Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “HOISTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Orbiter Payload Bay Bucket Hoist Mishap...An Accident We Should Never Forget

This slide presentation reviews the accident that occurred in 1985 when a bay bucket hoist fell from its stowed position. This accident damaged the orbiter, injured a technician, and delayed the launch. The accident was investigated, and the cause of the accident was determined to be the practice of two-blocking. Two-blocking is the result of hoisting beyond the intended safe upper limit of hook travel to the point of solid contact between the load block and the upper block or hoist/trolley structure. The usual result is immediate failure of the wire rope, due to the ropes being cut by the grooves of the drum or sheaves. The design of the hoist, the inspection, and the operator training were all in part responsible for this failure.

Lytle, Bradford P.↗

Orion Crew Module / Service Module Structural Weight and Center of Gravity Simulator and Vehicle Motion Simulator Hoist Structure for Orion Service Module Umbilical Testing

An Orion Crew Module Service Module Structural Weight and Center of Gravity Simulator and a Vehicle Motion Simulator Hoist Structure for Orion Service Module Umbilical Testing were designed during a summer 2014 internship in Kennedy Space Centers Structures and Mechanisms Design Branch. The simulator is a structure that supports ballast, which will be integrated into an existing Orion mock-up to simulate the mass properties of the Exploration Mission-1 flight vehicle in both fueled and unfueled states. The simulator mimics these configurations through the use of approximately 40,000 lbf of steel and water ballast, and a steel support structure. Draining four water tanks, which house the water ballast, transitions the simulator from the fueled to unfueled mass properties. The Ground Systems Development and Operations organization will utilize the simulator to verify and validate equipment used to maneuver and transport the Orion spacecraft in its fueled and unfueled configurations. The second design comprises a cantilevered tripod hoist structure that provides the capability to position a large Orion Service Module Umbilical in proximity to the Vehicle Motion Simulator. The Ground Systems Development and Operations organization will utilize the Vehicle Motion Simulator, with the hoist structure attached, to test the Orion Service Module Umbilical for proper operation prior to installation on the Mobile Launcher. Overall, these two designs provide NASA engineers viable concepts worthy of fabricating and placing into service to prepare for the launch of Orion in 2017.

VMS↗

Autonomous Stabilization and Orientation Control of Hoisted Payloads

An orientation control system prototype has been developed for hoisted payloads. This system will allow payloads to be lifted off inclined surfaces while maintaining orientation control, allowing removal of tightly packed payloads without colliding with adjacent objects. For this concept, the payload is hoisted with a crane using a rigging system composed of a cable routed through two capstans and three or four attachment points on the payload. Motors rotate the capstans to adjust the cable lengths to the payload, and thereby control the orientation of the payload. Initial testing of the prototype was completed using manual control, however the algorithms necessary to fully automate the system are presented in this paper.

control↗

Locking side pull hoist ring assembly

An assembly for rotating a workpiece including a locking side pull hoist ring removably attachable to a side surface of the workpiece. The locking side pull hoist ring comprises a load bearing structure, a rotation mechanism attached to the side surface of the workpiece that rotates about a rotation axis extending through the rotation mechanism, a locking mechanism configured to transition between a locked state and an unlocked state, and a support member connecting the load bearing structure and the rotation mechanism. The support member rotatably supports the rotation mechanism for rotation about the rotation axis and rotatably supports the load bearing structure for rotation about a second axis. In the locked state, the locking mechanism prevents rotation of the rotation mechanism by securing the rotation mechanism to the support member.

Nadiadi, Irfan Yunas↗

Square tubing reduces cost of telescoping bridge crane hoist

Using standard square tubing in a telescoping arrangement reduces the cost of a bridge crane hoist. Because surface tolerances of square tubing need not be as accurate as the tubing used previously and because no spline is necessary, the square tubing is significantly less expensive than splined telescoping tubes.

Bernstein, G.↗

Hoisting frame facilitates handling of large objects

Hoisting frame can be used with a standard 5-ton forklift to handle the large spreader bars, or other bulky pieces of equipment, much faster and more efficiently than with a boom or gantry crane. In addition forklifts of this type are more readily available.

Colpean, K. V.↗

Automatic leveling and equalizing hoist device

Hoist uses six equally spaced support points with the load equalized between pairs to prevent over-stressing of any one point of support. The pickup point is automatically shifted through a motor driven feedback system to level the load throughout the lifting period.

