At least 19 records

Findings of the US research needs workshop on the topic of fusion power

The US Department of Energy, Office of Fusion Energy Sciences (OFES) conducted a Research Needs Workshop, referred to as ReNeW, in June 2009. The information developed at this workshop will help OFES develop a plan for US fusion research during the ITER era, roughly the next two decades. The workshop was organized in five Themes, one of which was Harnessing Fusion Power (or Fusion Power for short). The top level goal of the Fusion Power Theme was to identify the research needed to develop the knowledge to design and build, with high confidence, robust and reliable systems that can convert fusion products to useful forms of energy in a reactor environment, including a self-sufficient supply of tritium fuel. Each Theme was subsequently subdivided into Panels to address specific topics. The Fusion Power Panel topics were: Fusion Fuel Cycle; Power Extraction; Materials Science; Safety and Environment; and Reliability, Availability, Maintainability and Inspectability (RAMI). Finally, here we present the key findings of the Fusion Power Theme.

Meier, W. R.↗

Tokamak Energy’s pre-concept design for a fusion power plant: an overview of ST-E1

Climate change and rapidly rising energy demand, driven in part by artificial intelligence and data-centre growth, create an urgent need for stable, low-carbon, and abundant power. Fusion is a promising long-term solution, yet its commercialisation faces a fundamental paradox in today’s investment environment: pilot plants are essential to de-risk physics, engineering, and operations, but their limited lifetime energy output and high upfront costs make them difficult to finance. This paper presents Tokamak Energy’s response: ST-E1, a pre-concept design for a low-aspect-ratio tokamak power plant engineered specifically to overcome this challenge. ST-E1 is designed from the outset for phased operation—pilot and commercial phases, with an upgrade phase in between—with emphasis on commercial viability, maintainability, nuclear engineering, modularity, and upgradability. A key design principle is the deliberate separation of long-lived assets, such as the magnet cage and vacuum vessel, from replaceable in-vessel systems. This provides an attractive and credible investment approach to generate operational data and de-risk key technologies while preserving most capital-intensive assets for later commercial phases. The architecture supports continuous optimisation toward high net electric power (targeting 800–1000 MW net electric), a normalised capital expenditure of $\$$ 12–14k/kW of net electric power, and high availability (targeting > 80%). A tokamak core with a 5 m major radius, aspect ratio of 2.3, and on-plasma axis toroidal field of 5.25 T was selected to meet these objectives. This paper summarises the ST-E1 design philosophy, principal features, and development methodology. It introduces a Focus Collection of 11 papers detailing the pre-concept design of the entire tokamak and corresponding plant.

ST-E1↗

Fusion power production in International Thermonuclear Experimental Reactor baseline H-mode scenarios

Self-consistent simulations of 15 MA ITER H-mode DT scenarios, from ramp-up through flat-top, are carried out. Electron and ion temperatures, toroidal angular frequency, and currents are evolved, in simulations carried out using the predictive TRANSPort and integrated modeling code starting with initial profiles and equilibria obtained from tokamak simulation code studies. Studies are carried out examining the dependence and sensitivity of fusion power production on electron density, argon impurity concentration, choice of radio frequency heating, pedestal temperature without and with E × B flow shear effects included, and the degree of plasma rotation. The goal of these whole-device ITER simulations is to identify dependencies that might impact ITER fusion performance.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Overview of the physics basis for the ARC fusion power plant

Commonwealth Fusion Systems plans to build ARC as the first fusion power plant at a site in Chesterfield County, Virginia, USA by the early 2030s. We present an overview of analysis comprising the physics basis of the ARC V3A design, a high-magnetic-field tokamak with 𝐵 0 =11.4 T, 𝐼 𝑝 =12.0 MA, 𝑅 0 =4.62 m, 𝑎 =1.18 m. ARC V3A is designed to produce 𝑃 𝑓⁡𝑢⁢𝑠 ≈1.13 GW DT fusion power and deliver ⩾400 MW net electric power to the grid. This overview includes quantitative analysis of fundamental issues for design of and operational plasma scenarios for a tokamak power plant, and lays out the design targets and strategic choices for ARC, including empirical fusion performance projections, assessment of H-mode access, ion cyclotron resonance heating simulations, alpha particle physics and time-dependent full-pulse simulations. This is complemented by topical papers on fusion performance and transport, disruption physics, boundary physics and magnetohydrodynamic stability. Critically, these studies identify key model uncertainties and physics risks to be retired through SPARC operation. Due to the modular nature of ARC, early results from SPARC can be incorporated into the design of the first ARC as well as subsequent replacements of the ARC vacuum vessel.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Comparison of Fuel Cycles for Lead-Lithium and Pure Lithium Liquid Metal Walls in a Magnetized Target Fusion Power Plant

