Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “HOISTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Locking side pull hoist ring assembly

An assembly for rotating a workpiece including a locking side pull hoist ring removably attachable to a side surface of the workpiece. The locking side pull hoist ring comprises a load bearing structure, a rotation mechanism attached to the side surface of the workpiece that rotates about a rotation axis extending through the rotation mechanism, a locking mechanism configured to transition between a locked state and an unlocked state, and a support member connecting the load bearing structure and the rotation mechanism. The support member rotatably supports the rotation mechanism for rotation about the rotation axis and rotatably supports the load bearing structure for rotation about a second axis. In the locked state, the locking mechanism prevents rotation of the rotation mechanism by securing the rotation mechanism to the support member.

Nadiadi, Irfan Yunas↗

Research and Experiment on the Key Technologies of the Spent Fuel Storage in HTR-PM - 18486

High Temperature Reactor demonstration project of China (HTR-PM) is one of the major national science and technology projects, some key technologies for the design and operation of the demonstration project are formed to research according to the main technology. The spent fuel storage system is one of the main systems of the HTR-PM. In order to solve the technical problems related to the operation of spent fuel, several experiments have been conducted, including: spent fuel loading, getting back, spent fuel canister hoisting, storage well cover hoisting, storage canister drop and so on. In the study process, the test facility has been set up to carry on the operation and the experiment verification to ensure the reliability and safety of the spent fuel storage system. Spent fuel storage system undertakes spent fuel receiving, spent fuel canister transfer, storage, lifting and other functions in HTR-PM, the project research need to solve several major technical problems related to the spent fuel operation, which mainly include: Develop the transportable spent fuel canister for HTR-PM, the canister is corrosion resistance, impact resistance, and is in subcritical condition when loaded with fuel. Develop the spent fuel canister hoister, which could hoist the spent fuel canister safely and reliably. Develop the spent fuel storage well cover hoister, which could hoist the well cover safely and reliably. Study the small probability of the spent fuel canister in extreme condition of canister hoist falling accidents, to ensure the radiation protect safety and residual heat removal safety of the canister in case of the canister drop when lifting. Develop the spent fuel charging device and return device, which could load the spent fuel elements into the spent fuel canister, and could take out the fuel elements from the canister. The key technology and equipment of the spent fuel storage system in HTR-PM would be solved through the research of the project. Project research is very important for the implementation and safe operation of the HTR-PM project. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Salt Repository Concept for CSNF in 21-PWR Size Canisters