Brower, J. R.↗

Positioning Mechanism For Hoisting

Mechanism positions large, heavy objects in container for lifting out by hoist, crane, or winch. Handles objects gently and ensures they are lifted cleanly away in vertical direction without bumping container. Developed for lifting offset pieces of solid-propellant core out of rocket motor through its propellant port. Similar specialized mechanisms can be developed to lift other specially shaped, specially contained heavy objects. Track in base of mechanism guides each trunnion and piece to which attached to middle as hydraulic rods extend. When mechanism lifted, tilted pieces swing inward and come to rest on energy-absorbing paddle.

Marlin, John D., III↗

Space-saving hoist for tank manholes

Working platform and collapsible basket facilitate entry of men with equipment into the overhead manhole of a deep tank. A winch and pulley rigging hold the basket which is suspended in the manhole. The basket is suspended at three points without the rig impinging on the area of the manhole.

Ehrhardt, W. R., Jr.↗

Research and Experiment on the Key Technologies of the Spent Fuel Storage in HTR-PM - 18486

High Temperature Reactor demonstration project of China (HTR-PM) is one of the major national science and technology projects, some key technologies for the design and operation of the demonstration project are formed to research according to the main technology. The spent fuel storage system is one of the main systems of the HTR-PM. In order to solve the technical problems related to the operation of spent fuel, several experiments have been conducted, including: spent fuel loading, getting back, spent fuel canister hoisting, storage well cover hoisting, storage canister drop and so on. In the study process, the test facility has been set up to carry on the operation and the experiment verification to ensure the reliability and safety of the spent fuel storage system. Spent fuel storage system undertakes spent fuel receiving, spent fuel canister transfer, storage, lifting and other functions in HTR-PM, the project research need to solve several major technical problems related to the spent fuel operation, which mainly include: Develop the transportable spent fuel canister for HTR-PM, the canister is corrosion resistance, impact resistance, and is in subcritical condition when loaded with fuel. Develop the spent fuel canister hoister, which could hoist the spent fuel canister safely and reliably. Develop the spent fuel storage well cover hoister, which could hoist the well cover safely and reliably. Study the small probability of the spent fuel canister in extreme condition of canister hoist falling accidents, to ensure the radiation protect safety and residual heat removal safety of the canister in case of the canister drop when lifting. Develop the spent fuel charging device and return device, which could load the spent fuel elements into the spent fuel canister, and could take out the fuel elements from the canister. The key technology and equipment of the spent fuel storage system in HTR-PM would be solved through the research of the project. Project research is very important for the implementation and safe operation of the HTR-PM project. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Historical Analysis of Crane Mishaps at Kennedy Space Center

Cranes and hoists are widely used in many areas. Crane accidents and handling mishaps are responsible for injuries, costly equipment damage, and program delays. Most crane accidents are caused by preventable factors. Understanding these factors is critical when designing cranes and preparing lift plans. Analysis of previous accidents provides insight into current recommendations for crane safety. Cranes and hoists are used throughout Kennedy Space Center to lift everything from machine components to critical flight hardware. Unless they are trained crane operators, most NASA employees and contractors do not need to undergo specialized crane training and may not understand the safety issues surrounding the use of cranes and hoists. A single accident with a crane or hoist can injure or kill people, cause severe equipment damage, and delay or terminate a program. Handling mishaps can also have a significant impact on the program. Simple mistakes like bouncing or jarring a load, or moving the crane down when it should go up, can damage fragile flight hardware and cause major delays in processing. Hazardous commodities (high pressure gas, hypergolic propellants, and solid rocket motors) can cause life safety concerns for the workers performing the lifting operations. Most crane accidents are preventable with the correct training and understanding of potential hazards. Designing the crane with human factors taken into account can prevent many accidents. Engineers are also responsible for preparing lift plans where understanding the safety issues can prevent or mitigate potential accidents. Cranes are widely used across many areas of KSC. Failure of these cranes often leads to injury, high damage costs, and significant delays in program objectives. Following a basic set of principles and procedures during design, fabrication, testing, regular use, and maintenance can significantly minimize many of these failures. As the accident analysis shows, load drops are often caused or influenced by human factors. Therefore, proper training and understanding of crane safety throughout the workforce is critical. It is important that the engineers designing the cranes, lift planners preparing the lift plans, operators performing the lifts, and training officers conducting the operator training all understand the problems that can happen with cranes and how to ensure the safety of the workforce and equipment being lifted.

