Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FERMILAB”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

The Measurement of the Anomalous Magnetic Moment of the Muon at Fermilab

The anomalous magnetic moment of the muon is one of the most precisely measured quantities in experimental particle physics. Its latest measurement at Brookhaven National Laboratory deviates from the Standard Model expectation by approximately 3.5 standard deviations. The goal of the new experiment, E989, now under construction at Fermilab, is a fourfold improvement in precision. Here in this article, we discuss the details of the future measurement and its current status.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Upgrading Fermilab’s accelerator control system with ACORN

The Fermilab Accelerator Complex is the largest national user facility in the Office of High Energy Physics (DOE/HEP) program and the only national user facility operating at Fermilab. Fermilab serves as the host to the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE), the laboratory’s flagship project for neutrino science that is under construction. LBNF/DUNE will be powered by megawatt beams from an upgraded accelerator, the Proton Improvement Plan II (PIP-II) that will replace the laboratory’s aging linear accelerator with a new one based on superconducting radio-frequency cavities. The Accelerator Controls Operations Research Network (ACORN) Project will support LBNF/DUNE and PIP-II by modernizing the accelerator control system. The project is at the conceptual design phase and looking to achieve Critical Decision 1 (CD-1) later this year. The scope and structure of the project will be presented, along with an overview of how that has changed in the past year. Current design and technology choices will be shared. Specific challenges facing the project will be addressed, along with current thinking on solutions.

Roehrig, Christian [Fermilab]↗

Experimental longitudinal emittance manipulation using laser-based photoionization in the Fermilab Linac

A series of simulations and beam studies were conducted at Fermilab’s linear accelerator to evaluate the effectiveness of longitudinal emittance control via laser-induced photoionization. While similar laser techniques have been employed at Fermilab to enhance injection and extraction efficiency into the Booster, the work presented here focuses on extending these methods to bunch-by-bunch manipulation. This approach utilizes fine-scale correction of the H- bunches’ longitudinal spatial distribution. In theory, loosely confined particles in longitudinal phase space contribute to emittance growth during acceleration. By selectively removing these outlying particles through laser scraping (H- + γ → H + e-), this growth can be reduced. This report presents experimental results from both symmetric and asymmetric longitudinal scraping of H⁻ bunches in the Fermilab linac, which were subsequently injected into Booster, and evaluates the broader applicability of this method for future high-intensity accelerator operations.

Landon, Parker [Boston U.; Fermilab]↗

Pre-commissioning of the wide-dynamic range halo monitor to be installed in the Fermilab MI-8 line

The beam halo can contribute to beam losses in accelerators and is very difficult to measure. With an increase in beam intensity following the PIP-II upgrade at Fermilab, the beam losses are expected to be higher with some coming from beam halo. Therefore, it is important to measure the sources of beam halo to minimize the beam losses. A modified Halo Monitor developed by J-PARC will be installed in Fermilab MI-8 transfer line to measure the beam halo. In this paper, an update on the beam profile monitor fabrication is covered. The updates include the location selection for the Halo Monitor in the MI-8 transfer line, shielding options for instrumentation, initial testing of equipment, and ray tracing simulations for the Offner optics and the targets used in the monitor.

Babacan, Betiay [IIT, Chicago; Fermilab]↗

Fermilab's controls development with virtual accelerator

Control Systems development is often the last thing considered when designing and building new equipment, e.g. a new detector or superconducting RF LINAC; however when the new equipment is installed, it is the first thing desired to be operational for testing. Due to frequent delays in building new equipment and project deadlines, control system development and testing is often curtailed. A way to alleviate this problem is to simulate the control system, though this will be challenging for complex systems.The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC for the remainder of the existing accelerator complex. The new LINAC consists of a warm front end (WFE), 23 superconducting RF cryomodules (of 5 types), and a beam transfer line (BTL) to the existing complex.The accelerator physics group has a parallel project to create a digital twin (DT) of the PIP-II accelerator. We have coupled the EPICS controls to this DT and are developing both the DT and EPICS software in parallel. This will allow us to develop the EPICS software framework, the HMIs, sequences, high level physics applications, and other services for use in a fully functional control system.This presentation will detail the work that we have performed to date and show demonstrations of controlling and monitoring the status of the accelerator, as well as future plans for this work.

