Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “HOT CANYON”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Areas with Surface Thermal Anomalies as Detected by ASTER and LANDSAT Data around South Canyon Hot Springs, Garfield County, Colorado

This map shows areas of anomalous surface temperature around South Canyon Hot Springs as identified from ASTER and LANDSAT thermal data and spatial based insolation model. The temperature for the ASTER data was calculated using the Emissivity Normalization Algorithm that separate temperature from emissivity. The incoming solar radiation was calculated using spatial based insolation model developed by Fu and Rich (1999). Then the temperature due to solar radiation was calculated using emissivity derived from ASTER data. The residual temperature, i.e. temperature due to solar radiation subtracted from ASTER temperature was used to identify thermally anomalous areas. Areas having anomalous temperature in the ASTER data are shown in blue diagonal hatch, while areas having anomalous temperature in the LANDSAT data are shown in magenta on the map. Thermal springs and areas with favorable geochemistry are also shown. Springs or wells having non-favorable geochemistry are shown as blue dots.

15 GEOTHERMAL ENERGY↗

Hot Canyon

This historical film footage, originally produced in the early 1950s as part of a series by WOI-TV, shows atomic research at Ames Laboratory. The work was conducted in a special area of the Laboratory known as the "Hot Canyon".

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Waste Treatment Plant - 12508

The Waste Treatment Plant (WTP) will immobilize millions of gallons of Hanford's tank waste into solid glass using a proven technology called vitrification. The vitrification process will turn the waste into a stable glass form that is safe for long-term storage. Our discussion of the WTP will include a description of the ongoing design and construction of this large, complex, first-of-a-kind project. The concept for the operation of the WTP is to separate high-level and low-activity waste fractions, and immobilize those fractions in glass using vitrification. The WTP includes four major nuclear facilities and various support facilities. Waste from the Tank Farms is first pumped to the Pretreatment Facility at the WTP through an underground pipe-in-pipe system. When construction is complete, the Pretreatment Facility will be 12 stories high, 540 feet long and 215 feet wide, making it the largest of the four major nuclear facilities that compose the WTP. The total size of this facility will be more than 490,000 square feet. More than 8.2 million craft hours are required to construct this facility. Currently, the Pretreatment Facility is 51 percent complete. At the Pretreatment Facility the waste is pumped to the interior waste feed receipt vessels. Each of these four vessels is 55-feet tall and has a 375,000 gallon capacity, which makes them the largest vessels inside the Pretreatment Facility. These vessels contain a series of internal pulse-jet mixers to keep incoming waste properly mixed. The vessels are inside the black-cell areas, completely enclosed behind thick steel-laced, high strength concrete walls. The black cells are designed to be maintenance free with no moving parts. Once hot operations commence the black-cell area will be inaccessible. Surrounded by black cells, is the 'hot cell canyon'. The hot cell contains all the moving and replaceable components to remove solids and extract liquids. In this area, there is ultrafiltration equipment, cesium-ion exchange columns, evaporator boilers and recirculation pumps, and various mechanical process pumps for transferring process fluids. During the first phase of pretreatment, the waste will be concentrated using an evaporation process. Solids will be filtered out, and the remaining soluble, highly radioactive isotopes will be removed using an ion-exchange process. The high-level solids will be sent to the High-Level Waste (HLW) Vitrification Facility, and the low activity liquids will be sent to the Low-Activity Waste (LAW) Vitrification Facility for further processing. The high-level waste will be transferred via underground pipes to the HLW Facility from the Pretreatment Facility. The waste first arrives at the wet cell, which rests inside a black-cell area. The pretreated waste is transferred through shielded pipes into a series of melter preparation and feed vessels before reaching the melters. Liquids from various facility processes also return to the wet cell for interim storage before recycling back to the Pretreatment Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Brigham City Hydro Generation Project

Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction from Jerome, Idaho for the Upper Power Plant construction. A kickoff meeting was June 24, 2014 and demolition was immediately started on building. Because of a delivery delay of Turbine, Generator and Equipment from Canyon Brigham City had to request another extension for the final date of completion. DOE awarded modification (.007) to Brigham City with a new completion date of August 1, 2015. The Turbine has had a few adjustments to help with efficiency; but the Generator had a slight vibration when generator got hot so Canyon Industries had U S Motor’s that manufactured the generator come to check out the issue. The other Equipment seems to be running normal. Brigham City, Sunrise Engineering and Canyon Industries met to determine what the vibration in the generator was and how to solve the issue Us Motor’s found some welds that failed: they have been repaired. U S Motor’s delivered the repaired generator Feb. 17, 2015. Canyon Industries arranged for a crane to installed generator in Power Plant. U S Motor’s balanced and wired generator. Plant Operators put the generator back on line. Canyon Industries returned and gave their approval to keep Hydro online. After Hydro was put back into operations it kept going off line because of overheating issues. Canyon Industries returned and replaced sensors and adjusted them to the proper settings for normal operations. Brigham City added additional steel screens to windows to increase air flow in Power Plant Building. After construction phase of the Upper Hydro Plant some landscaping has been restored around the building additional gravel brought in and leveled out and the road that was cut through for conduits to run wires. A retaining wall was installed to protect penstock. The Upper Hydro Plant is complete and in full operations. The final reimbursement was submitted.

