Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Jobs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Identifying the "Right Stuff": An Exploration-Focused Astronaut Job Analysis

Industrial and organizational (I/O) psychologists play a key role in NASA astronaut candidate selection through the identification of the competencies necessary to successfully engage in the astronaut job. A set of psychosocial competencies, developed by I/O psychologists during a prior job analysis conducted in 1996 and updated in 2003, were identified as necessary for individuals working and living in the space shuttle and on the International Space Station (ISS). This set of competencies applied to the space shuttle and applies to current ISS missions, but may not apply to longer-duration or long-distance exploration missions. With the 2015 launch of the first 12- month ISS mission and the shift in the 2020s to missions beyond low earth orbit, the type of missions that astronauts will conduct and the environment in which they do their work will change dramatically, leading to new challenges for these crews. To support future astronaut selection, training, and research, I/O psychologists in NASA's Behavioral Health and Performance (BHP) Operations and Research groups engaged in a joint effort to conduct an updated analysis of the astronaut job for current and future operations. This project will result in the identification of behavioral competencies critical to performing the astronaut job, along with relative weights for each of the identified competencies, through the application of job analysis techniques. While this job analysis is being conducted according to job analysis best practices, the project poses a number of novel challenges. These challenges include the need to identify competencies for multiple mission types simultaneously, to evaluate jobs that have no incumbents as they have never before been conducted, and working with a very limited population of subject matter experts. Given these challenges, under the guidance of job analysis experts, we used the following methods to conduct the job analysis and identify the key competencies for current and potential future missions.

Barrett, J. D.↗

IPG Job Manager v2.0 Design Documentation

This viewgraph presentation provides a high-level design of the IPG Job Manager, and satisfies its Master Requirement Specification v2.0 Revision 1.0, 01/29/2003. The presentation includes a Software Architecture/Functional Overview with the following: Job Model; Job Manager Client/Server Architecture; Job Manager Client (Job Manager Client Class Diagram and Job Manager Client Activity Diagram); Job Manager Server (Job Manager Client Class Diagram and Job Manager Client Activity Diagram); Development Environment; Project Plan; Requirement Traceability.

Hu, Chaumin↗

Planning and Monitoring Multi-Job Type Swarm Search and Service Missions

To transition from control theory to real applications, it is important to study missions such as Swarm Search and Service (SSS) where vehicles are not only required to search an area, but also service all jobs that they find. In SSS missions, each type of job requires a group of vehicles to break off from the swarm for a given amount of time to service it. The required number of vehicles and the service rate are unique to each job type. Once a job has been completed, the vehicles are able to return to the swarm for use elsewhere. If not, enough vehicles are present in the swarm at the time that the job is identified, that job is dropped without being serviced. In SSS missions that occur in open environments, the arrival rate of jobs varies dynamically as vehicles move in and out of the swarm to service jobs. Human operators are tasked with effectively planning and managing these complex missions. This paper presents a user study that seeks to test the efficacy and ease-of-use of a prediction model known as the Hybrid Model as an aid in planning and monitoring tasks. Results show that the novel computational model aid allows operators to more effectively choose the necessary swarm size to handle expected mission workload, as well as, maintain sufficient situation awareness to evaluate the performance of the swarm during missions.

swarm search and service↗

Aerial Refueling Process Rescheduling Under Job Related Disruptions

The Aerial Refueling Scheduling Problem (ARSP) can be defined as determining the refueling completion times for each fighter aircraft (job) on the multiple tankers (machines) to minimize the total weighted tardiness. ARSP assumes that the jobs have different release times and due dates. The ARSP is dynamic environment and unexpected events may occur. In this paper, rescheduling in the aerial refueling process with a time set of jobs will be studied to deal with job related disruptions such as the arrival of new jobs, the departure of an existing job, high deviations in the release times and changes in job priorities. In order to keep the stability and to avoid excessive computation, partial schedule repair algorithm is developed and its preliminary results are presented.

Kaplan, Sezgin↗

Swarm Size Planning Tool for Multi-Job Type Missions

As part of swarm search and service (SSS) missions, swarms are tasked with searching an area while simultaneously servicing jobs as they are encountered. Jobs must be immediately serviced and can be one of multiple types. Each type requires that vehicle(s) break off from the swarm and travel to the job site for a specified amount of time. The number of vehicles needed and the service time for each job type are known. Once a job has been successfully serviced, vehicles return to the swarm and are available for reallocation. When planning SSS missions, human operators are tasked with determining the required number of vehicles needed to handle the expected job demand. The complex relationship between job type parameters makes this choice challenging. This work presents a prediction model used to estimate the swarm size necessary to achieve a given performance. User studies were conducted to determine the usefulness and ease of use of such a prediction model as an aid during mission planning. Results show that using the planning tool leads to 7 times less missed area and a 50 percent cost reduction.