The most straightforward concept for disposal of large, heavy packages containing commercial spent nuclear fuel (CSNF) in a repository in bedded salt, would be to emplace them directly on the floor in emplacement tunnels. In-tunnel axially aligned horizontal emplacement would minimize excavated volume and avoid drilling of large-diameter emplacement boreholes. A similar concept was proposed in Germany for direct disposal of POLLUX ® canisters. The repository would be constructed at a depth of 500 to 1,000 m for isolation from the surface, and for sufficient overburden stress to ensure creep reconsolidation of repository openings. It could entail modular panels of emplacement tunnels arranged on headings oriented in cardinal directions from a central core, to accommodate the estimated 140,000 MTU total U.S. CSNF inventory. To do so, the overall area of the repository layout would be approximately 20 km 2 . Many layouts are possible, but the approach should be modular, excavation should be deferred for as long as possible to avoid maintenance, and the emplacement areas should share support facilities and shafts. Vertical shafts would be used in accordance with mining practice in sedimentary basins. Large diameter shafts would be needed for ventilation exhaust and waste transport, with smaller shafts for waste salt removal, men & materials, and ventilation intake. The spacing between disposal tunnels as estimated from thermal modeling, seeks to limit the maximum average areal thermal load in the panels to 11 W/m 2 to control long-term heat buildup in the host rock. Peak salt temperature would occur within a few years and would be dominated by each waste package locally, simplifying thermal management. There would be some flexibility to decrease the package spacing or increase the emplacement thermal power limit Backfilling emplaced waste packages immediately with mine-run crushed salt would provide shielding and expedite reconsolidation. This arrangement would isolate adjacent waste packages from one another by the intervening backfill, especially after it reconsolidates and its properties approach those of intact salt. After the repository is fully loaded and the performance confirmation program is complete, activities to permanently close the repository would be initiated. During closure operations all openings in the host salt would be backfilled, then shafts would be sealed, and boreholes plugged. Plans for the Waste Isolation Pilot Plant (WIPP) show how sealing and plugging could be done. A monitoring program could continue for 50 years or longer after repository closure. With an emplacement thermal power limit of 10 kW per waste package, nearly all the CSNF that is projected to be produced by the current fleet of reactors in the U.S. could be emplaced over a period of approximately 50 years starting in calendar 2048. No barriers to implementation in a reasonable timeframe have been identified from this generic analysis. Engineering challenges include: 1) shaft construction; 2) a very-large capacity shaft hoist; 3) overpack design; 4) a transport-emplacement-vehicle (TEV) for transporting waste packages once they are underground and emplacing them remotely; and 5) remotely operated equipment for emplacing backfill. The method of shaft construction would depend on site-specific conditions, and could involve freezing the subsurface. A shaft hoist with payload capacity of 175 MT seems technically and economically feasible based on development work in Germany, and it would be the largest hoist of its kind. The function of disposal overpacks would be to provide reliable containment during repository operations, which could be accomplished using a corrosion allowance material such as a low-carbon steel. Development effort would be needed to determine overpack thickness (e.g., 7 to 20 cm) that can resist corrosion and loading from salt creep, to rovide containment throughout the repository operational period. The transport-emplacement vehicle (TEV) would be similar to previous concepts, particularly one option proposed for a Yucca Mountain repository. It would move over a rough salt floor on independently driven and steered wheels, and carry heavy shielding in addition to a waste package. By analogy to the safety case for the WIPP in New Mexico, human intrusion is likely to be the dominant mode of radionuclide release from the repository. Treatment of human intrusion for a CSNF repository in salt could depend on promulgation of site-specific changes in the regulations. Radionuclide release and migration would be quite limited for undisturbed conditions. There may be opportunities for improved understanding of salt performance with waste heating, based on future in situ testing in an underground salt research laboratory. This report also discusses a developing area of salt rock mechanics that involves low-stress, low strain-rate creep that might cause large, heavy waste packages to slowly sink. Site-specific sampling, testing, and modeling would be used to determine if the mechanism is important enough to merit consideration in design, or inclusion in performance assessment. Part of engineering design and postclosure safety assessment for a CSNF repository in salt would be to implement a methodology to show that the probability of a criticality event in the repository, when waste packages eventually breach and are flooded, is less than the probability screening threshold for performance assessment. In the methodology, a criticality analysis would be performed for waste packages in the repository, incorporating measures that could be introduced as needed to limit reactivity, for example using fuel selection and loading rules, and crediting the absorption of thermal neutrons by natural chlorine in the environment. A similar analysis has been underway for CSNF stored in dual-purpose canisters. Ideally the strategy would be developed prior to actually loading SNF assemblies into canisters used in waste packages for disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Respirable Release Fraction Measurement Chamber (RRFMC) - 18321

The Respirable Release Fraction Measurement Chamber (RRFMC) is designed to hoist a container to a predetermined height, drop it, and then utilize aerosol particle counters to measure the mass of powder that is released from failed containers. The RRFMC hoist mechanism is located inside an airtight (6.1 m high) steel enclosure that isolates the released test aerosol from the surrounding lab room environment. Accurate measurement of the released test powder is necessary for estimating the total released mass of material. Cerium oxide will be used as a surrogate for plutonium oxide. The range of the aerodynamic diameter of cerium oxide test powder was characterized both by cascade impaction and aerodynamic sizing. The scope of this paper includes the physical parameters required for accurately measuring the total mass of released powder, the fabrication of the tower, various strategies to optimize concentration sampling, and developing methods to accurately measure the respirable fraction, airborne release fraction, and the damage ratio. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Crane. Incidental Classroom Instruction 20295

The purpose of this course is to introduce safe hoisting and rigging practices to personnel who are attempting to become LANL incidental crane operators and to review and refresh safe hoisting and rigging practices with existing incidental crane operators.

