Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Green Proving Ground program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Blowdown Recovery System for Cooling Tower Water Treatment

From 2014-2017, the U.S. General Services Administration's (GSA's) average nationwide water rates increased 41%. Rapidly escalating costs, mandated water-reduction targets, and the fact that an average of 28% of commercial office building water use is associated with heating and cooling led the GSA Green Proving Ground program to select alternative water treatment technologies for in-field validation. This report summarizes the latest alternative water treatment evaluation completed in 2022 - a Blowdown Recovery System for Cooling Tower Water Treatment. This Green Proving Ground program project assessed the performance of an alternative water treatment system provided by Aqualogix for treating cooling tower blowdown at the Lloyd D. George U.S. Courthouse in Las Vegas, Nevada.

13 HYDRO ENERGY↗

Field Validation of a Building Operating System Platform

The U.S General Services Administration's (GSA's) Green Proving Ground program, in partnership with the National Renewable Energy Laboratory. completed a large pilot study of an Energy Management Information Systems (EMIS) with Automated System Optimization (ASO). Four test bed facilities, each with different building characteristics and systems, were chosen for the implementation of cloud-based EMIS with ASO. Depending on functionality, this tool can be extremely effective in energy management and energy optimization in buildings. The capabilities evaluated in the pilot ranged from energy savings and energy consumption predictions to evaluations of user acceptance, operability, and ease of installation. This report presents the methodology, lessons learned and best practices, and deployment recommendations for the GSA's portfolio of commercial office space, comprising more than 8,500 properties.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Structural Dynamics Observations in Space Launch System Green Run Hot Fire Testing

The Space Launch System (SLS) Core Stage (CS) Thrust Vector Control (TVC) system is comprised of eight mechanical feedback Shuttle heritage Type III TVC actuators and four RS-25 engines, each attached to a Shuttle heritage gimbal block/bearing. Two actuators are used to move each engine in two planes perpendicular to one another (i.e., pitch and yaw). The TVC system design leverages hardware from the Space Shuttle program as well as new hardware designed specifically for the Core Stage. The Green Run Hot Fire (GRHF) of the SLS Core Stage provided a flight-like ground test environment for verification of integrated vehicle TVC performance. A TVC model coupled to a vehicle structural dynamic model has been developed previously and incrementally validated in subsystem tests and simulations. Still, some aspects of TVC performance in GRHF were not anticipated. The ensuing investigation demonstrated the need for well-instrumented test environments, various levels of modeling fidelity, test-representative structural models, and caution in reuse of legacy components. This paper is the sixth installment in a seven-paper series surveying the design, engineering, test validation, and flight performance of the Core Stage Thrust Vector Control system. It introduces the salient structural dynamic phenomena uncovered in ambient and hot fire testing. During the Green Run test campaign, a comparison of ambient and hot fire step responses showed a significant change in apparent damping due to the presence of friction, challenging long standing assumptions that friction could be neglected. Additionally, the characteristic response of the engine and thrust structure during GRHF proved to be more complex than anticipated, as evidenced by the available actuator, thrust structure, and engine measurements. While the string-potentiometer based test instrumentation was intended to allow for reconstruction of the engine angles along the two control axes, the geometric placement, location uncertainty, and responses in overlapping frequency spectra revealed additional phenomena requiring further analysis and post-processing. The observations from both modal and frequency response testing during the Green Run ambient and hot fire configurations led to Engine and Core Stage FEM (finite element model) updates. When evidence of unexpected engine motion was found in engine section accelerometer data, the authors pursued additional structural analysis leading to FEM updates associated with the TVC gimbal and thrust structure. Through collaboration between structures, TVC, and flight control disciplines, the test-informed models and root-cause analysis led to confident flight rationale for the first flight of the SLS launch vehicle.

Richard K. Moore↗

Structural Dynamics Observations in Space Launch System Green Run Hot Fire Testing

The Space Launch System (SLS) Core Stage (CS) Thrust Vector Control (TVC) system is comprised of eight mechanical feedback Shuttle heritage Type III TVC actuators and four RS-25 engines, each attached to a Shuttle heritage gimbal block/bearing. Two actuators are used to move each engine in two planes perpendicular to one another (i.e., pitch and yaw). The TVC system design leverages hardware from the Space Shuttle program as well as new hardware designed specifically for the Core Stage. The Green Run Hot Fire (GRHF) of the SLS Core Stage provided a flight-like ground test environment for verification of integrated vehicle TVC performance. A TVC model coupled to a vehicle structural dynamic model has been developed previously and incrementally validated in subsystem tests and simulations. Still, some aspects of TVC performance in GRHF were not anticipated. The ensuing investigation demonstrated the need for well-instrumented test environments, various levels of modeling fidelity, test-representative structural models, and caution in reuse of legacy components. This paper is the sixth installment in a seven-paper series surveying the design, engineering, test validation, and flight performance of the Core Stage Thrust Vector Control system. It introduces the salient structural dynamic phenomena uncovered in ambient and hot fire testing. During the Green Run test campaign, a comparison of ambient and hot fire step responses showed a significant change in apparent damping due to the presence of friction, challenging long standing assumptions that friction could be neglected. Additionally, the characteristic response of the engine and thrust structure during GRHF proved to be more complex than anticipated, as evidenced by the available actuator, thrust structure, and engine measurements. While the string-potentiometer based test instrumentation was intended to allow for reconstruction of the engine angles along the two control axes, the geometric placement, location uncertainty, and responses in overlapping frequency spectra revealed additional phenomena requiring further analysis and post-processing. The observations from both modal and frequency response testing during the Green Run ambient and hot fire configurations led to Engine and Core Stage FEM (finite element model) updates. When evidence of unexpected engine motion was found in engine section accelerometer data, the authors pursued additional structural analysis leading to FEM updates associated with the TVC gimbal and thrust structure. Through collaboration between structures, TVC, and flight control disciplines, the test-informed models and root-cause analysis led to confident flight rationale for the first flight of the SLS launch vehicle.

Richard Moore↗