Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Feasibility Study”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

SU-E-J-208: Feasibility Study On Using Small Plastic Phantoms for Auditing Radiation Output of MR-Linac Systems

Purpose: To study feasibility of using small plastic phantoms designed for conventional linac output auditing to measure the output of MR-Linac systems. Methods: For simulations, the CT scan of an IROC(formerly RPC) acrylic block phantom designed for 8 MV beams was imported in a research version of the treatment planning system (Monaco). Dose delivered to three TLDs in the block was calculated with a Monte Carlo algorithm and a beam model based on an MR-linac prototype with and without a magnetic field (B=1.5T). In a large mathematical water phantom, the same beam was used to calculate dose in full scatter conditions. The block factor (F) was calculated as the ratio of the average dose to the block TLDs to the dose at the reference point in the mathematical phantom. For experimental measurement, four IROC blocks were irradiated with the MR-linac prototype, and data were analyzed by IROC. Results: The F factor without a B field was 1.053. When a B field was applied, it changed the dose distribution in the block, especially on the edges. With a B field parallel to the long axes of the TLD, F was 1.038. However, with a perpendicular B field, F factor increased slightly to 1.075. In the IROC report, the output determined with two blocks parallel to the B field was 2.3% higher than the output by the two blocks perpendicular to the B field. The average of all four blocks was within 2% of machine output measured with an ion chamber. Conclusion: It may be feasible to expand the utility of the acrylic block phantoms for radiation output auditing from conventional linacs to MR-linacs. However, the scatter correction factor can change due to the B field and its orientation to the block. More symmetric phantom designs may be less prone to mistakes. We acknowledge research support from Elekta.

60 APPLIED LIFE SCIENCES↗

The North Dakota integrated carbon storage complex feasibility study

Here, the Energy & Environmental Research Center is investigating the feasibility of safely, permanently, and economically storing 50 million tonnes of CO 2 in central North Dakota, United States, over a 25-year operational period, should a business case for CO 2 storage emerge. The study is part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory CarbonSAFE initiative and addresses the technical and nontechnical challenges of commercially deploying a CO 2 storage project. Evaluation of cores from two stratigraphic test wells demonstrate that the Broom Creek Formation (sandstone) is an excellent candidate for the geologic storage of CO 2 and the overlying Opeche Formation a competent cap rock.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Automated evaluation of setup errors in carbon ion therapy using PET: Feasibility study

Purpose: To investigate the possibility of detecting patient mispositioning in carbon-ion therapy with particle therapy positron emission tomography (PET) in an automated image registration based manner. Methods: Tumors in the head and neck (H and N), pelvic, lung, and brain region were investigated. Biologically optimized carbon ion treatment plans were created with TRiP98. From these treatment plans, the reference β{sup +}-activity distributions were calculated using a Monte Carlo simulation. Setup errors were simulated by shifting or rotating the computed tomography (CT). The expected β{sup +} activity was calculated for each plan with shifts. Finally, the reference particle therapy PET images were compared to the “shifted” β{sup +}-activity distribution simulations using the Pearson's correlation coefficient (PCC). To account for different PET monitoring options the inbeam PET was compared to three different inroom scenarios. Additionally, the dosimetric effects of the CT misalignments were investigated. Results: The automated PCC detection of patient mispositioning was possible in the investigated indications for cranio-caudal shifts of 4 mm and more, except for prostate tumors. In the rather homogeneous pelvic region, the generated β{sup +}-activity distribution of the reference and compared PET image were too much alike. Thus, setup errors in this region could not be detected. Regarding lung lesions the detection strongly depended on the exact tumor location: in the center of the lung tumor misalignments could be detected down to 2 mm shifts while resolving shifts of tumors close to the thoracic wall was more challenging. Rotational shifts in the H and N and lung region of +6° and more could be detected using inroom PET and partly using inbeam PET. Comparing inroom PET to inbeam PET no obvious trend was found. However, among the inroom scenarios a longer measurement time was found to be advantageous. Conclusions: This study scopes the use of various particle therapy PET verification techniques in four indications. The automated detection of patients' setup errors was investigated in a broad accumulation of data sets. The evaluation of introduced setup errors is performed automatically, which is of utmost importance to introduce highly required particle therapy monitoring devices into the clinical routine.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Feasibility study of a compact heavy ion source for investigation of laboratory magnetospheric plasma

We are developing a laser ion source to provide a high brightness multi-charged heavy ion beam as a part of the heavy ion beam probe system, which will be used to diagnose plasma potential in the Ring Trap 1 device at the University of Tokyo. As a probe beam, Nb2+ was selected, and a detailed laser irradiation condition was explored. It was found that the laser power density of 1.2 × 109 W/cm2 gives the maximum particle number of Nb2+ per laser energy from a niobium foil target. Essential ablation plasma parameters to design the laser ion source were also obtained. The expected beam current was more than 12 mA/cm2, with a pulse width of 3.1 µs at 200 mm away from the target.