Hanlet, Pierrick [Fermilab]↗

Modern control system applications at Fermilab with Dart and Flutter

The control system at Fermilab is undergoing an unprecedented modernization effort. Hundreds of legacy applications originally developed with technology from the early nineties will be replaced with a suite of modern web applications. The selection of an user interface framework is a key technology decision that will impact on all the applications developed over the next decade. The Controls department at Fermilab has decided to use Google’s Dart language and Flutter framework for future application development. In this paper we will discuss the decision process that selected Dart/Flutter and the development of early general purpose control system applications with the framework.

Diamond, John [Fermilab]↗

Surrogate model for third-integer resonance extraction at the Fermilab Delivery Ring

We present an ongoing work in which a surrogate model is being developed to reproduce the response dynamics of the third-integer resonant extraction process in the Delivery Ring (DR) at Fermilab. This is in pursuit of smoothly extracting circulating beam to the Mu2e Experiment’s production target, whereby the goal is to extract a uniform slice of the circulating 1e12 protons in the DR over 25,000 turns (43 ms). The DR contains 3 harmonic sextupoles that excite a third-integer resonance and three fast, tune-ramping quadrupole magnets that drive the horizontal tune towards the 29/3 resonance. In our initial work, the surrogate model trains on a semi-analytical simulation provided in the same format as live data. Using Reinforcement Learning (and other potential ML methods), the trained surrogate acts as the “environment” in which a simple ML control agent could learn to dynamically adjust the quadrupole ramp at 430 break points within the 43 microsecond spill window. The controller will be hosted on a dedicated Arria 10 FPGA. In this work, we report the accuracy and fidelity of the surrogate model in comparison to the response dynamics of the physics simulator.

Narayanan, Aakaash [Fermilab]↗

APOLLO: a facility-scale differentiable virtual accelerator at Fermilab FAST/IOTA

As the design complexity of modern accelerators grows, there is more interest in using advanced simulations that have fast execution time or yield additional insights like gradients. The FAST/IOTA facility has been working on implementing and experimentally validating an end-to-end digital twin that is both fast and gradient-aware, allowing for rapid prototyping of new software and experiments with minimal beam time costs. Our framework integrates physics and ML codes for linac and ring simulation through a set of generic interfaces between surrogate and physics-based sections. To reproduce device inputs and outputs, system state is exposed as a deterministic event loop in a specialized discrete event simulator architecture. Because Fermilab is undergoing control system transition, several APIs were implemented as final user interfaces - a fully asynchronous EPICS soft IOC, a gRPC-based Data Pool Manager (DPM), and legacy ACNET protocols. We discuss implementation details as well as challenges handling live data assimilation and future plans to extend modelling to main complex proton accelerators like PIPII and Booster.

Kuklev, Nikita [Fermilab]↗

The Mu2e Experiment at Fermilab: A Search for Lepton Flavor Violation

The Mu2e experiment at Fermilab will search for the charged lepton flavor violating process of neutrino-less μ → e coherent conversion in the field of an aluminum nucleus. About 7⋅1017 muons, provided by a dedicated muon beam line in construction at Fermilab, will be stopped in 3 years in the aluminum target. The corresponding single event sensitivity will be 2.5⋅10−17. In this presentation, a brief overview of the physics explored by the μ → e conversion will be given, followed by a description of the Mu2e experimental apparatus and the expected detector performance.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Fermilab PIP-II machine protection system digitized data noise elimination scheme and its FPGA implementation

In Fermilab's PIP-II machine protection system, beam loss signals from various detectors are digitized at 125 MS/s. Noise from both high-frequency sources and low-frequency 60 Hz AC power equipment can contaminate the data. To suppress noise across these ranges—especially 60 Hz and its harmonics, which overlap with beam loss signal frequencies—advanced digital processing beyond standard filtering is required. Several real-time functional blocks were simulated and tested on an FPGA: (1) a dual time-constant discharging integrator filter, (2) a de-ripple baseline extraction and storage block, and (3) a fast-recovery discharging integrator. The nonlinear IIR integrator filter removes high-frequency noise and feeds into the baseline extractor. Upon detecting abrupt beam loss, it switches to a longer time constant to prevent baseline distortion. The de-ripple block calculates a valid baseline by averaging over multiple 60 Hz periods, storing results in a 4096-word FPGA RAM. This baseline is subtracted from raw data before integration by the fast-recovery block, which resets quickly after use. All blocks achieved expected performance and were successfully implemented on a low-cost FPGA.

