Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FERMILAB ACCELERATOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A Cost-Effective Upgrade Path for the Fermilab Accelerator Complex

The Fermilab Proton Improvement Plan II, or PIP-II, would enable the world's most intense high-energy neutrino beam and would help scientists search for rare particle physics processes. The PIP-II goal is to deliver 1.2 MW of proton beam power from the Fermilab Main Injector, over the energy range 60 - 120 GeV, at the start of operation of the LBNF/DUNE program. PIP-II provides a variety of upgrade paths to higher beam power from the Main Injector, as demanded by the neutrino science program and as recommended by the 2014 P5 report. Delivering more than 2 MW to the LBNF target in the future will require a replacement of the existing Booster. This report outlines a cost-effective Booster replacement option and an upgrade path for the Fermilab Accelerator Complex to attain 2.4-MW beam power on the LBNF target, as well as to retain the capability to provide 8-GeV proton beams to the existing Fermilab Muon Campus via the existing Recycler ring. Its cost-effectiveness is achieved by: (1) using a small-diameter metallic vacuum chamber in the Booster replacement and (2) reusing the existing Recycler ring. Reusing the Recycler ring may be of particular advantage since it is presently employed to deliver 8-GeV beams to the Muon Campus experiments. The present concept also retains such a capability.

43 PARTICLE ACCELERATORS↗

Fermilab's controls development with virtual accelerator

Control Systems development is often the last thing considered when designing and building new equipment, e.g. a new detector or superconducting RF LINAC; however when the new equipment is installed, it is the first thing desired to be operational for testing. Due to frequent delays in building new equipment and project deadlines, control system development and testing is often curtailed. A way to alleviate this problem is to simulate the control system, though this will be challenging for complex systems.The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC for the remainder of the existing accelerator complex. The new LINAC consists of a warm front end (WFE), 23 superconducting RF cryomodules (of 5 types), and a beam transfer line (BTL) to the existing complex.The accelerator physics group has a parallel project to create a digital twin (DT) of the PIP-II accelerator. We have coupled the EPICS controls to this DT and are developing both the DT and EPICS software in parallel. This will allow us to develop the EPICS software framework, the HMIs, sequences, high level physics applications, and other services for use in a fully functional control system.This presentation will detail the work that we have performed to date and show demonstrations of controlling and monitoring the status of the accelerator, as well as future plans for this work.

Hanlet, Pierrick [Fermilab]↗

Experience with crystals at Fermilab accelerators

Crystals were used at Fermilab accelerators for slow extraction and halo collimation in the Tevatron collider, and for channeling radiation generation experiments at the FAST electron linac facility. In this paper we overview past experience and major outcomes of these studies and discuss opportunities for new crystal acceleration R&D program.

43 PARTICLE ACCELERATORS↗

Beam Position Monitor and Energy Analysis at the Fermilab Accelerator Science and Technology Facility

Fermilab Accelerator Science and Technology Facility has produced its first beam with an energy of 20 MeV. This energy is obtained by the acceleration at the Electron Gun and the Capture Cavity 2 (CC2). When fully completed, the accelerator will consist of a photoinjector, one International Liner Collider (ILC)-type cryomodule, multiple accelerator R&D beamlines, and a downstream beamline to inject 300 MeV electrons into the Integrable Optics Test Accelerator (IOTA). We calculated the total energy of the beam and the corresponding energy to the Electron Gun and CC2. Subsequently, a Beam Position Monitors (BPM) error analysis was done, to calculate the device actual resolution.

43 PARTICLE ACCELERATORS↗

Fermilab Accelerator Complex: Status and Improvement Plans

Fermilab carries out an extensive program of accelerator-based high-energy particle physics research, which relies on 8 GeV and 120 GeV proton accelerators. Routine operations with 700 kW, 120 GeV proton beam power on a neutrino target was achieved in 2017. There are plans to further increase the beam power to the 900 kW range. The next major upgrade of the Fermilab accelerator complex, the PIP-II project, is under development. Its goal is to deliver 1.2 MW of beam power on target at the start of the DUNE experiment in the middle of the next decade. PIP-II will replace the existing 40-year old 400 MeV normal-conducting Linac with a modern 800 MeV superconducting RF based linear accelerator. There are several concepts for future upgrades that will increase the beam power to >2.4 MW, after replacement of the existing 8 GeV Booster synchrotron. The Muon Campus provides 3.1 GeV polarized muons to the g-2 experiment and will provide 8 kW of 8 GeV protons to the Mu2e production target. The Fermilab Test Beam Facility provides a primary 120 GeV proton beam of moderate intensity, (1-300 kHz) and secondary particle beams of energies down to about 1 GeV, consisting of hadrons, muons and/or electrons/photons for detectors tests. In this article we discuss the current performance of the Fermilab accelerator complex, the upgrade plans for the next two decades, and the accelerator R&D program to address cost and performance risks for these upgrades.

