Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “HOT CANYON”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Areas with Surface Thermal Anomalies as Detected by ASTER and LANDSAT Data around South Canyon Hot Springs, Garfield County, Colorado

This map shows areas of anomalous surface temperature around South Canyon Hot Springs as identified from ASTER and LANDSAT thermal data and spatial based insolation model. The temperature for the ASTER data was calculated using the Emissivity Normalization Algorithm that separate temperature from emissivity. The incoming solar radiation was calculated using spatial based insolation model developed by Fu and Rich (1999). Then the temperature due to solar radiation was calculated using emissivity derived from ASTER data. The residual temperature, i.e. temperature due to solar radiation subtracted from ASTER temperature was used to identify thermally anomalous areas. Areas having anomalous temperature in the ASTER data are shown in blue diagonal hatch, while areas having anomalous temperature in the LANDSAT data are shown in magenta on the map. Thermal springs and areas with favorable geochemistry are also shown. Springs or wells having non-favorable geochemistry are shown as blue dots.

15 GEOTHERMAL ENERGY↗

Hot Canyon

This historical film footage, originally produced in the early 1950s as part of a series by WOI-TV, shows atomic research at Ames Laboratory. The work was conducted in a special area of the Laboratory known as the "Hot Canyon".

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Waste Treatment Plant - 12508

The Waste Treatment Plant (WTP) will immobilize millions of gallons of Hanford's tank waste into solid glass using a proven technology called vitrification. The vitrification process will turn the waste into a stable glass form that is safe for long-term storage. Our discussion of the WTP will include a description of the ongoing design and construction of this large, complex, first-of-a-kind project. The concept for the operation of the WTP is to separate high-level and low-activity waste fractions, and immobilize those fractions in glass using vitrification. The WTP includes four major nuclear facilities and various support facilities. Waste from the Tank Farms is first pumped to the Pretreatment Facility at the WTP through an underground pipe-in-pipe system. When construction is complete, the Pretreatment Facility will be 12 stories high, 540 feet long and 215 feet wide, making it the largest of the four major nuclear facilities that compose the WTP. The total size of this facility will be more than 490,000 square feet. More than 8.2 million craft hours are required to construct this facility. Currently, the Pretreatment Facility is 51 percent complete. At the Pretreatment Facility the waste is pumped to the interior waste feed receipt vessels. Each of these four vessels is 55-feet tall and has a 375,000 gallon capacity, which makes them the largest vessels inside the Pretreatment Facility. These vessels contain a series of internal pulse-jet mixers to keep incoming waste properly mixed. The vessels are inside the black-cell areas, completely enclosed behind thick steel-laced, high strength concrete walls. The black cells are designed to be maintenance free with no moving parts. Once hot operations commence the black-cell area will be inaccessible. Surrounded by black cells, is the 'hot cell canyon'. The hot cell contains all the moving and replaceable components to remove solids and extract liquids. In this area, there is ultrafiltration equipment, cesium-ion exchange columns, evaporator boilers and recirculation pumps, and various mechanical process pumps for transferring process fluids. During the first phase of pretreatment, the waste will be concentrated using an evaporation process. Solids will be filtered out, and the remaining soluble, highly radioactive isotopes will be removed using an ion-exchange process. The high-level solids will be sent to the High-Level Waste (HLW) Vitrification Facility, and the low activity liquids will be sent to the Low-Activity Waste (LAW) Vitrification Facility for further processing. The high-level waste will be transferred via underground pipes to the HLW Facility from the Pretreatment Facility. The waste first arrives at the wet cell, which rests inside a black-cell area. The pretreated waste is transferred through shielded pipes into a series of melter preparation and feed vessels before reaching the melters. Liquids from various facility processes also return to the wet cell for interim storage before recycling back to the Pretreatment Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Brigham City Hydro Generation Project

Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction from Jerome, Idaho for the Upper Power Plant construction. A kickoff meeting was June 24, 2014 and demolition was immediately started on building. Because of a delivery delay of Turbine, Generator and Equipment from Canyon Brigham City had to request another extension for the final date of completion. DOE awarded modification (.007) to Brigham City with a new completion date of August 1, 2015. The Turbine has had a few adjustments to help with efficiency; but the Generator had a slight vibration when generator got hot so Canyon Industries had U S Motor’s that manufactured the generator come to check out the issue. The other Equipment seems to be running normal. Brigham City, Sunrise Engineering and Canyon Industries met to determine what the vibration in the generator was and how to solve the issue Us Motor’s found some welds that failed: they have been repaired. U S Motor’s delivered the repaired generator Feb. 17, 2015. Canyon Industries arranged for a crane to installed generator in Power Plant. U S Motor’s balanced and wired generator. Plant Operators put the generator back on line. Canyon Industries returned and gave their approval to keep Hydro online. After Hydro was put back into operations it kept going off line because of overheating issues. Canyon Industries returned and replaced sensors and adjusted them to the proper settings for normal operations. Brigham City added additional steel screens to windows to increase air flow in Power Plant Building. After construction phase of the Upper Hydro Plant some landscaping has been restored around the building additional gravel brought in and leveled out and the road that was cut through for conduits to run wires. A retaining wall was installed to protect penstock. The Upper Hydro Plant is complete and in full operations. The final reimbursement was submitted.

13 HYDRO ENERGY↗

Evaluation of the Potential for Precipitation of Solids during Storage of Non-Aluminum SNF Solutions

Non-aluminum clad spent nuclear fuels (NASNF) stored in the L-Area basin will be dissolved in H-Canyon using the 6.3D electrolytic dissolver. The solutions will be stored in either the hot or warm canyon until the preparation of a sludge batch for the Defense Waste Processing Facility. Spent nuclear fuel solutions could be stored for 1-2 years before transfer to the H-Area Tank Farm depending on the interval between sludge batches. The solution level in the storage tanks will be maintained; therefore, precipitation of solids due to evaporation is not an issue. However, the precipitation of solids from completely dissolved SNF due to solution instabilities has been observed during intermediate storage of solutions generating hydrated oxides.The presence of fissile material in these solids is generally associated with zirconium molybdate, which is known to act as a host lattice for Pu and can carry the actinides upon precipitation. The formation of zirconium molybdate solids which carry fissile material is a potential concern for the storage of NASNF solutions. To address this concern, the Savannah River National Laboratory performed a literature review to identify knowledge gaps which may require experimental work to determine if the formation of solids is a concern during storage of these solutions. Based on the literature review, the precipitation of zirconium molybdate solids from the Campaign 1 NASNF solutions during intermediatestorage is expected. This conclusion is supported by the identification of zirconium molybdate solids found on the H-Canyon 6.1D Dissolver MK-12 insert spacer. The formation of the zirconium molybdate solids is attributed to hydrolysis and radiolytic processes in the nitric acid solution. As the molybdate solids form, U and Pu can substitute for Zr in the crystal lattice resulting in co-precipitation. Generally, the Pu substitutes directly into the crystal lattice during precipitation while the U associated with the molybdate solids more likely absorbs from the solution. The U in the NASNF solutions is present as uranyl nitrate, a 2+ cation which will not substitute as easily into the molybdate crystal lattice for the Zr 4+ ion.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contaminant Migration Modeling to Support the In Situ Decommissioning of Hardened Nuclear Facilities - 20215

