Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Geologic Characterization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Design and simulation of a muon detector to characterize geological overburden

This study presents the design, construction, and simulation of a mobile muon detector tailored for geological overburden characterization. The detector employs plastic scintillator paddles with silicon photomultipliers (SiPMs) and a QuarkNet data acquisition system, offering a portable solution suitable for remote field deployment. The simulator’s modular aluminum frame allows for adjustable geometry and directional sensitivity, while its battery system supports over a week of autonomous operation. Preliminary experimental tests confirmed that its muon flux measurements were consistent with theoretical expectations. A comprehensive simulation framework using Geant4 and CORSIKA was developed to model detector response and overburden effects. Analytical and Monte Carlo methods were used to assess quadrant resolution and infer muon directionality. This work lays the foundation for future overburden mapping and supports the development of reconstruction algorithms for geological applications.

72 - PHYSICS OF ELEMENTARY PARTICLES AND FIELDS

Petrographic and Advanced Geologic Characterization Report on One Earth Energy #1 (API# 1211325373)

The One Earth Energy #1 (OEE1, API 1211325373) well was drilled to a depth of 7,099 feet from the Pennsylvanian bedrock to the Precambrian granite. In total, 99 thin sections were taken from Rotary Sidewall Core (RSWC) from 2,275 feet to 6,903 feet; 59 thin sections were taken from Whole Core (WC) from 4,311.5 to 6,519.2 feet for this report. This report details specifically thin section point-counting analysis that includes mineralogical and pore space analysis, including grain size analysis annotated thin section photomicrographs, scanning electron microscopy (SEM) with energy dispersive X-ray spectroscopy (EDS), and statistics of grain size analysis on Mount Simon thin sections from OEE1. Characterized units include the St. Peter Sandstone, Eminence Formation, Potosi Dolomite, Franconia Formation, Davis Member, Ironton Sandstone, Galesville Sandstone, Eau Claire Formation, Elmhurst Sandstone, Mt. Simon Sandstone, and Argenta Formation.

09 BIOMASS FUELS

Petrographic and Advanced Geologic Characterization Report on Lively Grove #1 (API# 1218924947)

Lively Grove #1 (LG1 API number 1218924947) well was drilled to a depth of 5,758 feet, from the Glen Dean Limestone to the top of the Precambrian unit. In total, 49 thin sections were taken from Rotary Sidewall Core (RSWC), and one thin section was taken from Whole Core (2,918 feet, New Albany Shale) from 1,700 to 5,872 feet for this report. This report details specifically thin section point-counting analysis that includes mineralogical and pore space analysis, including grain size analysis annotated thin section photomicrographs, scanning electron microscopy (SEM) with Energy Dispersive x-ray Spectroscopy (EDS), X-ray Diffraction (XRD), statistics of grain size analysis on St. Peter Sandstone thin sections, and Argon-Argon (Ar-Ar) dating on Precambrian samples from LG1. Characterized units include the Salem Limestone, New Albany Shale, Trenton Group, Joachim Dolomite, St. Peter Sandstone, Everton Formation, Eminence Formation, Davis Member, Eau Claire Formation, and Precambrian Basement.

