A Framework for Streamlining Large Load Interconnection: An Assessment of Current Practices and Emerging Strategies for Fair and Efficient Load Interconnection Processes

This report focuses on current perceptions, challenges, and processes related to interconnection of LELs to the grid; while these loads include several types of entities, the primary focus of this work is on data centers, the largest current driver of this growth. It begins by summarizing relevant context related to load growth in the United States, including key stakeholder perceptions as data center deployment drive historic load growth nationwide. It then reviews the current landscape of large load interconnection processes and challenges and then proposes a framework of potential strategies intended to support a more consistent, streamlined, and fair approach to load interconnection. This framework is adapted from solutions proposed or adopted to address similar challenges faced in generator interconnection queues as well as notable reforms currently being proposed or enacted for large loads that could be more widely adopted.

24 POWER TRANSMISSION AND DISTRIBUTION

A Grassroots Network and Community Roadmap for Interconnected Autonomous Science Laboratories for Accelerated Discovery

Scientific discovery is being revolutionized by AI and autonomous systems, yet current autonomous laboratories remain isolated islands unable to collaborate across institutions. We present the Autonomous Interconnected Science Lab Ecosystem (AISLE), a grassroots network transforming fragmented capabilities into a unified system that shorten the path from ideation to innovation to impact and accelerates discovery from decades to months. AISLE addresses five critical dimensions: (1) cross-institutional equipment orchestration, (2) intelligent data management with FAIR compliance, (3) AI-agent driven orchestration grounded in scientific principles, (4) interoperable agent communication interfaces, and (5) AI/ML-integrated scientific education. By connecting autonomous agents across institutional boundaries, autonomous science can unlock research spaces inaccessible to traditional approaches while democratizing cutting-edge technologies. This paradigm shift toward collaborative autonomous science promises breakthroughs in sustainable energy, materials development, and public health.

Ferreira da Silva, Rafael [Oak Ridge National Labo

Policy and Cost Allocation Considerations for Large Electric Load Interconnections: Emerging Policy Trends in Rate Structures, Interconnection, and Cost Impacts on Other System Users

Load growth in the United States is rapidly increasing: load from data centers alone has tripled over the past decade, and this growth is forecasted to continue accelerating. These and other large electric loads (LELs) promise economic benefits at the state and local level, but their deployment has also led to increasing concerns about grid impacts and potential cost shifts onto other ratepayers. Legislators, regulators, and other stakeholders are increasingly proposing and enacting policies in effort to balance these and other considerations. This white paper reviews state-level legislation, selected utility rate cases, and relevant federal orders in an effort to describe and categorize relevant trends in policies related to LEL cost allocation, interconnection, and deployment. Policy categories identified through this review include tax incentives, rate actions, and requirements related to interconnection, permitting, and reporting. By offering a taxonomy of policies, this white paper aims to offer a resource to policymakers and other stakeholders navigating this transformative moment for the grid.

24 POWER TRANSMISSION AND DISTRIBUTION

A review of United States energy-only generator interconnection service policy and considerations for reform

Grid interconnection has emerged as a significant obstacle to the development of new electricity resources. There is growing interest in energy-only interconnection, which is an interconnection service option meant to allow the interconnection of new generators without ensuring their energy deliverability during all hours through the transmission system to customers. This approach potentially avoids upfront congestion-related transmission upgrades but could increase curtailment risk. Interest in energy-only interconnection is shaped by incomplete understanding of how interconnection policy functions in different jurisdictions, a knowledge gap that makes it difficult to determine how energy-only interconnection might be better used or re-designed. In this paper, we provide a regulatory review of energy-only interconnection in U.S. interconnection policy and practice, identifying jurisdictions in which rules are close to -or farther from-the theoretical concept of energy-only interconnection service. We find substantial jurisdictional differences in how energy-only interconnection is implemented, driven by differences in resource adequacy frameworks, real-time transmission operations, and state-level procurement practices. U.S. regulators have preferred local jurisdictional flexibility over federal prescription of interconnection study methods and procedures, which also contributes to differences among regions. Such findings raise fundamental questions about whether competition policies in electricity markets should extend beyond spot energy markets and into more prescriptive guidelines around interconnection rules and market entry. This paper sheds light on tensions that energy-only interconnection raises in allowing generators to access the transmission system on an as available basis and discusses how controlling thresholds for congestion-related network upgrades may be a barrier to electricity market entry.