13 HYDRO ENERGY↗

Evaluation of the Potential for Precipitation of Solids during Storage of Non-Aluminum SNF Solutions

Non-aluminum clad spent nuclear fuels (NASNF) stored in the L-Area basin will be dissolved in H-Canyon using the 6.3D electrolytic dissolver. The solutions will be stored in either the hot or warm canyon until the preparation of a sludge batch for the Defense Waste Processing Facility. Spent nuclear fuel solutions could be stored for 1-2 years before transfer to the H-Area Tank Farm depending on the interval between sludge batches. The solution level in the storage tanks will be maintained; therefore, precipitation of solids due to evaporation is not an issue. However, the precipitation of solids from completely dissolved SNF due to solution instabilities has been observed during intermediate storage of solutions generating hydrated oxides.The presence of fissile material in these solids is generally associated with zirconium molybdate, which is known to act as a host lattice for Pu and can carry the actinides upon precipitation. The formation of zirconium molybdate solids which carry fissile material is a potential concern for the storage of NASNF solutions. To address this concern, the Savannah River National Laboratory performed a literature review to identify knowledge gaps which may require experimental work to determine if the formation of solids is a concern during storage of these solutions. Based on the literature review, the precipitation of zirconium molybdate solids from the Campaign 1 NASNF solutions during intermediatestorage is expected. This conclusion is supported by the identification of zirconium molybdate solids found on the H-Canyon 6.1D Dissolver MK-12 insert spacer. The formation of the zirconium molybdate solids is attributed to hydrolysis and radiolytic processes in the nitric acid solution. As the molybdate solids form, U and Pu can substitute for Zr in the crystal lattice resulting in co-precipitation. Generally, the Pu substitutes directly into the crystal lattice during precipitation while the U associated with the molybdate solids more likely absorbs from the solution. The U in the NASNF solutions is present as uranyl nitrate, a 2+ cation which will not substitute as easily into the molybdate crystal lattice for the Zr 4+ ion.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contaminant Migration Modeling to Support the In Situ Decommissioning of Hardened Nuclear Facilities - 20215

The decommissioning of hardened nuclear facilities provides a unique challenge in balancing current worker dose with exposure to future receptors and media. In situ decommissioning (ISD) is a cost-effective and safe option for the closure of such facilities but requires a detailed understanding of the threat that radioactive and hazardous constituents remaining in the facilities pose to groundwater and surrounding surface water. The Savannah River Site (SRS) extensively employs contaminant migration models within the decommissioning process to develop site-specific removal, grouting, and monitoring strategies in support of safe and effective final end states of nuclear facilities. This work discusses the use of contaminant migration modeling in the ISD process at SRS, including specific examples from the closure of P-Reactor and R-Reactor, Building 235-F, F-Canyon and F/H Laboratory Complex. Migration models developed during the closure of P-Reactor and R-Reactor were divided into four source areas: the reactor vessel, the process area, the disassembly basin, and the purification wing. Each source area was assigned a specific inventory and migration pathway and was then subject to varying hypothetical removal, capping, and grouting schemes. Modeling indicated that groundwater Maximum Concentration Limits (MCLs) might be exceeded if no action was taken for eleven and ten constituents of concern (COCs) at P-Reactor and R-Reactor, respectively. These exceedances could occur in as few as 200 to 500 years. Alternatively, the migration modeling demonstrated that the selected ISD actions reduced contaminant mobility which allowed for significant radioactive decay and resulted in fewer predicted exceedances of groundwater MCLs (five COCs for P-Reactor; eight COCs for R-Reactor). In response to the modeling results for P-Reactor and R-Reactor, effectiveness monitoring programs were developed to target contaminants, specific to each reactor, that may migrate to groundwater. Contaminant migration modeling also revealed that roof collapse was a large factor in the release of COCs to the environment, giving rise to roof improvements, and an inspection and vegetation control program to ensure roof stability over time. Contaminant migration modeling is also aiding in the closure planning for hardened facilities in F Area. Building 235-F housed the Actinide Billet Line, which produced Np-237 billets for irradiation in SRS reactors, and the Plutonium Fuel Form (PuFF) facility that produced Pu-238 heat sources for the space program. As a result of these missions, areas within Building 235-F contain considerable residual amounts of both Pu-238 and Np-237. Contaminant migration modeling of Building 235-F was originally performed in 2012 to identify the feasibility of ISD and the amount of radioactive material removal required to prevent the exceedance of groundwater MCLs. The original model indicated that a 60% reduction in the PuFF facility Pu-238 inventory could keep groundwater concentrations below standards, while Np-237 did not pose a threat to groundwater. However, updates to the model with an emphasis on source impact pathways revealed that, due to the orientation of the source areas relative to groundwater flow, no amount of reasonable removal of Pu-238 would keep groundwater concentrations below MCLs and that Np-237 could be a large contributor to localized MCL exceedances. With this insight, the refined 2019 model is being used to assist in the development of grouting plans specific to each facility source area, where bentonite may be utilized to slow the migration of Pu-238 and its daughter products from the PuFF facility and a reducing grout may decrease Np-237 transport by ensuring the nuclide remains in the less mobile +IV oxidation state. The beginning phases of contaminant migration modeling are underway for F-Canyon and associated facilities using lessons learned from the Reactors and Building 235-F. A contaminant migration pathway, similar to the pathway used for the reactor vessels, is being developed for the hot and warm canyons. The F-Canyon inventories are being spatially refined to identify specific and localized source zones, comparable to Building 235-F, that may impact groundwater. Contaminant migration modeling provides vital input within the ISD process, from facility investigation to post closure effectiveness monitoring, making it a valuable tool in the development of safe and effective end states for hardened nuclear facilities at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GrayQb TM Single-Faced Version 2 (SF2) Hanford Plutonium Reclamation Facility (PRF) deployment report

