort lead by Professor Danon, performed an assay of fuel pins, and used a fission chamber with plutonium to evaluate the impact of room return.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Packaging and Transportation Support at LANL CTMA 2012

Operations Support Packaging and Transportation (OS-PT) supports LANL in various functions. Some highlights of the past year have been with the work relating to environmental remediation, type B packaging, non-DOT compliant transfers, and special permit training. The TA-21 remediation project was part of the ARRA funding that LANL received. The $212 million in funding was used to demolish 24 buildings at TA-21, excavate the lab's oldest waste disposal site, and install 16 groundwater monitoring wells. The project was completed ahead of schedule and under budget. More than 300 tons of metal was recycled and all the soil excavated from MDA-B was replaced with clean fill. OS-PT supported this projected by transporting more than 7 million pounds of waste to TA-54 Area G with an addendum to their TSD. Because of the public access on the transfer route, Los Alamos County restricted the transfer to happen from 2:00 AM to 4:00 AM. OS-PT conducted 8 transfers in support of this project. Some concerns included the contaminated trailers at receipt facilities when transferring filled Super Sacks. Future Super Sacks were over packed into new IP-2 Super Sacks before shipping. OS-PT is also supporting the remediation of TA-54 Area G. LANL has an agreement with the State of New Mexico to remove all TRU waste currently stored above ground from at Area G. OS-PT supports this initiative with transfers of TRU waste under LANL's TSD and support of TRU shipments to WIPP. Another project supported by our organization is gas cylinder/dewar recycling and remediation. We are focusing on reducing risk associated with unneeded gasses at LANL. To minimized excessive ordering, to save money and time, and to minimize hazards OS-PT is supporting a gas recycling program. This program will allow programmatic organization across LANL to share unused/unneeded gasses. Instead of old dewars being disposed of, OS-PT has began identifying these dewars and sending them for refurbishment. To date, this effort has saved LANL $450K and estimated saving for future efforts will be more than $1.5 million. Some Projects that are happening here at LANL are offsite source recovery, weapon component transfers, and isotope science production. There are specific packages that help support these projects for the shipment of related materials. OS-PT provides support to these packages to ensure they are and will be available to continue this support. The Areva 435-B Overpack will help the Offsite Source Recovery Project recover high activity gamma sources from various locations across the globe. The Safety Analysis for Packaging is scheduled for initial completion June of 2012. The DPP-1 package is designed to replace the Model FL, which was designed by Rocky Flats and began service in 1990. LANL has collaborated on package design with LLNL, Pantex, Y-12, and KCP. LANL is supporting LLNL on component fixture development. Testing to 10 CFR 71 is to be completed in the Fall of 2012 and scheduled for NA-174 approval in 2014. The SAFESHIELD package helps supports LANL's Isotope production projects. This package can transfer highly irradiated materials from LANL's accelerator to material processing facilities. LANL worked to renew the SAFESHEILD's Certification for 5 more years.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LANL Continuity of Operations Plan

The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratory EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may be required to support an allhazards event, including a national security emergency, major fire, catastrophic natural disaster, man-made disaster, terrorism event, or technological disaster by rendering LANL buildings, infrastructure, or Technical Areas unsafe, temporarily unusable, or inaccessible.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Summary of LANL FY19 Technical Interface Coordination with SHINE