01 COAL, LIGNITE, AND PEAT

Williston Basin Resource Study for Commercial-Scale Subsurface Hydrogen Storage

The Energy & Environmental Research Center (EERC), in partnership with the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL), the EERC’s State Energy Research Center (SERC), MPLX Operations LLC, and TC Energy Development Holdings Inc. (a subsidiary of TC Energy Corporation), studied the potential for subsurface hydrogen storage and recovery in the Williston Basin of western North Dakota. The project’s goal was to evaluate the feasibility of large-scale, secure geologic H 2 storage to support future hydrogen generation, storage, and use. This work included laboratory testing, H 2 –rock–fluid exposure experiments, literature reviews on H 2 embrittlement, and reservoir modeling and simulations. The study included an assessment of storage potential across three types of storage reservoirs using both reservoir simulation and DOE’s web-based tool SHASTA-HELP (Subsurface Hydrogen Assessment, Storage, and Technology Acceleration – Hydrogen Estimator for Logistical Planning), as well as investigation of potential H 2 production and markets for commercial-scale deployment. Building on prior EERC gas storage research, three storage options were selected for detailed evaluation: the Broom Creek Formation (a clastic saline reservoir), the Dickinson Lodgepole Mounds (DLM) complex (carbonate mud mound structures) of the Lodgepole Formation (an active oil and gas producing reservoir), and the Dunham Salt Interval of the Piper Formation (to be used for engineered salt cavern development). These targets were prioritized based on prior EERC research using datasets related to seal capacity, reservoir quality, mechanical integrity, and injectivity. Exposure tests on Broom Creek and DLM samples showed mineral dissolution and precipitation that increased brine salinity and altered reservoir rock surfaces. Although these results provide useful insight, they are limited by small sample sizes and short-term (30-day) exposure, requiring further study to assess long-term storage integrity. Salt formations were not tested because of their known nonreactivity and established mechanical stability. Results of reservoir simulations performed for a single site demonstrated that the Broom Creek Formation may be capable of receiving up to 42,000 tonnes of injected H 2 over 7 months via one well. H 2 recovery took place over 5 months, resulting in approximately 26,000 tonnes (~62% without cushion gas [CG]). This work suggests water production may be important and subsequent cycles of injection and production may perform more efficiently; however, significant site-specific work in the future is needed to assess actual reservoir performance of injection and withdrawal of H 2 storage. For oil reservoir potential, a multiple-well model was used to simulate injection of approximately 32,000 tonnes of H 2 into a single wellbore while simultaneously producing in place reservoir fluids from four offset wells to maintain reservoir pressure. The simulation results suggested a high recovery (~98%); in addition, cost advantages through existing infrastructure could be realized. Challenges in this reservoir include vi managing gas purity and leakage risks. In both scenarios, production of H 2 takes place in a single-well scenario with 10 cycles (7 months of injection and 5 months of production) over 10 years. Finally, the use of engineered caverns in the Dunhan Salt was evaluated, and the results suggest that while they have a smaller capacity (<1000 tonnes per cavern), they exhibit nearly complete gas recovery (>99%), fast response times, and low purity risk. While caverns in North Dakota may be smaller in capacity, fields can be developed in galleries to accommodate the volumetric needs and rapid turnaround times necessary to meet market demands. Geographic limitations and thin salt intervals in North Dakota may represent less total storage potential than salt domes elsewhere, but significant opportunities exist to expand this market for gas storage in North Dakota. A basinwide assessment was performed to estimate a first-of-its-kind value for H 2 storage on a large scale. DOE’s SHASTA-HELP, combined with EERC simulation work, was used to perform the assessment. Estimated H 2 storage potential varied widely for each formation type. The Broom Creek saline formation was estimated to have a storage potential of approximately 1.7–90.5 million tonnes (MMt). The DLM oil reservoirs were estimated to have 0.07–0.19 MMt of capacity. Notably, each of these estimates relies on significant assumptions regarding reservoir thickness, porosity, permeability, and CG needed for operation. Much research is needed to understand the true site-specific storage resource potential of each formation. Using the Dunham Salt Interval for cavern development may result in as much as 4.79 MMt (up to 2.87 MMt working gas) of H 2 storage potential. An important note for consideration is that the values presented here need significantly more geological characterization and engineering assessments prior to gaining confidence in performance. This will be a focal point for future research and development needs. The basinwide evaluation also indicated that North Dakota has significant H 2 generation potential, with estimates up to a possible 13 MMt annually, suggesting a substantial opportunity for H 2 market development and thus the need for commercial-scale H 2 storage to facilitate growth and resilience. Key Recommendations 1. Conduct detailed site characterization (3D seismic, well logs, core sampling) to reduce geologic uncertainty. 2. Perform techno-economic analyses incorporating market, regulatory, and incentive frameworks. 3. Investigate long-term interactions among H 2 , CGs, well materials, and formations to assess risks. 4. Develop pilot- and field-scale demonstrations to validate models and establish best practices.

