Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Exterior Insulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Benefits Of Automated Construction And Energy Efficiency Measures In Modular Homes

This article builds on and adds to a Buildings XV publication that introduced the Transformative Efficiency and Automation in Modular Homes (TEAMH) project. The TEAMH project sought to develop a scalable solution for producing modular homes with 20-50% energy savings and similar cost relative to site-fabricated single-family home construction. A key aspect of the project was assessing the potential for labor cost reductions through automation-assisted construction using light gauge steel (LGS). To quantify the advantages of this approach, side-by-side comparisons were made between traditional wood-framed construction and automation-assisted LGS construction. This demonstration involved constructing one wood-framed wall and several LGS test walls, accompanied by a time-and-motion study. The results indicated that automation assistance could decrease construction time and associated labor costs by as much as 46%. High-performance envelope technologies for exterior insulation and air sealing were evaluated to compare modular homes with site-built homes that meet the International Energy Conservation Code (IECC). A key technology considered was vacuum insulation panels (VIPs) with fiberglass cores. Guarded hot box testing of multiple full-scale wall assemblies containing different combinations of exterior continuous insulation systems containing phenolic foam and VIPs. Testing on various full-scale wall assemblies revealed that, with LGS construction, cavity insulation had minimal impact on exterior wall performance. Omitting cavity insulation can reduce labor and material costs while streamlining manufacturing, as its installation is labor-intensive and not easily automated due to the need for precise placement around wiring and other internal components. Guarded hot box tests of multiple LGS test walls with foam and VIP-based exterior insulation systems achieved R-values of up to 31 hr-ft2-°F/Btu. Finally, building energy modeling of multiple modular home designs indicated that the upgraded envelope assemblies can yield heating energy savings of up to 50% and cooling energy savings of up to 30% compared to IECC 2018 standards.

Shrestha, Som [ORNL] (ORCID:0000000183993797)

Rain erosion considerations for launch vehicle insulation systems

In recent years the Delta launch vehicle has incorporated the capability to be launched through rain. This capability was developed to eliminate a design constraint which could result in a costly launch delay. This paper presents the methodology developed to implement rain erosion protection for the insulated exterior vehicle surfaces. The effect of the interaction between insulation material rain erosion resistance, rainstorm models, surface geometry and trajectory variations is examined. It is concluded that rain erosion can significantly impact the performance of launch vehicle insulation systems and should be considered in their design.

Daniels, D. J.

STS-114 Micrometeoroid/Orbital Debris (MMOD) Post-Flight Assessment

NASA Johnson Space Center (JSC) personnel assisted Kennedy Space Center (KSC) inspection teams in the identification of 41 micrometeoroid/orbital debris (MMOD) impact sites on the OV-103 vehicle (Discovery) during STS-114 postflight inspections. There were 14 MMOD impacts reported on the crew module windows (Figure 1). The largest impact feature, a 6.6 mm x 5.8 mm crater on window #4, was caused by a particle with an estimated diameter of 0.22 mm (Figure 2). This impact was among the largest ever recorded on a crew module window. The window was removed and replaced. Scanning Electron Microscope/Energy Dispersive X-ray (SEM/EDX) analysis of dental mold samples from the impact site to determine particle origin was inconclusive, possibly due to contamination picked up on the ferry flight from Edwards Air Force Base to KSC. The radiators on the inside of the payload bay doors sustained 19 impacts (Figure 3) with one of the impacts causing a face sheet perforation. The 0.61 mm diameter hole was produced by a particle with an estimated diameter of 0.4 mm, which approaches the 0.5-mm critical particle diameter of the wing leading edge reinforced carbon-carbon (RCC) panel high-temperature regions (Zone 3, Figure 4) that was established during Return to Flight testing of the RCC panels. An inspection of the payload bay door exterior insulation (FRSI) revealed a 5.8 mm x 4.5 mm defect that was caused by an MMOD particle with unknown composition, as the sample obtained was contaminated. Figure 5 provides a summary of the exterior surface survey that was conducted following the STS-114 mission. Two windows were removed and replaced due to hypervelocity impact. Nineteen impacts were recorded on the payload bay door radiators, with one face sheet penetration. Three impact sites were identified on the FRSI. There were four hypervelocity impact sites detected on the wing leading edge RCC panels. One impact was detected on the top cover of the TPS sample box (TSB) payload that was mounted on a carrier in the aft portion of the payload bay.