The decommissioning of hardened nuclear facilities provides a unique challenge in balancing current worker dose with exposure to future receptors and media. In situ decommissioning (ISD) is a cost-effective and safe option for the closure of such facilities but requires a detailed understanding of the threat that radioactive and hazardous constituents remaining in the facilities pose to groundwater and surrounding surface water. The Savannah River Site (SRS) extensively employs contaminant migration models within the decommissioning process to develop site-specific removal, grouting, and monitoring strategies in support of safe and effective final end states of nuclear facilities. This work discusses the use of contaminant migration modeling in the ISD process at SRS, including specific examples from the closure of P-Reactor and R-Reactor, Building 235-F, F-Canyon and F/H Laboratory Complex. Migration models developed during the closure of P-Reactor and R-Reactor were divided into four source areas: the reactor vessel, the process area, the disassembly basin, and the purification wing. Each source area was assigned a specific inventory and migration pathway and was then subject to varying hypothetical removal, capping, and grouting schemes. Modeling indicated that groundwater Maximum Concentration Limits (MCLs) might be exceeded if no action was taken for eleven and ten constituents of concern (COCs) at P-Reactor and R-Reactor, respectively. These exceedances could occur in as few as 200 to 500 years. Alternatively, the migration modeling demonstrated that the selected ISD actions reduced contaminant mobility which allowed for significant radioactive decay and resulted in fewer predicted exceedances of groundwater MCLs (five COCs for P-Reactor; eight COCs for R-Reactor). In response to the modeling results for P-Reactor and R-Reactor, effectiveness monitoring programs were developed to target contaminants, specific to each reactor, that may migrate to groundwater. Contaminant migration modeling also revealed that roof collapse was a large factor in the release of COCs to the environment, giving rise to roof improvements, and an inspection and vegetation control program to ensure roof stability over time. Contaminant migration modeling is also aiding in the closure planning for hardened facilities in F Area. Building 235-F housed the Actinide Billet Line, which produced Np-237 billets for irradiation in SRS reactors, and the Plutonium Fuel Form (PuFF) facility that produced Pu-238 heat sources for the space program. As a result of these missions, areas within Building 235-F contain considerable residual amounts of both Pu-238 and Np-237. Contaminant migration modeling of Building 235-F was originally performed in 2012 to identify the feasibility of ISD and the amount of radioactive material removal required to prevent the exceedance of groundwater MCLs. The original model indicated that a 60% reduction in the PuFF facility Pu-238 inventory could keep groundwater concentrations below standards, while Np-237 did not pose a threat to groundwater. However, updates to the model with an emphasis on source impact pathways revealed that, due to the orientation of the source areas relative to groundwater flow, no amount of reasonable removal of Pu-238 would keep groundwater concentrations below MCLs and that Np-237 could be a large contributor to localized MCL exceedances. With this insight, the refined 2019 model is being used to assist in the development of grouting plans specific to each facility source area, where bentonite may be utilized to slow the migration of Pu-238 and its daughter products from the PuFF facility and a reducing grout may decrease Np-237 transport by ensuring the nuclide remains in the less mobile +IV oxidation state. The beginning phases of contaminant migration modeling are underway for F-Canyon and associated facilities using lessons learned from the Reactors and Building 235-F. A contaminant migration pathway, similar to the pathway used for the reactor vessels, is being developed for the hot and warm canyons. The F-Canyon inventories are being spatially refined to identify specific and localized source zones, comparable to Building 235-F, that may impact groundwater. Contaminant migration modeling provides vital input within the ISD process, from facility investigation to post closure effectiveness monitoring, making it a valuable tool in the development of safe and effective end states for hardened nuclear facilities at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GrayQb TM Single-Faced Version 2 (SF2) Hanford Plutonium Reclamation Facility (PRF) deployment report

The Savannah River National Laboratory (SRNL) in partnership with CH2M Plateau Remediation Company (CHPRC) deployed the GrayQb TM SF2 radiation imaging device at the Hanford Plutonium Reclamation Facility (PRF) to assist in the radiological characterization of the canyon. The deployment goal was to locate radiological contamination hot spots in the PRF canyon, where pencil tanks were removed and decontamination/debris removal operations are on-going, to support the CHPRC facility decontamination and decommissioning (D&D) effort. The PRF canyon D&D effort supports completion of the CHPRC Plutonium Finishing Plant Decommissioning Project. The GrayQb TM SF2 (Single Faced Version 2) is a non-destructive examination device developed by SRNL to generate radiation contour maps showing source locations and relative radiological levels present in the area under examination. The Hanford PRF GrayQbTM Deployment was sponsored by CH2M Plateau Remediation Company (CHPRC) through the DOE Richland Operations Office, Inter-Entity Work Order (IEWO), DOE-RL IEWO- M0SR900210.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GrayQb Single-Faced Version 2 Open Environment Test - 16344

