Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “HOT CELL WINDOW REPLACEMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Laboratory Impacts 2017

The laboratory impacts at Idaho National Lab consist of neutron radiography reactor doubles throughput; electric vehicle wireless charging; assessing chemical weapons in Panama; hot cell window replacement; developing better batteries and other impacts.

99 GENERAL AND MISCELLANEOUS↗

Window to the Hot Cell: The Challenges of Repairing a Specialized Nuclear Containment

Here, at the Idaho National Laboratory (INL) nuclear R&D site we come across a myriad of challenges and health hazards. Recently, a first time activity for the INL was to replace a hot cell window put in place circa 1977. This job evolution was complex in nature and involved several health and safety hazards. A hot cell is a containment designed to protect workers from radioactivity yet continue to allow work with remote handled tools and windows for visibility. The hot cell window weighed approximately 14,000 lbs. and was held in place by 1.6 cubic yards of high density grout. Removal of the window required abrasive grout removal techniques, radiological control efforts, specialized ventilation, and personal protective equipment utilization. In order to contain the large amounts of dust from the removal of concrete and potential contamination exposure a special containment tent and ventilation system was designed to protect workers in the surrounding areas from dust and debris. Once the window was removed it had to be further taken apart for shipment. While performing this activity, several lead sheets and lead wool was required to be removed. Overall it took 38 days to accomplish this task and had several organizations involved. There were no injuries or unexpected conditions that occurred during this job task. This was the first time this activity was performed at the INL and was completed in a successful manner. Further windows are set to be replaced in the near future.

99 GENERAL AND MISCELLANEOUS↗

Proton irradiation damage of an annealed Alloy 718 beam window

Mechanical testing and microstructural analysis was performed on an Alloy 718 window that was in use at the Los Alamos Neutron Science Center (LANSCE) Isotope Production Facility (IPF) for approximately 5 years. It was replaced as part of the IPF preventive maintenance program. The window was transported to the Wing 9 hot cells at the Chemical and Metallurgical Research (CMR) LANL facility, visually inspected and 3-mm diameter samples were trepanned from the window for mechanical testing and microstructural analysis. Shear punch testing and optical metallography was performed at the CMR hot cells. The 1-mm diameter shear punch disks were cut into smaller samples to further reduce radiation exposure dose rate using Focus Ion Beam (FIB) and microstructure changes were analyzed using a Transmission Electron Microscopy (TEM). Irradiation doses were determined to be ~0.2–0.7 dpa (edge) to 11.3 dpa (peak of beam intensity) using autoradiography and MCNPX calculations. The corresponding irradiation temperatures were calculated to be ~34–120 °C with short excursion to be ~47–220 °C using ANSYS. Mechanical properties and microstructure analysis results with respect to calculated dpa and temperatures show that significant work hardening occurs but useful ductility still remains. The hardening in the lowest dose region (~0.2–0.7 dpa) was the highest and attributed to the formation of γ" precipitates and irradiation defect clusters/bubbles whereas the hardening in the highest dose region (~11.3 dpa) was lower and attributed mainly to irradiation defect clusters and some thermal annealing.

36 MATERIALS SCIENCE↗

Rotating Target Development for SNS Second Target Station

A rotating target for the second target station (STS) at SNS has been identified as an option along with a mercury target. Evaluation of the rotating target alternative for STS has started at 1.5 MW which is considered an upper bound for the power. Previous preconceptual design work for a 3 MW rotating target is being modified for the lower power level. Transient thermal analysis for a total loss of active water cooling has been done for a simplified 2D model of the target and shielding monolith which shows that peak temperatures are well below the level at which tungsten vaporization by steam could exceed site boundary dose limits. Design analysis and integration configuration studies have been done for the target-moderator-reflector assembly which maximizes the number of neutron beam lines and provides for replacement of the target and moderators. Target building hot cell arrangement for this option will be described. An option for operation in rough vacuum without a proton beam window using Ferro fluid seals on a vertical shaft is being developed. A full scale prototypic drive module based on the 3 MW preconceptual design has been fabricated and successfully tested with a shaft and mock up target supplied by the ESS-Bilbao team. Overall planning leading to decision between mercury and the rotating target in 2011 will be discussed