Hyde, J.

A study of numerical methods for computing reentry trajectories for shuttle-type space vehicles

The reuseable exterior insulation system (REI) is studied to determine the optimal reentry trajectory for a space shuttle, which minimizes the heat input to the fuselage. The REI is composed of titanium, covered by a surface insulation material. The method of perturbation functions was used to generate the trajectories, and proved to be an effective technique for generating families of solutions, once an initial trajectory has been obtained.

Source record

An evaluation of low-cost payload carrier

Payload carrier designed for space vehicles is essentially cargo carrier that supports, positions, and protects various equipment and materials used in conducting experiments in weightless space environment. Proposed carrier entitled Materials Experiment Assembly II (MEA-II) is considered superior to previously developed models in size, weight, and cost to user. Structure is lightweight with insulated exterior and can be custom sized to meet user needs.

Yost, V. H.

LH2 fuel tank design for SSTO

This report will discuss the design of a liquid hydrogen fuel tank constructed from composite materials. The focus of this report is to recommend a design for a fuel tank which will be able to withstand all static and dynamic forces during manned flight. Areas of study for the design include material selection, material structural analysis, heat transfer, thermal expansion, and liquid hydrogen diffusion. A structural analysis FORTRAN program was developed for analyzing the buckling and yield characteristics of the tank. A thermal analysis Excel spreadsheet was created to determine a specific material thickness which will minimize heat transfer through the wall of the tank. The total mass of the tank was determined by the combination of both structural and thermal analyses. The report concludes with the recommendation of a layered material tank construction. The designed system will include exterior insulation, combination of metal and organize composite matrices and honeycomb.

Wright, Geoff

Transformative Efficiency and Automation in Modular Homes (TEAMH)

This report documents the Transformative Efficiency and Automation in Modular Homes (TEAMH) project, which evaluates the integration of advanced building envelope technologies and automation-assisted modular construction to improve residential energy performance and construction efficiency. The study investigates high-performance insulation systems, including vacuum insulation panels (VIPs), combined with light gauge steel (LGS) modular construction and factory automation. Laboratory testing, whole-building energy modeling across multiple climate zones, and factory demonstrations were conducted to assess thermal performance, energy savings, and production efficiency. Results indicate that upgraded envelope assemblies can achieve up to ~50% heating and ~34% cooling energy savings relative to IECC 2018 code-compliant homes, while automation-assisted construction can reduce wall assembly time by 24%–46% compared to conventional wood framing. The findings demonstrate the potential for scalable, high-performance modular homes that deliver significant energy savings with competitive projected costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Demonstration of a Particle Impact Monitoring System for Crewed Space Exploration Modules

When micrometeorite or debris impacts occur on a space habitat, crew members need to be quickly informed of the likely extent of damage, and be directed to the impact location for possible repairs. The goal of the Habitat Particle Impact Monitoring System (HIMS) is to develop a fully automated, end-to-end particle impact detection system for crewed space exploration modules, both in space and on the surfaces of Solar System bodies. The HIMS uses multiple thin film piezo-polymer vibration sensors to detect impacts on a surface, and computer processing of the acoustical signals to characterize the impacts. Development and demonstration of the HIMS is proceeding in concert with NASA's Habitat Demonstration Unit (HDU) Project. The HDU Project is designed to develop and test various technologies, configurations, and operational concepts for exploration habitats. This paper describes the HIMS development, initial testing, and HDU integration efforts. Initial tests of the system on the HDU were conducted at NASA?s 2010 Desert Research and Technologies Studies (Desert-RATS). Four sensor locations were assigned near the corners of a rectangular pattern. To study the influence of wall thickness, three sets of four sensors were installed at different layer depths: on the interior of the PEM wall, on the exterior of the same wall, and on the exterior of a layer of foam insulation applied to the exterior wall. Once the system was activated, particle impacts were periodically applied by firing a pneumatic pellet gun at the exterior wall section. Impact signals from the sensors were recognized by a data acquisition system when they occurred, and recorded on a computer for later analysis. Preliminary analysis of the results found that the HIMS system located the point of impact to within 8 cm, provided a measure of the impact energy / damage produced, and was insensitive to other acoustic events. Based on this success, a fully automated version of this system will be completed and demonstrated as part of a crew "Caution/Warning" system at the 2011 Desert-RATS, along with a crew response procedure.