The Savannah River National Laboratory (SRNL) in partnership with CH2M Plateau Remediation Company (CHPRC) deployed the GrayQb TM SF2 radiation imaging device at the Hanford Plutonium Reclamation Facility (PRF) to assist in the radiological characterization of the canyon. The deployment goal was to locate radiological contamination hot spots in the PRF canyon, where pencil tanks were removed and decontamination/debris removal operations are on-going, to support the CHPRC facility decontamination and decommissioning (D&D) effort. The PRF canyon D&D effort supports completion of the CHPRC Plutonium Finishing Plant Decommissioning Project. The GrayQb TM SF2 (Single Faced Version 2) is a non-destructive examination device developed by SRNL to generate radiation contour maps showing source locations and relative radiological levels present in the area under examination. The Hanford PRF GrayQbTM Deployment was sponsored by CH2M Plateau Remediation Company (CHPRC) through the DOE Richland Operations Office, Inter-Entity Work Order (IEWO), DOE-RL IEWO- M0SR900210.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GrayQb Single-Faced Version 2 Open Environment Test - 16344

The GrayQb{sup TM} Single Faced Version 2 (SF2) is a non-destructive examination device developed to generate radiation contour maps showing source locations and relative radiological levels present in an area under examination. This device allows for characterization of radioactively contaminated areas such as hot cells, gloveboxes, small and large rooms, hallways, and waste tanks. The goal of GrayQb{sup TM} (pronounced 'Gray Cube') is to provide a low cost easily deployable device to aid in the process of decontamination and decommissioning (D and D). The GrayQb{sup TM} SF2 device is approximately a six inch cube weighing seven (7) pounds composed of a tungsten shield with integrated collimator, radiation imaging medium (Phosphor Storage Plate), and digital camera. This paper details the design upgrades incorporated into the new version of the GrayQb{sup TM} SF2 device and the characterization testing of this upgraded device. Device results from controlled testing performed at the Savannah River Site (SRS) Health Physics Instrument Calibration Laboratory (HPICL) are presented, as well as results from the open environment field testing performed in the E-Area Low Level Waste Storage Area. Follow on work performed deploying the GrayQb SF2 device at the Hanford Plutonium Reclamation Facility (PRF) to assist in the radiological characterization of the canyon will also be presented. Testing of the redesigned GrayQb{sup TM} SF2 device demonstrated its ability to detect low energy isotopes, e.g. Am-241 and Pu-238, not only indoors in controlled environments with well-defined source locations, but also in open environment field areas with a significant high energy background. Additionally, it was demonstrated that the device could detect higher energy isotopes (Cs-137 and Co-60) in a controlled setting and with additional testing and/or modifications to device and software, would likely be able to detect these isotopes in the open environment field testing. Follow on 2015 work performed at Hanford proved GrayQb to be a useful tool in the radiological characterization of the PRF canyon. Distribution tendencies of the radiological hot spots were identified that provided insights which will assist in more efficient planning of the continued D and D effort. Hot spots were identified which can be targeted during the future D and D effort and used as markers during the NDA assessment to quantify the radiological environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ACCELERATED PILOT PROJECT FOR U CANYON DEMOLITION

