Engineering PapersSearch

SEARCH · Engineering Papers

Results for “JETTISON SYSTEM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Jettison system for a large inflatable antenna

This paper describes a jettison system used to separate a large, inflatable-deployable antenna from a free-flying spacecraft. The jettison system consists of four discrete Marman band clamps, released simultaneously via pyrotechnics. The design, analysis, analytical simulation, and testing of the system are discussed. Of particular note is the correlation of test results with the Marman band design calculations.

Jarosz, Don

Jettisoning system for a parachute's canister

Three-point automatically released suspension and jettisoning system operates independently of lander's power system and releases parachute on touchdown. The system is based on a ball-lock device operated by the shock of the parachute's opening and by the subsequent decay in the load on the main cord.

Lonborg, J. O.

Orion Launch Abort System Jettison Motor Performance During Exploration Flight Test 1

This paper presents an overview of the flight test objectives and performance of the Orion Launch Abort System during Exploration Flight Test-1. Exploration Flight Test-1, the first flight test of the Orion spacecraft, was managed and led by the Orion prime contractor, Lockheed Martin, and launched atop a United Launch Alliance Delta IV Heavy rocket. This flight test was a two-orbit, high-apogee, high-energy entry, low-inclination test mission used to validate and test systems critical to crew safety. This test included the first flight test of the Launch Abort System performing Orion nominal flight mission critical objectives. Although the Orion Program has tested a number of the critical systems of the Orion spacecraft on the ground, the launch environment cannot be replicated completely on Earth. Data from this flight will be used to verify the function of the jettison motor to separate the Launch Abort System from the crew module so it can continue on with the mission. Selected Launch Abort System flight test data is presented and discussed in the paper. Through flight test data, Launch Abort System performance trends have been derived that will prove valuable to future flights as well as the manned space program.

McCauley, Rachel J.

Design of a Jettison System For Space Transit Vehicles

Many options to re-use waste are currently being developed by NASA. These include combustion, compaction, torrefaction, and converting waste materials to an easily stored base polymer for future use. Human exploration missions require large amounts of supplies such as food, clothing and spare parts. A many-month journey to Mars will result in the generation of a substantial amount of problematic waste products. It is thought that this waste must be discarded to enable a Mars transit mission. The most cost-effective, reliable, and safest method to address this problem may be to simply jettison these materials from the spacecraft. The ability to jettison requires a multi-component integrated system design. Major components include a launcher, airlocks, trash bags, and tracking system. Depending upon mission requirements, a jettison dedicated airlock may be necessary. In other cases, the crew airlock might be all that’s needed. Examples of what to jettison include food waste, fecal containers, broken equipment, foam, expendables, hygiene products, health items, wipes, and clothing. The most important design factor is always crew safety. Other features to consider are loss of air due to the inefficiencies of vacuum pumps in the airlock, outgassing from the bags, and liquids condensing on the airlock that result in unwanted coatings. The launching system design must consider many different features: while in planetary orbit, a minimum exit velocity is necessary so the jettisoned material will not complete an orbit only to return and strike the ship. Also, for planetary protection issues, enabling waste to be sent to distant non-critical locations is highly desirable. When the space craft is in planetary transit to say, Mars, the jettison exit velocity should be low if the material is not released along the direction of travel. This is to minimize trajectory perturbations due to jettison-imposed torque on the spacecraft. Design considerations for the launcher include exit velocity, power consumption, volume and mass of material jettisoned, and frequency of jettison. Finally, the launcher must be able to handle many different types and shapes of waste products. This paper will discuss these design issues and give guidance to a pathway forward.

