Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Execution Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Advanced Fuels Campaign Execution Plan

The Advanced Fuels Campaign (AFC) Execution Plan details the strategy, mission, scope, and goals—both near-term and long-term—along with the structure and organization of nuclear fuels and materials research, development, and demonstration (RD&D) activities within the Fuel Cycle Technologies (FCT) program. The FCT program, tasked by the U.S. Department of Energy (DOE), employs a science-based approach to advance fuel technologies. This approach integrates theory, experiments, and multi-scale modeling and simulation (M&S) to develop a predictive understanding of fuel fabrication processes and fuel/cladding performance under irradiation, moving beyond traditional empirical methods. The long-term goals of the AFC are guided by the AFC Strategic Plan and align with the DOE Office of Nuclear Energy (NE) Roadmap [1], which outlines a multi-decade vision for demonstrating and qualifying advanced fuel forms to support diverse fuel cycle options. Near-term goals focus on enhancing accident tolerant fuels (ATF) for Light Water Reactors (LWR), a significant challenge that demands balancing immediate objectives with ongoing progress toward advanced reactor missions. Accelerating the traditional fuel qualification process to meet ATF objectives is another critical challenge. A detailed set of 5-year goals, summarized below, has been developed in line with the overarching science-based fuel development approach: • Advanced LWR Fuel Technologies: By 2027, support the development of advanced LWR fuel technologies with improved performance and enhanced accident tolerance. This includes high burnup (HBu), low enriched uranium (LEU)+, coated cladding, and doped fuel, aimed at complementing industry-led significant LWR uprates and plant refurbishments. • Tristructural Isotropic (TRISO) Fuel: Achieve qualification by 2028 and develop improved designs for emerging markets. • Metal Fuel: Achieve qualification by 2028 and develop improved designs for emerging markets. • Molten Salt Fuel: By 2027, deploy a robust program that enables fuel salt qualification technologies needed to support fuel salt research and development (R&D), focusing on emergent needs to derisk fuel salt production and utilization in advanced reactors. • Long-Term ATF: Develop fuel technologies that enable significant power uprates (~50%) in refurbished or new LWRs while optimizing fissile material utilization and waste disposal. The 5-year milestones in the AFC Execution Plan are contingent on an assumed budget. This Execution Plan will be updated annually to reflect actual funding profiles as budget guidance becomes available, ensuring milestones are adjusted accordingly. In summary, the AFC Execution Plan presents a comprehensive strategy to advance nuclear fuel technologies through a science-based approach, addressing both near-term and long-term goals while adapting to funding realities.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced Fuels Campaign Execution Plan