Nakamura, K. (ORCID:0000000176882589)↗

Ultrasonic Nakagami-parameter characterization of parotid-gland injury following head-and-neck radiotherapy: A feasibility study of late toxicity

Purpose: The study aims to investigate whether Nakagami parameters—estimated from the statistical distribution of the backscattered ultrasound radio-frequency (RF) signals—could provide a means for quantitative characterization of parotid-gland injury resulting from head-and-neck radiotherapy. Methods: A preliminary clinical study was conducted with 12 postradiotherapy patients and 12 healthy volunteers. Each participant underwent one ultrasound study in which ultrasound scans were performed in the longitudinal, i.e., vertical orientation on the bilateral parotids. For the 12 patients, the mean radiation dose to the parotid glands was 37.7 ± 9.5 Gy, and the mean follow-up time was 16.3 ± 4.8 months. All enrolled patients experienced grade 1 or 2 late salivary-gland toxicity (RTOG/EORTC morbidity scale). The normal parotid glands served as the control group. The Nakagami-scaling and Nakagami-shape parameters were computed from the RF data to quantify radiation-induced parotid-gland changes. Results: Significant differences in Nakagami parameters were observed between the normal and postradiotherapy parotid glands. Compared with the control group, the Nakagami-scaling parameter of the postradiotherapy group decreased by 25.8% (p < 0.001), and the Nakagami-shape parameter decreased by 31.3% (p < 0.001). The area under the receiver operating characteristic curve was 0.85 for the Nakagami-scaling parameter and was 0.95 for the Nakagami-shape parameter, which further demonstrated the diagnostic efficiency of the Nakagami parameters. Conclusions: Nakagami parameters could be used to quantitatively measure parotid-gland injury following head-and-neck radiotherapy. Moreover, the clinical feasibility was demonstrated and this study provides meaningful preliminary data for future clinical investigation.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Feasibility study to use neutron capture for an ultralow energy nuclear-recoil calibration in liquid xenon

The feasibility of an ultra-low energy nuclear-recoil measurement in liquid xenon using neutron capture is investigated for a small (sub-kilogram) liquid xenon detector that is optimized for a high scintillation gain, and a pulsed neutron source. Further, the measurement uses the recoil energies imparted to xenon nuclei during the de-excitation process following neutron capture, where promptly emitted γ cascades can provide the nuclei with up to 0.3 keV nr of recoil energy due to conservation of momentum. A successful calibration of scintillation photon and ionization electron yields below this energy will contribute to a greater sensitivity for liquid xenon experiments in searches for light WIMPs.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Feasibility Study for Battle Mountain Renewable Energy Park

The Feasibility Study for the Battle Mountain Renewable Energy Park project (“Feasibility Study”) will assess the feasibility, benefits and impacts of a 5 Mega Watt (MW) solar photovoltaic (PV) generating system (the “Solar Project” or “Energy Park”) on the Te-Moak Tribe of Western Shoshone Indians of Nevada Battle Mountain Colony in Battle Mountain, Nevada (NV). The Energy Park will provide power for export to utility off-takers and job training and employment for Tribal members and revenue for the Tribe. This Feasibility Study will be a collaborative effort between the Tribal government, consultants, Tribal members and stakeholders and will allow the Tribe to make informed decisions regarding the Solar Project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Net-zero Microgrid Program Report: Microrred de la Montaña Feasibility Study (Executive Summary Extended)