At the U.S. Department of Energy's Hanford Site in southeast Washington State, CH2M HILL Plateau Remediation Company (CH2M HILL) is underway on a first-of-a-kind project with the decommissioning and demolition of the U Canyon. Following the U.S. Environmental Protection Agency's Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) Record of Decision for the final remediation of the canyon, CH2M HILL is combining old and new technology and techniques to prepare U Canyon for demolition. The selected remedial action called first for consolidating and grouting equipment currently in the canyon into lower levels of the plant (openings called cells), after which the cell galleries, hot pipe trench, ventilation tunnel, drains and other voids below the operating deck and crane-way deck levels will be filled with approximately 20,000 cubic yards of grout and the canyon roof and walls demolished down to the approximate level of the canyon deck. The remaining canyon structure will then be buried beneath an engineered barrier designed to control potential contaminant migration for a 500-year life. Methods and lessons learned from this project will set the stage for the future demolition of Hanford's four other canyon-type processing facilities.

54 ENVIRONMENTAL SCIENCES↗

Geothermal Fault Zone and Fluid Imaging through Joint Airborne ZTEM and Ground MT Data Inversion Analysis

This project has aimed to achieve detailed electrical resistivity resolution at geothermal reservoir scales by combining airborne natural electromagnetic (EM) field surveying (ZTEM) with ground magnetotelluric (MT) measurements to approximate an airborne MT geophysical method. MT alone is relatively expensive and may have permitting challenges in sensitive areas. Airborne ZTEM field data contains only the magnetic field, requires a background assumption, and has been limited to relatively high frequencies, thus suffering uniqueness problems. Based on proto-type 2D simulations, ZTEM ambiguities may be reduced through formal incorporation with possibly sparse ground MT soundings, which we pursued in full 3D for this project. The methodology was tested at the high-temperature Roosevelt Hot Springs geothermal system, Utah, which was considered advantageous given the near total exposure of crystalline reservoir rocks across the project area. ZTEM and ground MT survey data were acquired in 2017, subcontracted to outside parties with which we have worked in the past. These included 80 remote-referenced tensor MT soundings over the Mineral Mountains and adjacent Roosevelt Hot Spring producing geothermal system. These MT stations abut later coverage of a similar number of MT stations taken for the Utah FORGE project providing excellent total data aperture to re-solve structure beneath both project areas better than either set alone. The airborne ZTEM survey covered 704 line kilometers in E-W flight lines with a 250 m line spacing. Although this survey was timed during a maintenance-related shutdown of power production at the Roosevelt Hot Springs, other noise sources difficult to identify but including two high-voltage state-scale transmission lines compromised the ZTEM survey badly leading to unusable responses. Thus, with DOE management concurrence, the project proceeded to emphasize inversion and interpretation of the joint SubTER-FORGE MT data sets with regard to the Roosevelt Hot Springs reservoir recharge and to deep heat sources for both it and the Utah FORGE EGS project area. We also investigated the joint ZTEM-MT sampling concept with data sets from the Eleven Mile Canyon prospect area donated by the U.S. Navy (A. Sabin, PoC). Inversion of the SubTER-FORGE MT data using the HexMT 3D finite element algorithm reveals a large, low-resistivity anomaly extending sub-vertically through the depth range of the crust beneath the western Mineral Mountains. The steep conductive zone connects in the lower crust to a more tabular conductor characteristic of much of the Great Basin that generally is ascribed to current mafic magmatic underplating, hybridization and fluid release. The location of the resolved anomaly relative to the recent (0.5-0.8 Ma) eruptive centers of the Mineral Mountains implicates it as remnants of the magma body which fed these centers. This structure appears to be currently feeding heat and fluids upward into the Roosevelt Hot Springs hydrothermal system, as well as heat laterally to the FORGE project area. Separate and joint inversion models were carried out for the donated Eleven Mile Canyon MT-ZTEM data set to demonstrate concept. ZTEM only inversion showed two main alteration zones in the western portion of the project area known from geological mapping. Joint inversion including an E-W profile of MT soundings sharpened these features considerably. It also resolved in much greater detail the graben related normal faulting structure of the central project area which lies at depths exceeding the sensitivity of ZTEM alone. The sparse number of MT da-ta relative to the ZTEM required upweighting the former by a factor of several, but an exact procedure awaits future research. Our final impression is that sparse MT data can improve resolution of the subsurface over that of ZTEM alone. However, well sampled MT data are to be preferred and offer the simplicity of interpreting just one data type, and possess the superior resolution capability coming with the electric field everywhere, and from their high bandwidth.