Chandarana, Meghan↗

Scheduling periodic jobs using imprecise results

One approach to avoid timing faults in hard, real-time systems is to make available intermediate, imprecise results produced by real-time processes. When a result of the desired quality cannot be produced in time, an imprecise result of acceptable quality produced before the deadline can be used. The problem of scheduling periodic jobs to meet deadlines on a system that provides the necessary programming language primitives and run-time support for processes to return imprecise results is discussed. Since the scheduler may choose to terminate a task before it is completed, causing it to produce an acceptable but imprecise result, the amount of processor time assigned to any task in a valid schedule can be less than the amount of time required to complete the task. A meaningful formulation of the scheduling problem must take into account the overall quality of the results. Depending on the different types of undesirable effects caused by errors, jobs are classified as type N or type C. For type N jobs, the effects of errors in results produced in different periods are not cumulative. A reasonable performance measure is the average error over all jobs. Three heuristic algorithms that lead to feasible schedules with small average errors are described. For type C jobs, the undesirable effects of errors produced in different periods are cumulative. Schedulability criteria of type C jobs are discussed.

Chung, Jen-Yao↗

Job Scheduling Under the Portable Batch System

The typical batch queuing system schedules jobs for execution by a set of queue controls. The controls determine from which queues jobs may be selected. Within the queue, jobs are ordered first-in, first-run. This limits the set of scheduling policies available to a site. The Portable Batch System removes this limitation by providing an external scheduling module. This separate program has full knowledge of the available queued jobs, running jobs, and system resource usage. Sites are able to implement any policy expressible in one of several procedural language. Policies may range from "bet fit" to "fair share" to purely political. Scheduling decisions can be made over the full set of jobs regardless of queue or order. The scheduling policy can be changed to fit a wide variety of computing environments and scheduling goals. This is demonstrated by the use of PBS on an IBM SP-2 system at NASA Ames.

Henderson, Robert L.↗

A program to reduce coronary heart disease risk by altering job stresses

This study reports the design, implementation, and evaluation of a program attempting to reduce job stress by improving person-environment fit with respect to job aspects such as work load, responsibility, and interpersonal relationships. In order to assess the effects of the program, measures of both stress and strain were collected at three points in time--just prior to the program, immediately after the program, and three months after completion of the program. Measures of strain included systolic and diastolic blood pressure, determinations of glucose, cholesterol, and uric acid in the plasma, job satisfaction, and job related self-esteem. The findings were interpreted in light of both program incidents within specific experimental groups and general aspects of the program common to the experimental groups. Additional analyses indicated that both good person-environment fit with respect to participation predicts to good fit with respect to other job aspects over a three month interval and that stress causes strain, rather than the reverse.

Campbell, D. B.↗

Job Management Requirements for NAS Parallel Systems and Clusters

A job management system is a critical component of a production supercomputing environment, permitting oversubscribed resources to be shared fairly and efficiently. Job management systems that were originally designed for traditional vector supercomputers are not appropriate for the distributed-memory parallel supercomputers that are becoming increasingly important in the high performance computing industry. Newer job management systems offer new functionality but do not solve fundamental problems. We address some of the main issues in resource allocation and job scheduling we have encountered on two parallel computers - a 160-node IBM SP2 and a cluster of 20 high performance workstations located at the Numerical Aerodynamic Simulation facility. We describe the requirements for resource allocation and job management that are necessary to provide a production supercomputing environment on these machines, prioritizing according to difficulty and importance, and advocating a return to fundamental issues.

Saphir, William↗

Job-mix modeling and system analysis of an aerospace multiprocessor.

An aerospace guidance computer organization, consisting of multiple processors and memory units attached to a central time-multiplexed data bus, is described. A job mix for this type of computer is obtained by analysis of Apollo mission programs. Multiprocessor performance is then analyzed using: 1) queuing theory, under certain 'limiting case' assumptions; 2) Markov process methods; and 3) system simulation. Results of the analyses indicate: 1) Markov process analysis is a useful and efficient predictor of simulation results; 2) efficient job execution is not seriously impaired even when the system is so overloaded that new jobs are inordinately delayed in starting; 3) job scheduling is significant in determining system performance; and 4) a system having many slow processors may or may not perform better than a system of equal power having few fast processors, but will not perform significantly worse.

Mallach, E. G.↗

An analysis of job placement patterns of black and non-black male and female undergraduates at the University of Virginia and Hampton Institute

Research questions were proposed to determine the relationship between independent variables (race, sex, and institution attended) and dependent variables (number of job offers received, salary received, and willingness to recommend source of employer contact). The control variables were academic major, grade point average, placement registration, nonemployment activity, employer, and source of employer contact. An analysis of the results revealed no statistical significance of the institution attended as a predictor of job offers or salary, although significant relationships were found between race and sex and number of job offers received. It was found that academic major, grade point average, and source of employer contact were more useful than race in the prediction of salary. Sex and nonemployment activity were found to be the most important variables in the model. The analysis also indicated that Black students received more job offers than non-Black students.

