Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “High capacity transmission line”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Multi-Gigawatt Electric Highway

Ultra-Compact Electrical Transmission Lines are a new transmission line technology that uses large, hollow, aluminum beams to carry current instead of thin wires. Capacity is 4.5 times higher, power losses are 3 times lower, and cost per mile is a little lower than conventional lines. Resilience and reliability are higher. The beams are enclosed within concrete walls and out of the weather, protected from high winds, ice storms, fires, and lightning. The 230 kV version is 9 feet high x 11 feet wide and can use existing rights of way next to existing transmission lines or highways. With a little landscaping, these transmission lines are not an eyesore and will be much easier to permit on existing rights of way.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Game Theory Approaches for System-level Incentive Design

This report presents a generalized Stackelberg game framework for designing and evaluating financial incentives that enhance power system resilience through strategic deployment of distributed energy resources(DERs) under various contingencies. The proposed approach addresses the challenge of coordinating individual community investment decisions to meet system-wide resilience objectives. The framework is demonstrated in a three-community test system subjected to two transmission contingency scenarios: inter-community line failure (Case 1) and complete main grid disconnection (Case 2). In both cases, three incentive levels are compared: a Base case with no financial incentives, and low and high incentive cases. In Case 1, the Base case (no incentives) results in a total installed DER capacity of 217.2 MW, with no load shedding due to alternative routing, but community costs remain high. Increasing incentives raises DER deployment to 286.9 MW, lowers aggregate community costs by $22M annually, and completely avoids the need for costly new transmission line construction. In Case 2, the Base case results in 24.3 MWh of unserved load; introducing incentives eliminates all load shedding and ensures up to 89 MWh of battery storage is available for emergency reserve. These results demonstrate that targeted incentives can dramatically improve grid resilience and cost-effectiveness. The framework thus offers policymakers and system planners a robust tool to quantify and compare the effectiveness of incentive programs for multi-community transmission networks behavior, system resilience, and economic efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Enhanced Computational Framework for Energy Storage Participation in Transmission Planning with Electricity Market Participation: Dynamic Market Participation Restriction Estimation

In the previous study and report, we developed a computational framework to explore the technical and economic viability of the dual use of pumped storage hydropower (PSH) for both transmission assets and market participation. The rationale for the dual-use application is to improve the resource utilization rate and reduce the cost recovery burden. A PSH-based transmission solution generally has a large capacity, which corresponds to a higher investment cost compared to a traditional line solution. Market participation may allow the PSH asset to offset part of its high investment cost. A critical question is whether it is economically and technically viable to allow dual use of a PSH-based transmission project without jeopardizing transmission system reliability. And a more specific follow-up question is how to improve market participation performance while maintaining transmission reliability. In this study, we extend the computational framework by updating the method to determine transmission service obligation requirements dynamically based on the possibility of the need for transmission service in operation. Specifically, we correlate the need for transmission service with the probability of thermal overloading on a monitored transmission line, which is essentially based on the probability distribution of power flow and its probability of exceeding the line rating based on system dispatch and operational uncertainties. In addition, the need depends on the level of risk that a system operator is willing to take. The higher the risk tolerance, the lower the requirement that the system operator would apply to the PSH project as a transmission asset. The requirements are updated every day before the PSH project determines its market participation strategy. With the updated transmission service requirements, it is expected that a PSH project can serve as a transmission asset when the transmission system is at risk and really needs it, while it can participate in a market with sufficient information and certain restrictions. In this way, the transmission service quality and market participation performance can both be improved.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Transferring data oscilloscope to an IBM using an Apple II+

A set of PASCAL programs permitting the use of a laboratory microcomputer to facilitate and control the transfer of data from a digital oscilloscope (used with photomultipliers in experiments on soot formation in hydrocarbon combustion) to a mainframe computer and the subsequent mainframe processing of these data is presented. Advantages of this approach include the possibility of on-line computations, transmission flexibility, automatic transfer and selection, increased capacity and analysis options (such as smoothing, averaging, Fourier transformation, and high-quality plotting), and more rapid availability of results. The hardware and software are briefly characterized, the programs are discussed, and printouts of the listings are provided.