Opiela, J. N.

Thermal/structural analysis of the shaft-disk region of a fan drive system

In January 1989, a mishap occurred in the National Transonic Facility wind tunnel at NASA-Langley. It is believed that the failure of an insulation retainer holding foam insulation around the exterior of the fan drive shaft resulted in the subsequent damage to other components in the tunnel. The effect was determined of removing the external thermal insulation on the shaft would have on the stresses on the shaft, disk and bolts holding the two together. To accomplish this, a detailed thermal/structural finite element analysis of the shaft-disk interface was performed. The maximum stresses on the three components were determined for several configurations and conditions with and without the external thermal insulation, and then these results were compared to the original analyses to access the effect of removing the external thermal insulation on the proposed future operation of the shaft/disk structures of the fan drive system. Although the stresses were higher without the external insulation, the stresses did meet all stress criteria. In addition, all stresses were within the infinite life regime of the Modified Goodman diagram. Therefore, it was determined that the structural integrity of the shaft-disk region is not compromised if the external insulation is removed.

Gregory, Peyton B.

Utilization of spray on foam insulation for manned and unmanned spacecraft and structures

The idea of using spray-on foam insulation as a passive thermal and micrometeorite protection system is explored. The benefits of applying an exterior coating of foam insulation can be: (1) the foam can provide a thermally stable shield that can assist in reducing the strain on traditional space radiator systems and can also act as a passive thermal guard, allowing a greater fault tolerance if the standard system should fail; (2) the foam can act as an ablative shell diminishing the effects of natural and manmade debris striking the structure; (3) the foam is lightweight - about 1/2 ounce per sq ft; (4) the foam is low cost and easy to maintain; and (5) the foam is a stable material that does not react when exposed to earth or lunar environments.

Hancock, Thomas M., III

Cost Effective Electrochromic Glazing Repositioning For Insulating Glass & Secondary Windows

This project addressed both technical and economic objectives toward significantly increasing the availability of ElectroChromic (EC) dynamic architectural glass at reduced cost. In contrast to the prevailing industry location of the EC device layer on the exterior light of an Insulating Glass (IG) unit, Project Objectives assessed the feasibility of a) repositioning the device layer midway between two IG panes to configure triple glazing, and b) independently framed to enable positioning to the building interior independent of the original glass configured as a dynamic secondary window. Parallel research complementing both EC-IG and EC-WinSert configurations addressed integral Photo Voltaic, and ceiling mounted “broadcast” power to circumvent the significant onsite electrical con tracting normally associated with the installation of commercial EC glazing.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Debris Impact Detection Instrument for Crewed Modules

