Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Golder”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Innovations in Sustainable Passive Wastewater Treatment - 20236

Sustainable water treatment systems, engineered to mimic natural processes and utilize natural materials, yield economic and environmental benefits through reductions in long term operational inputs, including: power, chemicals, and labor. Golder is an industry leader in the development and implementation of sustainable technologies at operating and closed mines. We continue to innovate these technologies and customize solutions to meet client needs by applying past experience and focused research. Sustainable (or passive) water treatment systems include ponds, wetlands, flow-through natural media beds, and limestone drains. These systems can blend in with a natural environment, are highly cost-effective for long-term water treatment, and can outcompete traditional active treatment technologies. Application of sustainable technologies relative to active technologies can be influenced by the influent water matrix, effluent limitations, flow rate of water requiring treatment, and available land area. In this presentation, four Golder-developed systems are reviewed as case studies, demonstrating our continued progressive approach to advancing sustainable water treatment technologies to meet industry needs. These case studies focus on design innovations and operational performance from data collected from the operational systems. Resources (power, chemicals, labor) required for the operation of each case study are compared with those that would be required for operation of their active treatment technology alternatives. - Case Study 1 presents an anaerobic biochemical reactor (BCR), a technology typically implemented for metals treatment and acid neutralization, for the treatment of sulfate to low concentrations (<250 mg/L). Active treatment via reverse osmosis (RO) membrane filtration is typically required for treatment of sulfate to similar concentrations, this innovation provides potential for sustainable treatment to replace the need for energy, chemical, labor, and waste (brine) intensive RO treatment for specific applications. Magnetite waste rock materials from the site were upcycled for use in this system to provide sequestration of the sulfide generated in the BCR. - Case Study 2 examines another novel application of the conventional BCR, modified for the removal of radionuclides and metals (uranium, radium, and selenium) at a closed uranium mine. - Case Study 3 presents implementation of sustainable treatment for mine drain water from a historic mine site, now a state park with around 100,000 visitors per year. The system includes a pond, wetland, and manganese removal bed surrounded by public trails designed to maintain the character of the park. The system treats for arsenic, iron, and manganese at relatively high flows (up to 1,200 gpm), with large seasonal fluctuations in flow and quality. - Case Study 4 is a unique project for which Golder is currently designing a sustainable treatment system, with no energy input, to treat nitrate in mine water post-closure at a site near the arctic circle. In this unprecedented application, climate, management of freshet, and space availability presented substantial technical challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Front-End Engineering and Design: Project Tundra Carbon Capture System (Final Report)

As the next phase of Project Tundra, Minnkota Power Cooperative (MPC) completed a front-end engineering and design (FEED) study to install a post-combustion CO 2 capture system (CCS) at the MPC operated (Square Butte Electric Cooperative-owned) Milton R. Young Station (MRYS) Unit 2 (MRY2), a 477-MW power plant fueled by North Dakota lignite. The project team completed the FEED with Fluor’s Econamine FG Plus℠ (EFG+) technology and is taking the next steps leading up to start of construction. Team members included FEED technical lead Fluor Enterprises (Fluor); owner’s engineer and balance of plant (BOP) engineer Burns & McDonnell (BMcD); leading carbon capture consultants (David Greeson Consulting, Hunt International Energy Services); environmental consultants (AECOM, Agora Environmental), other BOP engineering consultants (Golder Associates, Nels); cost-share funding agency, the North Dakota Industrial Commission (NDIC); and the Energy & Environmental Research Center (EERC). Project Tundra’s goal is to implement carbon capture, utilization, and storage (CCUS) in North Dakota, while preserving the use of lignite. Future options could lead to revitalizing legacy oil fields and creating a new CO 2 enhanced oil recovery (EOR) industry. The topic of this report is the FEED study for the carbon dioxide capture portion of Project Tundra. Building on the findings of a pre-FEED study for MRY2, the key deliverables contained in this FEED study are: a) design, costing, and performance data needed to commence project financing activities; b) engineering and material balances required to file for all project permits; and c) a final project schedule. Based on the results of the previous pre-FEED study, MPC and its team evaluated two options to provide the large amount of steam needed to operate the CCS: 1) installation of new natural gas package boilers and a new pipeline to supply natural gas to the facility and 2) extraction of steam from the existing MRYS steam turbine generator. The FEED study was performed using the package boilers option, as it was deemed to have the lowest technical risk, overall cost, and cost uncertainty. A key feature of the design, however, was the mixing the natural gas boilers’ flue gas with the MRY2 flue gas. This increased the size of the CCS system. This design also enabled the tie-in of Unit 1 flue gas for times when Unit 2 is offline. The CCS was designed to capture a combined 12,978 short tons per day (STPD) of CO 2 from the flue gases produced by the existing MRY Unit 2 along with flue gas produced by the new boiler package within the CCS. The 12,978 STPD CO 2 capture is achieved by normally processing 100% of the total available MRY Unit 2 flue gas (considering full load operation) and 100% of the boiler package flue gas, then removing 90% of the CO 2 available from the processed flue gas streams.