In FY19, Los Alamos National Laboratory (LANL) provided technical support for SHINE emergent needs and technical interface coordination including coordination of SHINE CFD and thermal hydraulics conference calls, Mo-99 meetings and reviews, national laboratory conference calls, and program management activities such as reporting and tracking requirements for current FY19 activities. LANL has also provided general technology consultation support for emerging issues. LANL has participated in the bi-weekly conference calls with SHINE and other national laboratories regarding LANL’s current activities. Activities discussed include FY18 carryover items including the ANSYS Fluent-Nek5000 comparison study (for assessment of Nek5000 for coupled calculations), Supo 3-D CFD model geometry validation, and releasing CFD-MCNP coupled codes for the generic solution vessel simulations. Also, additional mid-year funded activities discussed during these conference calls include the ANL bubble experiment #2 collaboration. SHINE had a general technology consultation request in FY19. SHINE inquired about LANL’s capability to measure enrichment percentage of uranium samples, however, additional information is needed to continue. The meeting minutes for these activities are shown in Appendix A. LANL has also been providing monthly updates on the laboratory SharePoint site (managed by Pacific Northwest National Laboratory) regarding current FY19 activities. Monthly updates include current activity milestone and deliverable status, completion date updates and variances if applicable, and actual cost at the task dependent activity level. LANL attended several Mo-99 meetings and reviews in FY19. LANL attended the FY19 Mo-99 Laboratory Mid-Year Program and Financial Review at Argonne National Laboratory (ANL) on March 20-21, 2019, as well as the FY19 Mo-99 Program Meeting and Mid-Year Financial Review in Chicago, IL on April 29-30, 2019. LANL also attended the FY20 Laboratory Work Package Planning Meeting at ANL on June 4-6, 2019.

43 PARTICLE ACCELERATORS↗

Upgrades to meet LANL SF, 121-2011, hazardous waste facility permit requirements

Members of San IIdefonso have requested information from LANL regarding implementation of the revision to LANL's Hazardous Waste Facility Permit (the RCRA Permit). On January 26, 2011, LANL staff from the Waste Disposition Project and the Environmental Protection Division will provide a status update to Pueblo members at the offices of the San IIdefonso Department of Environmental and Cultural Preservation. The Waste Disposition Project presentation will focus on upgrades and improvements to LANL waste management facilities at TA-50 and TA-54. The New Mexico Environment Department issued LANL's revised Hazardous Waste Facility permit on November 30, 2010 with a 30-day implementation period. The Waste Disposition Project manages and operates four of LANL's permitted facilities; the Waste Characterization, Reduction and Repackaging Facility (WCRRF) at TA-SO, and Area G, Area L and the Radioassay and Nondestructive Testing facility (RANT) at TA-54. By implementing a combination of permanent corrective action activities and shorter-term compensatory measures, WDP was able to achieve functional compliance on December 30, 2010 with new Permit requirements at each of our facilities. One component of WOP's mission at LANL is centralized management and disposition of the Laboratory's hazardous and mixed waste. To support this mission objective, WOP has undertaken a project to upgrade our facilities and equipment to achieve fully compliant and efficient waste management operations. Upgrades to processes, equipment and facilities are being designed to provide defense-in-depth beyond the minimum, regulatory requirements where worker safety and protection of the public and the environment are concerned. Upgrades and improvements to enduring waste management facilities and operations are being designed so as not to conflict with future closure activities at Material Disposal Area G and Material Disposal Area L.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiological characterization of high Cs-137 waste items at LANL combining Cs-137 NDA results and acceptable process knowledge - 15592