General Fusion (GF) is developing an adaptable, commercial fusion power plant based on magnetized target fusion (MTF). The GF approach involves forming a spherical torus of deuterium-tritium plasma in a large (~4 m diameter) cavity formed in liquid metal, and then collapsing that cavity with an array of pneumatic piston drivers. The liquid metal is constantly flowing through the fusion chamber and out to processing systems where tritium and heat will be extracted using tritium extraction technologies and heat exchangers, respectively. Here, this study focuses on two candidate designs for the liquid metal blanket and first wall material for the General Fusion Magnetized Target Fusion (GF MTF) power plant and assesses their impact on the tritium fuel cycle. The first candidate is the lead lithium eutectic (LLE) and the second candidate is pure lithium (Li). It was found that the main differences between LLE and Li designs are the extraction technologies required to remove tritium from the blanket and the amount of tritium and its distribution within the facility. More than 80% of the in-process tritium inventory for the LLE design is contained in the isotope separation system, while for the Li design, over 60% of the in-process tritium inventory is contained within the blanket material. This is due to significant tritium retention by Li. For the Li blanket, the burden of tritium processing rests on the blanket extraction technology rather than the traditional exhaust processing route. Thus, the blanket extraction technology is a main driver of tritium inventory in the Li system and determines the subsequent interface with the tritium processing plant.

General Fusion↗

Power and particle exhaust for the ARC fusion power plant

To successfully show that fusion is an attractive energy source, the ARCTM fusion power plant will need to operate with a robust, integrated power and particle exhaust solution. To maximise ARC’s fusion power output while avoiding excessive erosion of the plasma-facing components, we will need to radiatively dissipate most of the power crossing the last-closed flux surface, injecting radiating impurities such as argon or neon to access divertor detachment. Divertor detachment will need to be integrated with a high-performance core plasma, and with efficient impurity pumping to prevent the accumulation of helium ash in the core. To access and control detachment in high-performance plasmas, we have designed ARC with up–down-symmetric divertors, with secondary X-points in long, tightly baffled outer legs. Using a core-edge modelling workflow, we predict that with this divertor design, ARC will access detachment with modest argon seeding in the divertor (c Ar,div ∼0.9%), which should have minimal impact on the core ( Z eff,core <0.5) for reasonable argon enrichment (c Ar,div /c Ar,core =6). Due to the high predicted divertor neutral pressure (p div ∼20 Pa), we predict that ARC will sufficiently pump helium to limit ash accumulation in the core (c He,core <2%) for a helium enrichment of c He,div /c He,core =0.4. ARC’s divertor design is expected to increase the stability of a detachment front in the outer divertor leg, helping to prevent divertor reattachment during smaller heat-flux transients such as scrape-off-layer filaments associated with the quasi-continuous exhaust regime. However, this buffering will not be sufficient to prevent divertor reattachment during large type-I edge-localised modes (ELMs), and as such these will need to be avoided on ARC. Experiments on SPARC will be used to select an integrated scenario which avoids or mitigates type-I-ELMs while maintaining access to detachment, good core fusion performance and sufficient impurity exhaust. SPARC experiments will also be used to finalise ARC’s divertor design, by studying the impact of magnetic and first-wall geometry on detachment stability, impurity enrichment and neutral baffling under conditions similar to those expected for ARC. In conclusion, our analysis finds that ARC will have a viable power and particle exhaust solution which is compatible with high-power operations, and this solution will be validated in experiments on SPARC.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Fusion Power measurement at ITER

Nuclear fusion research aims to provide energy for the future in a sustainable way and the ITER project scope is to demonstrate the feasibility of nuclear fusion energy. ITER is a nuclear experimental reactor based on a large scale fusion plasma (tokamak type) device generating Deuterium - Tritium (DT) fusion reactions with emission of 14 MeV neutrons producing up to 700 MW fusion power. The measurement of fusion power, i.e. total neutron emissivity, will play an important role for achieving ITER goals, in particular the fusion gain factor Q related to the reactor performance. Particular attention is given also to the development of the neutron calibration strategy whose main scope is to achieve the required accuracy of 10% for the measurement of fusion power. Neutron Flux Monitors located in diagnostic ports and inside the vacuum vessel will measure ITER total neutron emissivity, expected to range from 1014 n/s in Deuterium - Deuterium (DD) plasmas up to almost 10{sup 21} n/s in DT plasmas. The neutron detection systems as well all other ITER diagnostics have to withstand high nuclear radiation and electromagnetic fields as well ultrahigh vacuum and thermal loads. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