99 GENERAL AND MISCELLANEOUS↗

RLUOB Toppled Load: Near Miss to Personnel Injury (Incident Investigation Final Report)

On Monday, February 25, 2019, at approximately 1430, the Logistics Central Shop (LOG-CS) Hoisting and Rigging (H&R) crew moved an anti-vibration table on the first floor of Technical Area 55 (TA-55), Building 400, Radiological Laboratory/Utilities/Office Building (RLUOB). The table was designed to be anchored to the facility floor on pedestals to provide vibration dampening for an electron microscope (SEM/TEM). The table was approximately 86 inches wide by 56 inches tall, an asymmetrical load. It weighed approximately 2,300 pounds. The crew was transporting the load using a lifting device, specifically a Vere Optical Table Hoist. The work control package (Integrated Work Document [IWD] and H&R Ordinary Lift Plan) included staging the table, moving the load from the loading dock through corridors into a laboratory, and installing the table. During the table move, the riggers made adjustments to the lifting device to enable the load and device to pass through security double doors. After the crew successfully passed through the security double doors, three riggers moved the load approximately ten linear feet further at which point the lifting device and load fell to the RLUOB facility floor. No injuries were sustained as a result of the toppled load and frame. The rigging crew immediately notified supervision who then notified the TA-55 Facility Operations Director (FOD). After further review, the TA-55 FOD categorized the event as a near miss to personnel injury. The scene was preserved and all H&R operations within the TA-55 directorate were paused pending a review of all lift plans with the rigging supervisor and the Chemistry and Metallurgy Research Replacement (CMRR) Construction Manager. All lift plans were to be reviewed prior to resumption of H&R lifts within the directorate. Additionally, all newly generated lift plans will be reviewed by the TA-55 FOD, the H&R supervisor and the affected manager. The Associate Laboratory Director for Weapons Production (ALDWP) appointed a team to investigate the event, identify all relevant facts, and determine the direct, contributing, and root causes. The team was also charged with reviewing other similar events to identify common causes for multiple recurring events and the organizational and management weaknesses that have led to failure to correct recurring events. (See Appendix A: Memo, Appointment of Accident Investigation Board.)

99 GENERAL AND MISCELLANEOUS↗

Cable-driven additive manufacturing system

A cable-driven additive manufacturing system includes an end effector configured for linear translation within a three-dimensional workspace, an aerial hoist suspending the end effector by at least one suspension cable, a plurality of base stations disposed below the aerial hoist, and control cables running from each of the base stations to the end effector.

Post, Brian K.↗

Engineering for Operation of a Future Belgian Deep Geological Repository for ILW and HLW - 12379

