Freeze-Thaw Engineered Dual Conductivity Polymeric Binder Stabilizes Large-Volume-Change Lithium–Ion Battery Anodes
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
The reductive functionalization of inert substrates such as chloroarenes is a critical yet challenging transformation relevant to both environmental remediation and organic synthesis. Combining electricity and light is an emerging strategy to access the deeply reducing potentials required for single electron transfer to chloroarenes, yet this approach is limited by poor stability and mechanistic ambiguity. Here, in this work, we demonstrate heterogeneous electrophotocatalysis using redox-active rylene diimide polymers for the reduction of chloroarenes. We find that the electrophotocatalytic activity varies dramatically as a function of the rylene diimide and the redox-inactive polymer backbone. In particular, a flexible, non-conjugated perylenediimide polymer outperforms all other tested electrophotocatalysts. Transient absorption spectroscopy reveals that precomplexation between the doubly reduced perylenediimide and the haloarene substrate is key to productive catalysis. Overall, this work highlights heterogeneous electrophotocatalysis using insoluble redox-active organic materials and provides critical structure–property insights into solid-state electrophotocatalytic activity, informing the development of next-generation materials for sustainable synthesis.
Aero-hydro-elastic-servo numerical models used to design and analyze wind turbines are based on thousands of variable input parameters that dictate the inflow, aerodynamic, structural, and control characteristics of the system as well as sea state, hydrodynamic, and mooring characteristics for fixed-bottom and floating offshore wind turbines. Each of these parameters has some level of uncertainty, which can significantly impact the predicted loads. Understanding the uncertainty in the inputs is critical to understanding the uncertainty in the outputs. This work demonstrates a screening technique to identify which parameters ultimate loads are most sensitive to so that more focus can be given to quantifying the possible range of those parameters. This technique has been demonstrated previously for different turbine and load case types and is extended here for a floating offshore wind turbine in design load cases with transient events both in the inflow and operations. Each load case features a deterministic gust, including variations in wind speed, direction, and shear. Load cases are considered with an operating turbine as well as with prescribed fault, startup, and shutdown procedures. The study found that key input parameters with a large impact on loads include the length of the gust, the magnitude of direction change and speed in the gust, the initial wind speed, and the shape of the gust profile.
Iron-chromium-aluminum (FeCrAl) alloys are potential accident tolerant fuel (ATF) cladding candidates for light-water reactors but are difficult to fabricate as thin-walled tubes via conventional cast-and-wrought routes. Powder metallurgy (PM) offers a manufacturing alternative with improved compositional control, but its transient accident performance has not been directly benchmarked against wrought variants. This study evaluates the burst behavior of commercially developed PM-processed FeCrAl alloys, PM-C26M (Fe-12Cr-6Al-2Mo) and the high precipitate density FA-SMT (Fe-22Cr-5Al-3Mo), under simulated light-water reactor accident transient conditions. Burst testing was conducted using the Severe Accident Test Station with heating rates of 5 °C/s and 50 °C/s and internal pressures ranging from 25 MPa to 100 MPa. PM-C26M reproduced wrought C26M burst behavior within 7–37 °C across the stress range, indicating that PM processing does not compromise transient strength. FA-SMT exhibited markedly higher burst temperatures and reduced heating-rate sensitivity, consistent with its engineered precipitate strengthening. FA-SMT rupture exhibited axial "unzipping" rather than the lateral tearing characteristic of PM- and wrought C26M. Post-test EBSD and fractography indicate that this behavior is strongly correlated with strain-gated intergranular void nucleation associated with the dense precipitate architecture of FA-SMT, a response absent in the comparatively clean PM-C26M matrix and consistent with rupture morphologies reported for oxide-dispersion strengthened (ODS) FeCrAl of similar base-matrix chemistry to PM-C26M. These findings highlight the potential of powder metallurgy as a viable fabrication route for ATF claddings from an accident performance standpoint.
The 2014 discovery of living deep-sea coral reefs along the Northwest Hawaiian Islands (NWHI) and lower Emperor Seamount Chain (ESC), despite the North Pacific’s shallow aragonite saturation horizon (ASH) and high CaCO3 dissolution rates, underscores the need to understand the local seawater chemistry that allows these reefs to persist. We investigated seawater carbonate chemistry using discrete samples along the NWHI and ESC from two cruises ~1 year apart (08/26/21 – 09/26/21, 09/09/22 – 10/24/22). Across the two cruises, ASH depth difference ranged from 15 to 77 m. Since the Pacific ASH shoals by 1–2 m yr?¹, this long-term trend cannot explain the magnitude of ASH change observed between cruises. Temperature-salinity plots similarly indicate no major shifts in intermediate water masses that could account for these changes. Instead, ASH depth variability was primarily governed by localized biogeochemical processes, namely changes in intermediate water respiration and CaCO3 dissolution. Indicators for dissolution (TA*) and respiration (AOU) suggest changes in ASH depth were driven by changes in dissolution at the northern- and southern-most sites, whereas respiration exerted stronger control at central sites. Combining 2021 and 2022 data with data from 2014 – 2019 (excluding 2018) revealed high interannual ASH variability, by as much as >200 m at one site. Deep-sea coral reefs across the NWHI and ESC currently reside close to the ASH depth and likely experience seasonal and interannual shifts between under- and supersaturation. As ocean acidification progresses however, persistent exposure to undersaturated seawater could further threaten these critical deep-sea ecosystems.