Miller, D. L.↗

Abstract for CRADA among NETL, Ohio University, and MetalKraft Technologies, LLC

The electrical grid faces challenges for meeting accelerated electricity demand arising from the electrification of building and transportation sectors. According to the DOE Grid Development Office, 70% of transmission lines are approaching the end of their lifecycle. The aging grid and insufficient transmission capacity necessitate the development of new technologies to improve overall grid performance. The conventional conductors used for electrical transmission lines suffer from substantial energy losses, high costs and low durability. These inefficiencies result in higher operational costs, increased energy waste, and difficulties in managing power flow. Improving the grid will require metals and composites with higher electrical conductivity and strength than the materials currently used. This CRADA will develop technologies to improve the grid by fabricating carbon metal composites with improved electrical, structural, and mechanical properties in comparison to metals that do not contain carbon additives. The composites will be made by incorporating carbon materials (graphite, graphene) into aluminum, copper, and other metals. The work will focus primarily on improving material properties that enhance the performance of these materials in electrical conductor applications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Concurrent Cooling Effects of Dynamic Line Ratings on Wind Plant Gen-Tie Lines

This report was prepared for the Wind Energy Technology Office for the FY 2022, quarter 2 deliverable. This details the use of dynamic line rating technology to rate a series of gen tie lines connecting wind plants to the regional transmission lines. This consists of two primary study regions, the first on the desert west of Idaho Falls, and the second in the region east of the Cascades along the Columbia River Gorge. The TREAD program that was developed at INL was used to create generated gen-tie lines based on nearby regional transmission line connections. The capacity availability of the gen tie lines are compared with the power production of the wind farms. Overall, the INL Site location shows a much greater capacity for the gen-tie lines due to the higher wind speeds. Across both locations, the HRRR data shows higher wind speeds than observed at the observational weather stations. For both the Columbia Gorge and Idaho areas, the sites show that a statically rate gen-tie could carry additional capacity far above the rated during periods of high wind due to the concurrent cooling effects.

17 WIND ENERGY↗

Optimization Model and Algorithm for Capacity Planning and Operation of Reliable and Carbon-neutral Power Systems with High Penetration of Renewable Generation

In this work, we propose a Generalized Disjunctive Programming (GDP) model that optimizes both long-term capacity planning (such as the number and size of dispatchable/renewable generators, batteries, and transmission lines) and hourly operation (such as on/off schedules of dispatchable generators, power output from each generator, and power flow) to maximize power system reliability while minimizing total cost and CO2 emissions.

Cho, Seolhee↗

Sensitivity Effects of High Temperature Overhead Conductors to Line Rating Variables

IEEE/CIGRE standards provide a base for overhead transmission line ratings Steady State Ampacity industry standard for Static Ratings using conservative environmental assumptions Measurement of many types of sensors provide a possibility to provide more capacity as a time varying capability Direct sensors of line temperature, tension, or sag provide critical, location specific information. Require complex transformation to determine line ampacity rating Are direct measurements sensors placed at key location(s)? Testing and careful calibration of sensors required Need to understand impact of uncertainties on sensors/measurements/ and forecasts

24 POWER TRANSMISSION AND DISTRIBUTION↗

Low Latency and High Data Rate (LLHD) Scheduler: A Multipath TCP Scheduler for Dynamic and Heterogeneous Networks

The scheduler is a crucial component of the multipath transmission control protocol (MPTCP) that dictates the path that a data packet takes. Schedulers are in charge of delivering data packets in the right order to prevent delays caused by head-of-line blocking. The modern Internet is a complicated network whose characteristics change in real-time. MPTCP schedulers are supposed to understand the real-time properties of the underlying network, such as latency, path loss, and capacity, in order to make appropriate scheduling decisions. However, the present scheduler does not take into account all of these characteristics together, resulting in lower performance. We present the low latency and high data rate (LLHD) scheduler, which successfully makes scheduling decisions based on real-time information on latency, path loss, and capacity, and achieves around 25% higher throughput and 45% lower data transmission delay than Linux’s default MPTCP scheduler.