The GrayQb{sup TM} Single Faced Version 2 (SF2) is a non-destructive examination device developed to generate radiation contour maps showing source locations and relative radiological levels present in an area under examination. This device allows for characterization of radioactively contaminated areas such as hot cells, gloveboxes, small and large rooms, hallways, and waste tanks. The goal of GrayQb{sup TM} (pronounced 'Gray Cube') is to provide a low cost easily deployable device to aid in the process of decontamination and decommissioning (D and D). The GrayQb{sup TM} SF2 device is approximately a six inch cube weighing seven (7) pounds composed of a tungsten shield with integrated collimator, radiation imaging medium (Phosphor Storage Plate), and digital camera. This paper details the design upgrades incorporated into the new version of the GrayQb{sup TM} SF2 device and the characterization testing of this upgraded device. Device results from controlled testing performed at the Savannah River Site (SRS) Health Physics Instrument Calibration Laboratory (HPICL) are presented, as well as results from the open environment field testing performed in the E-Area Low Level Waste Storage Area. Follow on work performed deploying the GrayQb SF2 device at the Hanford Plutonium Reclamation Facility (PRF) to assist in the radiological characterization of the canyon will also be presented. Testing of the redesigned GrayQb{sup TM} SF2 device demonstrated its ability to detect low energy isotopes, e.g. Am-241 and Pu-238, not only indoors in controlled environments with well-defined source locations, but also in open environment field areas with a significant high energy background. Additionally, it was demonstrated that the device could detect higher energy isotopes (Cs-137 and Co-60) in a controlled setting and with additional testing and/or modifications to device and software, would likely be able to detect these isotopes in the open environment field testing. Follow on 2015 work performed at Hanford proved GrayQb to be a useful tool in the radiological characterization of the PRF canyon. Distribution tendencies of the radiological hot spots were identified that provided insights which will assist in more efficient planning of the continued D and D effort. Hot spots were identified which can be targeted during the future D and D effort and used as markers during the NDA assessment to quantify the radiological environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology Development in Support of Hyperspectral Infrared Atmospheric Sounding in a CubeSat

Hyperspectral infrared sounding in a CubeSat will provide a new dimension to the current suite of IR sounders by allowing measurements at multiple times of day and enabling formation flying of IR sounders for new data products such as Atmospheric Motion Vector (AMV) winds. This paper focuses on technology development during the CubeSat Infrared Atmospheric Sounder (CIRAS) project sponsored by the NASA Earth Science Technology Office (ESTO), and coincident studies by the NOAA Office of Projects, Planning, and Analysis (OPPA). The CIRAS approach incorporates key new instrument technologies developed at JPL’s Microdevices Lab (MDL) including a 2D array of High Operating Temperature Barrier Infrared Detector (HOT-BIRD) material, selected for its high uniformity, low cost, low noise and higher operating temperatures than traditional materials. The second key technology is an MWIR Grating Spectrometer (MGS) designed by Ball Aerospace with a JPL MDL slit and immersion grating to provide hyperspectral infrared imaging in a CubeSat volume. The third key technology is a blackbody calibration target fabricated with MDL’s black silicon to have very high emissivity in a flat plate construction. JPL has completed design and breadboard of the mechanical, electronic and thermal subsystems for CIRAS payload including a HOT-BIRD FPA, with filters in a dewar and a breadboard of the electronics and scan mirror assembly. Blue Canyon Technologies, developer of the CIRAS 6U CubeSat, completed the Final Design Review for the spacecraft.

Yee, Karl↗

Geothermal Fault Zone and Fluid Imaging through Joint Airborne ZTEM and Ground MT Data Inversion Analysis

