Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Hydro”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Hydro power flexibility for power systems with variable renewable energy sources: an IEA Task 25 collaboration: Hydro power flexibility for power systems

Hydro power is one of the most flexible sources of electricity production. Power systems with considerable amounts of flexible hydro power potentially offer easier integration of variable generation, e.g., wind and solar. However, there exist operational constraints to ensure mid-/long-term security of supply while keeping river flows and reservoirs levels within permitted limits. In order to properly assess the effective available hydro power flexibility and its value for storage, a detailed assessment of hydro power is essential. Due to the inherent uncertainty of the weather-dependent hydrological cycle, regulation constraints on the hydro system, and uncertainty of internal load as well as variable generation (wind and solar), this assessment is complex. Hence, it requires proper modeling of all the underlying interactions between hydro power and the power system, with a large share of other variable renewables. A summary of existing experience of wind integration in hydro-dominated power systems clearly points to strict simulation methodologies. Recommendations include requirements for techno-economic models to correctly assess strategies for hydro power and pumped storage dispatch. These models are based not only on seasonal water inflow variations but also on variable generation, and all these are in time horizons from very short term up to multiple years, depending on the studied system. Another important recommendation is to include a geographically detailed description of hydro power systems, rivers' flows, and reservoirs as well as grid topology and congestion.

13 HYDRO ENERGY↗

Theory of hydro-equivalent ignition for inertial fusion and its applications to OMEGA and the National Ignition Facility

The theory of ignition for inertial confinement fusion capsules [R. Betti et al., Phys. Plasmas 17, 058102 (2010)] is used to assess the performance requirements for cryogenic implosion experiments on the Omega Laser Facility. The theory of hydrodynamic similarity is developed in both one and two dimensions and tested using multimode hydrodynamic simulations with the hydrocode DRACO [P. B. Radha et al., Phys. Plasmas 12, 032702 (2005)] of hydro-equivalent implosions (implosions with the same implosion velocity, adiabat, and laser intensity). The theory is used to scale the performance of direct-drive OMEGA implosions to the National Ignition Facility (NIF) energy scales and determine the requirements for demonstrating hydro-equivalent ignition on OMEGA. Hydro-equivalent ignition on OMEGA is represented by a cryogenic implosion that would scale to ignition on the NIF at 1.8 MJ of laser energy symmetrically illuminating the target. It is found that a reasonable combination of neutron yield and areal density for OMEGA hydro-equivalent ignition is 3 to 6 × 1013 and ∼0.3 g/cm2, respectively, depending on the level of laser imprinting. This performance has not yet been achieved on OMEGA.

Nora, R.↗

1.1.1.401 - Groundbreaking Hydro and I AM Hydro Prizes

The Hydropower Geotechnical Foundations Prize ("Groundbreaking Hydro Prize") offered a total of $300,000 in cash prizes to elicit and advance innovative concepts for low-head (up to 30 ft of hydraulic head) hydropower geotechnical foundation technologies. The Innovations in Advanced Manufacturing for Hydro (I AM Hydro) prize sought to identify new ideas with the potential to have a disruptive impact in the hydropower industry and offered up to $250,000 in cash prizes.

HYDRO ENERGY↗

Coupled Thermo–Hydro–Mechanical Modeling of Hydro-Shearing Stimulation in an Enhanced Geothermal System in the Raft River Geothermal Field, USA

The Raft River Enhanced Geothermal System (EGS) demonstration project aims to improve the geothermal production by enhancing the reservoir permeability via shear stimulation in well RRG-9. In this paper, we performed a series of 3D thermo– hydro–mechanical (THM) simulations to investigate the influence of hydraulic and thermal effects on the development of this EGS. The model includes synthetic fracture populations based on borehole televiewer images and in-situ stress measurements from well RRG-9. Fracture permeability evolution is determined using an empirical permeability law developed from laboratory experiments. The model was calibrated by comparing the hydraulic response to field observations, including wellhead pressure, injection rate, and well injectivity. Particularly, we analyzed the enhancement of reservoir permeability and the spatial extent of the stimulation zone for the given injection schedule. Our results indicate that the permeability enhancement of fractured geothermal reservoir is caused by the combined effects of injection-induced cooling and fluid pressure increase. The decrease of temperature plays a dominant role in reactivation of natural fractures under the hydro-shearing mechanism, while the higher injection pressure promotes shear failure and enlarges the stimulation zone. Finally, for the specified extensional stress state, the model favors greatest permeability enhancement along the maximum horizontal principal stress, a moderate vertical enhancement, and a smaller gain along the minimum horizontal principal stress.