Anderson, A. F.↗

Job Scheduling in a Heterogeneous Grid Environment

Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

Shan, Hong-Zhang↗

The honeymoon effect in job performance - Temporal increases in the predictive power of achievement motivation

Correlations between a job performance criterion and personality measures reflecting achievement motivation and an interpersonal orientation were examined at three points in time after completion of job training for a sample of airline reservations agents. Although correlations between the personality predictors and performance were small and nonsignificant for the 3-month period after beginning the job, by the end of six and eight months a number of significant relationships had emerged. Implications for the utility of personality measures in selection and performance prediction are discussed.

Helmreich, Robert L.↗

Scheduling periodic jobs that allow imprecise results

The problem of scheduling periodic jobs in hard real-time systems that support imprecise computations is discussed. Two workload models of imprecise computations are presented. These models differ from traditional models in that a task may be terminated any time after it has produced an acceptable result. Each task is logically decomposed into a mandatory part followed by an optional part. In a feasible schedule, the mandatory part of every task is completed before the deadline of the task. The optional part refines the result produced by the mandatory part to reduce the error in the result. Applications are classified as type N and type C, according to undesirable effects of errors. The two workload models characterize the two types of applications. The optional parts of the tasks in an N job need not ever be completed. The resulting quality of each type-N job is measured in terms of the average error in the results over several consecutive periods. A class of preemptive, priority-driven algorithms that leads to feasible schedules with small average error is described and evaluated.

Chung, Jen-Yao↗

Evaluation of Job Queuing/Scheduling Software: Phase I Report

The recent proliferation of high performance work stations and the increased reliability of parallel systems have illustrated the need for robust job management systems to support parallel applications. To address this issue, the national Aerodynamic Simulation (NAS) supercomputer facility compiled a requirements checklist for job queuing/scheduling software. Next, NAS began an evaluation of the leading job management system (JMS) software packages against the checklist. This report describes the three-phase evaluation process, and presents the results of Phase 1: Capabilities versus Requirements. We show that JMS support for running parallel applications on clusters of workstations and parallel systems is still insufficient, even in the leading JMS's. However, by ranking each JMS evaluated against the requirements, we provide data that will be useful to other sites in selecting a JMS.

Jones, James Patton↗

JSD: Parallel Job Accounting on the IBM SP2

The IBM SP2 is one of the most promising parallel computers for scientific supercomputing - it is fast and usually reliable. One of its biggest problems is a lack of robust and comprehensive system software. Among other things, this software allows a collection of Unix processes to be treated as a single parallel application. It does not, however, provide accounting for parallel jobs other than what is provided by AIX for the individual process components. Without parallel job accounting, it is not possible to monitor system use, measure the effectiveness of system administration strategies, or identify system bottlenecks. To address this problem, we have written jsd, a daemon that collects accounting data for parallel jobs. jsd records information in a format that is easily machine- and human-readable, allowing us to extract the most important accounting information with very little effort. jsd also notifies system administrators in certain cases of system failure.

Saphir, William↗

Second Evaluation of Job Queuing/Scheduling Software

The recent proliferation of high performance workstations and the increased reliability of parallel systems have illustrated the need for robust job management systems to support parallel applications. To address this issue, NAS compiled a requirements checklist for job queuing/scheduling software. Next, NAS evaluated the leading job management system (JMS) software packages against the checklist. A year has now elapsed since the first comparison was published, and NAS has repeated the evaluation. This report describes this second evaluation, and presents the results of Phase 1: Capabilities versus Requirements. We show that JMS support for running parallel applications on clusters of workstations and parallel systems is still lacking, however, definite progress has been made by the vendors to correct the deficiencies. This report is supplemented by a WWW interface to the data collected, to aid other sites in extracting the evaluation information on specific requirements of interest.

Jones, James Patton↗

Scheduling real-time, periodic jobs using imprecise results

A process is called a monotone process if the accuracy of its intermediate results is non-decreasing as more time is spent to obtain the result. The result produced by a monotone process upon its normal termination is the desired result; the error in this result is zero. External events such as timeouts or crashes may cause the process to terminate prematurely. If the intermediate result produced by the process upon its premature termination is saved and made available, the application may still find the result unusable and, hence, acceptable; such a result is said to be an imprecise one. The error in an imprecise result is nonzero. The problem of scheduling periodic jobs to meet deadlines on a system that provides the necessary programming language primitives and run-time support for processes to return imprecise results is discussed. This problem differs from the traditional scheduling problems since the scheduler may choose to terminate a task before it is completed, causing it to produce an acceptable but imprecise result. Consequently, the amounts of processor time assigned to tasks in a valid schedule can be less than the amounts of time required to complete the tasks. A meaningful formulation of this problem taking into account the quality of the overall result is discussed. Three algorithms for scheduling jobs for which the effects of errors in results produced in different periods are not cumulative are described, and their relative merits are evaluated.

Liu, Jane W. S.↗