Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Energy Options Analysis, Outreach”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Project Earth Lover

Under this project, the Ponca Tribe of Nebraska (PTN) will conduct An Energy Options Analysis (EOA) to empower Tribal Leadership with critical information to allow them to effectively screen energy options that will further develop the Tribe's long-term strategic plan and energy vision. The PTN will also provide community workshops to enhance Tribal Members' capabilities, skills and awareness of energy efficiency and conservation technology and practices. A 90- minute workshop will be conducted at each of the 5 sites and one-hundred tribal members will receive an energy efficiency kit.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Multi-State Model for Catalyzing the National Home Energy Retrofit Market (Final Technical Report)

In the fall of 2010, the Alabama Department of Economic and Community Affairs (ADECA) launched the Multi-State Model for Catalyzing the National Home Energy Retrofit Market Project (Multi-State Project). This residential energy efficiency pilot program was a collaborative effort among the states of Alabama, Massachusetts, Virginia, and Washington, and was funded by competitive State Energy Program (SEP) awards through the U.S. Department of Energy (DOE). The objective of this project was to catalyze the home energy efficiency retrofit market in select areas within the state of Alabama. To achieve this goal, the project addressed a variety of marketplace elements that did not exist, or were underdeveloped, at the outset of the effort. These included establishing minimum standards and credentials for marketplace suppliers, educating and engaging homeowners on the benefits of energy efficiency and addressing real or perceived financial barriers to investments in whole-home energy efficiency, among others. The anticipated effect of the activities would be increased market demand for retrofits, improved audit to retrofit conversion rates and growth in overall community understanding of energy efficiency. The four-state collaborative was created with the intent of accelerating market transformation by allowing each state to learn from their peers, each of whom possessed different starting points, resources, and strategies for achieving the overall objective. The four partner states engaged the National Association of State Energy Officials (NASEO) to oversee a project steering committee and to manage the project evaluation for all four states. The steering committee, comprised of key program partners, met on a regular basis to provide overall project coordination, guidance, and progress assessment. While there were variances in program design among the states, there were several common elements: use of the Energy Performance Score (EPS) platform; an audit and home energy rating tool; emphasis on community based coordination and partnerships; marketing and outreach to increase homeowner participation; training for market actors; access to financing options including rebates, incentives, and loan products; and an in depth process evaluation to support continual program improvement and analysis. In Alabama, Nexus Energy Center operated energy efficiency retrofit programs in Huntsville and Birmingham. In the Huntsville community the AlabamaWISE program was available in five Alabama counties: Cullman, Lawrence, Limestone, Madison, and Morgan. In Birmingham, the program was available to residents in Jefferson and Shelby Counties. In both communities, the program was similar in terms of program design but tailored marketing and partnerships to address the unique local conditions and population of each community. ADECA and the Southeast Energy Efficiency Alliance (SEEA) provided overall project management services and common resources to the local program administrator Nexus Energy Center, including contracted services for contractor training, quality assurance testing, data collection and reporting, and compliance. The fundamental components of the AlabamaWISE program included a vertical contractor-based business model; comprehensive energy assessments; third-party quality assurance; rebates for installation of energy saving measures; accessible, low-interest financing; targeted and inbound marketing; Energy Performance Score (EPS) tool to engage and educate homeowners; training for auditors, contractors, and real estate professionals; and online resources for education and program enrollment. Program participants were eligible to receive rebates or financing toward the assessments and upgrades to their home provided they reached at least 20 percent deemed or modeled energy savings. The design of each program focused on addressing several known barriers including: limited homeowner knowledge on the benefits of energy efficiency, lack of financing options, lack of community support for energy efficiency programs, and lack of trained market actors including contractors and real estate professionals. The programs were able to make progress on addressing all of these barriers and were most successful in offering financing options and training market actors. The most challenging barriers proved to be the act of building a market for energy efficiency where none previously existed, convincing homeowners of the value in investing in energy efficiency (and therefore completing retrofits), engaging electric and natural gas utilities to partner on delivery, and achieving the overall project target of 1,365 completed retrofits. The components that proved to be the most valuable to program success were engaged contractor networks that could promote and endorse the program, partnerships with local business and organizations, and the access to rebates, incentives and financing mechanisms. The programs were successful in building relationships with a variety of community participants including: local contractors, Associations of REALTORS, home builders associations, universities, utilities, local and state governments, and other non-profit organizations. Throughout this program, 933 building audits and 795 building retrofits were completed making homes in Alabama more comfortable, less expensive to operate, more valuable to the marketplace, and safer and healthier for families. Continuing on this momentum, Nexus Energy Center plans to continue operating and expanding operations in Alabama as a Home Performance with ENERGY STAR sponsor and will continue to provide energy services and education to communities in Alabama.