58 GEOSCIENCES↗

A multiscale hydro-geochemical-mechanical approach to analyze faulted CO 2 reservoirs: Original Research Article: A multiscale hydro-geochemical-mechanical approach to analyze faulted CO 2 reservoirs

This paper applies a multiscale hydro-geochemical-mechanical approach to analyze faulted CO 2 reservoirs using the STOMP-CO 2 -R code that is coupled to the ABAQUS® finite element package. STOMP-CO 2 -R models the reactive transport of CO 2 causing mineral volume fraction changes that are captured by an Eshelby-Mori-Tanka model implemented in ABAQUS®. A three-dimensional (3D) STOMP-CO 2 -R model for a reservoir containing an inclined fault was built to analyze a formation containing a reaction network with 5 minerals: albite, anorthite, calcite, kaolinite and quartz. A 3D finite element mesh that exactly maps the STOMP-CO 2 -R grid is developed for coupled hydro-geochemical-mechanical analyses. The model contains alternating sandstone and shale layers. The impact of reactive transport of CO 2 on the geomechanical properties of reservoir rocks and seals are studied in terms of mineral composition changes that affect their geomechanical responses. Simulations assuming extensional and compressional stress regimes with and without coupled geochemistry are performed to study the stress regime effect on the risk of hydraulic fracture. The tendency for the fault to slip is examined in terms of stress regime, geomechanical and geochemical-mechanical effects as well as fault inclination. The results show that mineralogical changes due to long-term injection of CO 2 reduce the permeability and elastic modulus of the reservoir, leading to increased risk of hydraulic fracture in the injection location and at the caprock seal immediately above the injection zone. Fault slip is not predicted to occur. However, fault inclination and stress regime have an important impact on the slip tendency factor.

54 ENVIRONMENTAL SCIENCES↗

LIS-Hydro: Authoritative Source for OCONUS Hydro-Intelligence

U.S. military forces are often tasked to participate in a variety of transboundary water-related decision-making activities, including humanitarian assistance operations through Department of State tasking, support of in-country infrastructure development activities that help develop or improve diplomatic relationships, and support of transboundary water treaty negotiations or disputes to reduce risk of conflict caused by water security issues. The U.S. intelligence communities have identified the coordination over shared water resources as an area of significant concern to U.S. national security (U.S. National Defense Strategy, 2018). Such transboundary water issues are projected to intensify in the future under increasingly complex population dynamics, political tensions due to parallel issues, and a changing climate. A 2017 joint NASA, USACE/RDC, and U.S. Air Force co-sponsored workshop revealed a lack of sufficient decision support tools and access to timely technical and contextual information needed to assess and respond to potential water-related threats around the world. The need for an integrated operational service, with the capacity to combine and synthesize hydrological modeling, assimilation, forecasting, and visualization capabilities across the U.S. Government, was highlighted as a key recommendation. In direct response, a subset of the U.S. Department of Defense, National Intelligence Community, and Oak Ridge National Laboratory are collaborating on the development of a fully integrated hydro-modeling and streamflow prediction system (i.e., LIS-Hydro). Completion of the project and sustainment of the operational capability by Air Force Weather will establish a national asset to assist federal agencies implement government-wide strategies around water resources (U.S. Global Water Strategy, 2017). The hydrological products and services will, for the very first time, establish a routinely available authoritative source of global water intelligence information supporting war-fighters, planners, and decision makers at all echelons and services of the U.S. military, Federal government, and intelligence community. A summary of the interagency scientific collaboration in addressing some of the key gaps and needs identified during the 2017 workshop will be presented.

Land Information System↗

Crystal-Packing Trends for a Series of 6,9,12,15,18-Pentaaryl-1-hydro[60]fullerenes

The relationship between the size of the substituents of aryl groups in a series of fifteen 6,9,12,15,18-pentaaryl-1-hydro[60]fullerenes and the solid-state structures and packing motifs of these compounds has been analyzed. Pentaarylfullerenes have a characteristic “badminton shuttlecock” shape that causes several derivatives to crystallize into columnar stacks. However, many pentaarylfullerenes form non-stacked structures with, for example, dimeric, layered, diamondoid, or feather-in-cavity relationships between molecules. Computational modeling gave a qualitative estimate of the best shape match between the ball and socket surfaces of each pentaarylfullerene. The best match was for pentaarylfullerenes with large, spherically shaped para-substituents on the aryl groups. The series of pentaarylfullerenes was characterized by single-crystal X-ray diffraction. A total of 34 crystal structures were obtained as various solvates and were categorized by their packing motifs.

36 MATERIALS SCIENCE↗

Technoeconomic Studies for the Rorex Creek Pumped Storage Hydro Project: An Evaluation of New Pumped Storage Hydro in the Tennessee Valley Authority System

This report evaluates the economic viability of the proposed 1,200 MW, 23,365 MWh Rorex Creek Pumped Storage Hydro (PSH) plant that would be located near Pisgah, Alabama. In addressing this question, this study has developed processes, models and data that better value PSH from a utility perspective, more specifically a vertically integrated utility, enabling optimal PSH design and deployment. This study is designed to enhance TVA’s toolset in making PSH investment decisions and contribute to the design of a more cost-effective, stable future grid. These techniques can then be applied to a broader range of assets and utilities.