43 PARTICLE ACCELERATORS↗

AI-Ready Control System for the Fermilab Accelerator Complex

Reliable, high-intensity operation of the Fermilab Accelerator Complex is critical to the success of the Long-Baseline Neutrino Facility and Deep Underground Neutrino Experiment. We describe the requirements and infrastructure necessary to support routine use of artificial intelligence and machine learning (AI/ML) in the accelerator control system. Three capabilities are identified: a machine learning operations (MLOps) framework standardizing the lifecycle of AI/ML automation from data management through deployment and monitoring; a data quality framework defining and enforcing standards required to build trustworthy AI/ML applications; and workflow integration with large language models to assist physicists, engineers, and operators with information retrieval, code development, and routine analysis. Use cases spanning beam diagnostics, beam control, and support system automation illustrate the technical requirements across the complex.

43 PARTICLE ACCELERATORS↗

Recent Progress in High Intensity Operation of the Fermilab Accelerator Complex

We report on the status of the Fermilab accelerator com-plex. Beam delivery to the neutrino experiments surpassed our goals for the past year. The Proton Improvement Plan is well underway with successful 15 Hz beam operation. Beam power of 700 kW to the NOvA experiment was demonstrated and will be routine in the next year. We are also preparing the Muon Campus to commission beam to the g-2 experiment.

43 PARTICLE ACCELERATORS↗

The Fermilab Accelerator Division Electronic Logbook (ADEL) at 10 Years

The current Fermilab Accelerator Division (AD) Electronic Logbook (ADEL) wasfirst released in 2013. It’s creation a decade ago represented a markedimprovement over the previous electronic logbook (eLog) and brought about the first consolidated Fermilab AD eLog built upon a relational database. Over the past ten years, ADEL has performed admirably, logging nearly one million user entered entries, comments and files, undergoing a revision and adding many additional features. However, as the work of Fermilab has changed, so has theuse of ADEL, some of which it had not been designed for.

43 PARTICLE ACCELERATORS↗

The Machine Protection System for the Fermilab Accelerator Science and Technology Facility

The Machine Protection System (MPS) for the Fermilab Accelerator Science and Technology Facility (FAST) has been implemented and tested. The system receives signals from several subsystems and devices which conveys the relevant status needed to the safely operate the accelerator. Logic decisions are made based on these inputs and some predefined user settings which in turn controls the gate signal to the laser of the photo injector. The inputs of the system have a wide variety of signal types, encoding methods and urgencies for which the system is designed to accommodate. The MPS receives fast shutdown (FSD) signals generated by the beam loss system and inhibits the beam or reduces the beam intensity within a macropulse when the beam losses at several places along the accelerator beam line are higher than acceptable values. TTL or relay contact signals from the vacuum system, toroids, magnet systems etc., are chosen with polarities that ensure safe operation of the accelerator from unintended events such as cable disconnection in the harsh industrial environment of the experimental hall. A RS422 serial communication scheme is used to interface the operation permit generator module and a large number of movable devices each reporting multi-bit status. The system also supports operations at user defined lower beam levels for system conunissioning. The machine protection system is implemented with two commercially available off-the-shelf VMEbus based modules with on board FPGA devices. The system is monitored and controlled via the VMEbus by a single board CPU

Wu, Jinyuan↗

High brightness gamma-ray production at Fermilab Accelerator Science and Technology (FAST) facility

Electron beams with energies of the order of a few 100's of MeV and low transverse emittance, in combination with powerful infrared lasers, allow for the production of high quality gamma rays through Inverse Compton Scattering (ICS). At Fermilab Accelerator Science and Technology (FAST) facility, a 300 MeV beam will be used to generate gamma rays with maximum photon energies of up to ~1.5 MeV and brightness of the order of 10 21 photons/[s-(mm-mrad) 2- 0.1%BW]. Due to the low electron-beam transverse emittance, the relative bandwidth of the scattered radiation is expected to be ≤ 1%. A key challenge toward the production of high radiation dose and brightness is to enhance the energy of the infrared 3 ps laser pulses to the joule level. Finally, in this contribution, we present the plans for the experimental setup, along with comprehensive numerical simulations of the ICS process.