Steve Sepka

Orion Launch Abort System Performance During Exploration Flight Test 1

The Orion Launch Abort System Office is taking part in flight testing to enable certification that the system is capable of delivering the astronauts aboard the Orion Crew Module to a safe environment during both nominal and abort conditions. Orion is a NASA program, Exploration Flight Test 1 is managed and led by the Orion prime contractor, Lockheed Martin, and launched on a United Launch Alliance Delta IV Heavy rocket. Although the Launch Abort System Office has tested the critical systems to the Launch Abort System jettison event on the ground, the launch environment cannot be replicated completely on Earth. During Exploration Flight Test 1, the Launch Abort System was to verify the function of the jettison motor to separate the Launch Abort System from the crew module so it can continue on with the mission. Exploration Flight Test 1 was successfully flown on December 5, 2014 from Cape Canaveral Air Force Station's Space Launch Complex 37. This was the first flight test of the Launch Abort System preforming Orion nominal flight mission critical objectives. The abort motor and attitude control motors were inert for Exploration Flight Test 1, since the mission did not require abort capabilities. Exploration Flight Test 1 provides critical data that enable engineering to improve Orion's design and reduce risk for the astronauts it will protect as NASA continues to move forward on its human journey to Mars. The Exploration Flight Test 1 separation event occurred at six minutes and twenty seconds after liftoff. The separation of the Launch Abort System jettison occurs once Orion is safely through the most dynamic portion of the launch. This paper will present a brief overview of the objectives of the Launch Abort System during a nominal Orion flight. Secondly, the paper will present the performance of the Launch Abort System at it fulfilled those objectives. The lessons learned from Exploration Flight Test 1 and the other Flight Test Vehicles will certainly contribute to the vehicle architecture of a human-rated space launch vehicle.

McCauley, Rachel

Learning About Ares I from Monte Carlo Simulation

This paper addresses Monte Carlo simulation analyses that are being conducted to understand the behavior of the Ares I launch vehicle, and to assist with its design. After describing the simulation and modeling of Ares I, the paper addresses the process used to determine what simulations are necessary, and the parameters that are varied in order to understand how the Ares I vehicle will behave in flight. Outputs of these simulations furnish a significant group of design customers with data needed for the development of Ares I and of the Orion spacecraft that will ride atop Ares I. After listing the customers, examples of many of the outputs are described. Products discussed in this paper include those that support structural loads analysis, aerothermal analysis, flight control design, failure/abort analysis, determination of flight performance reserve, examination of orbit insertion accuracy, determination of the Upper Stage impact footprint, analysis of stage separation, analysis of launch probability, analysis of first stage recovery, thrust vector control and reaction control system design, liftoff drift analysis, communications analysis, umbilical release, acoustics, and design of jettison systems.

Hanson, John M.

Compact Antispin Parachute System

Costs and complexity of parachute system greatly reduced. Rigidtowline parachute system operates in three steps: (1) When aircraft begins to spin, parachute compartment opened up, and parachute unfolds; (2) Parachute deployed and spin terminated; and (3) Parachute released. Advantage of towline system allows use of much smaller parachute, reducing design loads on structural reinforcement. Also, complex pyrotechnic-deployment or jettison systems no longer necessary.

Whipple, R. D.

Separation and Staging Mechanisms for the Indian SLV-3 Launch Vehicle

A unique separation and jettison system for the ascent fairing and a staging system for the apogee motor of the first Indian satellite launch vehicle are described. Design features, development problems, and mission constraints are discussed in addition to the solutions adopted. A qualification summary is included for each system, and flight results obtained from SLV-3 launches are described.

Abdulmajeed, M. K.

Helicopter in-flight stores jettison

A helicopter emergency external-stores jettison system accommodating an experimental simplified mounting system is presented. The system's conceptual approach is described, including store interface, attachment, functional mechanisms, and system initiation. It is novel both in the stores' mounting interface logic and in the modifications to existing technology for the components. Two nonfragmenting 'ridge cut' explosive bolts were mounted in each 600-pound store to interface with a simple plate on the aircraft. Starting designs with proven technology and functional margins were demonstrated by analysis and test through the design and development. Design details of the system's components, from the explosive bolt to the initiation handle, are described.

Bement, Laurence J.

Solar maximum mission panel jettison analysis remote manipulator system

A study is presented of the development of the Remote Manipulator System (RMS) configurations for jettison of the solar panels on the Solar Maximum Mission/Multimission Satellite. A valid RMS maneuver between jettison configurations was developed. Arm and longeron loads and effector excursions due to the solar panel jettison were determined to see if they were within acceptable limits. These loads and end effector excursions were analyzed under two RMS modes, servos active in position hold submode, and in the brakes on mode.