Gorman, Will

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection Description This dataset contains input and output data for the manuscript Mongird, K. et al. (under review) titled "Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection". Input data corresponds to gridded spatial siting attributes that are necessary to conduct a random forest machine learning analysis of siting feature importance. Output data includes SHAP feature analysis outputs, and classification report values. For data on power plant siting results referred to in the manuscript, please refer to the CERF: IM3 Projected Western US Power Plant Locations data download page. The downloadable data includes values for eight different future scenarios for the Western US. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 Technical Information The dataset includes two sets of data files: (1) CERF gridded siting parameters and (2) Feature analysis outputs and classification reports. All downloadable data is in csv file format. Files with x/y coordinate information use the Albers Equal Area Conic projection (ESRI:102003). 1. CERF Gridded Siting Parameters This directory provides a balanced sample of gridded CERF siting parameters data for eight different scenarios for the Western US through 2055, seven different technologies, and eight timesteps. This data serves as input to the feature analysis. It contains the following parameters. region_name - name of region (i.e., state) sited - binary value representing whether the grid cell received a siting of that technology type (1=True) rcp - binary value representing scenario resource concentration pathway (0 = RCP4.5, 1 = RCP8.5) ssp - binary value representing scenario shared socioeconomic pathway (0 = SSP3, 1 = SSP5) climate - binary value representing cooler (0) or hotter (1) GCM forcing tech_name - generation technology name sited_year - year that values correspond to transmission_cost - cost of transmission interconnection pipeline_cost - cost of natural gas pipeline interconnection interconnection_cost - total interconnection cost (sum of transmission cost and gas pipeline cost) lmp - associated locational marginal value ($/MWh) associated with the grid cell, timestep, scenario, and technology xcoord - x-coordinate of location ycoord - y-coordinate of location 2a. Feature Analysis Output The dataset includes the feature analysis shap output for locational marginal price and interconnection cost. It contains the following parameters. technology - generator technology name scenario - name of scenario feature - name of feature, either locational_marginal_price or interconnection_cost value - the mean of absolute value of SHAP values for given feature 2b. Feature Analysis Classification Report This download includes the classification report associated with each random forest model. The dataset contains the following parameters. technology - generation technology name scenario - name of scenario test - one of precision (the proportion of predicted positives that are actually correct), recall (the proportion of actual positives that were correctly identified), f1-score (the harmonic mean of precision and recall) 0.0 - value of test for classification of 0 (grid cell not chosen for siting) 1.0 - value of test for classification of 1 (grid cell chosen for siting) accuracy - accuracy of model (i.e., fraction of all predictions that were right) macro avg - Simple average of test values for all classes weighted avg - Weighted average of test values for all classes, weighted based on Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall [Pacific Northwest National Labor

A Combined Computational and Mathematical Analysis of Interconnect Fatigue Potential in Photovoltaic Modules

A finite element model of a 60-cell monocrystalline silicon glass-polymer photovoltaic module was simulated with ±1.0 kPa and ±2.4 kPa loads applied to the glass to calculate the deformation under load. Cell-to-cell displacements were used to approximate interconnect strain and stress. A mathematical fatigue cycle life relation was fitted to data for the interconnect material (copper), to generate a life prediction at each interconnect location based on the local stress means, reversal extents, and amplitudes. Interconnect stress was found to be significantly asymmetric about zero despite symmetric positive and negative module loads due to laminate thickness offsets about the neutral plane and the effects of module framing. Cycle life results indicated that interconnect fatigue failure was unlikely to occur over a 30-year lifetime of conservative wind and snow load cycles since the typical cell design feature of leaving some unconstrained length between the cell edge and first solder pad increases the effective gauge length and decreases the stress levels below the material endurance limit. Follow-up analyses found that 3.6 mm and 6.4 mm were the minimum unconstrained lengths required to survive the assumed lifetime of wind and snow cycles, respectively, confirming that typical industrial module constructions with 8–15 mm unconstrained lengths should survive conservatively. Notably, large magnitude, low-cycle snow loading was consistently the limiting factor requiring a longer unconstrained interconnect length. Finally, insights and workflows from this study inform module interconnection design limits for survival against mechanical fatigue in deployment environments.

14 SOLAR ENERGY

Multi‐Objective Optimization for Rapid Identification of Novel Compound Metals for Interconnect Applications

Abstract Interconnect materials play the critical role of routing energy and information in integrated circuits. However, established bulk conductors, such as copper, perform poorly when scaled down beyond 10 nm, limiting the scalability of logic devices. Here, a multi‐objective search is developed, combined with first‐principles calculations, to rapidly screen over 15,000 materials and discover new interconnect candidates. This approach simultaneously optimizes the bulk electronic conductivity, surface scattering time, and chemical stability using physically motivated surrogate properties accessible from materials databases. Promising local interconnects are identified that have the potential to outperform ruthenium, the current state‐of‐the‐art post‐Cu material, and also semi‐global interconnects with potentially large skin depths at the GHz operation frequency. The approach is validated on one of the identified candidates, CoPt, using both ab initio and experimental transport studies, showcasing its potential to supplant Ru and Cu for future local interconnects.