15 GEOTHERMAL ENERGY↗

Demonstration of Chemical Decladding and Disposition Options of Non-Al Clad Fuels at the Savannah River Site [Poster]

The Savannah River Site’s H-Canyon processes aluminum-clad fuels from foreign and domestic research reactors to recover enriched uranium. However, there is an extensive inventory of non-Al-clad fuels currently in the storage basin, many of which are damaged or at risk of failure. Most of these are clad with stainless steel or Zircaloy, which are incompatible with H-Canyon’s process chemistry. Development of decladding methods is therefore critical to the waste cleanup mission at SRS. Here we demonstrate the dissolution of stainless steel using the SULFEX process developed at Oak Ridge and the dissolution of Zircaloy using the ZIRFLEX process developed at the Hanford Site. Dissolution and offgassing rates are consistent with previous studies and show that these cladding materials can be processed even below reflux conditions. Waste streams have been treated and quantified, providing valuable information for potential future process development in H-Canyon. This study has demonstrated that the technology may be feasible in the near term for processing smaller damaged fuels in the SRS hot cells.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demonstration of Chemical Decladding and Disposition Options for Non-Al Clad Fuels in H-Canyon

Aqueous disposition of non-Al clad fuels was studied in order to determine if H-Canyon would be a viable disposition option for this type of L-Basin fuel. A review of the L-Basin fuel types and its condition was done suggesting two major cladding types, Zircaloy and 304L stainless steel needed to be studied. Dissolution flowsheets options were reviewed. Sulfex and Zirflex processes were chosen as best for H-Canyon integration. Both process flowsheets were demonstrated on a lab scale to determine decladding rate, and off-gas and waste production. The resulting data suggested decladding in H-Canyon was an option but dissolver corrosion as well as off-gas and waste generation needed to be addressed. Small scale dissolution in a hot cell of smaller damaged fuel is a viable option with the flowsheets tested.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PREPARATION OF U-PLANT FOR FINAL DEMOLITION AND DISPOSAL - 12109E

The U-Plant is one of the five major nuclear materials processing facilities at Hanford and was chosen as a pilot project to develop the modalities for closure of the other four facilities at Hanford and the rest of the Department of Energy (DOE) complex. The remedy for this facility was determined by a Record of Decision (ROD) pursuant to the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). That remedy was to 'Close in Place - Partially Demolished Structure'. The U-Plant facility is identified as the 221-U Building and is a large, concrete structure nominally 247m (810 ft) long, 20 M (66 ft) wide and 24 m (77 ft) high with approximately 9 m (30 ft) being below grade level. It is a robust facility with walls ranging from 0.9 m to 2.7 m (3 ft to 9 ft) thick. One large room extends the entire length of the building that provides access to 40 sub-grade processing cells containing tanks, piping and other components. The work breakdown was divided into three major deliverables: (1) Tank D-10 Removal: removal of Tank D-10, which contained TRU waste; (2) Equipment Disposition: placement of contaminated equipment in the sub-grade cells; and (3) Canyon Grouting: grouting canyon void spaces to the maximum extent practical. A large number of pieces of contaminated equipment (pumps, piping, centrifuges, tanks, etc) from other facilities that had been stored on the canyon operating floor were placed inside of the sub-grade cells as final disposition, grouted and the cell shield plug reinstalled. This action precluded a large volume of waste being transported to another burial site. Finally, {approx}19,000 m3 ({approx}25,000 yd3) of grout was placed inside of the cells (in and around the contaminated equipment), in the major galleries. the ventilation tunnel, the external ventilation duct, and the hot pipe trench to minimize the potential for void spaces and to reduce the mobility, solubility, and/or toxicity of the grouted waste. The interim condition of the facility is 'cold and dark'. Upon availability of funding the structure will have contamination fixative applied to all contaminated surfaces and may be explosively demolished, with the remaining structure buried under an engineered barrier.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Resource Characterization to Estimate Potential for Electricity Co-Production at Blackburn Oil Field, Nevada

The U.S. Department of Energy estimates that an annual average of 25 billion barrels of hot water are produced from oil and gas wells within the United States. The thermal energy available in the co-produced water stream is usually discarded, as the produced waters are considered an inconvenience by the operators and are disposed of using injection wells. However, utilizing organic Rankine cycle (ORC) generators, a vast amount of thermal energy can be captured and converted into electricity (albeit at relatively low efficiency due to the low temperatures). The National Renewable Energy Laboratory (NREL), in collaboration with Transitional Energy and Grant Canyon Oil & Gas, evaluated the feasibility of geothermal co-production of electricity by utilizing existing oil wells in Blackburn oil field in Nevada. The once prolific Blackburn oil field is located in Pine Valley, approximately 45 miles east-southeast of Elko, Nevada. Currently, the wells targeting the highly fractured Devonian Nevada dolomite reservoir are operating at a water cut ratio of more than 99%, with individual fluid (oil and water) production rates reaching 7.4 L/s (4,021 BBL/day). Analysis of publicly available data showed that the combination of the suitable wells' maximum historical production rates reached 22.90 L/s. The production from these wells occurs naturally and the wells are choked (and even shut down) by the operator to mitigate excessive water production, indicating a strong reservoir recharge and future opportunity to increase the water production for geothermal electricity generation. The main goal of this study was to evaluate the productivity of the existing wells, the performance of the reservoir, the surface network, and the operational constraints in order to achieve 1 MWe of electricity production from the field's water production. Utilizing the GEOPHIRES tool, we have determined that a twofold to threefold increase in the total fluid production, compared to the historical production under artificial restraint (choke), is required to reach a 1-MWe net target output for a low-temperature ORC system with air-cooled condensers. Lower flow rates would be required when utilizing water-based condensers instead of air-cooled condensers. However, that would require a constant supply of cold water, which may be challenging given the arid environment of the project site.

