Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ISRO”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

The NASA ISRO SAR (NISAR) Mission - Validation of Science Measurement Requirements

The NASA ISRO Synthetic Aperture Radar (NISAR) is scheduled for launch early in 2024 from the Satish Dhawan Space Centre (SDSC), at Sriharikota, near Chennai, India. This mission is the result of a collaboration between NASA and Indian Space Research Organization (ISRO), where NASA has contributed elements of the mission such as an L-band SAR, and ISRO has contributed other elements, such as an S-band SAR. After successful launch, the NISAR mission will collect left-looking L-band SAR data over most of the Earth’s land areas twice during every 12-day exact repeat orbit. (once while in an ascending orbit direction and once while in a descending orbit direction). NASA and ISRO have individual and joint requirements on the mission that include the performance of the imaging radars onboard the spacecraft. For example, NASA must demonstrate that this L-band SAR will achieve a set of identified science measurement accuracy requirements that span Ecosystem science, Solid Earth science, and Cryosphere science disciplines. Likewise, ISRO has several applications objectives on both the L-band and S-band data from NISAR that the ISRO science team and project will be developing and testing. Pre-launch and post-launch activities have been planned to validate that these requirements are met. Here, we will discuss how the NASA plans are being executed and will present any initial results at the conference.

Chapman, Bruce↗

Aboveground Biomass Estimation Using NISAR Simulated ALOS-2 Time Series Data

Aboveground biomass (AGB) is a critical parameter to better understand the global carbon cycle and to develop sustainable forest management. However, a large uncertainty prevails. L-band SAR data have demonstrated strong potential to accurately retrieve AGB over low-biomass regions (<100 Mg ha-1). The upcoming NASA-ISRO Synthetic Aperture Radar mission will collect data at L- and S-band over earth’s landmass with a repeat period of 12 days, allowing us to have ample data for monitoring biomass and its dynamics. One of the key science requirements of the mission is to produce annual AGB maps at 1-ha resolution with RMS accuracy of 20 Mg/ha for 80 percentage of area over low-biomass regions in Calibration/Validation sites. The NISAR biomass algorithm will generate AGB maps based on the parameterization of semi-empirical model along with NISAR time-series dual pol data (HH and HV). To calibrate and validate the model for mission requirements, the mission will use reference estimates of AGB produced from ground inventory plots and airborne LiDAR data collected over selected sites distributed across different global ecoregions. This paper presents the initial results of the calibration/validation of the NISAR AGB retrieval algorithm over the Lenoir Landing (LENO), Alabama, USA site using NISAR simulated ALOS-2 time series data. Five multi-temporal dual-pol HH and HV NISAR Simulated ALOS 2 data collections were used as input to assess the performance of the model. The model AGB retrieval results shows that the NISAR model was able to achieve RMS accuracy within 20 Mg/ha.

Ramachandran, Naveen [Jet Propulsion Laboratory, C↗