Grimes, Elizabeth M.↗

Accelerating nuclear-integrated data center pursuits in the USA: SWOT analysis, power-thermal management strategies and demonstration plan

Here, this study explores the increasing interest in leveraging nuclear power to meet the escalating energy demands of data centers in the United States (U.S.) by focusing on key factors that contribute to accelerated deployment. The study highlights the importance of N+1/N+2 power supplies (where N is the required number of units), outlines research and innovations in nuclear-integrated data center thermal management and demonstration plan. It also provides updates about status and costing of various reactor system designs. A summarized strengths, weaknesses, opportunities, and threats (SWOT) analysis shows the potential options for grid connectivity, reactors, and site selection. Suitable site discussions consider land and water availability, grid access, and optical fiber connectivity, and the study presents graded prospects for Department of Energy (DOE) sites with a specific example. Community engagement and partnerships are emphasized, particularly the roles of local government, federal agencies, utilities, and data center industry partners, which are crucial for accelerating deployment, business outreach, and approvals. The study provides actionable insights for stakeholders to accelerate the deployment of nuclear-powered data centers.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Nebraska Integrated Carbon Capture and Storage Pre-Feasibility Study

In collaboration with the Nebraska Public Power District (NPPD), the Energy & Environmental Research Center (EERC) has conducted a pre-feasibility study for a commercial-scale carbon dioxide (CO 2 ) geologic storage complex in western Nebraska integrated with potential CO 2 capture at Gerald Gentleman Station (GGS). GGS is the largest coal-fired electricity-generating station in Nebraska, emitting 8.5 million metric tons (Mt) of CO 2 annually, and is located near the town of Sutherland. This pre-feasibility (Phase 1) project has been executed as part of the U.S. Department of Energy (DOE) CarbonSAFE program, a multiphase initiative to support the deployment of large-scale carbon capture and storage (CCS) projects. Each CarbonSAFE project is required to demonstrate the potential to capture and store at least 50 million tonnes (Mt) of CO 2 over a 25-year operational period. The EERC and NPPD established a coordination team to identify challenges to a potential Nebraska CCS project, comprising local stakeholder organizations, which met twice in Lincoln and via several Webinars, providing feedback and guidance throughout the pre-feasibility study. The EERC also secured the technical support of Schlumberger Carbon Services and Computer Modelling Group Ltd. (CMG). The project comprised four technical themes, all using published information sources. Regional and stakeholder analysis, including identification of sensitive environmental areas, potential resource conflicts, and strategies for public outreach. A review of geographic and socioeconomic characteristics, in combination with geologic characterization in the subbasinal analysis described below, identified an area to the southwest and within a 75-mile radius of GGS as the most prospective for development of a storage site. This area largely avoided lands with protected status such as wetlands. A public outreach plan has also been developed for implementation in any further phases of CCS assessment in western Nebraska, for example a CarbonSAFE Phase 2 feasibility study. Scenario analysis, addressing economic and regulatory factors. GGS is the only single major source of CO 2 emissions capable of satisfying the CarbonSAFE 50-Mt scale requirement within the study region. Chemical absorption using amines was identified as the most viable technology for postcombustion CO 2 capture at GGS. The total cost of a CCS project at GGS was estimated to be between $67/tonne CO 2 for capture and auxiliary boiler to minimize parasitic load and $70/tonne CO 2 avoided cost, using the Carnegie-Mellon University Integrated Environmental Control Model (IECM). The total avoided cost included the capture facility and parasitic load, a flue