43 PARTICLE ACCELERATORS↗

Simulation of Cascaded Longitudinal-Space-Charge Amplifier at the Fermilab Accelerator Science & Technology (Fast) Facility

Cascaded Longitudinal Space Charge Amplifiers (LSCA) have been proposed as a mechanism to generate density modulation over a board spectral range. The scheme has been recently demonstrated in the optical regime and has confirmed the production of broadband optical radiation. In this paper we investigate, via numerical simulations, the performance of a cascaded LSCA beamline at the Fermilab Accelerator Science & Technology (FAST) facility to produce broadband ultraviolet radiation. Our studies are carried out using elegant with included tree-based grid-less space charge algorithm.

43 PARTICLE ACCELERATORS↗

An Upgrade Path for the Fermilab Accelerator Complex

The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac that can be used for lower-energy particle physics experiments as well, such as directing beam toward the Muon Campus at Fermilab for example. Any further significant upgrade of the beam power to DUNE, however, will be impeded by the limitations of the present Booster synchrotron at the facility. To increase the power to DUNE by a factor of two would require a new accelerator arrangement to feed the Main Injector that does not include the Booster. In what follows, a path toward upgrading the Fermilab accelerator complex to bring the beam power for DUNE to 2.4 MW is presented, using a new rapid-cycling synchrotron plus an energy upgrade to the PIP-II linac. The path includes the ability to instigate a new lower-energy, very high-power beam delivery system for experiments that can address much of the science program presented by the Booster Replacement Science Working Group. It also allows for the future possibility to go beyond 2.4 MW up to roughly 4 MW from the Main Injector.

43 PARTICLE ACCELERATORS↗

FERMILAB ACCELERATOR R&D PROGRAM TOWARDS INTENSITY FRONTIER ACCELERATORS : STATUS AND PROGRESS

The 2014 P5 report indicated the accelerator-based neutrino and rare decay physics research as a centrepiece of the US domestic HEP program at Fermilab. Operation, upgrade and development of the accelerators for the near- term and longer-term particle physics program at the Intensity Frontier face formidable challenges. Here we discuss key elements of the accelerator physics and technology R&D program toward future multi-MW proton accelerators and present its status and progress. INTENSITY FRONTIER ACCELERATORS

43 PARTICLE ACCELERATORS↗

European Contributions to Fermilab Accelerator Upgrades and Facilities for the DUNE Experiment

The Proton Improvement Plan (PIP-II) to the FNAL accelerator chain and the Long-Baseline Neutrino Facility (LBNF) will provide the world's most intense neutrino beam to the Deep Underground Neutrino Experiment (DUNE) enabling a wide-ranging physics program. This document outlines the significant contributions made by European national laboratories and institutes towards realizing the first phase of the project with a 1.2 MW neutrino beam. Construction of this first phase is well underway. For DUNE Phase II, this will be closely followed by an upgrade of the beam power to > 2 MW, for which the European groups again have a key role and which will require the continued support of the European community for machine aspects of neutrino physics. Beyond the neutrino beam aspects, LBNF is also responsible for providing unique infrastructure to install and operate the DUNE neutrino detectors at FNAL and at the Sanford Underground Research Facility (SURF). The cryostats for the first two Liquid Argon Time Projection Chamber detector modules at SURF, a contribution of CERN to LBNF, are central to the success of the ongoing execution of DUNE Phase I. Likewise, successful and timely procurement of cryostats for two additional detector modules at SURF will be critical to the success of DUNE Phase II and the overall physics program. The DUNE Collaboration is submitting four main contributions to the 2026 Update of the European Strategy for Particle Physics process. This paper is being submitted to the 'Accelerator technologies' and 'Projects and Large Experiments' streams. Additional inputs related to the DUNE science program, DUNE detector technologies and R&D, and DUNE software and computing, are also being submitted to other streams.

43 PARTICLE ACCELERATORS↗