The Advanced Fuels Campaign (AFC) Execution Plan outlines the strategy, mission, scope, near-term and long-term goals, structure, and organization associated with nuclear fuels and materials research, development, and demonstration activities within the Department of Energy’s (DOE) Nuclear Fuel Cycle and Supply Chain (NFCSC) program. NFCSC has been given responsibility to identify and mature advanced fuel technologies for the DOE using a science-based approach, focused on developing a fundamental understanding of nuclear fuels and materials to drive development of integrated nuclear fuel and materials technology. This science-based approach combines theory, experiments, and multiscale modeling and simulation to achieve a predictive understanding of relevant behaviors ranging from fuel fabrication processes (and their resulting fuel microstructures) through fuel/cladding performance under irradiation (in contrast to more empirical, observation-based approaches frequently used in fuel performance modeling and fuel qualification). The traditional scope of AFC includes the evaluation and development of multiple fuel forms to support two fuel cycle options: once-through and full recycle. The word “fuel” is used generically to include conventional fuels, transmutation targets, and any associated cladding or duct materials. The once-through fuel cycle addresses advanced light water reactor fuels with enhanced performance, extended burnup, and reduced waste generation. In fiscal year (FY) 2012, AFC’s scope expanded to include research, development, and demonstration (RD&D) for light water reactor (LWR) fuels with enhanced accident tolerance. Fuel fabrication activities include the development of innovative methods to enhance process efficiencies, reduce waste, and improve control over as-fabricated fuel microstructural properties to achieve desired in-reactor performance. Using modern modeling and simulation approaches, the objective is to predict fresh fuel properties given the feedstock characteristics and fabrication process parameters. The performance-related activities include small-scale, in-reactor, and out-of-reactor phenomenological testing (distinct from, but synergistic with, integral prototypic testing) and extensive, quantitative characterization (focusing on characterization of fuel and cladding materials at the scale of microstructure) both before and after testing. Larger-scale, prototypic experiments are conducted in concert with phenomenological testing to drive a Fuel Development and Qualification program, incorporating a fundamental understanding of fuel behavior performance characteristics. Then, using the tools developed under the productive science-based approach, fuels will be optimized to meet specific performance requirements, thereby minimizing the need to repeatedly perform large-scale, integral experiments over a wide parametric range as a means of experimental exploration. Two significant initiatives are underway within AFC. First, a gap analysis completed in early FY 2019 identified critical irradiation testing needs that are lacking within the national light water reactor (LWR) fuels testbed since the shutdown of the Halden Reactor in 2018. The identified gaps are for instrumented, prototypic testing of LWR fuels, especially under boiling water reactor conditions, ramp conditions, and conditions leading to fuel failure; these needs exist for supporting current LWR fuels and their possible extension to higher burnups, but are especially urgent relative to near-term development and qualification of accident-tolerant fuels. Recommendations that resulted from the Halden Gap Analysis focused on enhancements at Advanced Test Reactor (ATR) and Transient Reactor Test Facility (TREAT) to fill gaps in testing capabilities relative to these needs. Second, a concerted effort to develop and demonstrate a systematic approach to accelerating the development, testing, and qualification of new fuel systems has been initiated. This is highlighted by a test strategy that combines the considerable advances in multiscale, mechanistic fuel modeling of recent years with a MiniFuel separate effects test program in the High Flux Isotope Reactor (HFIR) and a Fission Accelerated Steady-state Testing (FAST) semi-integral accelerated test program in ATR. This approach is being tested/demonstrated using the metallic fuel system, but if successful it is expected to be extensible to multiple fuel types and diverse applications. This document includes an overview of the NFCSC program, a definition of science-based development of nuclear fuels, near-term goals for Advanced LWR fuels (ALFs), and longer-term goals for Advanced Reactor Fuels (ARFs) RD&D. This includes the activities that will be conducted to achieve success toward the grand challenge, as well as the goals and milestones to be achieved over the next few decades of research and development. Long-term goals are based on the DOE Office of Nuclear Energ

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced Fuels Campaign Execution Plan

The Advanced Fuels Campaign (AFC) Execution Plan outlines the strategy, mission, scope, near-term and long-term goals, structure, and organization associated with nuclear fuels and materials research, development, and demonstration activities within the Department of Energy’s (DOE) Nuclear Fuel Cycle and Supply Chain (NFCSC) program. NFCSC has been given responsibility to identify and mature advanced fuel technologies for the DOE using a science-based approach, focused on developing a fundamental understanding of nuclear fuels and materials to drive development of integrated nuclear fuel and materials technology. This science-based approach combines theory, experiments, and multiscale modeling and simulation to achieve a predictive understanding of relevant behaviors ranging from fuel fabrication processes (and their resulting fuel microstructures) through fuel/cladding performance under irradiation (in contrast to more empirical, observation-based approaches frequently used in fuel performance modeling and fuel qualification). The traditional scope of AFC includes the evaluation and development of multiple fuel forms to support two fuel cycle options: once-through and full recycle. The word “fuel” is used generically to include conventional fuels, transmutation targets, and any associated cladding or duct materials. The once-through fuel cycle addresses advanced light water reactor fuels with enhanced performance, extended burnup, and reduced waste generation. In fiscal year (FY) 2012, AFC’s scope expanded to include research, development, and demonstration (RD&D) for light water reactor (LWR) fuels with enhanced accident tolerance. Fuel fabrication activities include the development of innovative methods to enhance process efficiencies, reduce waste, and improve control over as-fabricated fuel microstructural properties to achieve desired in-reactor performance. Using modern modeling and simulation approaches, the objective is to predict fresh fuel properties given the feedstock characteristics and fabrication process parameters. The performance-related activities include small-scale, in-reactor, and out-of-reactor phenomenological testing (distinct from, but synergistic with, integral prototypic testing) and extensive, quantitative characterization (focusing on characterization of fuel and cladding materials at the scale of microstructure) both before and after testing. Larger-scale, prototypic experiments are conducted in concert with phenomenological testing to drive a Fuel Development and Qualification program, incorporating a fundamental understanding of fuel behavior performance characteristics. Then, using the tools developed under the productive science-based approach, fuels will be optimized to meet specific performance requirements, thereby minimizing the need to repeatedly perform large-scale, integral experiments over a wide parametric range as a means of experimental exploration. Two significant initiatives are underway within AFC. First, a gap analysis completed in early FY 2019 identified critical irradiation testing needs that are lacking within the national light water reactor (LWR) fuels testbed since the shutdown of the Halden Reactor in 2018. The identified gaps are for instrumented, prototypic testing of LWR fuels, especially under boiling water reactor conditions, ramp conditions, and conditions leading to fuel failure; these needs exist for supporting current LWR fuels and their possible extension to higher burnups, but are especially urgent relative to near-term development and qualification of accident-tolerant fuels. Recommendations that resulted from the Halden Gap Analysis focused on enhancements at Advanced Test Reactor (ATR) and Transient Reactor Test Facility (TREAT) to fill gaps in testing capabilities relative to these needs. Second, a concerted effort to develop and demonstrate a systematic approach to accelerating the development, testing, and qualification of new fuel systems has been initiated. This is highlighted by a test strategy that combines the considerable advances in multiscale, mechanistic fuel modeling of recent years with a MiniFuel separate effects test program in the High Flux Isotope Reactor (HFIR) and a Fission Accelerated Steady-state Testing (FAST) semi-integral accelerated test program in ATR. This approach is being tested/demonstrated using the metallic fuel system, but if successful it is expected to be extensible to multiple fuel types and diverse applications. This document includes an overview of the NFCSC program, a definition of science-based development of nuclear fuels, near-term goals for Advanced LWR fuels (ALFs), and longer-term goals for Advanced Reactor Fuels (ARFs) RD&D. This includes the activities that will be conducted to achieve success toward the grand challenge, as well as the goals and milestones to be achieved over the next few decades of research and development. Long-term goals are based on the DOE Office of Nuclear Energ