First calibration measurements of an FTIR absorption spectroscopy system for liquid hydrogen isotopologues for the isotope separation system of fusion power plants

Fusion facilities like ITER and DEMO will circulate huge amounts of deuterium and tritium in their fuel cycle with an estimated throughput of kg per hour. One important capability of these fuel cycles is to separate the hydrogen isotopologues (H{sub 2}, D{sub 2}, T{sub 2}, HD, HT, DT). For this purpose the Isotope Separation System (ISS), using cryogenic distillation, as part of the Tritium Enrichment Test Assembly (TRENTA) is under development at Tritium Laboratory Karlsruhe. Fourier transform infrared absorption spectroscopy (FTIR) has been selected to prove its capability for online monitoring of the tritium concentration in the liquid phase at the bottom of the distillation column of the ISS. The actual research-development work is focusing on the calibration of such a system. Two major issues are the identification of appropriate absorption lines and their dependence on the isotopic concentrations and composition. For this purpose the Tritium Absorption IR spectroscopy experiment has been set up as an extension of TRENTA. For calibration a Raman spectroscopy system is used. First measurements, with equilibrated mixtures of H{sub 2}, D{sub 2} and HD demonstrate that FTIR can be used for quantitative analysis of liquid hydro-gen isotopologues and reveal a nonlinear dependence of the integrated absorbance from the D{sub 2} concentration in the second vibrational branch of D{sub 2} FTIR spectra. (authors)

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Commercial objectives, technology transfer, and systems analysis for fusion power development

Fusion is an inexhaustible source of energy that has the potential for economic commercial applications with excellent safety and environmental characteristics. The primary focus for the fusion energy development program is the generation of central station electricity. Fusion has the potential, however, for many other applications. The fact that a large fraction of the energy released in a DT fusion reaction is carried by high energy neutrons suggests potentially unique applications. In addition, fusion R and D will lead to new products and new markets. Each fusion application must meet certain standards of economic and safety and environmental attractiveness. For this reason, economics on the one hand, and safety and environment and licensing on the other, are the two primary criteria for setting long range commercial fusion objectives. A major function of systems analysis is to evaluate the potential of fusion against these objectives and to help guide the fusion R and D program toward practical applications. The transfer of fusion technology and skills from the national labs and universities to industry is the key to achieving the long range objective of commercial fusion applications.

Dean, Stephen O.↗

Approach to startup inventory for viable commercial fusion power plant

With the increasing efforts to commercialize fusion power, private and government organizations are investing heavily in the development of technology to support a viable fusion power plant. Deuterium-Tritium (DT) fueled reactors are more prevalent than other proposed designs, requiring tritium processing and handling technology for safe operations and self-sufficiency. Further, each fusion power plant will need a specific-to-design startup inventory of tritium to begin operations. This startup inventory is required prior to breeding and is the minimum tritium inventory required to fill each processing component in the fuel cycle, to offset radioactive decay losses, and to avoid a zero-fuel situation for continuous operation. We present an approach to calculate the startup tritium inventory for a 500 MW th reactor, with considerations for reserve inventory for maintenance and commissioning. A baseline startup inventory was calculated to be approximately 327 gs. This value was obtained using modest assumptions about the technology and operating parameters of a fusion power plant. The required operating reserve inventory or the inventory necessary to keep a fusion power plant operational using only direct internal recycling for 24 h for the same plant design is approximately 642 gs. The approach and findings of this paper will enable fusion energy stakeholders to better utilize the existing scarce global tritium supply.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Liquid lithium loop system to solve challenging technology issues for fusion power plant