Blackburn↗

H-CANYON AIR EXHAUST TUNNEL INSPECTION VEHICLE DEVELOPMENT

The H-Canyon at Savannah River Site is a large concrete structure designed for chemical separation processes of radioactive material. The facility requires a large ventilation system to maintain negative pressure in process areas for radioactive contamination control and personnel protection. The ventilation exhaust is directed through a concrete tunnel under the facility which is approximately five feet wide and 8 feet tall that leads to a sand filter and stack. Acidic vapors in the exhaust have had a degrading effect on the surface of the concrete tunnels. Some areas have been inspected; however, the condition of other areas is unknown. Experience from historical inspections with remote controlled vehicles will be discussed along with the current challenge of inspecting levels below available access points. The area of interest in the exhaust tunnel must be accessed through a 14 X 14 inch concrete plug in the floor of the hot gang valve corridor. The purpose for the inspection is to determine the condition of the inside of the air tunnel and establish if there are any structural concerns. Various landmarks, pipe hangers and exposed rebar are used as reference points for the structural engineers when evaluating the current integrity of the air tunnel.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

CONSOLIDATION OF K BASIN SLUDGE DATA AND EXPERIENCES ON AGGLOMERATE FORMATION

The formation of high sludge strength agglomerates is a key concern to the Sludge Treatment Project (STP) to ensure the sludge can be retrieved after planned storage for up to 10 years in Sludge Transport and Storage Containers (STSC) at T Plant. This report addresses observations of agglomerate formation, conditions that the data shows lead to agglomeration, the frequency of agglomerate formation and postulated physiochemical mechanisms that may lead to agglomeration. Although the exact underlying chemistry of K Basin sludge agglomerate formation is not known, the factors that lead to agglomeration formation, based on observations, are as follows: (1) High Total Uranium Content (i.e., sample homogeneity and influence from other constituents); (2) Distribution of Uranium Phases (i.e., extent of conversion from uraninite to uranium oxide hydroxide compounds); (3) Sample Dry-out (loss of cover water); (4) Elevated temperature; (5) Solubility ofU(IV) phases vs. U(VI) phases; and (6) Long storage times. Agglomerated sludge has occurred infrequently and has only been observed in four laboratory samples, five samples subjected to hydrothermal testing (performed for 7 to 10 hours at {approx}185 C and 225 psig), and indirectly during six sampling events in the KE Basin. In the four laboratory samples where agglomerates were observed, the agglomerates exhibited high shear strength and the sample container typically had to be broken to remove the solids. The total uranium content (dry basis) for the four samples (KE Pit, KC-2/3 SS, KC-2/3 M250 and 96-13) were {approx}8 wt%, {approx}59.0 wt%, 68.3 wt% and 82 wt%. The agglomerates that were present during the six sampling events were undoubtedly disturbed and easily broken apart during sample collection, thus no agglomerates were observed in subsequent laboratory analyses. The highest shear strengths measured for K Basin sludge samples were obtained after hydrothermal treatment (7 to 10 hr at 185 C) of high-uranium-content KE canister sludge. The unconfined compressive strength of samples from this testing, measured by a pocket penetrometer, infers that their shear strength may be between 120 kPa and 170 kPa (PNNL-16496). These short-duration hydrothermal tests were conducted at temperatures much greater than the temperature of the T Plant canyon cells (-7 C to 33 C); however, the strength results provide an initial bounding target for sludge stored for many years, and an upper range for simulants (042910-53451-TP02 Rev 1). Sampling and characterization activities conducted in 2009 have measured the total uranium content and speciation for sludge stored in Engineered Containers SCS-CON-220, -240, -250, and -260 (PNNL-19035). Based on on-going testing that has measured the shear strength of uranium samples containing varying uranium (IV) to uranium (VI) ratios and the characterization of the Engineered Containers SCS-CON-220, -240, -250, and -260, it is unlikely that agglomerates will form on a large scale in this sludge. The highest measured total uranium concentration in the Engineered Container SCS-CON-220 sludge is 35.2 wt% and only 4 wt% to 6 wt% (dry) in Engineered Containers SCS-CON -240, -250, and -260. The uranium concentrations in Engineered Containers SCS-CON-220, -240, -250, and -260 sludge are below the threshold for agglomerate formation. Settler sludge however is estimated to contain {approx} 80 wt% (dry) total uranium, which could lead to the formation of high strength agglomerates depending on the relative concentrations of U(IV) and U(VI) compounds. One of the chief concerns of the STP is sludge dry-out. Samples archived in PNNL hot cells have been known to dry out and form hard clods of material, which are then difficult to reconstitute (HNF-6705). In 1996, all but one of the samples archived at the 222-S Laboratory dried out. These samples were composed of sludge collected from the KE Basin floor and Weasel Pit. However, in the STP's current design plans for sludge stored in STSCs at T Plant, there are provisions for continual water level observation and periodic water replenishment when needed, which dramatically lowers the risk of a dryout event. Recent 2009 KE Engineered Container sludge and KW Engineered Container sludge physical characterization lead to opportunistic data on the behavior of dried sludge. As shown in section 5 of this report, sludge core samples taken from Engineered Container 220 that have inadvertently dried after characterization activities indicate that the sludge is mostly composed of very 'weak' and friable solids. Since Engineered Container SCS-CON-220 sludge has the highest total uranium (uranium metal and uranium oxide) concentration of the four Engineered Containers sampled to date, if a dry-out event should occur in the STSC while stored at T Plant there is qualitative evidence to suggest that the solids would be 'weak' and friable in nature and thus easily mobilized.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fukushima Nuclear Crisis Recovery: A Modular Water Treatment System Deployed in Seven Weeks - 12489

