(U) Archive of Historic Pu-239 Jezebel Documents
The 239 Pu Jezebel experiment of 1954–1955 was reevaluated for the 2013 edition of the International Criticality Safety Benchmark Evaluation Project (ICSBEP) Handbook. Experimental logbooks, original drawings, mass accountability statements, internal reports, and published reports were used to model four actual Jezebel assemblies with high fidelity in three dimensions. Because plutonium-alloy part masses from 1954–1955 (the time of the original experiments) were not found, assumptions were made. The most important assumption was that the assembly masses given in Los Alamos report LA-4208 (Ref. 3) in 1969 were correct. With this basic assumption, and using information found in the logbooks and mass accountability statements from 1958–1960, a distribution of the LA-4208 assembly mass among the Pu-alloy parts was postulated. Subsequently, the SF Material Transfer Receipt (November 24, 1954) was found. It lists the masses of the major parts and several minor parts as of late-November 1954. In addition, as-built drawings for the initial delivery of the major parts (October 1954, before they were remachined to reduce their reactivity) were found. These important documents, which were discovered by accident, motivated what we hope will be the final detailed Jezebel reevaluation.