43 PARTICLE ACCELERATORS↗

Upgrade of Gamma Spectrometry Systems for ORNL TRISO Fuel PIE

Gamma spectrometry is a key element in much of the post-irradiation examination (PIE) work performed under the Advanced Gas Reactor Fuel Development and Qualification (AGR) Program (Demkowicz et al. 2015; Stempien et al. 2021). Gamma spectrometers are integrated into three major capabilities used at the Oak Ridge National Laboratory (ORNL) Irradiated Fuels Examination Laboratory (IFEL) for PIE of tristructural-isotropic (TRISO) coated particles and fuel compacts: the Core Conduction Cooldown Test Facility (CCCTF), the Vertical Counting System (VCS), and the Irradiated Microsphere Gamma Analyzer (IMGA). The CCCTF includes liquid-nitrogen-cooled traps to extract 85 Kr out of the He sweep gas that passes through the furnace in which the fuel compacts are heated during safety testing. Analysis of the 85 Kr activity in the traps is the primary indicator for TRISO failure during safety testing. The VCS is a system used to accurately measure gamma emission from components placed in a lead-shielded chamber. It is used to count the CCCTF deposition cups after removal from furnace. Each cup resides in the CCCTF furnace for typically 12–24 h and is periodically replaced with a fresh cup throughout the safety test. Metallic fission products collect on the water-cooled cups and several gamma-emitting isotopes ( 110 mAg, 134 Cs, 137 Cs, 154 Eu, and 155 Eu) are often measured and provide indication of the retention performance of the TRISO coatings. The VCS is also used to measure the presence of these isotopes on the CCCTF tantalum liner and sweep gas inlet tube for the determination of cup collection efficiency, as well as support other gamma spectrometry needs related to calibration of the 85 Kr fission gas traps and various other special PIE tasks. The IMGA uses gamma spectrometry to measure the inventory of gamma-emitting isotopes in individual TRISO particles. An automated particle handling system within the IMGA hot cell removes each particle from a source vial and positions it in front of a gamma detector, and output from the gamma spectrometer is used by the IMGA software to determine a destination vial such that particles are sorted according to their inventory and retention characteristics. At the conclusion of the AGR-1 and AGR-2 PIE campaigns, the gamma spectrometer systems used at ORNL to support that PIE had reached the end of its life cycle due to gradual obsolescence of the hardware and software. Upgrade of the Canberra Genie 2000 software used by these systems to a Windows 10 version was not a viable option, because the newest Windows 10 version offered by Mirion (the new owner of the Canberra technology) did not include the dynamic-link libraries (DLLs) needed for integration with the custom PIE software used with the CCCTF and IMGA, and Mirion had no current plans for development and release of Windows 10 versions of these DLLs with the Model S560 Genie 2000 Programming Library. Ultimately a switch was made to ORTEC gamma spectrometry systems, which appeared to be a more sustainable solution due to more proactive vendor support. The ORTEC conversion involved replacing the aging detector preamplifier and multichannel analyzer (MCA) hardware, upgrading the obsolete Windows 7 computers to Windows 10 compatible models, adopting ORTEC GammaVision software, and extensive modification of the ORNL-developed Visual Basic .NET (VB.NET) programs that provide the CCCTF and IMGA user interfaces.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