Chemistry

Regional inertia dynamics of U.S. interconnections: An event-based measurement approach

Power grid inertia plays a vital role in frequency stability following large disturbances, yet its distribution across the U.S. grid is highly uneven. While interconnection-wide inertia benchmarks are useful, they can mask regional variability driven by resource mix, network coupling, and geographic separation. This paper extends event-driven inertia estimation to the regional scale using field measurements from the Frequency Monitoring Network (FNET/GridEye). Starting from balancing authority and independent system operator footprints, candidate regions are refined using a composite coherency score that combines frequency-trajectory shape similarity, timing spread, and lead/lag behavior to ensure dynamic consistency. A filtered sliding difference method (FSDM) is then used to construct regional frequency trajectories, detect disturbance onset, and compute robust regional rate-of-change of frequency (RoCoF). Regional, local, and interconnection inertia are estimated by combining RoCoF with event power imbalance, and additional indicators (regional-to-system inertia ratio and inertial-support arrival time) quantify regional-to-interconnection coupling and relative regional contributions. The method is demonstrated on eleven regions across the Eastern Interconnection (EI) and the Western Electricity Coordinating Council (WECC), with the Electric Reliability Council of Texas (ERCOT) used for validation. In ERCOT, estimates compared against energy management system (EMS) values achieve a mean absolute percentage error of 17.94%. WECC exhibits consistently shorter inertial-support arrival times (0.15–0.3 s) than EI (0.7–1.1 s), highlighting contrasting coupling and disturbance-propagation behavior. Overall, the results reveal pronounced spatial heterogeneity in inertia and coupling, underscoring the value of regional monitoring for both operational decision-making and long-term system planning.

Disturbance events

Inertia Estimation and Trend Analysis of the United States Power Grid Interconnections

The transition from conventional to modern power systems is causing an increase in integration of inverter-based resources (IBRs). This generally leads to a decrease in total system inertia, which in-turn increases the system’s rate-of-change-of-frequency (RoCoF) during disturbances. This poses a threat to the frequency stability of the system and may falsely trigger protective devices. To monitor system status and plan for integrating renewable energy sources like photovoltaic, wind, and energy storage systems, a realistic study of inertia estimation and analysis in the United States (US) over the past decade is needed. This paper uses field-measured phasor measurement unit (PMU) data collected throughout the US from 2013 to 2023 via the Frequency Monitoring Network (FNET/GridEye) operated by the University of Tennessee, Knoxville (UTK) and Oak Ridge National Laboratory (ORNL). The collected PMU frequency data is utilized to estimate the system inertia of the three US interconnections: Eastern, Western, and Texas. Various RoCoF time windows are investigated for estimating the inertia of each interconnection by maximizing the correlation coefficient between the measured RoCoF and power mismatch. The resulting inertia trends over the past decade show approximately a 6% decline in inertia in the Eastern interconnection, a 15% decline in inertia in the Western interconnection, and a 16% increase in inertia in Texas. Key insights into how inertia is changing amidst the complex energy landscape are extracted using the fuel mix trend data. This provides valuable information for future energy strategies and planning.

30 DIRECT ENERGY CONVERSION

Beyond the Bridge: Contention-Based Covert and Side Channel Attacks on Multi-GPU Interconnect

Recently, high-speed interconnects like NVLink have become a standard integration in modern multi-GPU systems, serving as a crucial bridge between CPUs and GPUs. This study highlights the vulnerability of multi-GPU systems to covert and side-channel attacks arising from congestion on these interconnects. An adversary, operating without special permissions, can extract private information about a victim's activities by monitoring NVLink congestion. Specifically, we leverage this insight to develop a covert channel attack across two GPUs, achieving a respectable bandwidth of 33 Kbps. Additionally, we introduce a side-channel attack that allows attackers to fingerprint applications on a remote GPU by probing the shared NVLink interconnect. We underscore the urgent nature of the threats posed by these attacks and advocate for heightened awareness within both industry and academia to implement multi-GPU interconnects with enhanced security measures.