When micrometeoroid or debris impacts occur on a space habitat, crew members need to be quickly informed of the likely extent of damage, and be directed to the impact location for possible repairs. This is especially important because the outer walls of pressurized volumes are often not easily accessible, blocked by racks or cabinets. The goal of the Habitat Particle Impact Monitoring System (HIMS) is to develop a fully automated, end-to-end particle impact detection system for crewed space exploration modules. The HIMS uses multiple passive, thin film piezo-polymer vibration sensors to detect impacts on a surface, and computer processing of the acoustical signals to characterize the impacts. Development and demonstration of the HIMS is proceeding in concert with NASA's Habitat Demonstration Unit (HDU) Project. The HDU Project is designed to develop and test various technologies, configurations, and operational concepts for exploration habitats. This paper describes the HIMS development, initial testing, and HDU integration efforts. Initial tests of the system on the HDU were conducted at NASA s 2010 and 2011 Desert Research and Technologies Studies (Desert-RATS or D-RATS). The HDU lab module, as seen from above, has an open circular floorplan divided into eight wedge-shaped Segments. The side wall of the module -- the surface used for this technology demonstration -- is a hard fiberglass composite covered with a layer of sprayed-on foam insulation. Four sensor locations were assigned near the corners of a rectangular pattern on the wall of one segment of the HDU lab module. The flat, self-adhesive sensors were applied to the module during its initial outfitting. To study the influence of the wall s construction (thickness and materials), three sets of four sensors were installed at different layer depths: on the interior of the module s wall, on the exterior of the same wall, and on the exterior of the foam insulation. The signal produced when a vibration passes through a sensor is first sent through a pre-amplifier. The amplified signal then is sent to the data acquisition and data processing systems. The vibration data from the sensors are then processed and reduced to a form suitable for presentation to the crew.

Opiela, J.

Measuring Thermal Conductivity and Moisture Absorption of Cryo-Insulation Materials

NASA is seeking to develop thermal insulation material systems suitable for withstanding both extremely high temperatures encountered during atmospheric re-entry heating and aero- braking maneuvers, as well as extremely low temperatures existing in liquid fuel storage tanks. Currently, materials used for the high temperature insulation or Thermal Protection System (TPS) are different from the low temperature, or cryogenic insulation. Dual purpose materials are necessary to the development of reusable launch vehicles (RLV). The present Space Shuttle (or Space Transportation System, STS) employs TPS materials on the orbiter and cryo-insulation materials on the large fuel tank slung under the orbiter. The expensive fuel tank is jettisoned just before orbit is achieved and it burns up while re-entering over the Indian Ocean. A truly completely reusable launch vehicle must store aR cryogenic fuel internally. The fuel tanks will be located close to the outer surface. In fact the outer skin of the craft will probably also serve as the fuel tank enclosure, as in jet airliners. During a normal launch the combined TPS/cryo-insulation system will serve only as a low temperature insulator, since aerodynamic heating is relatively minimal during ascent to orbit. During re-entry, the combined TPS/cryo-insulation system will serve only as a high temperature insulator, since all the cryogenic fuel will have been expended in orbit. However, in the event of an.aborted launch or a forced/emergency early re-entry, the tanks will still contain fuel, and the TPS/cryo-insulation will have to serve as both low and high temperature insulation. Also, on long duration missions, such as to Mars, very effective cryo-insulation materials are needed to reduce bod off of liquid propellants, thereby reducing necessary tankage volume, weight, and cost. The conventional approach to obtaining both low and high temperature insulation, such as is employed for the X-33 and X-34 spacecraft, is to use separate TPS and cryo-insulation materials, which are connected by means of adhesives or stand-offs (spacers). Three concepts are being considered: (1) the TPS is bonded directly to the cryo-insulation which, in turn, is bonded to the exterior of the tank, (2) stand-offs are used to make a gap between the TPS and the cryo-insulation, which is bonded externally to the tank, (3) TPS is applied directly or with stand-offs to the exterior so the tank, and cryo-insulation is applied directly to the interior of the tank. Many potential problems are inherent in these approaches. For example, mismatch between coefficients of thermal expansion of the TPS and cryo-insulation, as well as aerodynamic loads, could lead to failure of the bond. Internal cryo-insulation must be prevent from entering the sump of the fuel turbo-pump. The mechanical integrity of the stand-off structure (if used) must withstand multiple missions. During ground hold (i.e., prior to launch) moisture condensation must be minimized in the gap between the cryo-insulation and the TPS. The longer term solution requires the development of a single material to act as cryo- insulation during ground hold and as TPS during re-entry. Such a material minimizes complexity and weight while improving reliability and reducing cost.