Materials Handling↗

A Salt Repository Concept for CSNF in 21-PWR Size Canisters

The most straightforward concept for disposal of large, heavy packages containing commercial spent nuclear fuel (CSNF) in a repository in bedded salt, would be to emplace them directly on the floor in emplacement tunnels. In-tunnel axially aligned horizontal emplacement would minimize excavated volume and avoid drilling of large-diameter emplacement boreholes. A similar concept was proposed in Germany for direct disposal of POLLUX ® canisters. The repository would be constructed at a depth of 500 to 1,000 m for isolation from the surface, and for sufficient overburden stress to ensure creep reconsolidation of repository openings. It could entail modular panels of emplacement tunnels arranged on headings oriented in cardinal directions from a central core, to accommodate the estimated 140,000 MTU total U.S. CSNF inventory. To do so, the overall area of the repository layout would be approximately 20 km 2 . Many layouts are possible, but the approach should be modular, excavation should be deferred for as long as possible to avoid maintenance, and the emplacement areas should share support facilities and shafts. Vertical shafts would be used in accordance with mining practice in sedimentary basins. Large diameter shafts would be needed for ventilation exhaust and waste transport, with smaller shafts for waste salt removal, men & materials, and ventilation intake. The spacing between disposal tunnels as estimated from thermal modeling, seeks to limit the maximum average areal thermal load in the panels to 11 W/m 2 to control long-term heat buildup in the host rock. Peak salt temperature would occur within a few years and would be dominated by each waste package locally, simplifying thermal management. There would be some flexibility to decrease the package spacing or increase the emplacement thermal power limit Backfilling emplaced waste packages immediately with mine-run crushed salt would provide shielding and expedite reconsolidation. This arrangement would isolate adjacent waste packages from one another by the intervening backfill, especially after it reconsolidates and its properties approach those of intact salt. After the repository is fully loaded and the performance confirmation program is complete, activities to permanently close the repository would be initiated. During closure operations all openings in the host salt would be backfilled, then shafts would be sealed, and boreholes plugged. Plans for the Waste Isolation Pilot Plant (WIPP) show how sealing and plugging could be done. A monitoring program could continue for 50 years or longer after repository closure. With an emplacement thermal power limit of 10 kW per waste package, nearly all the CSNF that is projected to be produced by the current fleet of reactors in the U.S. could be emplaced over a period of approximately 50 years starting in calendar 2048. No barriers to implementation in a reasonable timeframe have been identified from this generic analysis. Engineering challenges include: 1) shaft construction; 2) a very-large capacity shaft hoist; 3) overpack design; 4) a transport-emplacement-vehicle (TEV) for transporting waste packages once they are underground and emplacing them remotely; and 5) remotely operated equipment for emplacing backfill. The method of shaft construction would depend on site-specific conditions, and could involve freezing the subsurface. A shaft hoist with payload capacity of 175 MT seems technically and economically feasible based on development work in Germany, and it would be the largest hoist of its kind. The function of disposal overpacks would be to provide reliable containment during repository operations, which could be accomplished using a corrosion allowance material such as a low-carbon steel. Development effort would be needed to determine overpack thickness (e.g., 7 to 20 cm) that can resist corrosion and loading from salt creep, to rovide containment throughout the repository operational period. The transport-emplacement vehicle (TEV) would be similar to previous concepts, particularly one option proposed for a Yucca Mountain repository. It would move over a rough salt floor on independently driven and steered wheels, and carry heavy shielding in addition to a waste package. By analogy to the safety case for the WIPP in New Mexico, human intrusion is likely to be the dominant mode of radionuclide release from the repository. Treatment of human intrusion for a CSNF repository in salt could depend on promulgation of site-specific changes in the regulations. Radionuclide release and migration would be quite limited for undisturbed conditions. There may be opportunities for improved understanding of salt performance with waste heating, based on future in situ testing in an underground salt research laboratory. This report also discusses a developing area of salt rock mechanics that involves low-stress, low strain-rate creep that might cause large, heavy waste packages to slowly sink. Site-specific sampling, testing, and modeling would be used to determine if the mechanism is important enough to merit consideration in design, or inclusion in performance assessment. Part of engineering design and postclosure safety assessment for a CSNF repository in salt would be to implement a methodology to show that the probability of a criticality event in the repository, when waste packages eventually breach and are flooded, is less than the probability screening threshold for performance assessment. In the methodology, a criticality analysis would be performed for waste packages in the repository, incorporating measures that could be introduced as needed to limit reactivity, for example using fuel selection and loading rules, and crediting the absorption of thermal neutrons by natural chlorine in the environment. A similar analysis has been underway for CSNF stored in dual-purpose canisters. Ideally the strategy would be developed prior to actually loading SNF assemblies into canisters used in waste packages for disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