On March 11, 2011, the magnitude 9.0 Great East Japan earthquake, Tohoku, hit off the Fukushima coast of Japan. This was one of the most powerful earthquakes in recorded history and the most powerful one known to have hit Japan. The ensuing tsunami devastated a huge area resulting in some 25,000 persons confirmed dead or missing. The perfect storm was complete when the tsunami then found the four reactor, Fukushima-Daiichi Nuclear Station directly in its destructive path. While recovery systems admirably survived the powerful earthquake, the seawater from the tsunami knocked the emergency cooling systems out and did extensive damage to the plant and site. Subsequent hydrogen generation caused explosions which extended this damage to a new level and further flooded the buildings with highly contaminated water. Some 2 million people were evacuated from a fifty mile radius of the area and evaluation and cleanup began. Teams were assembled in Tokyo the first week of April to lay out potential plans for the immediate treatment of some 63 million gallons (a number which later exceeded 110 million gallons) of highly contaminated water to avoid overflow from the buildings as well as supply the desperately needed clean cooling water for the reactors. A system had to be deployed with a very brief cold shake down and hot startup before the rainy season started in early June. Joined by team members Toshiba (oil removal system), AREVA (chemical precipitation system) and Hitachi-GE (RO system), Kurion (cesium removal system following the oil separator) proposed, designed, fabricated, delivered and started up a one of a kind treatment skid and over 100 metric tons of specially engineered and modified Ion Specific Media (ISM) customized for this very challenging seawater/oil application, all in seven weeks. After a very short cold shake down, the system went into operation on June 17, 2011 on actual waste waters far exceeding 1 million Bq/mL in cesium and many other isotopes. One must remember that, in addition to attempting to do isotope removal in the competition of seawater (as high as 18,000 ppm sodium due to concentration), some 350,000 gallons of turbine oil was dispersed into the flooded buildings as well. The proposed system consisted of a 4 guard vessel skid for the oil and debris, 4 skids containing 16 cesium towers in a lead-lag layout with removable vessels (sent to an interim storage facility), and a 4 polishing vessel skid for iodine removal and trace cesium levels. At a flow rate of at least 220 gallons per minute, the system has routinely removed over 99% of the cesium, the main component of the activity, since going on line. To date, some 50% of the original activity has been removed and stabilized and cold shutdown of the plant was announced on December 10, 2011. In March and April alone, 10 cubic feet of Engineered Herschelite was shipped to Seabrook Nuclear Power Plant, NPP, to support the April 1, 2011 outage cleanup; 400 cubic feet was shipped to Oak Ridge National Laboratory (ORNL) for strontium (Sr-90) ground water remediation; and 6000 cubic feet (100 metric tons, MT, or 220,400 pounds) was readied for the Fukushima Nuclear Power Station with an additional 100 MT on standby for replacement vessels. This experience and accelerated media production in the U.S. bore direct application to what was to soon be used in Fukushima. How such a sophisticated and totally unique system and huge amount of media could be deployable in such a challenging and changing matrix, and in only seven weeks, is outlined in this paper as well as the system and operation itself. As demonstrated herein, all ten major steps leading up to the readiness and acceptance of a modular emergency technology recovery system were met and in a very short period of time, thus utilizing three decades of experience to produce and deliver such a system literally in seven weeks: - EPRI - U.S. Testing and Experience Leading to Introduction to EPRI - Japan and Subsequently TEPCO Emergency Meetings - Three Mile Island (TMI) Media and Vitrification Experience by PNNL - Commercial Nuclear Power Plant Media Experience (including long term Cs removal) - DOE Low Active Waste (LAW) and High Level Waste (HLW) in High Salt and pH Conditions Media and Vitrification Experience - National Laboratory (e.g. Oak Ridge National Laboratory, ORNL) Ground Water Media Experience - Gulf Oil Spill Media Experience in Seawater - All Media Had to be Fully Tested at High Rad Levels in Seawater and Oil Before Arriving in Japan - Final Waste Form and Disposal Experience (e.g., vitrification) - 100 Metric Tons (6000 cubic feet or 220,400 pounds) of Media had to be Immediately Available with the same amount in production as replacement media. [To date, for 2011, 400 MT of media have been prepared for Japan alone.] - Remote Operation, Modular Water Treatment Equipment Design and Fabrication in both Commercial NPP and DOE Canyon Operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