Lambert, Michael A.

Application of an Elongated Kelvin Model to Space Shuttle Foams

Spray-on foam insulation is applied to the exterior of the Space Shuttle s External Tank to limit propellant boil-off and to prevent ice formation. The Space Shuttle foams are rigid closed-cell polyurethane foams. The two foams used most extensively on the Space Shuttle External Tank are BX-265 and NCFI24-124. Since the catastrophic loss of the Space Shuttle Columbia, numerous studies have been conducted to mitigate the likelihood and the severity of foam shedding during the Shuttle s ascent to space. Due to the foaming and rising process, the foam microstructures are elongated in the rise direction. As a result, these two foams exhibit a non-isotropic mechanical behavior. In this paper, a detailed microstructural characterization of the two foams is presented. The key features of the foam cells are summarized and the average cell dimensions in the two foams are compared. Experimental studies to measure the room temperature mechanical response of the two foams in the two principal material directions (parallel to the rise and perpendicular to the rise) are also reported. The measured elastic modulus, proportional limit stress, ultimate tensile stress and the Poisson s ratios for the two foams are compared. The generalized elongated Kelvin foam model previously developed by the authors is reviewed and the equations which result from this model are presented. The resulting equations show that the ratio of the elastic modulus in the rise direction to that in the perpendicular-to-rise direction as well as the ratio of the strengths in the two material directions is only a function of the microstructural dimensions. Using the measured microstructural dimensions and the measured stiffness ratio, the foam tensile strength ratio and Poisson s ratios are predicted for both foams. The predicted tensile strength ratio is in close agreement with the measured strength ratios for both BX-265 and NCFI24-124. The comparison between the predicted Poisson s ratios and the measured values is not as favorable.

Sullivan, Roy M.

New Laboratory-Based Satellite Impact Experiments for Breakup Fragment Characterization

A consortium consisting of the NASA Orbital Debris Program Office, U.S. Air Force's Space and Missile Systems Center, the Aerospace Corporation, and University of Florida is planning a series of hypervelocity impact experiments on mockup targets at the U.S. Air Force's Arnold Engineering Development Complex (AEDC) in early 2014. The target for the first experiment resembles a rocket upper stage whereas the target for the second experiment represents a typical 60‐cm/50‐kg class payload that incorporates modern spacecraft materials and components as well as exterior wrap of multi‐layer insulation and three solar panels. The projectile is designed with the maximum mass that AEDC's Range G two‐stage light gas gun can accelerate to an impact speed of 7 km/sec. The impact energy is expected to be close to 15 MJ to ensure catastrophic destruction of the target after the impact. Low density foam panels are installed inside the target chamber to slow down and soft‐catch the fragments for post‐impact processing. Diagnostic instruments, such as x‐ray and high speed optical cameras, will also be used to record the breakup process. The main goal of this "DebriSat" project is to characterize the physical properties, including size, mass, shape, and density distributions, of orbital debris that would be generated by a hypervelocity collision involving an upper stage or a modern satellite in the low Earth orbit environment. In addition, representative fragments will be selected for laboratory optical and radar measurements to allow for better interpretation of data obtained by telescope and radar observations. This paper will provide a preliminary report of the impact results and the plans to process, measure, and analyze the fragments.

Liou, J.-C.

