Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Energy Savings Performance Contracts”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Energy Savings Performance Contract Energy Sales Agreements

An energy savings performance contract energy sales agreement (ESPC ESA) is a project structure, similar to a power purchase agreement, that uses the multiyear ESPC authority to implement renewable energy projects (referred to as ESA energy conservation measures [ECMs]) on federal buildings or land. The ESA ECM is initially privately owned for tax-incentive purposes, and the federal agency purchases the electricity it produces. An ESPC ESA is one of the most cost-effective methods for implementing on-site distributed energy projects at civilian federal agency sites.

energy savings performance contract↗

Energy Savings Performance Contract Energy Sales Agreements

An energy savings performance contract energy sales agreement - referred to as an ESPC ESA or ESPC with an ESA - is a project structure that uses the multiyear ESPC authority to implement distributed energy projects on federal buildings or land. The distributed energy project implemented under an ESPC ESA is referred to as an ESA energy conservation measure, or ESA ECM.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Savings Performance Contract Energy Sales Agreement Toolkit

FEMP developed the Energy Savings Performance Contracting Energy Sales Agreement (ESPC ESA) Toolkit to provide federal agency contracting officers and other acquisition team members with information that will facilitate the timely execution of ESPC ESA projects.

energy sales agreements↗

Energy Savings Performance Contracts (ESPCs)

Energy savings performance contracts (ESPCs) allow Federal agencies to conduct energy projects with limited to no up-front capital costs, minimizing the need for Congressional appropriations.

Energy, Savings, Performance, Contracts↗

Energy Savings Performance Contracting for Small Projects

Energy Savings Performance Contracting (ESPC) is a budget-neutral approach to make building improvements that reduce energy and water use and increase operational efficiency. ESPC can help public-sector planners use tomorrow’s energy savings to fund today's facility and infrastructure upgrades. This resource highlights strategies and case studies for implementing ESPC in smaller towns, rural counties, and small school districts to complete energy upgrades and maximize energy and cost savings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Potential for the Use of Energy Savings Performance Contracts to Reduce Energy Consumption and Provide Energy and Cost Savings in Non-Building Applications

The findings of this study indicate that potential exists in non-building applications to save energy and costs. This potential could save billions of federal dollars, reduce reliance on fossil fuels, increase energy independence and security, and reduce greenhouse gas emissions. The Federal Government has nearly twenty years of experience with achieving similar energy cost reductions, and letting the energy costs savings pay for themselves, by applying energy savings performance contracts (ESPC) in its buildings. Currently, the application of ESPCs is limited by statute to federal buildings. This study indicates that ESPCs can be a compatible and effective contracting tool for achieving savings in non-building applications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Savings Performance Contract (ESPC) ENABLE Program

The Energy Savings Performance Contract (ESPC) ENABLE program, a new project funding approach, allows small Federal facilities to realize energy and water savings in six months or less. ESPC ENABLE provides a standardized and streamlined process to install targeted energy conservation measures (ECMs) such as lighting, water, and controls with measurement and verification (M&V) appropriate for the size and scope of the project. This allows Federal facilities smaller than 200,000 square feet to make progress towards important energy efficiency and water conservation requirements.

Energy, Savings, Performance, Contract, ESPC, ENAB↗

Commissioning Guidance for Energy Savings Performance Contracts (ESPCs)

This Commissioning Guidance for Energy Savings Performance Contracts (ESPCs) is DOE’s official guidance for ordering agencies under the current DOE ESPC IDIQ contract. This guidance document explains how commissioning of energy conservation measures (ECMs) and water conservation measures (WCMs) is incorporated into the ESPC process, roles and responsibilities in project commissioning, and key elements of commissioning. This document updates the previous version, released in 2015. This guidance can also be used as applicable in the development of ESPC ENABLE and UESC performance assurance plans.

Walker, Christine↗

How To Determine and Verify Operations and Maintenance Savings in Energy Savings Performance Contracts

Operations and maintenance (O&M) savings frequently occur in energy savings performance contracts (ESPCs). During FY 2022, 37% of reported annual cost savings for projects awarded under the U.S. Department of Energy (DOE) ESPC indefinite delivery indefinite quantity (IDIQ) contracts and in the performance period were due to O&M or other energy- and/or water-related cost savings, with the balance (63%) from utility cost savings (i.e., energy or water cost savings). Sometimes the energy- and water-related cost savings are acknowledged and included in payments within ESPCs; other times, for various reasons, they are not. As presented in this guide, FEMP recommends including energy- and water-related cost savings that are O&M (including related repair and replacement) savings in the financial aspects of an ESPC, to the extent such savings can be documented. Inclusion of these savings will help augment project scopes and/or lower interest costs (by shortening financing terms). However, there is a burden of proof as to what constitutes acceptability in O&M savings that needs to be carefully considered and documented in individual projects. Beyond promoting a key tenet used in U.S. federal performance contracting—that savings must be from actual budgets and therefore based on the level of O&M that is actually occurring, not what should have been performed—FEMP also recommends good practice in establishing and documenting O&M baselines, formulating the rationale for baseline adjustments during the performance period, and conducting ongoing verification activities. This document concludes with five examples of how O&M savings may be handled, in situations ranging from the partial displacement of O&M contracts to consolidation and “virtualization” of servers in data centers. A key theme that permeates this guide is the importance of thoroughly documenting all conditions and assumptions used in the development of and accounting for O&M costs and savings throughout the ESPC life cycle, from baseline-setting to measurement and verification (M&V) of the savings during each year of the performance period. Doing so not only prevents internal claims of non-performance (especially in the case of staff turnover during the contract term), but also simplifies ordering agency and energy service company (ESCO) response in the event of scrutiny from oversight organizations, such as government audits. While this guide focuses on federal ESPCs, it may also be applicable when O&M savings are included in utility energy service contracts (UESCs) and non-federal ESPCs.

Voss, Phil↗

ePROJECT BUILDER: PROMOTING WIDER ADOPTION OF ENERGY SAVINGS PERFORMANCE CONTRACTS THROUGH STANDARDIZATION AND TRANSPARENCY

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Earni, Shankar↗

Using Revolving Loan Funds to Finance Energy Savings Performance Contracts in State and Local Agency Applications

Numerous pre-existing and newly emerging state- and locally-managed revolving loan funds (RLFs) are being used in conjunction with energy savings performance contracts (ESPCs) as an option for financing of energy efficiency projects. This document presents an overview of ESPCs and how they fit within the RLF framework. There are a variety of options available to state and local governments to catalyze the disbursement of available capital from RLFs and increase the number of ESPC projects within their jurisdictions. To demonstrate the implementation of this type of financing program in action, this report concludes with four program case studies of state-sponsored RLFs where ESPCs are an allowed use of funds.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Federal Energy Savings Performance Contracts: Frequently Asked Questions on the Scope of 42 U.S.C. § 8287 et seq.

Document provides clarification and guidance on issues commonly raised regarding the scope of 42 U.S.C. § 8287 et seq. It is a supplement to the Federal Energy Management Program's extensive collection of materials that are available to assist federal agencies execute successful energy savings performance contract (ESPC) projects.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