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced Fuels Campaign Execution Plan

The purpose of the Advanced Fuels Campaign (AFC) Execution Plan is to communicate the structure and management of research, development, and demonstration (RD&D) activities within the Fuel Cycle Research and Development (FCRD) program. Included in this document is an overview of the FCRD program, a description of the difference between revolutionary and evolutionary approaches to nuclear fuel development, the meaning of science-based development of nuclear fuels, and the “Grand Challenge” for the AFC that would, if achieved, provide a transformational technology to the nuclear industry in the form of a high performance, high reliability nuclear fuel system. The activities that will be conducted by the AFC to achieve success towards this grand challenge are described and the goals and milestones over the next 20 to 40 year period of research and development are established.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced Fuels Campaign Execution Plan (Revision 1)

The purpose of the Advanced Fuels Campaign (AFC) Execution Plan is to communicate the structure and management of research, development, and demonstration (RD&D) activities within the Fuel Cycle Research and Development (FCRD) program. Included in this document is an overview of the FCRD program, a description of the difference between revolutionary and evolutionary approaches to nuclear fuel development, the meaning of science-based development of nuclear fuels, and the "Grand Challenge" for the AFC that would, if achieved, provide a transformational technology to the nuclear industry in the form of a high performance, high reliability nuclear fuel system. The activities that will be conducted by the AFC to achieve success towards this grand challenge are described and the goals and milestones over the next 20 to 40 year period of research and development are established.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

G3P3 Phase 3 Project Execution Plan. Issue 1

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.

14 SOLAR ENERGY↗

Preliminary Project Execution Plan for the TREAT LEU Fuel Conversion Project

This project execution plan for the Transient Reactor Test (TREAT) facility Low Enriched Uranium (LEU) Fuel Conversion Project informs the reader of a high-level path forward for conversion of TREAT facilities at Idaho National Laboratory and provides guidance for INL personnel regarding the TREAT LEU Fuel Conversion Project. This project is part of the National Nuclear Security Administration’s Global Threat Reduction Initiative Reactor Conversion Program.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Environmental Management System Plan

Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environment will be evaluated. Objectives and targets will be developed (or updated) for each aspect that is determined to have a significant impact. Environmental Management Programs (EMPs) will be prepared (or updated) to document actions necessary for reducing certain environmental impacts. Each EMP will identify responsible parties and associated target deadlines for each action. Quarterly, environmental programs will be reviewed for compliance issues and effectiveness. Annually, an internal assessment will be performed to evaluate the progress of the EMS, and LBNL senior management will review the results. In addition, at least once every 3 years a third-party audit will be performed to validate that the EMS is being implemented according to plan.