Large-aperture (>30 cm) optical components that provide spatially tailored control of the properties of a laser beam, such as phase, polarization, and amplitude, have been the focus of much research and development in recent years. Such optics can improve energy throughput and target implosion efficiency in high-power laser systems conducting inertial confinement fusion research. Here, a method is demonstrated for fabricating freeform surface topographies into the birefringent crystalline material, potassium dihydrogen phosphate (KDP). Belt-on-wheel polishing with an oil-based fluid, developed to mitigate the deliquescent properties of KDP, is used to deterministically polish a freeform topography into KDP, enabling the fabrication of a wave plate with spatially arbitrary retardance. Testing of the laser-induced damage threshold of belt-on-wheel polished KDP was conducted at a wavelength of 351 nm and a pulse duration of 1 ns. The results revealed that the polished surfaces are highly resistant to laser-induced damage, making them suitable for large-aperture, high-power laser applications.
Understanding the formation timescale and structure of carbonaceous reaction products is critical for modeling the high-pressure equation-of-state of organic materials. We use the National Ignition Facility to shock-compress polycrystalline TATB (C 6 H 6 N 6 O 6 ) samples to ~70–130 GPa and ~4000–5500 K, employing in situ nanosecond X-ray diffraction to probe reaction products and velocimetry to measure transmitted compression wave profiles. Our diffraction data is consistent with the formation of diamond over timescales less than ~60 ns. This represents carbon condensation from a molecular explosive on timescales three times faster than previously reported and the earliest observation of diamond produced from reacting TATB. Reactive flow simulations with explicit chemistry reproduce the observed temporal structure within wave profiles to inform the distribution of P-T states. These findings provide direct evidence of ultrafast diamond formation in a reactive system at extreme conditions and provide new constraints for models of shock and detonation chemistry.
Understanding lithium-ion transport in tunnel-structured manganese oxides is essential for designing high-performance lithium-ion battery electrode materials. Here, we elucidate the early-stage lithiation mechanism of potassium-stabilized α-MnO 2 nanowires using in situ transmission electron microscopy (TEM) coupled with electron energy-loss spectroscopy (EELS), high-resolution TEM (HRTEM), and geometric phase analysis (GPA). Real-time TEM imaging reveals clear volume expansion at the reaction front, while EELS analysis uncovers lithium-ion diffusion far beyond this region, where no visible expansion is observed, indicating fast, defect-assisted transport. GPA and HRTEM analyses show that localized tensile and compressive strain fields, originating from pre-existing local tunnel structural variations, persist after lithiation. The tensile-strained regions enable lithium-ion insertion with minimal lattice distortion, offering additional free volume that facilitates rapid lithium-ion accommodation ahead of the structural transformation. Our results demonstrate a local tunnel variation-mediated fast diffusion pathway that precedes bulk reaction, underscoring the critical role of local strain in enabling early-stage lithium transport. Given the structural versatility of MnO 2 and its ability to accommodate diverse atomic arrangements beyond the well-known tunnel phases (β-, γ-, δ-, λ-, R-phases), our findings highlight the importance of understanding and engineering local structural environments. This work provides fundamental insights into the interplay between defects, strain, and ion dynamics, and presents defect engineering as a promising approach to enhance both rate performance and structural stability in manganese-based cathodes.
Rare event searches such as neutrinoless double beta decay and Weakly Interacting Massive Particle detection require ultra-low background detectors. Radon contamination is a significant challenge for these experiments, which employ highly sensitive radon assay techniques to identify and select low-emission materials. This work presents the development of ultra-sensitive electrostatic chamber (ESC) instruments designed to measure radon emanation in a recirculating gas loop, for future lower background experiments. Unlike traditional methods that separate emanation and detection steps, this system allows continuous radon transport and detection. This is made possible with a custom-built recirculation pump. A Python-based analysis framework, PyDAn, was developed to process and fit time-dependent radon decay data. Radon emanation rates are given for various materials measured with this instrument. A radon source of known activity provides an absolute calibration, enabling statistically-limited minimal detectable activities of 20 µBq. These devices are powerful tools for screening materials in the development of low-background particle physics experiments.
Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.