K-Basins Sludge Treatment and Packaging at the Hanford Site - 13585

Highly radioactive sludge resulting from the storage of degraded spent nuclear fuel has been consolidated in Engineered Containers (ECs) in the 105-K West Storage Basin located on the Hanford site near the Columbia River in Washington State. CH2M Hill Plateau Remediation Company (CHPRC) is proceeding with a project to retrieve the sludge, place it in Sludge Transport and Storage Containers (STSCs) and store those filled containers within the T Plant Canyon facility on the Hanford Site Central Plateau (Phase 1). Retrieval and transfer of the sludge material will enable removal of the 105-K West Basin and allow remediation of the subsurface contamination plumes under the basin. The U.S. Department of Energy (DOE) plans to treat and dispose of this K Basins sludge (Phase 2) as Remote Handled Transuranic Waste (RH TRU) at the Waste Isolation Pilot Plant (WIPP) located in New Mexico. The K Basin sludge currently contains uranium metal which reacts with water present in the stored slurry, generating hydrogen and other byproducts. The established transportation and disposal requirements require the transformation of the K Basins sludge to a chemically stable, liquid-free, packaged waste form. The Treatment and Packaging Project includes removal of the containerised sludge from T Plant, the treatment of the sludge as required, and packaging of all the sludge into a form that is certifiable for transportation to and disposal at WIPP. Completion of this scope will require construction and operation of a Sludge Treatment and Packaging Facility (STPF), which could be either a completely new facility or a modification of an existing Hanford Site facility. A Technology Evaluation and Alternatives Analysis (TEAA) for the STP Phase 2 was completed in 2011. A Request for Technology Information (RFI) had been issued in October 2009 to solicit candidate technologies for use in Phase 2. The RFI also included a preliminary definition of Phase 2 functions and requirements. Potentially applicable technologies were identified through a commercial procurement process, technical workshops, and review of the numerous previous sludge treatment technology studies. The identified technology approaches were screened using the criteria established in the Decision Plan, and focused bench top feasibility testing was conducted. Engineering evaluations of the costs, schedules, and technical maturity were developed and evaluated. Recommendations were developed based on technical evaluations. The criteria used in the evaluation process were as follows: (1) Safety, (2) Regulatory/stakeholder acceptance, (3) Technical maturity, (4) Operability and maintainability, (5) Life cycle cost and schedule, (6) Potential for beneficial integration with ongoing STP-Phase 1 activities, and (7) Integration with Site-wide RH-TRU processing/packaging, planning, schedule, and approach. The TEAA recommended Warm Water Oxidation (WWO) as the baseline treatment technology and two risk reduction enhancement options for further consideration during development of the process - size reduction and chemical oxidation (Fenton's reagent). The enhancement options would potentially allow a useful reduction in the total operating time required to process the K Basins sludge. The U.S. Department of Energy's Richland Field Office (DOE-RL) has approved this recommended technical approach. The baseline process can be broken down into the following main process steps: (1) STSC transfer from T Plant to the Sludge Treatment and Packaging Facility (STPF). (2) Retrieval of sludge from the STSCs and transfer to the Receipt and Reaction Tank (RRT). (3) Preparation for immobilization by oxidation using heated water (i.e., WWO) for those batches that require it and concentration by evaporating water at about atmospheric pressure in the RRT. (4) Immobilization by using additives to eliminate free liquids and packaging of the treated sludge into drums. (5) Inspection and handling of the filled drums prior to transfer to a separate storage and shipping facility. (6) Handling of vapor, condensate, and other waste streams generated by the process. Each of these steps is discussed in the paper, together with the current state of progress in developing the technology and requirements for continued development. A schematic of the recommended baseline WWO treatment process is given below. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