Here, steady-state fusion power plant designs present major divertor technology challenges, including high divertor heat flux both in steady-state and during transients. In addition to these concerns, there are the unresolved technology issues of long term dust accumulation and associated tritium inventory and safety issues. It has been suggested that radiation-based liquid lithium (LL) divertor concepts with a modest lithium-loop could provide a possible solution for these outstanding fusion reactor technology issues, while potentially improving reactor plasma performance. The application of lithium (Li) in NSTX resulted in improved H-mode confinement, H-mode power threshold reduction, and reduction in the divertor peak heat flux while maintaining essentially Li-free core plasma operation even during H-modes. These promising results in NSTX and related modeling calculations motivated the radiative liquid lithium divertor (RLLD) concept and its variant, the active liquid lithium divertor concept (ARLLD), taking advantage of the enhanced or non-coronal Li radiation in relatively poorly confined divertor plasmas. To maintain the LL purity in a 1 GW-electric class fusion power plant, a closed LL loop system with a modest circulating capacity of ~ 1 liter/second (l/sec) is envisioned. We examined two key technology issues: 1) dust or solid particle removal and 2) real time recovery of tritium from LL while keeping the tritium inventory level to an acceptable level. By running the LL-loop continuously, it can carry the dust particles and impurities generated in the vacuum vessel to the outside where the dust / impurities can be removed by relatively simple dust filter, cold trap and/or centrifugal separation systems. With ~ 1 l/sec LL flow, even a small 0.1% dust content by weight (or 0.5 g per sec) suggests that the LL-loop could carry away nearly 16 tons of dust per year. In a 1 GW-electric (or ~ 3 GW fusion power) fusion power plant, about 0.5 g / sec of tritium is needed to maintain the fusion fuel cycle assuming ~ 1 % fusion burn efficiency. It appears feasible to recover tritium (T) in real time from LL while maintaining an acceptable T inventory level. Laboratory tests are being conducted to investigate T recovery feasibility with the surface cold trap (SCT) concept.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Doubling fusion power with volumetric optimization in magnetic confinement fusion devices

A technique, volumetric power optimization, is presented for enhancing the power output of magnetic confinement fusion devices. Applied to a tokamak, this approach involves shifting the burning plasma region to a larger plasma volume while introducing minimal perturbations to the plasma boundary shape. This edge perturbation—squareness—is analogous to pinching and stretching the edge boundary. Stability calculations confirm that this edge alteration is compatible with maintaining plasma stability. This optimization method for optimizing fusion power output could improve the performance of magnetic confinement fusion power plants.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Methodology for Scaling Fusion Power Plant Availability

Normally in the U.S. fusion power plant conceptual design studies, the development of the plant availability and the plant capital and operating costs makes the implicit assumption that the plant is a 10th of a kind fusion power plant. This is in keeping with the DOE guidelines published in the 1970s, the PNL report1, "Fusion Reactor Design Studies - Standard Accounts for Cost Estimates. This assumption specifically defines the level of the industry and technology maturity and eliminates the need to define the necessary research and development efforts and costs to construct a one of a kind or the first of a kind power plant. It also assumes all the "teething" problems have been solved and the plant can operate in the manner intended. The plant availability analysis assumes all maintenance actions have been refined and optimized by the operation of the prior nine or so plants. The actions are defined to be as quick and efficient as possible. This study will present a methodology to enable estimation of the availability of the one of a kind (one OAK) plant or first of a kind (1st OAK) plant. To clarify, one of the OAK facilities might be the pilot plant or the demo plant that is prototypical of the next generation power plant, but it is not a full-scale fusion power plant with all fully validated "mature" subsystems. The first OAK facility is truly the first commercial plant of a common design that represents the next generation plant design. However, its subsystems, maintenance equipment and procedures will continue to be refined to achieve the goals for the 10th OAK power plant.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Tritium Breeding Blanket for a Commercial Fusion Power Plant - A System Engineering Assessment

The goal of developing a new source of electric power based on fusion has been pursued for decades. If successful, future fusion power plants will help meet growing world-wide demand for electric power. A key feature and selling point for fusion is that its fuel supply is widely distributed globally and virtually inexhaustible. Current world-wide research on fusion energy is focused on the deuterium-tritium (DT for short) fusion reaction since it will be the easiest to achieve in terms of the conditions (e.g., temperature, density and confinement time of the DT fuel) required to produce net energy. Over the past decades countless studies have examined various concepts for TBBs for both magnetic fusion energy (MFE) and inertial fusion energy (IFE). At this time, the key organizations involved are government sponsored research organizations world-wide. The near-term focus of the MFE community is on the development of TBB mock-ups to be tested on the ITER tokamak currently under construction in Caderache France. TBB concepts for IFE tend to be different from MFE primarily due to significantly different operating conditions and constraints. This report focuses on longer-term commercial power plants where the key stakeholders include: electric utilities, plant owner and operator, manufacturer, regulators, utility customers, and in-plant subsystems including the heat transfer and conversion systems, fuel processing system, plant safety systems, and the monitoring control systems.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Time-dependent scenario modeling for the ST-E1 fusion power plant

