Engineering PapersSearch

SEARCH · Engineering Papers

Results for “JUPITER PROJECT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Return to Jupiter - Project Galileo

The mission profile, instrumentation, and mission objectives of the Galileo probe are described. Scheduled for Shuttle launch in 1986, with a boost from the Centaur upper stage, the probe will require over 2 yr to reach the Jovian system. An atmospheric entry probe will be released during Jupiter approach, and the orbiting module will relay the temperature, pressure, radio signals, spectroscopy, magnetometry, and particle counts, originating from the parachuting probe. The orbiting module will then continue on to a series of flybys and orbits around the Jovian moons by using a gravity assist from Jupiter after each pass of a moon. The orbiter will record spectrometric, radiometric, dust, visual, magnetic, and radio propagation data. The television camera is a CCD device with 640,000 diodes forming an 800 x 800 array in one square centimeter.

Johnson, T. V.

A 5 Micron of beta Pictoris B at a Sub-Jupiter Projected Separation: Evidence for a Misalignment Between the Planet and the Inner, Warped Disk

We present and analyze a new M' detection of the young exoplanet Beta Pictoris b from 2008 VLT/NaCo data at a separation of approx. = 4 AU and a high signal-to-noise rereduction of L' data taken in December 2Q09. Based on our orbital analysis, the planet's orbit is viewed almost perfectly edge-on (i approx. 89 degrees) and has a Saturn-like semimajor axis of 9.50AU(+3.93 AU)/-(1.7AU) . Intriguingly, the planet's orbit is aligned with the major axis of the outer disk (Omega approx.31 degrees) but probably misaligned with the warp/inclined disk at 80 AU often cited as a signpost for the planet's existence. Our results motivate new studies to clarify how Beta Pic b sculpts debris disk structures and whether a second planet is required to explain the warp/inclined disk

Currie, Thayne

Project Galileo: The Jupiter Mission

Project Galileo is ecstatic to report that as of December 7, 1995, there are seventeen known satellites of Jupiter--the seventeenth being the first artificial satellite--the Galileo Orbiter!

Galileo

The Galileo Delta-VEGA mission to Jupiter

Project Galileo is to perform a more comprehensive investigation of the Jupiter system than was possible with Voyager. The Galileo spacecraft consists of both a planetary Orbiter and an atmospheric entry Probe. In connection with budgetary considerations and schedule problems, plans concerning the implementation of the project were changed a number of times. For the first seven months of 1982, the project Galileo was baselined as a Delta-VEGA transfer to be launched in 1985 by the Space Shuttle using the U.S. Air Force two-stage IUS as the upper stage augmented by a spacecraft Injection Module. The new mission and systems aspects of this 1985 Galileo Delta-VEGA baseline are compared to the prior 1985 Centaur direct transfer baseline. The techniques developed to virtually restore all the mission science in spite of greatly reduced launch vehicle performance are discussed. In July 1982, the U.S. Government reinstated the Centaur development and stipulated that Galileo be launched by Shuttle/Centaur in 1986.

Oneil, W. J.

News conference on Voyager-2-Jupiter encounter

The proceedings of a news conference on the Voyager 2 Jupiter project are presented. Topics include the instrumentation on the Voyager 2, Jupiter's atmosphere and magnetic field, the Jupiter moons, and the observations of lightning on Jupiter.

Source record

Electric Propulsion Technology Development for the Jupiter Icy Moons Orbiter Project

During 2004, the Jupiter Icy Moons Orbiter project, a part of NASA's Project Prometheus, continued efforts to develop electric propulsion technologies. These technologies addressed the challenges of propelling a spacecraft to several moons of Jupiter. Specific challenges include high power, high specific impulse, long lived ion thrusters, high power/high voltage power processors, accurate feed systems, and large propellant storage systems. Critical component work included high voltage insulators and isolators as well as ensuring that the thruster materials and components could operate in the substantial Jupiter radiation environment. A review of these developments along with future plans is discussed.

Source record

Fluorine-Hydrazine Propulsion Technology update

The current status of the fluorine hydrazine propulsion system development is discussed. Progress on the components, rocket engine, and system design is presented. A detailed look at a fluorine hydrazine system as a potential propulsion option for the Galileo Project (Jupiter orbiter) is delineated and the results of safety and technical reviews which were accomplished to verify the feasibility of this option are summarized.