In Belgium, an advanced conceptual design is being elaborated for deep geologic disposal of high level waste (HLW) and for low and intermediate level waste (LILW) not amenable for surface disposal. The concept is based on a shielded steel and concrete container for disposal of HLW, i.e., the Super-container. LILW will be disposed of in separately designed concrete caissons. The reference host rock is the Boom Clay, a poorly indurated clay formation in northeastern Belgium. Investigations into the potential host rock are conducted at the HADES underground research laboratory in Mol, Belgium. In 2009 the Belgian Agency for Management of Radioactive Waste and Enriched Fissile Materials (ONDRAF/NIRAS) initiated a four year research project aimed at confirming the fundamental feasibility of building and operating a repository. The goal of the program is to demonstrate at a detailed conceptual level that the proposed geologic disposal system can be safely constructed, operated, and progressively closed. Part of the broader research efforts being conducted includes evaluations optimization of the waste transportation shaft, subsurface transportation system, ventilation system, and evaluation of backfilling and sealing concepts for the repository design. The potential for implementation of a waste retrieval strategy encompassing the first 100 years after emplacement is also considered. In the framework of a four year research program aimed at confirming the fundamental feasibility of building and operating a repository in poorly indurated clay design studies have been underway to optimize the waste transportation shaft, subsurface transportation system, and ventilation system. Additionally backfilling and sealing concepts proposed for the potential repository have been reviewed in conjunction with impacts related to the potential future inclusion of a retrievability requirement in governing regulations. The main engineering challenges in the Belgian repository concept are size limitations on the underground facilities imposed by the mechanical behavior of the candidate host rock type (i.e., poorly indurated clay) and the resulting ground support requirements. Underground excavations in the Boom Clay require a significant level of ground support to ensure the openings remain stable. A concrete lining system has been developed to address this engineering requirement. As a result strict size limits are imposed on both the diameter of the tunnels and the dimensions of the shaft stations resulting in unique design challenges requiring maximal optimization of the available space. Ongoing studies indicate that a significant (20%) reduction in shaft diameter can be achieved by diagonally orienting the hoist guide rails with respect to the cage, optimizing the counter weight dimensions, and reconfiguring the auxiliary hoisting system as a single rope system. Reliable subsurface transportation of waste packages can be achieved through a hybrid rail/wheel system powered by a battery operated electric locomotive. Key components of the system, including the battery-powered locomotive and a turntable used for transitioning waste shipments from the access gallery into disposal galleries without the need for constructing turnouts, have been successfully demonstrated at the Gorleben exploratory facility and the Konrad repository in Germany, respectively. By optimizing the available space in the disposal galleries and limiting the introduction of hazardous gases by using electric powered systems combined with the relatively small number of workers envisioned in the Belgian repository concept adequate ventilation can be achieved to ensure safe operational conditions. The proposed sealing and backfill systems in the Belgian repository concept should provide adequate safeguards as currently planned. Should a future retrievability requirement be imposed on the design it appears likely that a partial backfilling strategy could be employed. The key component in ensuring retrievability in the design would be the selection of a backfill that combines the safety functions required in the current design concept with a material strength amenable to removal by hydro-jet excavation techniques. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PaR Tensile Truss for Nuclear Decontamination and Decommissioning - 12467

Remote robotics and manipulators are commonly used in nuclear decontamination and decommissioning (D and D) processes. D and D robots are often deployed using rigid telescoping masts in order to apply and counteract side loads. However, for very long vertical reaches (15 meters or longer) and high lift capacities, a telescopic is usually not practical due to the large cross section and weight required to make the mast stiff and resist seismic forces. For those long vertical travel applications, PaR Systems has recently developed the Tensile Truss, a rigid, hoist-driven 'structure' that employs six independent wire rope hoists to achieve long vertical reaches. Like a mast, the Tensile Truss is typically attached to a bridge-mounted trolley and is used as a platform for robotic manipulators and other remotely operated tools. For suspended, rigid deployment of D and D tools with very long vertical reaches, the Tensile Truss can be a better alternative than a telescoping mast. Masts have length limitations that can make them impractical or unworkable as lengths increase. The Tensile Truss also has the added benefits of increased safety, ease of decontamination, superior stiffness and ability to withstand excessive side loading. A Tensile Truss system is currently being considered for D and D operations and spent fuel recovery at the Fukushima Daiichi Nuclear Power Plant in Japan. This system will deploy interchangeable tools such as underwater hydraulic manipulators, hydraulic shears and crushers, grippers and fuel grapples. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Windscale Advanced Gas Cooled Reactor (WAGR) Decommissioning Project A Close Out Report for WAGR Decommissioning Campaigns 1 to 10 - 12474