Wu, Jinyuan [Fermilab]↗

The calorimeter system of the new muon g -2 experiment at Fermilab

The electromagnetic calorimeter for the new muon ( g −2) experiment at Fermilab will consist of arrays of PbF 2 Čerenkov crystals read out by large-area silicon photo-multiplier (SiPM) sensors. We report here the requirements for this system, the achieved solution and the results obtained from a test beam using 2.0–4.5 GeV electrons with a 28-element prototype array.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The Muon g-2 experiment at Fermilab

Precision measurements of the anomalous magnetic moment of the muon a are a stringent test of the Standard Model. The last measurement of a at Brookhaven National Laboratory (BNL) diers from the Standard Model prediction by 3-4: a possible indication of new physics. A successor to that experi- ment has been constructed at Fermilab, with the aim of reducing the experimental uncertainty by a factor of four to 140 ppb. The measurement technique continues to use the storage ring concept from BNL, with muons circulating in a highly uni- form magnetic dipole eld. The spin precession frequency is extracted by analysing the modulation of the rate of higher-energy positrons from muon decays, which are detected by 24 calorimeters around the inside of the ring. Compared to the previous experiment, signicant improvements have been made in the areas of muon beam preparation, storage ring hardware, eld measuring equipment, and detector and electronics systems. In these proceedings, I report on the status of the experiment as of June 2018, presenting an overview of the experiment's progress, some initial data from the rst run, and the anticipated timeline for a new result.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Evaluation of accuracy and resolution of the electron beam profile scanner at the Fermilab Main Injector

The objective of this work is to assess the accuracy of measurements made by the Electron Beam Profile Scanner (EBPS), which captures the trajectory of an electron beam with and without a proton beam present. The proton beam induces deflection in the electron beam, which is influenced by proton charges.For high-resolution images, the probe beam needs to be of high intensity, small diameter, and small divergence, evaluated using a YAG screen and an optical transition radiation (OTR) screen. Additionally, the point spread function (PSF) will be calculated to characterize the optical system's properties using ZEMAX software. The capabilities of the Hamamatsu Charge-Injection Device (CID) camera and Kimball Physics electron gun (e-gun) will be considered for accuracy.

Mwaniki, Matilda [IIT, Chicago; Fermilab]↗

Commissioning and First Results of the Fermilab Muon Campus

In the following years the Fermilab Muon Campus will deliver highly polarized muon beams to the storage ring of the Muon g-2 Experiment. The Muon Campus contains a target section wherein secondaries are produced, the Delivery Ring which separates the muons from the rest of the beam and a straight section that transports them to the storage ring. Here, we report the first experimental results and experience gained from commissioning the Muon Campus, including the interaction of the proton beam with the target, the transport of secondary beam over long sections, the monitoring of muons from the available diagnostics and the development of techniques for measuring the beam optics. We present detailed comparisons between experimental data and simulation and discuss the similarities and differences observed.

43 PARTICLE ACCELERATORS↗

Search for Muon Neutrino Disappearance in the Booster Neutrino Beam of Fermilab; Busqueda de Desaparicion de Neutrinos del Muon en el Haz de Neutrinos del Booster de Fermilab

In this work we carried out the disappearance analysis of muon neutrinos produced in the Fermilab Booster Neutrino Beam, using the data released to the public by the collaborations of the MiniBooNE and SciBooNE experiments. The calculations were made with programs in C and C++, implementing the ROOT libraries. From the analysis, using both the classical Pearson method and the Feldman and Cousins frequentist corrections, we obtained the 90\% C.L. limit for the oscillation parameters sin 2 2θ and Δm 2 in the region 0.1 ≤ Δm 2 ≤ 10 eV 2 using a two neutrino model. The result presented in this work is consistent with the official one, with small deviations ascribed to round-off errors in the format of the used data, as well as statistical fluctuations in the generation of fake experiments used in the Feldman and Cousins method. As the official one, our result is consistent with the null oscillation hypothesis. This work was carried out independently to the MiniBooNE and SciBooNE collaborations and its results are not official.

43 PARTICLE ACCELERATORS↗

Picosecond Synchronization System for the Distribution of Photon Pairs Through a Fiber Link Between Fermilab and Argonne National Laboratories

Here we demonstrate a three-node quantum network for C-band photon pairs using 2 pairs of 59 km of deployed fiber between Fermi and Argonne National Laboratories. The C-band pairs are directed to nodes using a standard telecommunication switch and the detection system is synchronized to picosecond scale timing resolution using a coexisting O-or L-band optical clock distribution system. We measure a reduction of coincidence to-accidental ratio (CAR) of the C-band pairs from 51 ± 2 to 5.3 ± 0.4 due to Raman scattering of the O-band clock pulses. Despite this reduction, the CAR is nevertheless suitable for quantum networks.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