03 NATURAL GAS

Improving Production in the Emerging Paradox Oil Play (Final Technical Report)

This report documents the results of the DOE-funded project Improving Production in the Emerging Paradox Oil Play, focused on integrating geological characterization, petrophysical analysis, reservoir simulation, and field development planning to improve hydrocarbon recovery from the Paradox Basin. Project activities included core and log analysis, assessment of reservoir heterogeneity and compartmentalization, evaluation of completion and stimulation strategies, and development of an uncertainty-aware field development framework. Findings highlight the importance of selective completions, geology-driven well placement, and targeted stimulation in vertically heterogeneous carbonate reservoirs.

02 PETROLEUM

Exploring Geologic Hydrogen: A New Frontier for Affordable, Reliable Energy Security

Recent successes in the exploration, drilling, and discovery of geologic hydrogen have generated notable excitement. This new energy resource has the potential to make an important contribution to our nation’s energy supply, resiliency, and security. Contemporary studies of geologic hydrogen have a common theme of suggesting places where it might be found or even more specifically, what rocks in what geologic formations may contribute to its formation — either naturally or via artificially induced means. This vital ongoing body of work sets the stage for imagining what may be possible with vast available quantities of naturally occurring hydrogen in the subsurface. While acknowledging current approaches to characterizing geologic hydrogen, this report advances the discussion by suggesting next steps, including the critical science and engineering necessary to make geologic hydrogen an affordable and reliable part of the U.S. energy portfolio.

08 HYDROGEN

MRCI Subtask 2.3: Developing Industrial Partnerships and Regional Technical Collaboration Final Technical Summary Report

Under the objective of regional data collection and helping accelerate deployment, MRCI collaborated with industrial stakeholders in their project planning, characterization, and analysis. Some examples of these collaborations are given below. The data and information shared by the industrial collaborations added to the regional CCS framework development and were incorporated into the overall datasets, while addressing any proprietary data requirements. Three examples of collaborative partnerships with industry that have provided geologic characterization data relevant and beneficial to the MRCI program are discussed below, including: the UIC Class II Injection Facility in Eastern Ohio, the Core Energy CO2-EOR (enhanced oil recovery) operation in Otsego County Michigan, and the Marquis ethanol plant in Hennepin Illinois.

CCS,CCUS,MRCI,Midwest USA,Technical Challenges,inj

Storage Field Development Plan: One Earth Energy

This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, and operational plans, and costs associated with the proposed One Earth Sequestration Carbon Capture and Storage (OES-CCS) site in McLean County, Illinois, near Gibson City. The proposed storage complex, known as the Mt. Simon Storage Complex, comprises the Cambrian Mt. Simon Sandstone reservoir and the primary seal, the Cambrian Eau Claire Formation. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Ordovician St. Peter Sandstone. Geologic characterization of the Mt. Simon Storage Complex at the OES-CCS site was performed by the Illinois Storage Corridor CarbonSAFE Phase III project, which also prepared and submitted three UIC Class VI applications to construct three injection wells; the permit applications were submitted and are in the federal EPA review process. A characterization well, OEE #1, was drilled to collect site-specific data. These data were analyzed and used to develop the UIC Class VI applications. The OEE #1 well will be converted to an in-zone monitoring (IZM) well for the injection phase. The proposed buildout for the OES-CCS site includes (1) three injection wells (OES #1, OES #2, and OES #3), (2) two IZM wells, (3) two above confining zone (ACZ) monitoring wells, one of which will be used to monitor the lowermost USDW, (4) capture and compression facilities, and (5) transportation facilities, i.e., pipelines. A pre-operational testing program was proposed in the Class VI permit application and will be employed at the site pending approval. Additional pre-injection (baseline), syn-injection, and post-injection monitoring and site care procedures will be followed by OES to ensure that injection activities are protective of human health and the environment. Injection is scheduled to begin in 2025, distributed across the three injection wells in accordance with the permit operating conditions. One Earth Sequestration intends to inject up to 90 million tonnes of CO 2 over a period of approximately 20 years. Injection will begin at approximately 0.5 million tonnes of CO 2 annually and ramp up to a maximum of 4.5 million tonnes annually. Daily injection rates are expected to range from 1,400 to 1,500 tonnes per day initially and reach a maximum of approximately 4,225 tonnes per day, depending on site geology and injectivity at each injection well location, and CO 2 availability. The costs associated with the OES-CCS project include pre-operational costs (e. g. additional seismic data acquisition and well drilling), capture and transportation facility and equipment costs, predicted field operating expenditures (OpEx), and decommissioning and post-injection site care (PISC) costs. The risks associated with project activities, such as site construction, injection operations, and verification of secure storage were evaluated, and mitigation strategies proposed to alleviate those risks.