This feasibility study provides the technical and economic rationale for the Microrred de la Montaña as a viable solution for supplying reliable and resilient electricity to an underserved region in Puerto Rico – a region that is the first to be disconnected from the grid and the last to be restored, enduring months long outages. It begins the process of the development of the microgrid through conceptual design, engineering, detailed electrical design, implementation, and operation. The Microrred de la Montaña is organized under the governance of the Cooperativa Hidroeléctrica de la Montaña (Cooperativa) which has legal status as a cooperative and power provider under the laws of Puerto Rico. The members are the municipalities of Adjuntas, Jayuya, Lares and Utuado with a combined population of 90,000. These municipalities are in central Puerto Rico – a mountainous region that is extremely vulnerable to weather events and excessive, long-duration power outages and are among the poorest and most disadvantaged regions in Puerto Rico. Funding from external sources is necessary to acquire the resources for a resilient power delivery system. Regulatory support is necessary to establish operational relationships with the incumbent power providers. The Microrred de la Montaña is envisioned as a resilient microgrid that manages distributed energy resources – local solar, storage, and hydroelectricity over an upgraded distribution network within the boundaries of four municipalities. This feasibility study provides the results of an extensive techno-economic analysis to form a sound basis for decision-making by community leaders, their constituents, funding and investment agencies, and regulators to realize the benefits that are achievable by fully implementing the design and planning recommended for the Microrred de la Montaña.

13 HYDRO ENERGY↗

Ion-optical and Associated Magnet Feasibility Study of a High Rigidity Spectrometer

Ion-optical and magnet-feasibility studies were performed for the High Rigidity Spectrometer (HRS) at the Facility for Rare Isotope Beam (FRIB). The High Rigidity Spectrometer (HRS) will be the centerpiece experimental tool of the Facility for Rare-Isotope Beams (FRIB) fast-beam program The high magnetic rigidity of the HRS (8 Tm) will match the rigidities at which rare-isotope production yields at the FRIB fragment separator are maximum across the entire chart of nuclei and enable experiments with the most neutron-rich nuclei available at FRIB. Gain factors in luminosity of up to two orders of magnitude are achievable compared to running with existing spectrometers, which have a maximum rigidity of 4 Tm. The ion-optical studies were performed to ensure that the layout and properties meet the requirements for the scientific program envisioned for and articulated by the FRIB user community. Based on the ion-optical studies, magnet-feasibility studies were carried out to ensure that the magnets required for the HRS meet these requirements and can be constructed. The results of the ion-optical and magnet-feasibility studies form the basis of the pre-conceptual design for the HRS.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

PUEBLO OF ZIA RENEWABLE ENERGY DEVELOPMENT FEASIBILITY STUDY

The Pueblo of Zia will conduct a comprehensive feasibility study for best-use application(s) for development of renewable energy resources on its tribally held TRUST lands (i.e., Trust Lands of Zia Indian Reservation). The feasibility study is essential for determining the technical and economic viability of a future renewable project(s) on Zia tribal lands, including the potential economic and environmental benefits for the Tribe. Project Objectives: The feasibility study is essential for determining the technical and economic viability of future renewable project(s) on Zia tribal lands, including the potential economic and environmental benefits for the Tribe to: 1. Provide a balanced local renewable power supply for Zia Pueblo, its members, tribal offices, schools and buildings, and businesses on tribal lands 2. Provide a firm power supply for export and commercial market distribution 3. Provide economic development for the Tribe and its members, including job training and creation, each in accordance with the goals and objectives as conveyed by the Pueblo of Zia Tribal Council, Tribal Administration, and outlined in The Pueblo of Zia Comprehensive Plan and Pueblo of Zia — Zia Enterprise Zone Master Plan. A key goal of the study is to analyze the integrated development of solar, geothermal, and wind renewable energy resources at Zia Pueblo, with added potential to combine gas-fired generation to accomplish energy firming. Geothermal offers a base load source of energy, providing power continuously for end users. Wind and solar offer intermediate and peaking sources of energy, which can be harvested throughout the day, with periods of variable but predicable output. Variability will be managed in an integrated manner, using Zia Pueblo's combined renewable resources to generate high-quality power. Tasks are intended to collect, catalog, map, and analyze existing data on Zia Pueblo's renewable energy resource base and then match resource attributes with the most suitable renewable technologies for tribal energy consumption and needs. Also, key impacts on cultural and social values of Zia Pueblo will be addressed. Selected most favorable uses and technologies will be further investigated to determine initial feasibility and market for business development for up to six sites located on tribal land. The anticipated result will be the recommended development of sites that have sufficient background study completed to warrant a business plan, detailed engineering feasibility, and acquisition of project financing. Valuable technical and economic information will accrue from this study that may be applied to scale up or down the various power technology potential on Zia Pueblo for maximum benefit and best area(s) of application, project phasing and potential for future replicability and expansion.

