Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Descent advisor preliminary field test

A field test of the Descent Advisor (DA) automation tool was conducted at the Denver Air Route Traffic Control Center in September 1994. DA is being developed to assist Center controllers in the efficient management and control of arrival traffic. DA generates advisories, based on trajectory predictions, to achieve accurate meter-fix arrival times in a fuel efficient manner while assisting the controller with the prediction and resolution of potential conflicts. The test objectives were to evaluate the accuracy of DA trajectory predictions for conventional- and flight-management-system-equipped jet transports, to identify significant sources of trajectory prediction error, and to investigate procedural and training issues (both air and ground) associated with DA operations. Various commercial aircraft (97 flights total) and a Boeing 737-100 research aircraft participated in the test. Preliminary results from the primary test set of 24 commercial flights indicate a mean DA arrival time prediction error of 2.4 sec late with a standard deviation of 13.1 sec. This paper describes the field test and presents preliminary results for the commercial flights.

Green, Steven M.

Descent Advisor Preliminary Field Test

A field test of the Descent Advisor (DA) automation tool was conducted at the Denver Air Route Traffic Control Center in September 1994. DA is being developed to assist Center controllers in the efficient management and control of arrival traffic. DA generates advisories, based on trajectory predictions, to achieve accurate meter-fix arrival times in a fuel efficient manner while assisting the controller with the prediction and resolution of potential conflicts. The test objectives were: (1) to evaluate the accuracy of DA trajectory predictions for conventional and flight-management system equipped jet transports, (2) to identify significant sources of trajectory prediction error, and (3) to investigate procedural and training issues (both air and ground) associated with DA operations. Various commercial aircraft (97 flights total) and a Boeing 737-100 research aircraft participated in the test. Preliminary results from the primary test set of 24 commercial flights indicate a mean DA arrival time prediction error of 2.4 seconds late with a standard deviation of 13.1 seconds. This paper describes the field test and presents preliminary results for the commercial flights.

Green, Steven M.

Demonstration of the fiducial concept using data from the March 1985 GPS field test

The first field test of NASA's Global Positioning System (GPS) Geodetic Program took place in March of 1985. The principal objective of this test was the demonstration of the feasibility of the fiducial station approach to precise GPS-based geodesy and orbit determination. Other objectives included an assessment of the performance of the several GPS receiver types involved in these field tests and the testing of the GIPSY software for GPS data analysis. In this article, the GIPSY (GPS Inferred Positioning System) software system is described and baseline solutions are examined for consistency with independent measurements made using very long baseline interferometry.

Davidson, J. M.

Optical cross beam field tests at ESSA Haswell Field site, October 1969

A series of tests with both the visible and IR optical cross beam systems was made at the Haswell, Colorado, Field Site of ESSA. This memorandum covers only the details of the test setup and runs. A joint field test program was undertaken by ESSA at a 164 meter (500 foot) meteorological tower. The tower was instrumented with wind sensors, temperature sensors, temperature sensors, fluctuating wind and temperature sensors and humidity sensors. The sensors were located at three elevations: 42, 192 and 162 meters. A movable elevator was also instrumented and could be positioned at any desired location along the tower height. The main object of the cross beam studies was to compare the visible and IR systems. The instruments were also arranged so that direct comparison with the sensors on the tower can be made.

Sandborn, V. A.

Objectives and first results of the NASA SETI sky survey field tests at Goldstone

Field tests of SETI (Search for Extraterrestrial Intelligence) prototype hardware and software began in March 1985 at Goldstone. With emphasis on the sky survey component of the NASA SETI search strategy, the article describes the survey characteristics, the detection strategy, and preliminary results of system tests.

Gulkis, S.

Mobilestar field test program

Various field tests were performed in order to gain practical experience and a broader understanding of mobile communications. The first phase consisted of CW propagation tests to develop firsthand experience of propagation phenomena. From this information, estimates of the feasibility and accuracy of power control were possible. The next phase tested the idea of power control. Equipment representative of that expected to be used in an actual mobile satellite communication system was assembled and tested under a variety of environments.

Rubow, Wayne

Photovoltaic-Powered Vaccine Refrigerator: Freezer Systems Field Test Results

A project to develop and field test photovoltaic-powered refrigerator/freezers suitable for vaccine storage was undertaken. Three refrigerator/freezers were qualified; one by Solar Power Corp. and two by Solvolt. Follow-on contracts were awarded for 19 field test systems and for 10 field test systems. A total of 29 systems were installed in 24 countries between October 1981 and October 1984. The project, systems descriptions, installation experiences, performance data for the 22 systems for which field test data was reported, an operational reliability summary, and recommendations relative to system designs and future use of such systems are explained. Performance data indicate that the systems are highly reliable and are capable of maintaining proper vaccine storage temperatures in a wide range of climatological and user environments.