97 MATHEMATICS AND COMPUTING↗

A Review of Value of Solar Studies In Theory and In Practice

This brief summarizes a collection of state- and utility-commissioned value-of-solar (VoS) studies and related literature, with a focus on who commissioned the study, which value and cost categories were discussed and/or quantified, and the methods used. Our objective is to compile information on prior VoS studies to inform state regulators and other stakeholders that may pursue related studies or integrate findings into rate design. The brief is organized into three parts: 1) an introduction to distributed solar photovoltaic (DPV) compensation; 2) a review of theoretical research on VoS; and 3) a review of VoS studies. The vast majority of VoS studies have served an informational role of quantifying the net benefits of PV. Three studies were commissioned in states or utility service territories that subsequently implemented VoS tariffs in California, New York, and Austin, Texas. When applied as a tariff, VoS aims to compensate PV output as efficiently as possible by doing so at rates that reflect the marginal benefits and costs of PV through value and cost categories that may vary temporally and/or geographically. This could lead to higher compensation in locations and times where more PV output is more valuable and consequently drive adoption in those locations to provide more societal benefits. Value and cost factors can be broadly grouped into five categories: generation, transmission, distribution, other utility, and other social categories. Those conducting VoS studies must weigh various tradeoffs when deciding which categories to include and quantify. Tradeoffs include prioritizing values based on their magnitude of value or cost impact, as well as taking into account the feasibility of data collection and accurate quantification. Values of higher magnitude and estimation feasibility are quantified in the majority of studies, including the earliest of studies conducted in the 2000s and 2010s. Additionally, some values of higher magnitude but low feasibility in the earliest of studies have become quantifiable in recent years. There are some values with low average system-wide levels but very high magnitude in specific locations or hours. The value magnitude in some cases can be tied to DPV penetration with low value in areas with little congestion and/or low penetration and vice versa. In these cases, values that are easier to quantify are often incorporated, while those that are more difficult are often addressed via a placeholder value. The placeholder value is paired with a discussion around data needs and methods to improve future estimates, as well as a conversation about when these value categories may increase in magnitude and necessitate more rigorous quantification. This brief summarizes findings from two meta-analyses of VoS studies that took place between 2005 and 2018, as well as findings from four additional studies published from 2018 to 2023. Table ES-1 summarizes the various value and cost categories included in each respective study and whether they were quantified, discussed, or omitted. Values such as avoided energy, capacity, transmission capacity, line losses, and avoided environmental costs are quantified in every study. Some categories were deemed harder to quantify and less impactful at the time of the study, so they were discussed but not quantified (e.g., ancillary services). Other categories, including many at the distribution level, were very locationally and/or temporally specific and dependent on high DPV penetration. These were sometimes quantified and at other times discussed. Notably, when it came to utility costs, integration costs were discussed in all cases, though they were deemed to have a small impact. Other utility costs were omitted for the most part; however, the utility-commissioned study (by NorthWestern Energy in Montana) included both lost utility revenue and programmatic/administrative cost categories. While there are some similarities across studies, each had fairly unique methods that are detailed in the body of this brief.

