Engineering PapersSearch

SEARCH · Engineering Papers

Results for “GSE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A Study to Compare the Failure Rates of Current Space Shuttle Ground Support Equipment with the New Pathfinder Equipment and Investigate the Effect that the Proposed GSE Infrastructure Upgrade Might Have to Reduce GSE Infrastructure Failures

The purposes of this study are to compare the current Space Shuttle Ground Support Equipment (GSE) infrastructure with the proposed GSE infrastructure upgrade modification. The methodology will include analyzing the first prototype installation equipment at Launch PAD B called the "Pathfinder". This study will begin by comparing the failure rate of the current components associated with the "Hardware interface module (HIM)" at the Kennedy Space Center to the failure rate of the neW Pathfinder components. Quantitative data will be gathered specifically on HIM components and the PAD B Hypergolic Fuel facility and Hypergolic Oxidizer facility areas which has the upgraded pathfinder equipment installed. The proposed upgrades include utilizing industrial controlled modules, software, and a fiber optic network. The results of this study provide evidence that there is a significant difference in the failure rates of the two studied infrastructure equipment components. There is also evidence that the support staff for each infrastructure system is not equal. A recommendation to continue with future upgrades is based on a significant reduction of failures in the new' installed ground system components.

Kennedy, Barbara J.

Fleet Size Requirements for Each GSE Type at Each Airport

This dataset contains the required number of vehicles for each GSE type at each airport under six charging scenarios: (1) charging when the battery state of charge is insufficient for the next service using 40-kW chargers (S1); (2) charging when the battery state of charge is insufficient for the next service using 20-kW chargers (S2); (3) charging starts immediately after each GSE completes a service task using 40-kW chargers (S3); (4) charging starts immediately after each GSE completes a service task using 20-kW chargers (S4); (5) charging during off-peak hours using 40-kW chargers (S5); and (6) charging during off-peak hours using 20-kW chargers (S6). ![image](gse-vehicles-chargers.png) Number of GSE vehicles per GSE type and chargers required for different airport categories under charging scenario 1.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

GSE Yearly Load Profiles for Each Airport Under Six Charging Scenarios

This dataset contains GSE yearly load profiles for each airport under six charging scenarios: (1) charging when the battery state of charge is insufficient for the next service using 40-kW chargers (S1); (2) charging when the battery state of charge is insufficient for the next service using 20-kW chargers (S2); (3) charging starts immediately after each GSE completes a service task using 40-kW chargers (S3); (4) charging starts immediately after each GSE completes a service task using 20-kW chargers (S4); (5) charging during off-peak hours using 40-kW chargers (S5); and (6) charging during off-peak hours using 20-kW chargers (S6). ![image](gse_load_profile_sample_day.png) GSE load profile of a sample day across different airport categories under charging scenario 1.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Electrifying Airport GSE: Monte Carlo Grid Impacts

Airports globally are shifting from ICE-powered to electric Ground Support Equipment (eGSE) to enhance efficiency, reduce operational costs, and improve operator health. Leveraging predictable routes, flat terrain, and low operational speeds, airports provide ideal conditions for electrification. This study evaluates freight GSE electrification at Dallas-Fort Worth International Airport (DFW), USA, using the Agile@ platform, which integrates three analytical methods: Freight Facility Model (FFM), Activity-Structure-Intensity-Fuel (ASIF), and Monte Carlo simulations. Results from 10,000 simulations indicate modest but critical increases in electricity demand and significant variability in GSE energy consumption. These insights emphasize the importance of data-driven scheduling, targeted maintenance, and strategic infrastructure planning. For high-uncertainty scenarios, airports are advised to deploy buffer energy storage systems (battery banks), implement demand-response charging strategies, schedule flexible workforce shifts, and prioritize proactive maintenance-particularly for equipment with higher operational uncertainty, such as tug tractors with trailers. Agile@ thus offers a robust, scalable, and data-driven framework to optimize long-term GSE planning and enhance reliability across diverse airport environments.

Bose, Ranjan [ORNL] (ORCID:0009000791026327)

Charger Requirements for GSE at Each Airport

This dataset contains the required number of chargers for GSE at each airport under six charging scenarios: (1) charging when the battery state of charge is insufficient for the next service using 40-kW chargers (S1); (2) charging when the battery state of charge is insufficient for the next service using 20-kW chargers (S2); (3) charging starts immediately after each GSE completes a service task using 40-kW chargers (S3); (4) charging starts immediately after each GSE completes a service task using 20-kW chargers (S4); (5) charging during off-peak hours using 40-kW chargers (S5); and (6) charging during off-peak hours using 20-kW chargers (S6).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

GSE, data management system programmers/User' manual

The GSE data management system is a computerized program which provides for a central storage source for key data associated with the mechanical ground support equipment (MGSE). Eight major sort modes can be requested by the user. Attributes that are printed automatically with each sort include the GSE end item number, description, class code, functional code, fluid media, use location, design responsibility, weight, cost, quantity, dimensions, and applicable documents. Multiple subsorts are available for the class code, functional code, fluid media, use location, design responsibility, and applicable document categories. These sorts and how to use them are described. The program and GSE data bank may be easily updated and expanded.