This project has aimed to achieve detailed electrical resistivity resolution at geothermal reservoir scales by combining airborne natural electromagnetic (EM) field surveying (ZTEM) with ground magnetotelluric (MT) measurements to approximate an airborne MT geophysical method. MT alone is relatively expensive and may have permitting challenges in sensitive areas. Airborne ZTEM field data contains only the magnetic field, requires a background assumption, and has been limited to relatively high frequencies, thus suffering uniqueness problems. Based on proto-type 2D simulations, ZTEM ambiguities may be reduced through formal incorporation with possibly sparse ground MT soundings, which we pursued in full 3D for this project. The methodology was tested at the high-temperature Roosevelt Hot Springs geothermal system, Utah, which was considered advantageous given the near total exposure of crystalline reservoir rocks across the project area. ZTEM and ground MT survey data were acquired in 2017, subcontracted to outside parties with which we have worked in the past. These included 80 remote-referenced tensor MT soundings over the Mineral Mountains and adjacent Roosevelt Hot Spring producing geothermal system. These MT stations abut later coverage of a similar number of MT stations taken for the Utah FORGE project providing excellent total data aperture to re-solve structure beneath both project areas better than either set alone. The airborne ZTEM survey covered 704 line kilometers in E-W flight lines with a 250 m line spacing. Although this survey was timed during a maintenance-related shutdown of power production at the Roosevelt Hot Springs, other noise sources difficult to identify but including two high-voltage state-scale transmission lines compromised the ZTEM survey badly leading to unusable responses. Thus, with DOE management concurrence, the project proceeded to emphasize inversion and interpretation of the joint SubTER-FORGE MT data sets with regard to the Roosevelt Hot Springs reservoir recharge and to deep heat sources for both it and the Utah FORGE EGS project area. We also investigated the joint ZTEM-MT sampling concept with data sets from the Eleven Mile Canyon prospect area donated by the U.S. Navy (A. Sabin, PoC). Inversion of the SubTER-FORGE MT data using the HexMT 3D finite element algorithm reveals a large, low-resistivity anomaly extending sub-vertically through the depth range of the crust beneath the western Mineral Mountains. The steep conductive zone connects in the lower crust to a more tabular conductor characteristic of much of the Great Basin that generally is ascribed to current mafic magmatic underplating, hybridization and fluid release. The location of the resolved anomaly relative to the recent (0.5-0.8 Ma) eruptive centers of the Mineral Mountains implicates it as remnants of the magma body which fed these centers. This structure appears to be currently feeding heat and fluids upward into the Roosevelt Hot Springs hydrothermal system, as well as heat laterally to the FORGE project area. Separate and joint inversion models were carried out for the donated Eleven Mile Canyon MT-ZTEM data set to demonstrate concept. ZTEM only inversion showed two main alteration zones in the western portion of the project area known from geological mapping. Joint inversion including an E-W profile of MT soundings sharpened these features considerably. It also resolved in much greater detail the graben related normal faulting structure of the central project area which lies at depths exceeding the sensitivity of ZTEM alone. The sparse number of MT da-ta relative to the ZTEM required upweighting the former by a factor of several, but an exact procedure awaits future research. Our final impression is that sparse MT data can improve resolution of the subsurface over that of ZTEM alone. However, well sampled MT data are to be preferred and offer the simplicity of interpreting just one data type, and possess the superior resolution capability coming with the electric field everywhere, and from their high bandwidth.

15 GEOTHERMAL ENERGY↗

Demonstration of Chemical Decladding and Disposition Options of Non-Al Clad Fuels at the Savannah River Site [Poster]

The Savannah River Site’s H-Canyon processes aluminum-clad fuels from foreign and domestic research reactors to recover enriched uranium. However, there is an extensive inventory of non-Al-clad fuels currently in the storage basin, many of which are damaged or at risk of failure. Most of these are clad with stainless steel or Zircaloy, which are incompatible with H-Canyon’s process chemistry. Development of decladding methods is therefore critical to the waste cleanup mission at SRS. Here we demonstrate the dissolution of stainless steel using the SULFEX process developed at Oak Ridge and the dissolution of Zircaloy using the ZIRFLEX process developed at the Hanford Site. Dissolution and offgassing rates are consistent with previous studies and show that these cladding materials can be processed even below reflux conditions. Waste streams have been treated and quantified, providing valuable information for potential future process development in H-Canyon. This study has demonstrated that the technology may be feasible in the near term for processing smaller damaged fuels in the SRS hot cells.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demonstration of Chemical Decladding and Disposition Options for Non-Al Clad Fuels in H-Canyon

Aqueous disposition of non-Al clad fuels was studied in order to determine if H-Canyon would be a viable disposition option for this type of L-Basin fuel. A review of the L-Basin fuel types and its condition was done suggesting two major cladding types, Zircaloy and 304L stainless steel needed to be studied. Dissolution flowsheets options were reviewed. Sulfex and Zirflex processes were chosen as best for H-Canyon integration. Both process flowsheets were demonstrated on a lab scale to determine decladding rate, and off-gas and waste production. The resulting data suggested decladding in H-Canyon was an option but dissolver corrosion as well as off-gas and waste generation needed to be addressed. Small scale dissolution in a hot cell of smaller damaged fuel is a viable option with the flowsheets tested.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dynamic response of induced pressures, suckdown, and temperatures for two tandem jet STOVL configurations