Cohen, Stuart↗

Assess the key physics that underpins high-hydro coupling-efficiency in NDCX-II experiments and high-gain heavy ion direct drive target designs using proven hydro codes like HYDRA

The simulations provided in this milestone have solidified the theoretical underpinning of direct drive targets and also the ability to design experiments on NDCX II that will enhance our understanding of ion-beam hydrodynamic coupling, and thus be relevant to IFE. For the case of the IFE targets, we have studied hydro and implosion efficiency using HYDRA in ID, a starting point towards the goal of polar direct drive in geometry compatible with liquid wall chambers. Recent analysis of direct drive fusion energy targets using heavy ion beams has found high coupling efficiency of ion beam energy into implosion energy. However, to obtain optimal coupling, the ion energy must increase during the pulse in order to penetrate the outflowing ablated material, and deposit the energy close enough to the fuel so that the fuel achieves sufficient implosion velocity. We have computationally explored ID (radial) time dependent models of ion driven direct drive capsule implosions using the Arbitrary Lagrangian-Eulerian (ALE) code HYDRA, to help validate the theoretical analysis done so far, particularly exploring the effects of varying the ion energy and ion current over the course of the pulse. On NDCX II, experiments have been proposed to explore issues of ion penetration of the outflowing plasma over the course of the ion pulse. One possibility is to create a first pulse of ions that heats a planar target, and produces an outflow of material. A second pulse, {approx}10 ns after the first, of higher ion energy (and hence larger projected range) will interact with this outflow before reaching and further heating the target. We have investigated whether the change in range can be tailored to match the evolution of the ablation front. We have carried out simulations using the one-dimensional hydrodynamic code DISH and HYDRA to set parameters for this class of experiments. DISH was upgraded with an ion deposition algorithm, and we have carried out ID (planar) simulations. HYDRA was also used for ID (planar) and 2D (r,z) simulations of potential experiments. We have also explored whether similar physics could be studied using an energy ramp (i.e., a velocity tilt) rather than two separate pulses. We have shown that an optimum occurs in the macropulse duration (with fixed velocity tilt) that maximizes the shock strength. In the area of IFE target design we have continued to explore direct drive targets composed of deuterium-tritium fuel and ablator layers. We have extended our previous target designs at 0.44 MJ drive energy, gain 50, (50 MeV foot, 500 MeV main pulse, Rb ion, which requires a large number of beams due to a high beam space charge constraint) to a power plant scale 3.7 MJ drive energy, gain {approx}150 (220 MeV foot, 2.2 GeV main pulse, Hg ion) that eases requirements on the accelerator. We have studied the effects of two important design choices on ICF target performance. We have shown that increasing the number of foot pulses may reduce the target's in-flight adiabat and consequently improve its compressibility and fusion yield. As in the case of laser drive, the first three shocks are the most important to the target's performance, with additional shocks contributing only marginally to compression and burn. We have also demonstrated that ion range lengthening during the main pulse can further reduce the target adiabat and improve the efficiency with which beam energy is coupled into the target. (Ion range lengthening using two different kinetic energies for the foot and main pulse has previously proven effective in the design of high gain targets).

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The Power Reclamation of Utilizing Micro-Hydro Turbines in the Aeration Basins of Wastewater Treatment Plants

Upgrading the aeration basin technology can improve the oxygen transfer efficiency (OTE), while keeping the energy consumption at its minimum level. Therefore, this paper introduces a new idea of installing micro-propeller turbines in the aeration basin of a wastewater treatment plant (WWTP) to extract power from the high-velocity location in the water column. This extracted power can be used to operate a mixer at the top of the membrane to induce the mixing in that region, which will drive the less oxygenated wastewater into the water column. The rest of the extracted power will rotate microturbine rotors for electric power generation. By applying the proposed microturbines to the 13 audited facilities, it was demonstrated to achieve a gross annual energy-savings of 3,836.9 MWh, a gross annual cost-saving of $260,497, and total CO 2 emissions that would be reduced by 2,714 metric tons/year. Generally, the addition of the proposed microturbines can save up to 15.7% of the annual plant electricity consumption (1.3–12.8% of the plant annual electricity bills).