PROTEC TM TEAR-OFFS: RESULTS OF LONG TERM TESTING

The Savannah River National Laboratory (SRNL) has completed a series of tests (Phases 1 and 2) to assess the potential use of a Mylar{reg_sign} tear-off system as a primary or secondary protective barrier to minimize acid etching ('frosting'), accidental scratching, and/or radiation damage for shielded cells, glovebox, and/or chemical hood windows. Conceptually, thin, multi-layered sheets of Mylar (referred to throughout this report as the ProTec{trademark} tear-off system) can be directly applied to the shielded cell, glovebox, or hood sash window to serve as a secondary (or primary) barrier. Upon degradation of visual clarity due to accidental scratching, spills/splatters, and/or radiation damage, the outer layer (or sheet) of Mylar could be removed refreshing or restoring the view. Due to the multilayer aspect, the remaining Mylar layers would provide continued protection for the window from potential reoccurrences. Although the concept of using a tear-off system as a protective barrier is conceptually enticing, potential technical issues were identified and addressed as part of this phased study to support implementation of this type of system in the Defense Waste Processing Facility (DWPF). Specific test conditions of interest to the DWPF included the performance of the tear-off system exposed to or under the following conditions: (1) acid(s) (concentrated (28.9 M) HF, concentrated (15.9M) HNO{sub 3}, 6M HCl, and 0.6M H{sub 3}BO{sub 3}); (2) base (based on handling of radioactive sludges with pH of {approx}12-13); (3) gamma radiation (due to radioactive sources or materials being used in the analytical cells); (4) scratch resistance (simulating accidental scratching with the manipulators); and (5) in-situ testing (sample coupons exposed to actual field conditions in DWPF). The results of the Phase 1 study indicated that the ProTec tear-off concept (as a primary or secondary protective barrier) is a potential technical solution to prevent or retard excessive damage that would result from acid etching, base damage (as a result of a sludge spill or splatter), gamma radiation damage, and/or accidental scratching (due to manipulator/tool contact). Although identified as a potential solution, the Phase 1 testing was relatively short-term with exposure times up to 1-2 months for the acid and gamma radiation tests. Phase 2 testing included longer exposure times for the acid resistance (up to 456 days) and gamma radiation exposure (700 days with a cumulative gamma dose of {approx}3.1 x 10{sup 5} rad) assessments. The tear-off system continued to perform well in these longer-term acid resistance testing and gamma exposure conditions. Complete removal of the tear-offs after these long-term exposure times indicate that not only could visual clarity be restored but the mechanical integrity could be retained. The results also provided insight into the ability of the ProTec tear-off system to withstand the chemical and physical abuses expected in off-normal shielded cells operations. The conceptual erasing of scratches or marks by excessive manipulator abuse was demonstrated in the SRNL Shielded Cells mock-up facility through the removal of the outer layer tear-off with manipulators. In addition, the Phase 2 testing included an in-situ assessment of a prototype tear-off system in the DWPF Sampling Cells where the system was exposed to actual field conditions including radioactive sources, acidic and basic environments, dusting, and chemical cleaning solutions over a 5-6 month period. DWPF personnel were extremely satisfied with the performance (including the successful removal of 3 layers with manipulators) of the ProTec tear-off system under actual field conditions. The successful removal of the outer layer tear-offs with the manipulator, using tabs not specifically designed for remote operations, demonstrates that the system is 'manipulator-friendly' and could be implemented in a remote environment. The ability to remove the outer layer tear-off not only regains visual clarity but also reduces waste disposal volumes (i.e., disposal of a thin sheet of Mylar which is 'collapsible' versus the bulk disposal of a rigid Lexan{reg_sign} sheet (alpha shield) or glovebox/sash window) which is more cost effective. The tear-off system could also reduce the number of cell entries needed to replace the Lexan sheet and increase the time interval between glovebox/sash window replacements, which can be costly and time consuming. Although the primary focus of this study addresses the application of the ProTec tear-off system to shielded cells windows, the concept is also potentially applicable to glovebox and hood sash windows. In fact, the tear-off concept is potentially applicable to any system where visual clarity is compromised given the environmental conditions of the test. In addition, the tear-offs could be applied to walls or shelves where a protective barrier would reduce deterioration or discoloration.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