99 GENERAL AND MISCELLANEOUS↗

SiC cladding R&D execution plan

To advance the development of accident-tolerant fuel cladding for light-water reactors, the Advanced Fuels Campaign actively addresses the R&D gap between the specialized technological progress in SiC-based composite materials, led by industrial partners, and the fundamental scientific understanding of material behavior under reactor operating conditions. The laboratory activities are systematically organized based on the Development Strategy document, which outlines critical barriers to the use of SiC composites in nuclear energy applications for the coming decade and beyond. To complement the strategy, this execution plan specifies a detailed year-by-year work package and establishes key milestones for assessing progress in technological advancement. This plan has been formulated in collaboration with principal investigators at national laboratories, stakeholders, and industry partners with the goal of closing technology gaps and readying SiC-based cladding technologies for full-scale commercial testing. The research conducted at the national laboratories is categorized into three primary subjects: (1) addressing challenges associated with the performance of SiC cladding under normal operating environments, (2) identifying the failure limits of SiC cladding under accident conditions, and (3) modeling fuel performance for SiC cladding systems. Comprehensive laboratory activities integrate the development of advanced modeling tools for SiC-based cladding systems with experimental validation via integrated testing of multiphysics phenomena. This document lays out the laboratory plan to support the development of SiC-based technologies, which have the potential for significant operational and safety benefits for the U.S. nuclear industry. This plan aligns with industry developer needs, relevant Nuclear Energy University Programs, and Nuclear Energy Advanced Modeling and Simulation Programs to ensure SiC cladding technologies are matured as efficiently as possible and will be maintained and updated to accommodate the dynamically evolving progress of development, capability needs, and resource availability.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Project Execution Plan for the Remote Handled Low-Level Waste Disposal Project

As part of ongoing cleanup activities at the Idaho National Laboratory (INL), closure of the Radioactive Waste Management Complex (RWMC) is proceeding under the Comprehensive Environmental Response, Compensation, and Liability Act (42 USC 9601 et seq. 1980). INL-generated radioactive waste has been disposed of at RWMC since 1952. The Subsurface Disposal Area (SDA) at RWMC accepted the bulk of INL’s contact and remote-handled low-level waste (LLW) for disposal. Disposal of contact-handled LLW and remote-handled LLW ion-exchange resins from the Advanced Test Reactor in the open pit of the SDA ceased September 30, 2008. Disposal of remote-handled LLW in concrete disposal vaults at RWMC will continue until the facility is full or until it must be closed in preparation for final remediation of the SDA (approximately at the end of fiscal year FY 2017). The continuing nuclear mission of INL, associated ongoing and planned operations, and Naval spent fuel activities at the Naval Reactors Facility (NRF) require continued capability to appropriately dispose of contact and remote handled LLW. A programmatic analysis of disposal alternatives for contact and remote-handled LLW generated at INL was conducted by the INL contractor in Fiscal Year 2006; subsequent evaluations were completed in Fiscal Year 2007. The result of these analyses was a recommendation to the Department of Energy (DOE) that all contact-handled LLW generated after September 30, 2008, be disposed offsite, and that DOE proceed with a capital project to establish replacement remote-handled LLW disposal capability. An analysis of the alternatives for providing replacement remote-handled LLW disposal capability has been performed to support Critical Decision-1. The highest ranked alternative to provide this required capability has been determined to be the development of a new onsite remote-handled LLW disposal facility to replace the existing remote-handled LLW disposal vaults at the SDA. Several offsite DOE and commercial disposal options exist for contact-handled LLW; however, offsite disposal options are either not currently available (i.e., commercial disposal facilities), practical, or cost-effective for all remote-handled LLW streams generated at INL. Offsite disposal of all INL and tenant-generated remote-handled waste is further complicated by issues associated with transporting highly radioactive waste in commerce; and infrastructure and processing changes at the generating facilities, specifically NRF, that would be required to support offsite disposal. The INL Remote-Handled LLW Disposal Project will develop a new remote handled LLW disposal facility to meet mission-critical, remote-handled LLW disposal needs. A formal DOE decision to proceed with the project has been made in accordance with the requirements of National Environmental Policy Act (42 USC§ 4321 et seq.). Remote-handled LLW is generated from nuclear programs conducted at INL, including spent nuclear fuel handling and operations at NRF and operations at the Advanced Test Reactor. Remote-handled LLW also will be generated by new INL programs and from segregation and treatment (as necessary) of remote handled scrap and waste currently stored in the Radioactive Scrap and Waste Facility at the Materials and Fuels Complex.

