Engineering PapersSearch

SEARCH · Engineering Papers

Results for “FERC Order 881”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Advanced Transmission Technologies – GETs and HPCs Session 1: ATT Foundations and Dynamic Line Ratings (DLRs)

The INL TADA GETs Cohort Session 1, held on November 4, 2025, convened experts to address the integration of advanced transmission technologies, including Grid-Enhancing Technologies (GETs) and High Performance Conductors (HPCs), with a focus on digital assurance challenges. The session highlighted the growing importance of cybersecurity, supply chain transparency, reliability, and business risk management in deploying GETs, especially Dynamic Line Ratings (DLRs). Participants examined how expanded attack surfaces, limited vendor pools, and new regulatory requirements—such as FERC Orders 881, 2023, and 1920—are influencing utilities and technology providers. The workshop underscored the need for cyber-informed engineering, secure-by-design principles, and practical risk management strategies, while fostering collaboration and knowledge sharing among industry peers. Technical discussions covered the evolution from static to dynamic line ratings, complexities of cloud-based architectures, and NERC CIP compliance challenges. The session concluded with a collaborative risk exercise and a preview of future workshops on advanced power flow control and transmission topology optimization, reinforcing the cohort’s commitment to advancing digital assurance in the energy sector.

24 - POWER TRANSMISSION AND DISTRIBUTION

Variable Transmission Line Ratings

This paper outlines the concept of variable-transmission facility ratings. This topic is of heightened importance following the recent Federal Energy Regulatory Commission (FERC) Order No. 881 which requires the implementation of ambient adjusted ratings (AARs) for FERC jurisdictional portions of the transmission system. Additionally, FERC issued an Advanced Notice of Proposed Rulemaking (ANOPR) implying a future order on Dynamic Line Rating (DLR) requirements. The various types of facility-rating methodologies will be discussed with a focus on how they can benefit the stability, capacity, and reliability of the grid.

24 - POWER TRANSMISSION AND DISTRIBUTION