Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Hoisting&Rigging”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Marine Energy Technology Development Risk Management Framework

Over the past decades, the global marine energy industry has suffered a number of serious technological and commercial setbacks. To help reduce the risks of industry failures and advance the development of new technologies, the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) developed a Marine Energy Risk Management Framework in 2015, with this revision published in 2024. This risk management framework shall be utilized on all DOE Water Power Technologies Office (WPTO) projects that require system testing in the open water. By addressing uncertainties, the Marine Energy Risk Management Framework increases the likelihood of successful development of marine energy converter technology. It covers projects of any technology readiness level technology performance level (TPL) and all risk types (e.g. technological risk, regulatory risk, commercial risk) over the development cycle. This risk framework is not a substitute for other risk management procedures that may be required for marine operations, such as installations at sea, hoisting and rigging, safe diver operations, and other safety requirements. This risk framework is intended to meet DOE's risk management expectations for marine energy technology research and development efforts from WPTO. It also provides an overview of other relevant risk management tools and documentation.

16 TIDAL AND WAVE POWER↗

Restructuring and Optimizing Reactor Building Lifting Processes & Designing a Solution for an Overhead Door Handling Forklift Attachment

This poster presents two innovative projects aimed at enhancing operational efficiency and safety at the Advanced Test Reactor (ATR) Complex. The first project focuses on restructuring the existing lift book used for hoisting operations within the ATR Reactor Building. The current lift book, a cumbersome 150+ page document, is being transformed into a more efficient format using charts that allow for quick identification of maximum lift heights based on object footprint and weight. This new method also considers various parameters such as floor integrity and reactor status, dividing entries into four distinct charts to improve usability and safety during lifts. The second project involves designing a specialized forklift attachment for handling an overhead door at the ATR Reactor Building. The attachment is engineered to securely lift and lower a 1200lb, 14ft long door, ensuring safe replacement operations. The design process included research on forklift attachment codes, modeling in Autodesk Inventor, and testing through Finite Element Analysis (FEA) and hand calculations to confirm the attachment's structural integrity. Future work includes completing detailed drawings and an Engineering Calculations Analysis and Review (ECAR) document to proceed with manufacturing and assembly. Together, these projects demonstrate a commitment to optimizing reactor building operations through innovative engineering solutions and safety considerations.

42 - ENGINEERING↗

Autonomous Stabilization and Orientation Control of Hoisted Payloads

An orientation control system prototype has been developed for hoisted payloads. This system will allow payloads to be lifted off inclined surfaces while maintaining orientation control, allowing removal of tightly packed payloads without colliding with adjacent objects. For this concept, the payload is hoisted with a crane using a rigging system composed of a cable routed through two capstans and three or four attachment points on the payload. Motors rotate the capstans to adjust the cable lengths to the payload, and thereby control the orientation of the payload. Initial testing of the prototype was completed using manual control, however the algorithms necessary to fully automate the system are presented in this paper.

control↗

Space-saving hoist for tank manholes

Working platform and collapsible basket facilitate entry of men with equipment into the overhead manhole of a deep tank. A winch and pulley rigging hold the basket which is suspended in the manhole. The basket is suspended at three points without the rig impinging on the area of the manhole.

Ehrhardt, W. R., Jr.↗