99 GENERAL AND MISCELLANEOUS↗

Joint LLNL, LANL, SNL, and IRSN High Multiplication Subcritical (Multiplicity) Benchmark Experiments Execution Plan (IER-518 CED-3a)

As part of the experiment design and planning, the critical experiment design team (CEDT), as well as additional stakeholders, convened a series of meetings to discuss the goals and requirements of execution for this experiment. The slides from these meetings are attached in Appendix A. The following sections summarize the outcome of those discussions and present the planned experimental configurations and measurements. The stated goals of this experiment are as follows: 1) Measure time-tagged list-mode data for configurations exceeding neutron multiplication of 100; 2) Provide intercomparison between LLNL, LANL, and IRSN detector systems and methodologies; 3) Generate experiment execution report(s) useful to a fundamental physics benchmark for the ICSBEP; 4) Leverage existing critical experiment and detector system benchmarks to limit required modeling and uncertainty analysis.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

INL Site Executable Plan for Energy and Transportation Fuels Management

It is the policy of the Department of Energy (DOE) that sustainable energy and transportation fuels management will be integrated into DOE operations to meet obligations under Executive Order (EO) 13423 "Strengthening Federal Environmental, Energy, and Transportation Management," the Instructions for Implementation of EO 13423, as well as Guidance Documents issued in accordance thereto and any modifcations or amendments that may be issued from time to time. In furtherance of this obligation, DOE established strategic performance-based energy and transportation fuels goals and strategies through the Transformational Energy Action Management (TEAM) Initiative, which were incorporated into DOE Order 430.2B "Departmental Energy, Renewable energy, and Transportation Management" and were also identified in DOE Order 450.1A, "Environmental Protection Program." These goals and accompanying strategies are to be implemented by DOE sites through the integration of energy and transportation fuels management into site Environmental Management Systems (EMS).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

INL Site FY 2010 Executable Plan for Energy and Transportation Fuels Management with the FY 2009 Annual Report

It is the policy of the Department of Energy (DOE) that sustainable energy and transportation fuels management will be integrated into DOE operations to meet obligations under Executive Order (EO) 13423 "Strengthening Federal Environmental, Energy, and Transportation Management," the Instructions for Implementation of EO 13423, as well as Guidance Documents issued in accordance thereto and any modifcations or amendments that may be issued from time to time. In furtherance of this obligation, DOE established strategic performance-based energy and transportation fuels goals and strategies through the Transformational Energy Action Management (TEAM) Initiative, which were incorporated into DOE Order 430.2B "Departmental Energy, Renewable energy, and Transportation Management" and were also identified in DOE Order 450.1A, "Environmental Protection Program." These goals and accompanying strategies are to be implemented by DOE sites through the integration of energy and transportation fuels management into site Environmental Management Systems (EMS).

Fossum, Ernest L.↗

2014 Zero Waste Strategic Plan Executive Summary.

Sandia National Laboratories/New Mexico is located in Albuquerque, New Mexico, primarily on Department of Energy (DOE) permitted land on approximately 2,800 acres of Kirtland Air Force Base. There are approximately 5.5 million square feet of buildings, with a workforce of approximately 9200 personnel. Sandia National Laboratories Materials Sustainability and Pollution Prevention (MSP2) program adopted in 2008 an internal team goal for New Mexico site operations for Zero Waste to Landfill by 2025. Sandia solicited a consultant to assist in the development of a Zero Waste Strategic Plan. The Zero Waste Consultant Team selected is a partnership of SBM Management Services and Gary Liss & Associates. The scope of this Plan is non-hazardous solid waste and covers the life cycle of material purchases to the use and final disposal of the items at the end of their life cycle.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ADAM Program Execution Plan LANL Inputs (FY2022)

The National Security Research Center (NSRC) is Los Alamos National Laboratory’s classified library. There are two groups associated with the NSRC, both of who work for LANL’s Weapons Research Services (WRS) division (WRS-SIS and WRS-WMT). These groups are funded in part by the NNSA Archives Program. The NSRC’s collections include tens of millions of documents from the Manhattan Project era through today. It is staffed with an expert, highly trained staff of librarians, archivists, digitizers, historians, and communications specialists. The NSRC traces its lineage to the wartime Technical Library created by J. Robert Oppenheimer during in 1943. Today, it supports a broad range of researchers within the LANL Weapons Program and beyond. The NSRC also has customers across other National Nuclear Security Administration labs and sites, and partners in the Department of Defense. This report highlights LANL accomplishments through NSRC.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