ST-E1 is a low aspect ratio fusion power plant being designed by Tokamak Energy targeting 1.5 GW of fusion power. Characterization of the ST-E1 flat-top scenario is described elsewhere McNamara et al (2026 Nucl. Fusion 66 086008); here we focus on addressing the question of how to ramp-up the ST-E1 plasma from an initial state following breakdown and flux-surface formation to the target flat-top state. Being low-aspect ratio, the available solenoid flux of ST-E1 is limited. Therefore, particular consideration is placed on developing ramp-up scenarios that predominantly use inductive flux provided by external vertical field coils. Through time-dependent modeling with METIS, we show that this is possible when the ramp-up is performed at relatively high plasma density: although auxiliary current drive efficiency is reduced, this is significantly outweighed by (1) higher electron-ion collisional equilibration, (2) higher fusion power once ions become sufficiently hot, (3) higher poloidal beta for increased vertical-field flux, and (4) potentially favorable exhaust compatibilities. Ultimately, we show the target ST-E1 flat-top performance can be reached after a ramp-up period lasting 150 s using less than 40 Vs of solenoid flux (with vertical field providing ∼ 90 Vs of flux). The sensitivity to model assumptions are presented, with the general observation that deleterious effects can be mitigated through minor alterations of the auxiliary power temporal waveform and/or total auxiliary power level. The impact of a solenoid and the auxiliary power mix (electron cyclotron heating only versus electron and ion cyclotron heating) on the ST-E1 ramp-up success are also discussed in appendices. On this latter topic, we show that the effect of direct-ion heating during ramp-up is obscured by the uncertainty in the pedestal dynamics, identifying a clear line of future work required to make a definite decision on the ST-E1 auxiliary power mix.

current ramp-up↗

Inertial Fusion Power Plant Concept of Operations and Maintenance

Parsons and LLNL scientists and engineers performed design and engineering work for power plant pre-conceptual designs based on the anticipated laser fusion demonstrations at the National Ignition Facility (NIF). Work included identifying concepts of operations and maintenance (O&M) and associated requirements relevant to fusion power plant systems analysis. A laser fusion power plant would incorporate a large process and power conversion facility with a laser system and fusion engine serving as the heat source, based in part on some of the systems and technologies advanced at NIF. Process operations would be similar in scope to those used in chemical, oil refinery, and nuclear waste processing facilities, while power conversion operations would be similar to those used in commercial thermal power plants. While some aspects of the tritium fuel cycle can be based on existing technologies, many aspects of a laser fusion power plant presents several important and unique O&M requirements that demand new solutions. For example, onsite recovery of tritium; unique remote material handling systems for use in areas with high radiation, radioactive materials, or high temperatures; a five-year fusion engine target chamber replacement cycle with other annual and multi-year cycles anticipated for major maintenance of other systems, structures, and components (SSC); and unique SSC for fusion target waste recycling streams. This paper describes fusion power plant O&M concepts and requirements, how O&M requirements could be met in design, and how basic organizational and planning issues can be addressed for a safe, reliable, economic, and feasible fusion power plant.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Maintenance strategy, structural design, and site layout of the ST-E1 fusion power plant

An effective fusion reactor maintenance scheme enables safe operations and short downtimes. This in turn leads to high availability, which is critical to the commercial viability of a power-producing plant. In tokamak-based fusion power plants, the chosen maintenance approach has a significant impact on the spatial design of the tokamak, as well as the surrounding infrastructure, and therefore needs to be considered from the outset. Tokamak Energy has developed a pre-concept design of a fusion power plant, ST-E1. This work describes the major drivers and constraints that have been considered, presents the tokamak architecture and chosen maintenance regime, and discusses how this enables the plant’s two-phased approach to demonstrating commercial operations. It also shows the implications for the design of other systems areas, in particular the machine structural arrangement and bioshield and hot cell layout. The reactor core segmentation and removal scheme replaces entire toroidal segments radially through a large vacuum port, along a single axis only. The result is a change-tolerant machine and plant layout that can accommodate the evolving designs of the tokamak.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