Bond, D. L.

Extreme Environments Solar Power Project For Use Near Jupiter

The Extreme Environment Solar Power (EESP) Project goal was to develop solar cell and solar array design concept technologies for space power applications in high radiation and low solar intensity, low temperature (LILT) environments. NASA missions focused on outer planets, such as Jupiter, are subjected to intense radiation while experiencing less than ten percent of the solar flux relative to a mission in the general vicinity of Earth. Under these conditions, present solar array technology is not as efficient in converting the sun’s energy, and the solar array performance degrades quickly due to the additional radiation exposure. The EESP Project objectives were accomplished through four competitively selected contracts. These contracts were awarded with a Base and two option periods of performance. The Base requirements included System Design and Component Test & Analysis with a duration of nine and one half (9.5) months. The Option I requirements involved the fabrication of test hardware that NASA would evaluate following its delivery, and this period of performance had a duration of thirteen (13) months. The Option II requirements involved the fabrication of a scalable system prototype that can be integrated into a system level application and be demonstrated in a relevant environment. Option II had a duration of fifteen (15) months. The Transformational Array (TA) is an array concept developed by JHU-APL with Deployable Space Systems (DSS), SolAero Technologies and NewForge Technologies that proceeded through all three contract periods. The TA combines the DSS Roll Out Solar Array (ROSA) with Flexible Array Concentrator Technology (FACT) and SolAero’s Inverted Metamorphic Multijunction (IMM) solar cells for operation in the EESP Project environment. To achieve the EESP Project goals, the JHU-APL team conducted several investigations to improve performance of the solar cells and increase their efficiency, reduce outgassing contamination of the concentrators from the solar cell assembly adhesives, and to test the robustness of a sample blanket during deployment and retraction. Additionally, the team performed vibration, thermal cycling, and performance tests at a Standard Power Module (SPM) level. At the end of Option II, the JHU-APL team achieved the following performance metrics: • 39% beginning of life (BOL) cell efficiency at 5 AU and -125 C • 29% end of life (EOL) efficiency at the blanket level at 50 W/m2, -125 C and 4x1015 1 MeV e/cm2 • Increased specific power to 8 W/kg at EOL for the entire array including structure, deployment, and pointing mechanisms • Demonstrated the ability to survive numerous deploy-retract cycles without degradation • Reached a current System-Level Technology Readiness Level, TRL5 This presentation will describe the Transformational Array and component technologies and will discuss future potential uses for the system.

Anna Maria Pal

Project Galileo at Jupiter

Galileo made a highly successful arrival at Jupiter on December 7, 1995. The Galileo Atmospheric Entry Probe transmitted the first-ever direct measurements of an outer planet to the Orbiter mothership for nearly one hour while decsending to a pressure depth of 23 bar-far beyond the 10 bar mission requirements...This paper will summarize: 1) the Probe mission results, both engineering and scientific, 2) the problems with the Orbiter tape recorder and its recovery, 3) the Orbiter engineering operations including the loading and performance of the new flight software, and 4) early science results from the arrival and first two orbits and Ganymede encounters. Overall, mission status and the forecast for the remainder of the Orbiter's two-year primary mission will also be provided.

Galileo

Jupiter Orbiter and Probe project - Synthesis of the mission design

The Jupiter Orbiter Probe (JOP), scheduled to be launched by the Shuttle IUS in 1981, is described in terms of its scientific mission objectives. These include: analysis of the chemical composition and physical state of Jupiter's atmosphere, the chemical composition and physical state of Ganymede and Callisto, and the topology and behavior of the magnetic field and energetic particle fluxes. Attention is given to an atmospheric probe which will be launched from the main probe, and to the navigation requirements necessary to 'bounce' the JOP around the Jovian moons.

Beckman, J. C.

Navigation of the 1982 Jupiter Orbiter Probe mission

A new NASA interplanetary flight project, called Jupiter Orbiter Probe (JOP), has been recently approved by Congress. JOP involves a dual mission intended to explore the planet Jupiter and its environment with an atmospheric probe and a planetary orbiter spacecraft. The probe and orbiter vehicles are to be launched in tandem as a single spacecraft during the time from December 1981 to January 1982. The spacecraft will arrive at Jupiter at the earliest on November 14, 1984. Navigating the JOP spacecraft will be a critical task for the JOP mission. Attention is given to aspects of probe and orbiter delivery, Jupiter orbit insertion and perijove raise, the Satellite Tour, navigation development and the navigation system, the probe delivery, example orbits, velocity perturbation and correction, orbit determination characteristics, orbit determination and control profile, and the correction velocity requirements.