NASA Ames Research Center has been conducting a program to improve the methods for predicting the jet-induced lift loss (suckdown) and hot gas ingestion on jet Short Takeoff and Vertical Landing (STOVL) aircraft during hover near the ground. As part of that program, small-scale hover tests were conducted to expand the current data base and to improve upon the current empirical methods for predicting jet-induced lift loss and hot gas ingestion (HGI) effects. This report is one of three data reports covering data obtained from hover tests conducted at Lockheed Aeronautical Systems, Rye Canyon Facility. It will include dynamic (time dependent) test data for both lift loss and HGI parameters (height, nozzle temperature, nozzle pressure ratio, and inlet location). The flat plate models tested were tandem jet configurations with three planform variations and variable position side-by-side sucking inlets mounted above the planform. Temperature time lags from 8-15 seconds were observed before the model temperatures stabilize. This was larger than the expected 1.5-second lag calculated from literature. Several possible explanations for the flow temperatures to stabilize may include some, or all, of the following: thermocouple lag, radiation to the model surface, and heat loss to the ground board. Further investigations are required to understand the reasons for this temperature lag.

Wardwell, Douglas A.↗

Amino Acid Abundances and Compositions in Iron and Stony-Iron Meteorites

The organic compositions of carbonaceous chondrite meteorites have been extensively studied; however, there have been fewer reports of other meteorite classes, and almost none from iron meteorites, which contain much less carbon than carbonaceous chondrites but make up ~4% of observed meteorite falls. Here, we report the bulk amino acid content of three iron meteorites (Campo del Cielo, IAB; Canyon Diablo, IAB; and Cape York, IIIAB) and both the metal and silicate portions of a pallasite (Imilac). We developed a novel method to prepare the samples for analysis, followed by hot water extraction and analysis via liquid chromatography‐mass spectrometry. Free amino acid abundances ranging from 301 to 1216 pmol/g were observed in the meteorites, with the highest abundance in the silicate portion of the pallasite. Although some of the amino acid content could be attributed to terrestrial contamination, evidence suggests that some compounds are indigenous. A suite of C(5) amino acids was observed with a distinct distribution favoring a straight chain (n‐pentanoic acid) structure; this straight chain dominance is suggestive of that observed in thermally altered stony meteorites. Amino acids were also observed in terrestrial iron granules that were milled and analyzed in the same way as the meteorites, although the distribution of detected amino acids was different. It is possible that similar formation mechanisms existed in both the meteorites and the terrestrial iron, or that observed amino acids resulted from reactions of precursors during sample preparation. This work suggests that iron meteorites should not be overlooked for contributions of amino acids and likely other soluble organic molecules to the early Earth. Future studies of iron–nickel meteorites and asteroids, such as Psyche, may provide further insights into their potential organic inventory.

Jamie E. Elsila↗

Forces and pressures induced on circular plates by a single lifting jet in ground effect

NASA Ames is conducting a program to develop improved methods for predicting suckdown and hot-gas ingestion on jet V/STOL aircraft when they are in ground effect. As part of that program a data base is being created that provides a systematic variation of parameters so that current empirical prediction procedures can be modified. The first series of tests in this program is complete. This report is one of three that presents the data obtained from tests conducted at Lockheed Aeronautical Systems - Rye Canyon Facility and the High Bay area of the 40 by 80 foot Wind Tunnel at Ames Research Center. Suckdown on two circular plates is examined.