14 SOLAR ENERGY↗

Integration of New Technology Considering the Trade-Offs Between Operational Benefits and Risks: A Case Study of Dynamic Line Rating

Electric grid operators are adept at handling complexity and uncertainty. However, with increasing introduction of renewable generation, distributed energy resources, and more frequent severe weather events, operators will experience new workload and challenging decision scenarios. Here, this paper quantifies risks and benefits from an operator's perspective of introducing weather based forecast Dynamic Line Ratings (DLR) using variable wind conditions in addition to ambient temperature to relieve transmission congestion and facilitating more offshore wind (OSW). A concept of operations (CONOPS) applied to a forecast DLR implementation and its integration with OSW is defined. A method for evaluating tradeoffs of derating to make the rating more conservative but decreasing the benefit was developed and applied to a case study for two existing overhead transmission lines on Long Island, New York. The CONOPS uses historical day-ahead and hour-ahead High Resolution Rapid Refresh weather forecasts and weather station data to support planning and real-time operations. The analysis determines the risk of downgrades in real-time operational rating compared to the forecast and quantifies the frequency and severity of last-minute downgrades. The risk is compared against the benefits in increased capacity to provide insights on the additional amount of uncertainty DLR and OSW will add to the operator's workload.

17 WIND ENERGY↗

Broadband bandpass Purcell filter for circuit quantum electrodynamics

In circuit quantum electrodynamics, qubits are typically measured using dispersively coupled readout resonators. Coupling between each readout resonator and its electrical environment, however, reduces the qubit lifetime via the Purcell effect. Inserting a Purcell filter counters this effect while maintaining high readout fidelity but reduces measurement bandwidth and, thus, limits multiplexing readout capacity. In this Letter, we develop and implement a multi-stage bandpass Purcell filter that yields better qubit protection while simultaneously increasing measurement bandwidth and multiplexed capacity. Here, we report on the experimental performance of our transmission-line-based implementation of this approach, a flexible design that can easily be integrated with current scaled-up, long coherence time superconducting quantum processors.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

SP-100 power system conceptual design for lunar base applications

A conceptual design is presented for a nuclear power system utilizing an SP-100 reactor and multiple Stirling cycle engines for operation on the lunar surface. Based on the results of this study, it was concluded that this power plant could be a viable option for an evolutionary lunar base. The design concept consists of a 2500 kWt (kilowatt thermal) SP-100 reactor coupled to eight free-piston Stirling engines. Two of the engines are held in reserve to provide conversion system redundancy. The remaining engines operate at 91.7 percent of their rated capacity of 150 kWe. The design power level for this system is 825 kWe. Each engine has a pumped heat-rejection loop connected to a heat pipe radiator. Power system performance, sizing, layout configurations, shielding options, and transmission line characteristics are described. System components and integration options are compared for safety, high performance, low mass, and ease of assembly. The power plant was integrated with a proposed human lunar base concept to ensure mission compatibility. This study should be considered a preliminary investigation; further studies are planned to investigate the effect of different technologies on this baseline design.

Mason, Lee S.↗

Tribal Engagement in Transmission Planning

The purpose of this white paper is to provide Tribes with information that (a) helps assess whether transmission access is important for their energy goals, and (b) provides guidance on how to engage in transmission planning, if and when doing so would help the Tribe achieve its energy goals. DOE's Office of Indian Energy notes that "Indian Country contains vast untapped energy resources" (OIE 2023). Individual tribes express a wide array of energy needs and goals, ranging from simple access to basic electricity service and energy efficiency tools, to the development of utility-scale generating plants. Access to transmission is a key part of this multifaceted tribal energy picture. About 2.3 percent of the nation's transmission miles are on tribal lands (OIE 2023). Even within that slice, however, circumstances vary widely. Much of that transmission is for local network delivery (138kV or less). There are some large-capacity 500kV lines, but in many cases the Tribe has limited access to them even when they run across the reservation. Some of the Tribes with the largest land area have little transmission, and some such as Navajo Nation and Hopi Tribe have many homes with no access to electricity. This white paper begins with a high-level summary of transmission issues that can affect a Tribe's energy goals. The discussion includes findings from major transmission-related studies, including the 2023 National Transmission Needs Study (GDO 2023). It then discusses strategies that could help a Tribe safeguard its interests when those interests intersect transmission infrastructure planning.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Probabilistic Zonal Reserve Requirements for Improved Energy Deliverability with Wind Power