13 HYDRO ENERGY↗

Hydro-chemo-mechanical phase field formulation for corrosion induced cracking in reinforced concrete

Steel corrosion induced cracking in reinforced concrete structures is often caused by volumetric straining at the steel-concrete interface. This volumetric strain is mainly controlled by the rate of generation of corrosion product, which depends on the diffusion of Cl{sup −} and dissolved O{sub 2} as well as the chemical reaction at the steel-concrete interface. While many numerical modeling techniques have been proposed to tackle this complex phenomenon, most have been limited to using staggered solution schemes, where the diffusion, chemical reaction, mechanical strain, and crack fields are solved for separately. Unfortunately, such approaches introduce numerical errors that can lead to unrealistic predictions. Therefore, a coupled solution, is needed to remove the formulation induced errors and understand this complex phenomenon. To provide a unifying solution framework for corrosion induced cracking in reinforced concrete, a phase field formulation is presented and implemented with FEM algorithms. The governing equations are derived from the system's free energy and Fick's law of diffusion. The proposed formulation was first validated in 1D by comparing the modeling results with the semi-analytical solution approximated via Laurent series to avoid singularities in the complex domain. 2D plane strain solutions to the embedded rebar undergoing corrosion induced cracking with pre-cracks are also presented and compared with the approximated solutions from linear elastic fracture mechanics theory (LEFM). The modeling of crack propagation enabled by the proposed formulation is also presented along with parametric studies to reveal the roles of the fracture toughness and permeability of the concrete on the corrosion induced cracking. A case study was also conducted on H-pile steel with concrete jackets to demonstrate the feasibility of modeling corrosion induced fracture in reinforced concrete structures with complex steel-concrete interfaces.

36 MATERIALS SCIENCE↗

Hydro-frac monitoring using ground time-domain electromagnetics: Hydro-frac monitoring using ground time-domain EM

& Engineers. As motivation for considering new electromagnetic techniques for hydraulic fracture monitoring, we develop a simple financial model for the net present value offered by geophysical characterization to reduce the error in stimulated reservoir volume calculations. Additionally, this model shows that even a 5% improvement in stimulated reservoir volume for a 1 billion barrel (bbl) field results in over 1 billion U.S. dollars (US$) in net present value over 24 years for US$100/bbl. oil and US$0.5 billion for US$50/bbl. oil. The application of conductivity upscaling, often used in electromagnetic modeling to reduce mesh size and thus simulation runtimes, is shown to be inaccurate for the high electrical contrasts needed to represent steel-cased wells in the earth. Fine-scale finite-difference modeling with 12.22-mm cells to capture the steel casing and fractures shows that the steel casing provides a direct current pathway to a created fracture that significantly enhances the response compared with neglecting the steel casing. We consider conductively enhanced proppant, such as coke-breeze-coated sand, and a highly saline brine solution to produce electrically conductive fractures. For a relatively small frac job at a depth of 3 km, involving 5,000 bbl. of slurry and a source midpoint to receiver separation of 50 m, the models show that the conductively enhanced proppant produces a 15% increase in the electric field strength (in-line with the transmitter) in a 10-Ωm background. In a 100-Ωm background, the response due to the proppant increases to 213%. Replacing the conductive proppant by brine with a concentration of 100,000-ppm NaCl, the field strength is increased by 23% in the 100-Ωm background and by 2.3% in the 10-Ωm background. Finally, all but the 100,000-ppm NaCl brine in a 10-Ωm background produce calculated fracture-induced electric field increases that are significantly above 2%, a value that has been demonstrated to be observable in field measurements. © 2015 European Association of Geoscientists

58 GEOSCIENCES↗

Brigham City Hydro Generation Project

Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction from Jerome, Idaho for the Upper Power Plant construction. A kickoff meeting was June 24, 2014 and demolition was immediately started on building. Because of a delivery delay of Turbine, Generator and Equipment from Canyon Brigham City had to request another extension for the final date of completion. DOE awarded modification (.007) to Brigham City with a new completion date of August 1, 2015. The Turbine has had a few adjustments to help with efficiency; but the Generator had a slight vibration when generator got hot so Canyon Industries had U S Motor’s that manufactured the generator come to check out the issue. The other Equipment seems to be running normal. Brigham City, Sunrise Engineering and Canyon Industries met to determine what the vibration in the generator was and how to solve the issue Us Motor’s found some welds that failed: they have been repaired. U S Motor’s delivered the repaired generator Feb. 17, 2015. Canyon Industries arranged for a crane to installed generator in Power Plant. U S Motor’s balanced and wired generator. Plant Operators put the generator back on line. Canyon Industries returned and gave their approval to keep Hydro online. After Hydro was put back into operations it kept going off line because of overheating issues. Canyon Industries returned and replaced sensors and adjusted them to the proper settings for normal operations. Brigham City added additional steel screens to windows to increase air flow in Power Plant Building. After construction phase of the Upper Hydro Plant some landscaping has been restored around the building additional gravel brought in and leveled out and the road that was cut through for conduits to run wires. A retaining wall was installed to protect penstock. The Upper Hydro Plant is complete and in full operations. The final reimbursement was submitted.

13 HYDRO ENERGY↗