Radiological characterization is an important component to disposition and disposal of radioactive waste at the Los Alamos National Laboratory. Gamma and neutron based non-destructive assay systems are available at LANL's TA-54 Area G for radiological characterization and are generally very effective in quantifying the transuranic radionuclide concentration required for a TRU or low level waste disposition determination. This is routinely performed by scaling some nuclides to direct assay results using acceptable process knowledge scaling from a directly measured key TRU nuclide, e.g., for gamma systems using a standard isotopic distribution to determine the amount of Pu-240 associated with a measured value of Pu-239. However, for two groups of LANL waste items that have high levels of Cs-137, these non-destructive assay systems were unable to make a standard TRU/LLW determination. Therefore, it was necessary to apply an extension of the typical scaling technique that keyed in on the direct Cs-137 gamma assay result to effectively characterize these waste items for TRU processing or LLW disposition. Two basic types of waste packages contained the high Cs-137 waste requiring special scaling: drums and boxes. The drums included 55-gallon, 85-gallon and 110-gallon volume sizes and the boxes included a corrugated metal box, a Standard Waste Box, and several overpack boxes containing oversized waste. All of these items contained radioactive waste generated from operations at the Chemistry and Metallurgical Research facility at LANL that included hot cell, metallographic sectioning and maintenance activities. All of the drums as well as the CMB, SWB and one oversized item in a plywood box were located above-ground at LANL's TA-54 Area G, while five of the oversized items were hot cell liners in metal boxes stored below-ground in shafts. All of the items were measured in the 2013-2014 time period at TA-54 Area G with LANL NDA systems. Most of the items were counted with LLW certified far-field gamma spectroscopy systems employing portable far-field HPGe detectors and carts and some of the items were counted on WIPP certified gamma only or gamma with neutron NDA systems. In all cases Cs-137 was quantified directly with a gamma measurement but the key TRU nuclides were not detectable. Thus, for each waste item AK/PK was studied and scaling factors to Cs-137 were established and applied to provide a comprehensive radiological characterization. A total of 49 waste items were successfully characterized as LLW based on this technique. The above ground waste items were dispositioned and disposed of at an offsite LLW repository and the below ground boxes were left in place as LLW in the TA-54 Area G shafts. This NDA with scaling application has proved effective and defensible in these high Cs-137 cases at LANL and will continue to be used as applicable and appropriate for future waste characterization at LANL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerating the disposition of transuranic waste from LANL - 9495

Los Alamos National Laboratory (LANL) was established during World War II with a single mission -- to design and build an atomic bomb. In the 65 years since, nuclear weapons physics, design and engineering have been the Laboratory's primary and sustaining mission. Experimental and process operations -- and associated cleanout and upgrade activities -- have generated a significant inventory of transuranic (TRU) waste that is stored at LANL's Technical Area 54, Material Disposal Area G (MDA G). When the Waste Isolation Pilot Plant (WIPP) opened its doors in 1999, LANL's TRU inventory totaled about 10,200 m{sup 3}, with a plutonium 239-equivalent curie (PE Ci) content of approximately 250,000 curies. By December 2008, a total of about 2,300 m3 (61,000 PE Ci) had been shipped to WIPP from LANL. This has resulted in a net reduction of about 1,000 m{sup 3} of TRU inventory over that time frame. This paper presents progress in dispositioning legacy and newly-generated transuranic waste (TRU) from ongoing missions at the LANL. The plans for, and lessons learned, in dispositioning several hundred high-activity TRU waste drums are reviewed. This waste population was one of the highest risks at LANL. Technical challenges in disposition of the high-activity drums are presented. These provide a preview of challenges to be addressed in dispositioning the remaining 6,800 m{sup 3} of TRU stored above ground and 2,400 m{sup 3} of TRU waste that is 'retrievably' stored below-grade. LANL is using subcontractors for much of this work and has formed a strong partnership with WIPP and its contractor to address this cleanup challenge.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LANL Meteorology Program Self-Assessment 2025 Update

The LANL Meteorological (Met) Program has been subject to several external reviews over the past 19 years. The DOE Meteorological Coordinating Council (DMCC) conducted an initial Met Program Site Assist Visit (SAV) in August 2006 (DMCC 2006). A follow-up SAV in August 2015 assessed progress (DMCC 2015), and in June 2023, the DOE Meteorological Subcommittee (DMSC), successor to the DMCC, conducted a second follow-up SAV (DMSC 2023), in which the Met Program was evaluated relative to the following 8 high-level questions: • What is the state of the meteorological services provided to its customers? • What is the quality of meteorological data provided to its customers and is it adequate and available to meet all customer needs? • What is the quality of atmospheric transport and diffusion modeling provided to its customers and is it applicable to complex wind flow patterns at LANL? • Are the current and future meteorological service customers being serviced appropriately? • Are there adequate human resources to meet present and future program customer needs and are they being appropriately leveraged? • Are existing instrumentation, facilities, and systems adequate to meet present and future customer needs? • Are LANL meteorological services conducted in an efficient, cost-effective manner? • Is meteorological data used to ensure safety & health of LANL personnel? More specific evaluations were performed relative to 23 performance objectives extracted from the ANSI/ANS-3.11- 2024 national standard and 14 separate performance objectives associated with consequence assessment and atmospheric transport and diffusion modeling in the consequence assessment element of DOE G 151.1-1B. In 2023, the DMSC SAV Team also reviewed the status of each of the 18 remaining recommendations from its 2015 SAV. Based on this review, DMSC stated in its Exit Briefing that the LANL meteorological program has gotten much stronger and more robust since 2015 and now represents one of the better managed programs within the DOE complex.