Bellavia, David C.↗

PREPARATION OF U-PLANT FOR FINAL DEMOLITION AND DISPOSAL - 12109E

The U-Plant is one of the five major nuclear materials processing facilities at Hanford and was chosen as a pilot project to develop the modalities for closure of the other four facilities at Hanford and the rest of the Department of Energy (DOE) complex. The remedy for this facility was determined by a Record of Decision (ROD) pursuant to the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). That remedy was to 'Close in Place - Partially Demolished Structure'. The U-Plant facility is identified as the 221-U Building and is a large, concrete structure nominally 247m (810 ft) long, 20 M (66 ft) wide and 24 m (77 ft) high with approximately 9 m (30 ft) being below grade level. It is a robust facility with walls ranging from 0.9 m to 2.7 m (3 ft to 9 ft) thick. One large room extends the entire length of the building that provides access to 40 sub-grade processing cells containing tanks, piping and other components. The work breakdown was divided into three major deliverables: (1) Tank D-10 Removal: removal of Tank D-10, which contained TRU waste; (2) Equipment Disposition: placement of contaminated equipment in the sub-grade cells; and (3) Canyon Grouting: grouting canyon void spaces to the maximum extent practical. A large number of pieces of contaminated equipment (pumps, piping, centrifuges, tanks, etc) from other facilities that had been stored on the canyon operating floor were placed inside of the sub-grade cells as final disposition, grouted and the cell shield plug reinstalled. This action precluded a large volume of waste being transported to another burial site. Finally, {approx}19,000 m3 ({approx}25,000 yd3) of grout was placed inside of the cells (in and around the contaminated equipment), in the major galleries. the ventilation tunnel, the external ventilation duct, and the hot pipe trench to minimize the potential for void spaces and to reduce the mobility, solubility, and/or toxicity of the grouted waste. The interim condition of the facility is 'cold and dark'. Upon availability of funding the structure will have contamination fixative applied to all contaminated surfaces and may be explosively demolished, with the remaining structure buried under an engineered barrier.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Suckdown, fountain lift, and pressures induced on several tandem jet V/STOL configurations

As part of a program to improve the methods for predicting the suckdown and hot gas ingestion for jet V/STOL aircraft in ground effect, a data base is being created that provides a systematic variation of parameters so that a new empirical prediction procedure can be developed. The first series of tests in this program was completed. Suckdown, fountain lift, and pressures induced on several two-jet V/STOL configurations are described. It is one of three reports that present the data obtained from tests conducted at Lockheed Aeronautical Systems-Rye Canyon Facility and in the High Bay area of the 40 by 80 foot wind tunnel complex at NASA Ames Research Center.

Bellavia, David C.↗

Resource Characterization to Estimate Potential for Electricity Co-Production at Blackburn Oil Field, Nevada

The U.S. Department of Energy estimates that an annual average of 25 billion barrels of hot water are produced from oil and gas wells within the United States. The thermal energy available in the co-produced water stream is usually discarded, as the produced waters are considered an inconvenience by the operators and are disposed of using injection wells. However, utilizing organic Rankine cycle (ORC) generators, a vast amount of thermal energy can be captured and converted into electricity (albeit at relatively low efficiency due to the low temperatures). The National Renewable Energy Laboratory (NREL), in collaboration with Transitional Energy and Grant Canyon Oil & Gas, evaluated the feasibility of geothermal co-production of electricity by utilizing existing oil wells in Blackburn oil field in Nevada. The once prolific Blackburn oil field is located in Pine Valley, approximately 45 miles east-southeast of Elko, Nevada. Currently, the wells targeting the highly fractured Devonian Nevada dolomite reservoir are operating at a water cut ratio of more than 99%, with individual fluid (oil and water) production rates reaching 7.4 L/s (4,021 BBL/day). Analysis of publicly available data showed that the combination of the suitable wells' maximum historical production rates reached 22.90 L/s. The production from these wells occurs naturally and the wells are choked (and even shut down) by the operator to mitigate excessive water production, indicating a strong reservoir recharge and future opportunity to increase the water production for geothermal electricity generation. The main goal of this study was to evaluate the productivity of the existing wells, the performance of the reservoir, the surface network, and the operational constraints in order to achieve 1 MWe of electricity production from the field's water production. Utilizing the GEOPHIRES tool, we have determined that a twofold to threefold increase in the total fluid production, compared to the historical production under artificial restraint (choke), is required to reach a 1-MWe net target output for a low-temperature ORC system with air-cooled condensers. Lower flow rates would be required when utilizing water-based condensers instead of air-cooled condensers. However, that would require a constant supply of cold water, which may be challenging given the arid environment of the project site.

Blackburn↗