09 BIOMASS FUELS

Carbon Utilization and Storage Partnership of the Western United States

This technical report documents research conducted under DOE Award No. DE-FE0031837 focused on evaluating the feasibility of carbon capture, utilization, and storage (CCUS) systems in the central and western United States. The project integrated geologic characterization, reservoir simulation, infrastructure modeling, and economic analysis to assess CO₂ storage potential near industrial sources and develop strategies for transport and sequestration. The work included subsurface modeling, risk assessment, monitoring and verification (MRV) planning, and evaluation of regulatory pathways such as EPA Underground Injection Control (UIC) Class VI permitting and IRS 45Q tax credit eligibility. Results demonstrate the viability of multiple storage approaches, including saline formations, enhanced coalbed methane recovery, and basalt mineralization, supported by data-driven workflows and regional analyses. The project also produced permitting templates, technology transfer activities, and stakeholder engagement efforts to support deployment readiness. These findings contribute to the development of scalable, economically viable CCUS systems and provide a repeatable framework for future carbon management projects.

20 FOSSIL-FUELED POWER PLANTS

Monitored Natural Attenuation (MNA) Assessment for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit (OU) and the Pen Branch Wetland

In October 2024, Savannah River National Laboratory (SRNL) was tasked to conduct an independent review of groundwater data and assess the monitored natural attenuation (MNA) performance related to the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit (OU) located in the central portion of the Savannah River Site (SRS). The SRNL assessment of MNA entailed an independent analysis of groundwater concentration data, groundwater elevation data, available surface water concentration data, soil concentration data, and relevant historical geological characterization logs for the CMP Pits OU. Historical data tables and records were obtained from both the Savannah River Nuclear Solutions - Area Completion Projects (SRNS&#x2;ACP) team and South Carolina State University (SCSU) and condensed into new data sets by the SRNL project team for more targeted analysis of MNA performance characteristics. All data pertaining to groundwater concentration, surface water concentration, and groundwater elevation were restricted to collection dates after any known active remediation for the CMP OU.

54 ENVIRONMENTAL SCIENCES

Unlocking the Tight Oil Reservoirs of the Powder River Basin, Wyoming

The project focused on detailed geologic characterization, geomechanical studies, well completion optimization, stimulation monitoring, and field development strategies. A key aspect involved partnerships with industry and academic collaborators such as Occidental Petroleum, Southern Illinois University, Britt Rock Mechanics and Piri Technologies. Data acquisition included drilling, logging, coring, deployment of fiber optics, and microseismic monitoring. The project emphasized feedback loops for continuous model updating and integration of economic evaluations to guide development strategies.