The reactor core of the Windscale Advanced Gas-Cooled Reactor (WAGR) has been dismantled as part of an ongoing decommissioning project. The WAGR operated until 1981 as a development reactor for the British Commercial Advanced Gas cooled Reactor (CAGR) power programme. Decommissioning began in 1982 with the removal of fuel from the reactor core which was completed in 1983. Subsequently, a significant amount of engineering work was carried out, including removal of equipment external to the reactor and initial manual dismantling operations at the top of the reactor, in preparation for the removal of the reactor core itself. Modification of the facility structure and construction of the waste packaging plant served to provide a waste route for the reactor components. The reactor core was dismantled on a 'top-down' basis in a series of 'campaigns' related to discrete reactor components. This report describes the facility, the modifications undertaken to facilitate its decommissioning and the strategies employed to recognise the successful decommissioning of the reactor. Early decommissioning tasks at the top of the reactor were undertaken manually but the main of the decommissioning tasks were carried remotely, with deployment systems comprising of little more than crane like devices, intelligently interfaced into the existing structure. The tooling deployed from the 3 tonne capacity (3te) hoist consisted either purely mechanical devices or those being electrically controlled from a 'push-button' panel positioned at the operator control stations, there was no degree of autonomy in the 3te hoist or any of the tools deployed from it. Whilst the ATC was able to provide some tele-robotic capabilities these were very limited and required a good degree of driver input which due to the operating philosophy at WAGR was not utilised. The WAGR box proved a successful waste package, adaptable through the use of waste box furniture specific to the waste-forms generated throughout the various decommissioning campaigns. The use of low force compaction for insulation and soft wastes provided a simple, robust and cost effective solution as did the direct encapsulation of LLW steel components in the later stages of reactor decommissioning. Progress through early campaigns was good, often bettering the baseline schedule, especially when undertaking the repetitive tasks seen during Neutron Shield and Graphite Core decommissioning, once the operators had become experienced with the equipment, though delays became more pronounced, mainly as a result of increased failures due to the age and maintainability of the RDM and associated equipment. Extensive delays came about as a result of the unsupported insulation falling away from the pressure vessel during removal and the inability of the ventilation system to manage the sub micron particulate generated during IPOPI cutting operations, though the in house development of revised and new methodologies ultimately led to the successful completion of PV and I removal. In a programme spanning over 12 years, the decommissioning of the reactor pressure vessel and core led to the production 110 ILW and 75 LLW WAGR boxes, with 20 LLW ISO freight containers of primary reactor wastes, resulting in an overall packaged volume of approximately 2500 cubic metres containing the estimated 460 cubic metres of the reactor structure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Restructuring and Optimizing Reactor Building Lifting Processes & Designing a Solution for an Overhead Door Handling Forklift Attachment

This poster presents two innovative projects aimed at enhancing operational efficiency and safety at the Advanced Test Reactor (ATR) Complex. The first project focuses on restructuring the existing lift book used for hoisting operations within the ATR Reactor Building. The current lift book, a cumbersome 150+ page document, is being transformed into a more efficient format using charts that allow for quick identification of maximum lift heights based on object footprint and weight. This new method also considers various parameters such as floor integrity and reactor status, dividing entries into four distinct charts to improve usability and safety during lifts. The second project involves designing a specialized forklift attachment for handling an overhead door at the ATR Reactor Building. The attachment is engineered to securely lift and lower a 1200lb, 14ft long door, ensuring safe replacement operations. The design process included research on forklift attachment codes, modeling in Autodesk Inventor, and testing through Finite Element Analysis (FEA) and hand calculations to confirm the attachment's structural integrity. Future work includes completing detailed drawings and an Engineering Calculations Analysis and Review (ECAR) document to proceed with manufacturing and assembly. Together, these projects demonstrate a commitment to optimizing reactor building operations through innovative engineering solutions and safety considerations.