Rourke, K. H.

Modelling Atmospheric Scatterers Using Spacecraft Observations

This project report reviews the analysis of data from the Voyager encounter with Neptune and Triton, and the primary Galileo mission to Jupiter. The project included analysis of the images from Voyager of the limb images from Neptune and Triton. Also included in the project was analysis of the Images from Galileo of Venus' and Jupiter's limb. The project work on the latitude bands and temporal variations on Uranus using the images from Voyager is summarized. Also, work on information from the Galileo Probe's Nephelometer is also covered

Rages, Kathy A.

Experiences in managing the Prometheus Project

Congress authorized NASA?s Prometheus Project in February 2003, with the first Prometheus mission slated to explore the icy moons of Jupiter. The Project had two major objectives: (1) to develop a nuclear reactor that would provide unprecedented levels of power and show that it could be processed safely and operated reliably in space for long-duration, deep-space exploration and (2) to explore the three icy moons of Jupiter - Callisto, Ganymede, and Europa - and return science data that would meet the scientific goals as set forth in the Decadal Survey Report of the National Academy of Sciences. Early in Project planning, it was determined that the development of the Prometheus nuclear powered Spaceship would be complex and require the intellectual knowledge residing at numerous organizations across the country. In addition, because of the complex nature of the Project and the multiple partners, approaches beyond those successfully used to manage a typical JPL project would be needed. This paper1 will describe the key experiences in managing Prometheus that should prove useful for future projects of similar scope and magnitude

nuclear

Energetic protons in Jupiter's radiation belts

Estimates of the location, density, and energy of energetic protons in the Jupiter radiation belts are presented. A model of the Jupiter magnetosphere is developed by scaling from the Earth magnetosphere. Solar wind parameters, and magnetic and electric field characteristics in the magnetosphere are given for the Earth and projected for Jupiter. The upper limit of the number density of energetic protons is calculated to be 310,000/cu m, and the energy density would be about 310,000 MeV/cu m, or 51 nJ/cu m. A magnetic moment of 100 MeV/gauss for solar wind particles, a magnetic field on Jupiter's surface of 10 gauss, and a McIlwain parameter L of 7 are used. Sources of energetic particles are cosmic rays, satellite-magnetosphere interaction, and the solar wind, and their contributions are discussed. The two components of trapped energetic particle drift, one due to corotational and convective fields and the other due to gradients in the magnetic field, are described, and their periods are given.

Brice, N.

Magnetometer instrument team studies for the definition phase of the outer planets grand tour

The objectives of magnetic field investigations on missions to the outer planets were defined as well as an instrumentation system, a program of studies and instrument development tasks was proposed for the mission definition phase of the Outer Planets Grand Tour project. A report on the status of this program is given. Requirements were also established for the spacecraft and the mission which would insure their compatibility with the magnetic field investigation proposed for the outer planets missions and developed figures of merit for encounter trajectories. The spacecraft-instrumentation interface and the on-board data handling system were defined in various reports by the Project Team and in the reports by the Science Steering Group. The defining program for exploring the outer planets within the more restrictive constraints of the Mariner Jupiter-Saturn project included defining a limited magnetic field investigation.

Coleman, P. J., Jr.

Studies for the Loss of Atomic and Molecular Species from Io

The general objective of this project is to advance our theoretical understanding of Io's atmosphere by studying how various atomic and molecular species are lost from this atmosphere and are distributed near the satellite and in the circumplanetary environment of Jupiter. The project is divided into well-defined studies described for the likely dominant atmospheric gases involving species of the SO2 family (SO2, SO, 02, 0, S) and for the trace atmospheric gas atomic sodium. The relative abundance of the members of the S02 family and Na (and its parent Na(x)) at the satellite exobase and their relative spatial densities beyond in the extended corona of lo are not well known but will depend upon a number of factors including the upward transport rate of gases from below, the velocity distribution and corresponding escape rate of gases at the exobase, and the operative magnetospheric/solar-photon driven chemistry for the different gases. This question of relative abundance will be studied in this project.

Smyth, William H.