Zhang, Yicheng

IM3 Projected U.S. Western Interconnection Grid Stress Dataset

This dataset provides projected grid stress and reliability results (including all model inputs and outputs from GO WEST and TEP) for Integrated Multisector, Multiscale Modeling (IM3) Phase 2 simulations across eight different scenarios for the U.S. Western Interconnection through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States from a set of Thermodynamic Global Warming (TGW) simulations. These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 GO WEST is an open-source power grid modeling framework for the U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BAs) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of the U.S. Western Interconnection (ACTIVSg10k). Users can select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on the GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within the GO WEST framework. The TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. In order to use TEP model, users need to create scenarios with the GO WEST framework. Please refer to README file for a detailed description of the dataset including individual files and references.

Capacity Expansion Model

Degrees of Rate Control in Interconnected Reaction Networks

Overall reactions in interconnected networks exhibit net, forward, and reverse rates that are governed by both constitutive elementary steps in the pathway of interest and branching elementary steps that lead to alternative products. Accordingly, steps in branching pathways exhibit negative net, forward, and reverse degrees of rate control, as they reduce reaction flux to the desired product. We here contextualize the forward and reverse degrees of rate control in terms of kinetic resistances (inverse of rates) and leverage the additive nature of kinetic resistance to decouple kinetic driving forces contributed by constitutive elementary steps and branching points (nodal species) in interconnected networks. Regardless of the network connectivity, forward and reverse degrees of rate control are shown to converge at equilibrium. Away from equilibrium, we identify two critical features of interconnected networks: stoichiometric regularity─condition where all stoichiometric numbers are unity─and pathway symmetry around nodal species─condition where branching pathways share the same rate constants, stoichiometry, and species concentrations/activities─that result in (i) equal forward, reverse, and consequently net degrees of rate control and (ii) forward and reverse degrees of rate control that exhibit constant offsets, respectively, across all extents of reaction. Furthermore, our discourse further provides a mathematical description for the influence of stoichiometric irregularity and pathway asymmetry on forward and reverse degrees of rate control. Altogether, the presented work details the effects of network (inter)connectivity and stoichiometry on reaction kinetics and, in doing so, establishes general protocols for capturing these effects as additive terms in the formulation of forward and reverse degrees of rate control.

10 SYNTHETIC FUELS

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection

The US Western Interconnection is facing unprecedented challenges in the form of less predictable peak demand, increasingly diverse generating resources, and fast-growing loads due to the onset of artificial intelligence, hyperscale computing, and electrification. Projecting where future generation may be developed is critical to maintaining a robust and resilient electric grid under this mounting uncertainty and variability. Using an integrated multisectoral, multiscale modeling framework that links a human-Earth systems model, an hourly load model, a geospatial power plant siting model, and an hourly grid operations model, we evaluate the power plant landscape evolution under eight alternative futures between 2020 and 2055. These futures represent a wide but plausible range of atmospheric conditions, emissions constraints, and economic, technological, and population growth assumptions. We find that local-level development can vary substantially both by generation type and capacity buildout across these futures. Specific regions of the Western Interconnection are projected to see large amounts of capacity development regardless of the future scenario. We additionally determine that projected power plant locations are more heavily influenced by the cost to interconnect to the electric grid than the locational energy value.

Mongird, Kendall

Towards dislocation-driven quantum interconnects

A central problem in the deployment of quantum technologies is the realization of robust architectures for quantum interconnects. We propose to engineer interconnects in semiconductors and insulators by patterning spin qubits at dislocations, thus forming quasi one-dimensional lines of entangled point defects. To gain insight into the feasibility and control of dislocation-driven interconnects, we investigate the optical cycle and coherence properties of nitrogen-vacancy (NV) centers in diamond, in proximity of dislocations, using a combination of advanced first-principles calculations. We show that one can engineer spin defects with properties similar to those of their bulk counterparts, including charge stability and a favorable optical cycle, and that NV centers close to dislocations have much improved coherence properties. Finally, we predict optically detected magnetic resonance spectra that may facilitate the experimental identification of specific defect configurations. Our results provide a theoretical foundation for the engineering of one-dimensional arrays of spin defects in the solid state.

Materials science

Comparative Analysis of Inter-Area Oscillations in the US Eastern and Western Interconnections

This paper presents a comparative analysis of interarea oscillations in the US Eastern and Western Interconnections using frequency disturbance data collected from the advanced wide-area Frequency Monitoring Network (FNET/GridEye), enabling us to investigate and compare the oscillation characteristics of both regions. The study analyzes the statistical data from the two interconnections, including total oscillation events, average dominant frequencies, damping ratios, and maximum amplitudes. We also explore the impact of seasonal and daily variations on oscillation occurrences and the influence of different grid topologies and operational practices. The results provide insights into both interconnections' stability and control characteristics, offering valuable information for power system operators to enhance grid stability and oscillation suppression measures.

Fu, Hao [University of Tennessee, Knoxville (UTK)]