14 SOLAR ENERGY↗

Nebraska Integrated Carbon Capture and Storage Pre-Feasibility Study

In collaboration with the Nebraska Public Power District (NPPD), the Energy & Environmental Research Center (EERC) has conducted a pre-feasibility study for a commercial-scale carbon dioxide (CO 2 ) geologic storage complex in western Nebraska integrated with potential CO 2 capture at Gerald Gentleman Station (GGS). GGS is the largest coal-fired electricity-generating station in Nebraska, emitting 8.5 million metric tons (Mt) of CO 2 annually, and is located near the town of Sutherland. This pre-feasibility (Phase 1) project has been executed as part of the U.S. Department of Energy (DOE) CarbonSAFE program, a multiphase initiative to support the deployment of large-scale carbon capture and storage (CCS) projects. Each CarbonSAFE project is required to demonstrate the potential to capture and store at least 50 million tonnes (Mt) of CO 2 over a 25-year operational period. The EERC and NPPD established a coordination team to identify challenges to a potential Nebraska CCS project, comprising local stakeholder organizations, which met twice in Lincoln and via several Webinars, providing feedback and guidance throughout the pre-feasibility study. The EERC also secured the technical support of Schlumberger Carbon Services and Computer Modelling Group Ltd. (CMG). The project comprised four technical themes, all using published information sources. Regional and stakeholder analysis, including identification of sensitive environmental areas, potential resource conflicts, and strategies for public outreach. A review of geographic and socioeconomic characteristics, in combination with geologic characterization in the subbasinal analysis described below, identified an area to the southwest and within a 75-mile radius of GGS as the most prospective for development of a storage site. This area largely avoided lands with protected status such as wetlands. A public outreach plan has also been developed for implementation in any further phases of CCS assessment in western Nebraska, for example a CarbonSAFE Phase 2 feasibility study. Scenario analysis, addressing economic and regulatory factors. GGS is the only single major source of CO 2 emissions capable of satisfying the CarbonSAFE 50-Mt scale requirement within the study region. Chemical absorption using amines was identified as the most viable technology for postcombustion CO 2 capture at GGS. The total cost of a CCS project at GGS was estimated to be between $67/tonne CO 2 for capture and auxiliary boiler to minimize parasitic load and $70/tonne CO 2 avoided cost, using the Carnegie-Mellon University Integrated Environmental Control Model (IECM). The total avoided cost included the capture facility and parasitic load, a flue gas desulfurization plant required for the use of amine solvent technology, transport via pipeline, and dedicated storage infrastructure. Nebraska has no legislation in place to address typical CCS-specific issues, for example pore space ownership for storage. Long-term liability, therefore, falls under the U.S. Environmental Protection Agency Underground Injection Control (UIC) Class 6 program regulations. Subbasinal analysis, addressing the potential for a dedicated subsurface “container” to store the required 50-Mt quantity of CO 2 . Modeling and simulation studies identified an area to the southwest of GGS with the potential for storage of 50 Mt CO 2 in the Cloverly Formation, comprising sandstones with interbedded and intermingled shales. The area of review (AOR) that would be required for monitoring under a Class VI operating permit was estimated to be as high as 400–700 square miles, due to uncertain pressure effects. The viability of this storage option is subject to significant uncertainty due to the relatively limited amount of existing characterization data available to the pre-feasibility study; for example, dynamic simulation indicated that the proposed storage rate might require as little as two or as many as 14 injection wells. A key uncertainty is the relative proportion and distribution of sandstone and shale within the Cloverly Formation. A preliminary, semiquantitative risk assessment also suggested uncertainty over storage capacity and injectivity constitute the most significant project risks at this pre-feasibility stage. No assessed risks were considered to rule out the possibility of a project moving to deployment. National Risk Assessment Partnership (NRAP) validation, using software tools developed by the National Energy Technology Laboratory (NETL) to assess risks associated with the potential 50-Mt CO 2 storage complex. NRAP tools were used to assess hypothetical leakage scenarios. Results broadly supported the conclusion of the semiquantitative risk analysis – for example, even worst-case analysis of theoretical leakage scenarios found limited migration rates and impacts. In summary, the work undertaken in this Phase 1 pre-feasibility study has shown that western Nebraska has potential to host a commercial-scale CCS project, including a dedicated storage “container” for 50 Mt of CO 2 . However, the following key challenges would need to be overcome: The business case for deploying CCS projects is uncertain; recently announced federal tax credits and sales of CO 2 for enhanced oil recovery may not cover the full costs of a CCS project at GGS, as estimated by this pre-feasibility study. The potential 50-Mt CO 2 dedicated storage container defined in this pre-feasibility study should be regarded as having a relatively low level of readiness to support a CCS project. Public outreach would be a vital element in western Nebraska, where sensitivities around such environmental issues as water resource protection and pipeline construction would need to be carefully addressed.