In power systems with high penetration of renewable energy resources, uncertainty and variability of these stochastic resources introduce additional challenges for the operation of power systems. To improve the power system's reliability in the face of uncertainty, reserves are required as additional generation capacity to rebalance the power system following random disturbances. However, reserve deliverability is not guaranteed, because it may encounter potential transmission line congestion. Zonal reserve requirements can address this issue, but operators lack efficient ways to allocate reserves to zones while accounting for wind power forecast uncertainty. Herein we propose a methodology for probabilistic zonal reserve requirements to address wind power forecast uncertainties. This method estimates the probability distribution of line flows based on the system generation margin and injection shift factor. This estimate is then used to construct pre-defined and post-zonal reserve requirements. Case studies demonstrate that the proposed method efficiently schedules energy and reserves to balance energy and manage deliverability with wind power forecast uncertainty.We also discuss operational implications of the proposed method.

17 WIND ENERGY↗

A cost–benefit framework to evaluate capacity upgrade options in overhead line transmission planning

This paper presents the methodology behind the new Reconductoring Economic and Financial Analysis (REFA) tool, an open-access software, used by transmission utilities to evaluate transmission capacity enhancement options. The proposed methodology is intended to be used in a new planning stage, after the capacity expansion and prior to the individual transmission project engineering, allowing capacity upgrade options (reconductoring, rebuild or voltage upgrade), and respective conductor selection, to be compared under the same economic basis. Furthermore, the REFA tool implements a methodology to rank project options and conductor types based on economic criteria, considering an approximation of the ampacity and sag constraints. Results, using 5 real transmission lines in the US, show that least-cost combinations of project and conductor types can be very diverse, which emphasizes the need for the proposed methodology and tool.

Advanced conductors↗

Variable Transmission Line Ratings

This paper outlines the concept of variable-transmission facility ratings. This topic is of heightened importance following the recent Federal Energy Regulatory Commission (FERC) Order No. 881 which requires the implementation of ambient adjusted ratings (AARs) for FERC jurisdictional portions of the transmission system. Additionally, FERC issued an Advanced Notice of Proposed Rulemaking (ANOPR) implying a future order on Dynamic Line Rating (DLR) requirements. The various types of facility-rating methodologies will be discussed with a focus on how they can benefit the stability, capacity, and reliability of the grid.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Quasi-Optical Transmission Line for 94-GHz Radar

A quasi-optical transmission line (QOTL) has been developed as a low-loss transmission line for a spaceborne cloudobserving radar instrument that operates at a nominal frequency of 94 GHz. This QOTL could also readily be redesigned for use in terrestrial millimeter-wave radar systems and millimeter-wave imaging systems. In the absence of this or another lowloss transmission line, it would be necessary to use a waveguide transmission line in the original radar application. Unfortunately, transmission losses increase and power-handling capacities of waveguides generally decrease with frequency, such that at 94 GHz, the limitation on transmitting power and the combined transmission and reception losses (greater than 5 dB) in a waveguide transmission line previously considered for the original application would be unacceptable. The QOTL functions as a very-lowloss, three-port circulator. The QOTL includes a shaped input mirror that can be rotated to accept 94-GHz transmitter power from either of two high-power amplifiers. Inside the QOTL, the transmitter power takes the form of a linearly polarized beam radiated from a feed horn. This beam propagates through a system of mirrors, each of which refocuses the beam to minimize diffraction losses. A magnetically biased ferrite disc is placed at one of the foci to utilize the Faraday effect to rotate the polarization of the beam by 45 degrees. The beam is then transmitted via an antenna system. The radar return (scatter from clouds, and/or reflections from other objects) is collected by the same antenna and propagates through the Faraday rotator in the reverse of the direction of propagation of the transmitted beam. In the Faraday rotator, the polarization of the received signal is rotated a further 45 degrees, so that upon emerging from the Faraday rotator, the received beam is polarized at 90 with respect to the transmitted beam. The transmitted and received signals are then separated by a wire-grid polarizer.

Perez, Raul M.↗