GEER Status Update

History: The Glenn Extreme Environments Rig (GEER) first became operational in the early part of 2015. Since that time GEER has completed a number of scientific tests and has undergone improvements in the chemical delivery system and analytics following a year of operations experience. Recent Updates: In June 2016, the GEER process system was rebuilt to provide a more robust system, higher accuracy and new capabilities. New insulation was installed on the exterior of the pressure vessel and gas lines. The newly revamped GEER plumbing system can provide extremely precise custom gas mixtures using any gas desired by the investigator in any combination. GEER can heat the resulting mixture up to 500 deg C and 1500 psia. The 304 stainless steel vessel walls were polished to reduce corrosion rate and reduce unwanted chemical reactions. The process lines were replaced with high purity Sulfinert coated tubing. The GEER team added the ability to individually boost specialty gases to GEER thus allowing operators to make very precise changes to the gas chemistry inside of GEER during a test while at high temperature and pressure. High accuracy mass flow meters were added to further improve gas mixing accuracy and precision. An in-line, integrated Inficon MicroGC Fusion was added for real time gas analysis along with a high purity gas sampling system, providing fully automated, real time analysis of the gas chemistry inside of GEER in minutes. This complements a co-located mass spectrometer and both are used for regular monitoring of the vessel chemistry. All internal vessel components were replaced with polished 304SS equivalents. Hot vent down capability was increased. Finally, an automated liquid injection system was added and is rated for max vessel operating conditions of (1500 psia, 500 C). Recent Results and Publications: In May 2016, GEER completed a test that exposed high temperature electronics to Venus surface conditions for 21.5 days. This demonstrated the potential for operating robotic spacecraft in the Venus environment without the need for thermal or environmental protection. Results from this test were published in December 2016 and received national media attention. In April 2017 GEER implemented an 80 day test at Venus surface conditions to simulate chemical weathering of expected Venus minerals. This test supported a ROSES award to a team led by Prof. Ralph Harvey of Case Western Reserve University. The test concluded in July 2017 and nearly doubled previous operation record of 42 days at Venus surface conditions. Preliminary results of these and previous experiments were presented at the recent Venus Modeling Workshop. In June 2017, NASA TM2017-219437 "Chemical and Microstructural Changes in Metallic and Ceramic Materials Exposed to Venusian Surface Conditions" was published. This report provides an extensive and valuable resource detailing the behavior of a variety of engineering materials at Venus surface conditions. Community Involvement: An external science advisory panel has been formed.

Kremic, Tibor

Plasma Sprayed Bondable Stainless Surface (BOSS) Coatings for Corrosion Protection and Adhesion Treatments

Plasma-sprayed Bondable Stainless Surface (BOSS) coatings are being developed under the Solid Propulsion Integrity Program's (SPIP) Bondlines Package. These coatings are designed as a steel case preparation treatment prior to insulation lay-up. Other uses include the exterior of steel cases and bonding surfaces of nozzle components. They provide excellent bondability - rubber insulation and epoxy bonds fail cohesively within the polymer - for both fresh surfaces and surfaces having undergone natural and accelerated environmental aging. They have passed the MSFC requirements for protection of inland and sea coast environment. Because BOSS coatings are inherently corrosion resistant, they do not require preservation by greases or oils. The reduction/elimination of greases and oils, known bondline degraders, can increase SRM reliability, decrease costs by reducing the number of process steps, and decrease environmental pollution by reducing the amount of methyl chloroform used for degreasing and thus reduce release of the ozone-depleting chemical in accordance with the Clean Air Act and the Montreal Protocol. The coatings can potential extend the life of RSRM case segments and nozzle components by eliminating erosion due to multiple grit blasting during each use cycle and corrosion damage during marine recovery. Concurrent work for the Air Force show that other BOSS coatings give excellent bondline strength and durability for high-performance structures of aluminum and titanium.

Davis, G. D.

Apparatus and Methods for Fluid Storage and Delivery

An apparatus and method for storing and delivering fluid to a person comprises, in at least one specific embodiment, a fluid reservoir having an internal volume therein with an opening disposed through a first wall or a second wall of the fluid reservoir and located toward a first end of the fluid reservoir. A first portion of a tube can be exterior to the fluid reservoir and a second portion of the tube can be disposed through the opening and within the internal volume. At least one insulation layer can be disposed about the exterior of the first wall of the fluid reservoir. The second wall of the fluid reservoir can be configured for transferring heat from or to the internal volume or from the person. At least one baffle is disposed within the internal volume and connected to the first wall and the second wall of the fluid reservoir.

Parazynski, Scott E.