02 PETROLEUM

One Earth Energy Seismic Interpretation

The objectives of the Illinois Storage Corridor (ISC) project are to accelerate commercial deployment of carbon capture utilization and storage at two individual sites and receive approvals for Underground Injection Control (UIC) Class VI permits for construction at each site (ISC Project Narrative, 2020). As part of this project, and as part of the subsurface geologic characterization, 2D seismic data was acquired at both sites. This report summarizes the findings from the 2D and 3D seismic interpretation at the One Earth Energy site near Gibson City, Illinois. The seismic data confirms the stratigraphic continuity of the Mt. Simon Arkose Zone storage interval and the Eau Claire confining unit across the project area. The seismic data also indicates that there are faults that transect the Mt. Simon Arkose Zone Sandstone storage reservoir within the modeled CO 2 plume (for more detailed information, see Faults and Fractures section of One Earth Energy Class VI Permit applications). However, the seismic data also shows that there are no faults within the modeled CO 2 plume that transect the confining unit Eau Claire Formation. The faults that transect the Mt. Simon Arkose Zone Sandstone storage reservoir all tip out in the Lower Mt. Simon Formation and do not reach the overlying Eau Claire confining unit. A small 3D survey acquired around the One Earth Energy #1 characterization well confirms these findings.

20 FOSSIL-FUELED POWER PLANTS

Prairie State Generating Company 2D Seismic Interpretation

The objectives of the Illinois Storage Corridor (ISC) project are to accelerate commercial deployment of carbon capture utilization and storage at two individual sites and receive approvals for Underground Injection Control (UIC) Class VI permits for construction at each site (ISC Project Narrative, 2020). As part of this project, and as part of the subsurface geologic characterization, two-dimensional (2D) seismic data was acquired at both sites. This report summarizes the findings from two phases of 2D acquisition and seismic interpretation at the Prairie State Generating Company site near Marissa, Illinois. The seismic data indicates the presence of three faults that completely transect the storage and confining units. The initial 2021 2D seismic acquisition revealed the presence of a feature two miles east of the Lively Grove #1 characterization well. The feature is a polyphase fault with a component of strike-slip motion, forming a small positive flower structure. The second phase of 2D seismic acquisition in 2022 constrained the maximum extent of the fault, indicating it has a relatively limited length. Other 2022 seismic lines revealed the presence of two other faults that transect the storage and confining units in the southwest and northeast portions of the 2D seismic acquisition area. The 2021 and 2022 2D seismic surveys have identified three specific locations within the project area that may have an elevated risk of out of zone CO 2 migration due to faulting. Further technical work will be needed to quantify this risk and determine how and if this risk will impact the placement of CO 2 injection wells across the project area.

01 COAL, LIGNITE, AND PEAT

Chemically Enabled CO 2 -Enhanced Oil Recovery in Multi-Porosity, Hydrothermally Altered Carbonates in the Southern Michigan Basin (Final Technical Report)