54 ENVIRONMENTAL SCIENCES↗

Conceptual Model of Climate Change Impacts at LANL

Goal 9 of the LANL FY15 Site Sustainability Plan (LANL 2014a) addresses Climate Change Adaptation. As part of Goal 9, the plan reviews many of the individual programs the Laboratory has initiated over the past 20 years to address climate change impacts to LANL (e.g. Wildland Fire Management Plan, Forest Management Plan, etc.). However, at that time, LANL did not yet have a comprehensive approach to climate change adaptation. To fill this gap, the FY15 Work Plan for the LANL Long Term Strategy for Environmental Stewardship and Sustainability (LANL 2015) included a goal of (1) establishing a comprehensive conceptual model of climate change impacts at LANL and (2) establishing specific climate change indices to measure climate change and impacts at Los Alamos. Establishing a conceptual model of climate change impacts will demonstrate that the Laboratory is addressing climate change impacts in a comprehensive manner. This paper fulfills the requirement of goal 1. The establishment of specific indices of climate change at Los Alamos (goal 2), will improve our ability to determine climate change vulnerabilities and assess risk. Future work will include prioritizing risks, evaluating options/technologies/costs, and where appropriate, taking actions. To develop a comprehensive conceptual model of climate change impacts, we selected the framework provided in the National Oceanic and Atmospheric Administration (NOAA) Climate Resilience Toolkit (http://toolkit.climate.gov/).

54 ENVIRONMENTAL SCIENCES↗

LANL Environmental ALARA Program Status Report for CY 2016

Los Alamos National Laboratory (LANL) ensures that radiation exposures to members of the public and the environment from LANL operations, past and present, are below regulatory thresholds and are as low as reasonably achievable (ALARA) through compliance with DOE Order 458.1 Radiation Protection for the Public and the Environment, and LANL Policy 412 Environmental Radiation Protection (LANL2016a). In 2007, a finding (RL.2-F-1) and observation (RL.2-0-1) in the NNSA/ LASO report, September 2007, Release of Property (Land) Containing Residual Radioactive Material Self-Assessment Report, indicated that LANL had no policy or documented process in place for the release of property containing residual radioactive material. In response, LANL developed PD410, Los Alamos National Laboratory Environmental ALARA Program. The most recent version of this document became effective in 2014 (LANL 2014a). The document provides program authorities, responsibilities, descriptions, processes, and thresholds for conducting qualitative and quantitative ALARA analyses for prospective and actual radiation exposures to the public and t o the environment resulting from DOE activities conducted on the LANL site.

54 ENVIRONMENTAL SCIENCES↗

Summary of LANL's Preliminary Evaluation of SWORD for FY14

This document summarizes LANL’s preliminary evaluation of the SWORD (SoftWare for Optimization of Radiation Detectors) software package for use by LANL for search scenario simulations. Project LANL12-RS-039J requires Los Alamos National Laboratory (LANL) to evaluate the SWORD software program utilized by Oak Ridge National Laboratory (ORNL) for DHS activities for use as a search scenario simulator for Emergency Response (ER) activities at LANL. Our evaluation addresses the ability of LANL to install the SWORD software on LANL computing networks and the ability of the device modeler skill set use the code during ER operations.

97 MATHEMATICS AND COMPUTING↗