01 COAL, LIGNITE, AND PEAT↗

Multiscale Mechanisms of Twisted Carbon Nanotube Yarns Probed In Situ by Soft X-rays during Tensile Loading

Piecing together carbon nanotubes (CNTs) into assemblies has so far failed to achieve the same elite strength performance metrics as individual CNTs, highlighting a critical deficiency in understanding the effects that the processing of individual nanostructures have on the performance of their derived macroscale assemblies, thereby hindering the development of a process-structure-performance map for these materials. Here, in this work, we propose a method to decouple the distribution orientation of nanoscale tortuosity and the microscale twist of CNT dry-spun yarns under applied loads via in situ soft X-ray probing at high energy (1200 eV) and low energy (280 eV), respectively. With this decoupling enabled by in situ soft X-ray scattering, we acquired a deeper understanding of the deformation mechanisms of these yarns. We found that for untreated yarns, the twist angle of collective CNT bundles at the macroscale is more sensitive to applied stress than the nanoscale alignment distribution. We also found that increasing nominal twist densities of yarns as well as increased strengthening via plasma treatments and polymer infiltration act to decrease the yarns’ sensitivity to realignment at the nanoscale and prevent failure by the slip mechanism.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Utah FORGE: Discrete Fracture Network (DFN) Data

The FORGE team is making these fracture models available to researchers wanting a set of natural fractures in the FORGE reservoir for use in their own modeling work. They have been used to predict stimulation distances during hydraulic stimulation at the open toe section of well 16A(78)-32. These fracture sets are fully stochastic and do not contain the deterministic set that matches the pilot well 58-32 FMI data. Well 58-32 has been completed and 16A(78)-32 is to be drilled as part of Phase 3. The original .fab files are not included due to redundancy. The *.fabgz data for the 800m and 1200m depth areas are in the native FracMan format and have been compressed using Gzip. Filtered data for the 800m depth area includes .csv spreadsheets, native FracMan (.fab), and GOCAD (.ts) files that are in a compressed zip format. The file titled "SGW 2020 Finnila and Podgorney DFN fracture files on GDR.pdf" is a description of the data and should be reviewed prior to data use.

15 GEOTHERMAL ENERGY↗

Miniature Beryllium Split-Hopkinson Pressure Bars for Extending the Range of Achievable Strain-Rates

Conventional Split Hopkinson Pressure Bars (SHPB) or “Kolsky” bars are often used for determining the high-rate compressive yield and failure strength of materials. However, for experiments generating very high strain-rates (>10 3 /s) miniaturization of the setup is often required for minimizing the effects of elastic wave dispersion in order to enable the inference of decreasingly short loading events from the data. Miniature aluminum and steel bars are often sufficient for meeting these requirements. However, for high enough strain-rates, miniaturization of steel or aluminum Kolsky bars may require prohibitively small diameter bars and test specimens that could become inappropriate for inferring representative properties of materials with large grain size relative to the test specimen size. The use of a beryllium Kolsky bar setup is expected to enable high rates to be accessible with larger diameter bars/specimen combinations due to the inherent physical properties of beryllium, which are expected to minimize the effects of elastic wave dispersion. For this reason, a series of beryllium Kolsky bars have been developed, and, in this paper, the dispersion characteristics of these bars are measured and compare the data with those of similarly sized 7075-T6 aluminum and C350 maraging steel. The results, which agree well with the theory, show no appreciable frequency dependence of the elastic wavespeed in the data from the beryllium bars, demonstrating its advantage over aluminum and steel in application to Kolsky bars.

36 MATERIALS SCIENCE↗

Transmission mounted electrical charging system PTO gear arrangement

A system includes a planetary gear assembly having a ring gear, a plurality of planet gears coupled to a carrier, and a sun gear coupled to a main shaft. The system further includes a driven gear coupled to the carrier, a countershaft gear coupled to the driven gear, a motor/generator coupled to the main shaft, and an actuator structured to change a coupling of the ring gear based on a position of the actuator.

Stoltz, Thomas Joseph↗