This is the Final Technical Report for the project "Chemically Enabled CO 2 -Enhanced Oil Recovery in Multi-Porosity, Hydrothermally Altered Carbonates in the Southern Michigan Basin." Over the course of six years of collaboration between Battelle and project partners, all stated objectives of the program have been completed, including full geological characterization of the TBR trend (See companion report for Task2), laboratory and modeling experiments to determine the optimum composition and design of CO 2 -EOR operations in the TBR trend, execution of a field test of chemically-enhanced CO 2 in a TBR well, and integration of the data and learnings gathered during these efforts into a full-trend development plan. Detailed reporting on these activities, their outcomes, and implications for trend-wide development is provided in the report. This report and encompassed data will provide TBR field operators with detailed information on what worked, what did not work, and how to proceed with production optimization of their TBR assets using chemically-enhanced CO 2 -EOR. CO 2 -EOR is a relatively well understood and broadly implemented strategy for increasing incremental production across the oil and gas industry, but its application has been primarily focused on reservoirs with limited heterogeneity. The intention of this project was show first that the same physical mechanisms that improve recovery factors in homogeneous reservoirs (namely wettability alteration, viscosity alteration, oil swelling, and mobility control) are at play in heterogeneous reservoirs. This was proven by the project’s laboratory studies and dynamic simulations, with the potential exception of mobility control, which needs further study. The second intention was to demonstrate via direct field testing that CO 2 -EOR can work in a strongly heterogeneous reservoir. While the field test strategy implemented during this project did not succeed in producing oil, data gathered during the test sheds light on what may work for field operators who try chemically-enhanced CO 2 -EOR within their own reservoirs, significantly reducing the level of uncertainty carried by first-of-a-kind commercial efforts that could (and should) follow this test. Simultaneously, the project has identified several large-volume ethanol plants and other sources of CO 2 emissions in the region and provided a handrail that CO 2 emitters and field operators can leverage to capture, transport, and inject that CO 2 into their fields. This project has also shown that, in many cases, the economics of CO 2 -EOR in the TBR are attractive. And finally, by completing a project of this scope in the southern Michigan Basin, the project has contributed to the knowledge base and operational experience of field operators, state regulatory agencies, local service companies, and state universities, with CO 2 -EOR projects which should allow follow-on projects to proceed safely and efficiently.

02 PETROLEUM

From Subsurface to System: Offshore CCS Development for the Northeastern U.S. Atlantic Shelf

This study evaluated offshore carbon sequestration potential and infrastructure design along the mid-north Atlantic outer continental shelf, addressing the limited onshore storage options in the northeastern U.S. The objective was to define viable CCS pathways by integrating geological characterization, reservoir modeling, and system-level engineering for decarbonizing regional industrial sources. The work was conducted under US DOE grant FE0032407 for the Regional Initiatives and builds on a previous prospective resources assessment project by Battelle.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Geoanalytical Evaluation of Saline Storage (GEESS) Geodatabase v2.0

The Geoanalytical Economic Evaluation of Saline Storage (GEESS) geodatabase was developed to support the United States Department of Energy (DOE) and National Energy Technology Laboratory (NETL) in their geologic carbon storage efforts by characterizing saline geologic formations present in the FECM/NETL CO2 Saline Storage Cost Model (CO2_S_COM) [1]. Using publicly available literature and data, the GEESS geodatabase characterizes 57 geologic formations across the lower-48 U.S. states in what are called Fully Integrated Geodatabases (FIGs). The FIG is a vector polygon feature containing thousands or tens of thousands of individual polygons, which each contain discrete geologic parameter values. A list of the critical geologic parameters that are characterized in the GEESS geodatabase are described in the “Processing Steps and Workflow” part of the ReadMe file, as well as the Data Catalog accompanying the GEESS geodatabase. The FIG is the basis of the GEESS geodatabase and is the direct representation of the collected geologic data. In addition to the FIG, the GEESS system contains grid files. Due to the complexity of the FIGs, grids are used to sample the geologic data so they can be exercised within CO2_S_COM. The grid files contain the geologic data sampled from the FIG, as well as estimates of “Plume Uncertainty Diameter” and “First-year Break-even Price of CO2” derived from CO2_S_COM based on the GEESS grid data.

carbon

Stochastic Ensemble Generation for Improved Characterization of Representing Geologic Variability in a Reservoir: IBDP Case Study for SMART Initiative

This document is a poster covering the findings from activities on training data generation, specifically geologic ensemble generation. The generated geologic realizations captured the range of possible permeability distributions of the subsurface at the Illinois Basin - Decatur Project (IBDP) site, based on available well log variabilities. The percentages of reservoirs and baffles in the injection zone and a truncation of baffle permeability led to more variance in the simulations. This will be used to build forward modeling, history matching, and optimization workflows. The geologic realizations were also ranked according to dynamic measures of hydraulic diffusivity, and simulations confirm a greater contrast between the reservoir and the baffles during injection.

stochastic ensemble generation