42 - ENGINEERING↗

Problems of Developing Solid Mineral Deposits on the Sea and Ocean Floor

Brief characteristics of the mineral raw material potential of the deep-sea deposits of ferromanganese nodules in the area of the Clarion-Clipperton Zone leased by Russia in the Pacific Ocean are presented. The creation at the Moscow Mining Institute (MGI) of the USSR’s first Scientific and Technical Problems Laboratory and the results of its work on extraction of minerals from the sea and ocean floor are reviewed. The research works carried out by MGI on underwater mining of ilmenite-rutile-zirconium sands on the Baltic Sea shelf and Iturup Island and tin under conditions of northern seas and the development of the technogenic placer of the East Siberian Sea are analyzed. The concept of using the kinetic energy of coaxially swirled fluid jets in hydrotransport-hoisting devices of vortex slurry preparation, which was tested in the Black Sea and an air-lift mud intake by mechanical and hydraulic loosening for extracting diamond-containing gravel-pebble rocks on the Namibia shelf is given.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Application of Different X-ray Techniques to Improve In-Service Carbon Fiber Reinforced Rope Inspection

Carbon fiber reinforced polymer ropes are gaining in significance in the fields of civil engineering and hoisting applications. Thus, methods of non-destructive testing (NDT) need to be developed and evaluated with respect to new challenges and types of defects. Particularly important is the development of in-service testing solutions which allow the integration in global online monitoring systems. Conventional methods like electrical resistivity or strain measurements using optical fibers are already in use. This study investigates the possibility of using various X-ray techniques to increase the reliability and significance of NDT and their applicability to in-service testing. Conventional film radiography is the most common technique; however, even after image enhancement of the digitized film, this technique lacks contrast sensitivity and dynamic range compared to digital detector array (DDA) radiography. The DDA radiography is a highly sensitive method; yet, the limitation is that it delivers 2D images of 3D objects. By the use of co-planar translational laminography the detectability of planar defects is superior to 2D methods due to multiple projection angles. Apart from this, it can be used on-site due to a rather simple setup and robust equipment. In this work two photon counting detectors (PCD) with different sensor materials (Si and CdTe) were used. The results show that the resolution and defect recognition is lower in case of DDA radiography and laminography using PCDs compared to high-resolution computed tomography. However, the DDA radiography and laminography are sensitive enough to both fiber breakage and delaminations and can be significantly advantageous in terms of measurement time and adaptability for on-site monitoring.

42 ENGINEERING↗

Implicit shock tracking for unsteady flows by the method of lines

Here, a recently developed high-order implicit shock tracking (HOIST) framework for resolving discontinuous solutions of inviscid, steady conservation laws is extended to the unsteady case. Central to the framework is an optimization problem which simultaneously computes a discontinuity-aligned mesh and the corresponding high-order approximation to the flow, which provides nonlinear stabilization and a high-order approximation to the solution. This work extends the implicit shock tracking framework to the case of unsteady conservation laws using a method of lines discretization via a diagonally implicit Runge-Kutta method by “solving a steady problem at each timestep”. We formulate and solve an optimization problem that produces a feature-aligned mesh and solution at each Runge-Kutta stage of each timestep, and advance this solution in time by standard Runge-Kutta update formulas. A Rankine-Hugoniot based prediction of the shock location together with a high-order, untangling mesh smoothing procedure provides a high-quality initial guess for the optimization problem at each time, which results in rapid convergence of the sequential quadratic programing (SQP) optimization solver. This method is shown to deliver highly accurate solutions on coarse, high-order discretizations without nonlinear stabilization and recover the design accuracy of the Runge-Kutta scheme. We demonstrate this framework on a series of inviscid, unsteady conservation laws in both one- and two- dimensions. We also verify that our method is able to recover the design order of accuracy of our time integrator in the presence of a strong discontinuity.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Main Injector ILA Lambertson Seal Installation

The Main Injector ILA Lambertson magnet uses an 18 inch tapered flange from EVAC. The flange resembles the flange on drawing MD-331910, Flange Weldment MIR Lambertson. Please note that these flanges are heavy. A PALD, portable automotive lifting device, i.e engine hoist, is required as well as the associated lifting fixture, to install the mating flange. The following are the steps to install the EVAC seal drawing MA331512, T/S Conventional Magnet MIR Lambertson Magnet Aluminum Knife Edge Seal.

43 PARTICLE ACCELERATORS↗