Ratajczak, A. F.

Field Test Report Neutron Scintillator Array Dry Storage Cask Scanner FY2024

During two weeks of Field Testing at the Idaho National Laboratory INTEC Cask Farm in July and August 2024, the LLNL Dry Storage Cask Scanner Array was lifted on top of an MC-10 dry storage fuel cask and operated to acquire neutron and gamma-ray data from the 24 fuel bundle positions. Neutron and gamma-ray data acquisition scans across the top of the cask of varying dwell times were performed July 15-18, 2024 and August 19-22, 2024 to evaluate the ability of the scanner data to reveal asymmetries in the fuel positions that reflect asymmetries in the MC-10 cask fuel bundle loading. The MC-10 cask 24 position fuel bundle loading at the INTEC Cask Farm is well documented, including the locations of six empty fuel bundle positions. This loading presents an opportunity to test the ability of the scanner system to detect diversion of spent fuel bundles as well as to validate the MC-10 cask MCNP modeling. The cask scanner array consists of six Stilbene crystal scintillator detectors and a linear actuator frame that moves the six detectors across the MC-10 dry storage cask to obtain data above each of the 24 fuel bundle positions. The detectors are connected to a pulse-shape discrimination data acquisition system capable of generating separate neutron and gamma-ray spectra for each detector and for each scan position. From the prior single detector Field Test in 2021 and iteration with MCNP modeling, the neutron and gamma-ray data were analyzed in multiple energy regions to identify an analysis method that would provide the strongest and most consistent signature of the asymmetric MC-10 cask fuel loading1 . From both the 2021 Field Test and the current Field Test results, the neutron capture gamma-ray count rate around 2.2 MeV provides the strongest signature of the asymmetric MC-10 cask fuel loading and has qualitative agreement with MCNP calculations. Counting all gamma-rays produces a similar signature. Neutrons emerging from the cask top are moderated and captured by the hydrogen in the polyethylene moderator and scintillator detector, producing a 2.2 MeV gamma ray which is seen in the scintillator gamma-ray spectrum. The count rate in the 2.2 MeV gamma-ray region is ~50 c/s, which is ~1000x higher than the ~0.05 n/s rate in the > 4MeV neutron region, and ~50x greater than the ~1 n/s rate in the neutrons > 500 keV region. Analysis of the 2.2 MeV neutron-capture Compton-scattered gamma-rays produces a statistically significant signature of the INTEC Cask Farm MC-10 asymmetric fuel loading. MCNP simulations indicate that the average neutron energy spectrum offers the potential to detect a large asymmetry from several missing bundles as well as individual missing fuel bundles. Testing this feature will require measurements on a cask with single missing elements.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Objectives and first results of the NASA SETI Sky Survey field tests at Goldstone, California

The objectives and preliminary results of the initial field tests of the prototype hardware and software for the NASA SETI program are reviewed with emphasis on the Sky Survey component of the NASA search strategy. In particular, attention is given to field test instrumentation, sky pixelation, sky survey field tests, baseline tests, antenna control tests, and radio frequency interference survey. The test results and observational experience will be used to finalize the design of the SETI Sky Survey processing system and to optimize the observational strategy and procedures in time to begin a full-scale Microwave Observing Program in 1990.

Gulkis, S.

Water-cooled Helmholtz coil for Ultra-low Magnetic Field Testing

Ultra-low magnetic field testing requires precise and finely calibrated instrumentation interacting with very marginal magnetic fields in highly controlled environments. We designed a large Helmholtz coil system for implementation around a 17.825-inch outer diameter Helium-3 Cryogenic fridge, to serve as both a field-zeroing device and to enable higher resolution on magnetic field sweeps during experiments. We present finite volume modeling and finite element analysis results which indicate the device could safely run at 20 [A] in perpetuity, producing a magnetic field of 65 [mT], without the surface facing the Cryogenic fridge exceeding 50°C. The overall system parts expense is $\$$4,882.76.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND

First Astronaut- Rover Interaction Field Test

The first Astronaut - Rover (ASRO) Interaction field test was conducted successfully on February 22-27, 1999, in Silver Lake, Mojave Desert, California in a representative planetary surface terrain. This test was a joint effort between the NASA Ames Research Center , Moffett Field, California and the NASA Johnson Space Center, Houston, Texas. As prototype advanced planetary surface space suit and rover technologies are being developed for human planetary surface exploration , it has been determined that it is important to better understand the potential interaction and benefits of an EVA astronaut interacting with a robotic rover . This interaction between an EVA astronaut and a robotic rover is seen as complementary and can greatly enhance the productivity and safety of surface excursions . This test also identified design requirements and options in an advanced space suit and robotic rover. The test objectives were: 1. To identify the operational domains where the EVA astronauts and rover are complementary and can interact and thus collaborate in a safe , productive and cost- effective way, 2. To identify preliminary requirements and recommendations for advanced space suits and rovers that facilitate their cooperative and complementary interaction, 3. To develop operational procedures for the astronaut-rover teams in the identified domains, 4. To test these procedures during representative mission scenarios during field tests by simulating the exploration of a planetary surface by an EVA crew interacting with a robotic rover, 5. To train a space suited test subject, simulated Earth-based and l or lander-based science teams, and robotic vehicle operators in mission configurations, and 6. To evaluate and understand socio-technical aspects of the astronaut - rover interaction experiment in order to guide future technologies and designs. Test results and areas for future research in the design of planetary space suits will be discussed .

Kosmo, Joseph J.

Magnetic field test coils are temperature compensated

Magnetic field test coils with auxiliary winding wound opposite to main coil winding eliminates changes in field configurations due to temperature changes. The auxiliary coil is made with aluminum wire.

Source record

Antarctic field tests of SARSAT personal locater beacons

Field tests of SARSAT personal locater beacons were conducted in the Antarctic to assess the viability of using these beacons to increase the safety of Antarctic field parties. Data were collected on the extent to which dry or wet snow, melting conditions, crevasse walls and snow bridges affected the ability of the SARSAT satellite to calculate an accurate position of the beacon. Average response time between beacon turn on and alert reception in McMurdo was between 4 and 5 hours for these tests. It is concluded that the SARSAT system is viable for Antarctic operations and it is recommended that it be implemented for future field operations. Because of obstruction of line-of-sight between beacon and satellite degrades the accuracy of the location calculation (particularly in wet snow), it is further recommended that field parties have sufficient numbers of beacons to insure that in an emergency, one will be able to operate from the surface.

Bindschadler, Robert

Onsite 40-kilowatt fuel cell power plant manufacturing and field test program

A joint Gas Research Institute and U.S. Department of Energy Program was initiated in 1982 to evaluate the use of fuel cell power systems for on-site energy service. Forty-six 40 kW fuel cell power plants were manufactured at the United Technologies Corporation facility in South Windsor, Connecticut, and are being delivered to host utilities and other program participants in the United States and Japan for field testing. The construction of the 46 fully-integrated power plants was completed in January 1985 within the constraints of the contract plan. The program has provided significant experience in the manufacture, acceptance testing, deployment, and support of on-site fuel cell systems. Initial field test results also show that these experimental power plants meet the performance and environmental requirements of a commercial specification. This Interim Report encompasses the design and manufacturing phases of the 40 kW Power Plant Manufacturing and Field Test program. The contract between UTC and NASA also provides UTC field engineering support to the host utilities, training programs and associated manuals for utility operating and maintenance personnel, spare parts support for a defined test period, and testing at UTC of a power plant made available from a preceding program phase. These activities are ongoing and will be reported subsequently.

Source record

Navigation Results from Desert Field Tests of the Rocky 7 Mars Rover Prototype

Upcoming missions to the surface of Mars will use mobile robots to traverse long distances from the landing site. To prepare enabling technologies for these missions, the protype rover, Rocky 7, has been tested in desert field trials conducted with a team of planetary scientists.

Mars mobile robots desert field trails sun-sensor

Field test experience

As a part of the Flat-Plate Solar Array Project (FSA), a field-test program was developed to obtain solar photovoltaic (PV) module performance and endurance data. These data are used to identify the specific characteristics of module designs under various environmental conditions. The information obtained from field testing is useful to all participants in the National Photovoltaics Program, from the research planner to the life-cycle cost analyst.

Weaver, R. W.

LSA field test

Degradation tests indicate that electrical degradation is not a slow monotonically increasing phenomenon as originally thought but occurs abruptly as the result of some traumatic event. This finding has led to a change in the test philosophy. A discussion of this change is presented along with a summary of degradation and failure data from all the sites and results from a variety of special tests. New instrumentation for in-field measurements are described. Field testing activity was expanded by the addition of twelve remote sites located as far away as Alaska and the Canal Zone. Descriptions of the new sites are included.

Jaffe, P.