Bauer, R. B.

Preliminary scientific rationale for a voyage to a thousand astronomical units

A proposed mission to 1000 astronomical units (TAU) is under study by the Jet Propulsion Laboratory. Launch date for a TAU mission is likely to be well into the first decade of the 21st century. Study of TAU has focused on the technologies required to carry out this ambitious mission and the identification of preliminary scientific rationale for such a deep space flight. A 1-MW nuclear-powered electric propulsion (NEP) system forms the baseline method for achieving the high velocities required. A solar system escape velocity of 106 km/s is needed to propel the TAU vehicle to 1000 AU in 50 years. The NEP system must accelerate the vehicle for about ten years before this velocity is attained because of the extremely low thrust nature of the xenon-fueled ion engines. At the end of the thrusting phase the NEP system is jettisoned to allow the TAU spacecraft and science experiments to coast out to 1000 AU. Another important technology for TAU is advanced optical communication systems, which are envisioned for transmitting science data to Earth. A 1-m optical telescope combined with a 10-W laser transponder can transmit 20 kbps to a 10-m Earth-orbit-based telescope from 1000 AU.

Etchegaray, M. I.

Ensuring Safe Exploration: Ares Launch Vehicle Integrated Vehicle Ground Vibration Testing

Integrated vehicle ground vibration testing (IVGVT) will be a vital component for ensuring the safety of NASA's next generation of exploration vehicles to send human beings to the Moon and beyond. A ground vibration test (GVT) measures the fundamental dynamic characteristics of launch vehicles during various phases of flight. The Ares Flight & Integrated Test Office (FITO) will be leading the IVGVT for the Ares I crew launch vehicle at Marshall Space Flight Center (MSFC) from 2012 to 2014 using Test Stand (TS) 4550. MSFC conducted similar GVT for the Saturn V and Space Shuttle vehicles. FITO is responsible for performing the IVGVT on the Ares I crew launch vehicle, which will lift the Orion crew exploration vehicle to low Earth orbit, and the Ares V cargo launch vehicle, which can launch the lunar lander into orbit and send the combined Orionilander vehicles toward the Moon. Ares V consists of a six-engine core stage with two solid rocket boosters and an Earth departure stage (EDS). The same engine will power the EDS and the Ares I second stage. For the Ares IVGVT, the current plan is to test six configurations in three unique test positions inside TS 4550. Position 1 represents the entire launch stack at liftoff (using inert first stage segments). Position 2 consists of the entire launch stack at first stage burn-out (using empty first stage segments). Four Ares I second stage test configurations will be tested in Position 3, consisting of the Upper Stage and Orion crew module in four nominal conditions: J-2X engine ignition, post Launch Abort System (LAS) jettison, critical slosh mass, and J-2X burn-out. Because of long disuse, TS 4550 is being repaired and reactivated to conduct the Ares I IVGVT. The Shuttle-era platforms have been removed and are being replaced with mast climbers that provide ready access to the test articles and can be moved easily to support different positions within the test stand. The electrical power distribution system for TS 4550 was upgraded. Two new cranes will help move test articles at the test stand and at the Redstone Arsenal railhead where first stage segments will be received in 2011. The Hydrodynamic Support systems (HDSs) used for Saturn and Shuttle have been disassembled and evaluated for use during IVGVT. Analyses indicate that the 45-year-old HDSs can be refurbished to support the Ares I IVGVT. An alternate concept for a pneumatic suspension system is also being explored. A decision on which suspension system configuration to use for IVGVT will be made in 2010. In the next three years, the team will complete the updates to TS 4550, upgrade the test and data collection equipment, and finalize the configurations of the test articles to be used in the IVGVT. With NASA's GVT capabilities reestablished, the FITO team will be well positioned to perform similar work on Ares V, the largest exploration launch vehicle NASA has ever built. The GVT effort continues NASA's 50-year commitment to using testing and data analysis for safer, more reliable launch vehicles.

Tuma, M. L.