Schlagheck, R. A.

Solar Constant (SOLCON) Experiment: Ground Support Equipment (GSE) software development

The Solar Constant (SOLCON) Experiment, the objective of which is to determine the solar constant value and its variability, is scheduled for launch as part of the Space Shuttle/Atmospheric Laboratory for Application and Science (ATLAS) spacelab mission. The Ground Support Equipment (GSE) software was developed to monitor and analyze the SOLCON telemetry data during flight and to test the instrument on the ground. The design and development of the GSE software are discussed. The SOLCON instrument was tested during Davos International Solar Intercomparison, 1989 and the SOLCON data collected during the tests are analyzed to study the behavior of the instrument.

Gibson, M. Alan

Shuttle Ground Support Equipment (GSE) T-0 Umbilical to Space Shuttle Program (SSP) Flight Elements Consultation

The NASA Engineering and Safety Center (NESC) was tasked with assessing the validity of an alternate opinion that surfaced during the investigation of recurrent failures at the Space Shuttle T-0 umbilical interface. The most visible problem occurred during the Space Transportation System (STS)-112 launch when pyrotechnics used to separate Solid Rocket Booster (SRB) Hold-Down Post (HDP) frangible nuts failed to fire. Subsequent investigations recommended several improvements to the Ground Support Equipment (GSE) and processing changes were implemented, including replacement of ground-half cables and connectors between flights, along with wiring modifications to make critical circuits quad-redundant across the interface. The alternate opinions maintained that insufficient data existed to exonerate the design, that additional data needed to be gathered under launch conditions, and that the interface should be further modified to ensure additional margin existed to preclude failure. The results of the assessment are contained in this report.

Wilson, Timmy R.

Thermal Design, Tvac Testing, and Lessons Learned for Critical GSE of ATLAS and the ICESat-2 Mission

This presentation describes the thermal design of the three main of optical components which comprise the Bench Checkout Equipment (BCE) for the Advanced Topographic Laser Altimeter System (ATLAS) instrument, which is flying on the ICESat-2 mission. Thermal vacuum testing of these components is also described in this presentation, as well as a few lessons learned. These BCE components serve as critical GSE for the mission; their purpose is to verify ATLAS is performing well. It has been said that, in one light, the BCE is the most important part of ATLAS, since, without it, ATLAS cannot be aligned properly or its performance verified before flight. Therefore, careful attention was paid to the BCEs thermal design, development, and component-level Tvac testing prior to its use in instrument-level and spacecraft-level Tvac tests with ATLAS. This presentation describes that thermal design, development, and testing, as well as a few lessons learned.

Thermal ATLAS BCE

GSE Preprocessor

Computer program for processing data on ground support equipment wiring in Apollo spacecraft

Source record

Space Tug Point Design Study. Volume 3: Design Definition. Part 2: Insulation, Meteoroid Protection, Structures, Mass Properties, GSE, Reliability and Safety

A study was conducted to determine the configuration and performance of a space tug. Detailed descriptions of the insulation, meteoroid protection, primary structure, and ground support equipment are presented. Technical assessments leading to the concept selection are analyzed. The tug mass properties, reliability, and safety assessments are included.

Source record

Space station data management system - A common GSE test interface for systems testing and verification

This paper examines the fundamental problems and goals associated with test, verification, and flight-certification of man-rated distributed data systems. First, a summary of the characteristics of modern computer systems that affect the testing process is provided. Then, verification requirements are expressed in terms of an overall test philosophy for distributed computer systems. This test philosophy stems from previous experience that was gained with centralized systems (Apollo and the Space Shuttle), and deals directly with the new problems that verification of distributed systems may present. Finally, a description of potential hardware and software tools to help solve these problems is provided.

Martinez, Pedro A.

Installation and Assembly, Electrical Ground Support Equipment (GSE), Specification for

This specification covers the general workmanship requirements and procedures for the complete installation and assembly of electrical ground support equipment (EGSE) such as terminal distributors, junction boxes, conduit and fittings, cable trays and accessories, interconnecting cables (including routing requirements), motor-control equipment, and necessary hardware as specified by the applicable contract and drawings.

Electrical and Electronics