54 ENVIRONMENTAL SCIENCES↗

SU-E-T-267: Proton Pencil Beam Scanning for Mediastinal Lymphoma: 4-Dimensional Feasibility Study

Purpose: To assess the feasibility of proton pencil beam scanning (PBS) for the treatment of mediastinal lymphoma. Methods: A group of 6 patients were planned using an anterior field with PBS. Spots with ∼5 mm σ were used for all patients, while large spots (∼10 mm σ) were employed for patients with motion perpendicular to the beam (≥5 mm). We considered volumetric repainting such that, in each fraction, the same field would be delivered twice. Four-dimensional dose was calculated on initial and verification 4-dimensional computed tomography (4D-CT) scans (2—3) based on respiratory trace and beam delivery sequence. This was implemented by binning the spots into separate plans on each 4D-CT phase respectively. Four starting phases were sampled for each painting and 4 energy switching times (0.5 s, 1 s, 3 s, and 5 s) were tested, resulting in 2560 dose distributions for the cohort. Plan robustness was measured for target and critical structures in terms of the percentage difference between delivered dose and planned dose. Results: For 5 of the 6 patients, the ITV (internal target volume) D 98% was degraded by <3% (standard deviations ∼ 0.1%) when averaged over the whole course (up to 5% per fraction). Deviations of mean lung dose, heart maximum dose, and cord maximum dose were within 5% of prescribed dose. For one patient with motion perpendicular to the beam (up to 5 mm), the degradation of ITV D 98% was 9% over the whole course (12% per fraction), which was mitigated to 1% (3% per fraction) by employing large spots and repainting. No significant difference in coverage was observed for different energy switching times. Conclusion: This feasibility study demonstrates that, for mediastinal lymphoma, the PBS plan robustness can be maintained during delivery when target motion is measured and volumetric repainting and/or large spots are employed. This work was supported by Ion Beam Application.

60 APPLIED LIFE SCIENCES↗

Ute Mountain Ute Tribe Community-Scale Solar Feasibility Study

Parametrix Inc. conducted a feasibility study for the Ute Mountain Ute Tribe to determine whether or not a community-scale solar farm would be feasible for the community. The important part of the study was to find where the best fit for the solar farm could be In the end, a 3MW community-scale solar farm was found best fit with the location of two hayfield sites.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Washoe Tribe Alternative Energy Feasibility Study Final Report

The Washoe Tribe of Nevada and California was awarded funding to complete the Washoe Tribe Alternative Energy Feasibility Study project. The main goal of the project was to complete an alternative energy feasibility study. This study was completed to evaluate “the potential for development of a variety of renewable energy projects and to conduct an alternative energy feasibility study that determines which alternative energy resources have the greatest economic opportunity for the Tribe, while respecting cultural and environmental values” (Baker-Tilly, 2014). The study concluded that distributed generation solar projects are the best option for renewable energy development and asset ownership for the Washoe Tribe. Concentrating solar projects, utility scale wind projects, geothermal, and biomass resource projects were also evaluated during the study and it was determined that these alternatives would not be feasible at this time.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Is Clean Hydrogen Production a Good Fit for Questa? Intermediate Feasibility Study Results

NREL conducted a feasibility study for a clean hydrogen production facility that would be located in Questa, New Mexico. This slide deck presents the history of the coalition of stakeholders that received NREL technical assistance through the Department of Energy's Communities Leading Energy Action Program. It describes how hydrogen is generated and its end uses. It describes two conceptual applications explored in the feasibility analysis, a grid-tied power generation and long-term storage application and a heavy-duty vehicle fueling application. The presentation details the configuration of these to applications in the Questa pilot facility, including system components, required inputs (water, electricity, and land for pv generation), and outputs in kilograms of hydrogen, megawatt hours of power delivered, and hours of vehicle hours of operation. The presentation addresses key concerns raised by groups engaged through a public outreach process, including safety, health, and environmental issues; water use; visual impacts; and costs and alternatives.

heavy-duty vehicle fueling↗