gas desulfurization plant required for the use of amine solvent technology, transport via pipeline, and dedicated storage infrastructure. Nebraska has no legislation in place to address typical CCS-specific issues, for example pore space ownership for storage. Long-term liability, therefore, falls under the U.S. Environmental Protection Agency Underground Injection Control (UIC) Class 6 program regulations. Subbasinal analysis, addressing the potential for a dedicated subsurface “container” to store the required 50-Mt quantity of CO 2 . Modeling and simulation studies identified an area to the southwest of GGS with the potential for storage of 50 Mt CO 2 in the Cloverly Formation, comprising sandstones with interbedded and intermingled shales. The area of review (AOR) that would be required for monitoring under a Class VI operating permit was estimated to be as high as 400–700 square miles, due to uncertain pressure effects. The viability of this storage option is subject to significant uncertainty due to the relatively limited amount of existing characterization data available to the pre-feasibility study; for example, dynamic simulation indicated that the proposed storage rate might require as little as two or as many as 14 injection wells. A key uncertainty is the relative proportion and distribution of sandstone and shale within the Cloverly Formation. A preliminary, semiquantitative risk assessment also suggested uncertainty over storage capacity and injectivity constitute the most significant project risks at this pre-feasibility stage. No assessed risks were considered to rule out the possibility of a project moving to deployment. National Risk Assessment Partnership (NRAP) validation, using software tools developed by the National Energy Technology Laboratory (NETL) to assess risks associated with the potential 50-Mt CO 2 storage complex. NRAP tools were used to assess hypothetical leakage scenarios. Results broadly supported the conclusion of the semiquantitative risk analysis – for example, even worst-case analysis of theoretical leakage scenarios found limited migration rates and impacts. In summary, the work undertaken in this Phase 1 pre-feasibility study has shown that western Nebraska has potential to host a commercial-scale CCS project, including a dedicated storage “container” for 50 Mt of CO 2 . However, the following key challenges would need to be overcome: The business case for deploying CCS projects is uncertain; recently announced federal tax credits and sales of CO 2 for enhanced oil recovery may not cover the full costs of a CCS project at GGS, as estimated by this pre-feasibility study. The potential 50-Mt CO 2 dedicated storage container defined in this pre-feasibility study should be regarded as having a relatively low level of readiness to support a CCS project. Public outreach would be a vital element in western Nebraska, where sensitivities around such environmental issues as water resource protection and pipeline construction would need to be carefully addressed.

54 ENVIRONMENTAL SCIENCES↗

Wave Energy Research, Testing and Demonstration Center

The purpose of this project was to build upon the research, development and testing experience of the Northwest National Marine Renewable Energy Center (NNMREC) to establish a non-grid connected open-ocean testing facility for wave energy converters (WECs) off the coast of Newport, Oregon. The test facility would serve as the first facility of its kind in the continental US with a fully energetic wave resource where WEC technologies could be proven for west coast US markets. The test facility would provide the opportunity for self-contained WEC testing or WEC testing connected via an umbilical cable to a mobile ocean test berth (MOTB). The MOTB would act as a “grid surrogate” measuring energy produced by the WEC and the environmental conditions under which the energy was produced. In order to realize this vision, the ocean site would need to be identified through outreach to community stakeholders, and then regulatory and permitting processes would be undertaken. Part of those processes would require environmental baseline studies and site analysis, including benthic, acoustic and wave resource characterization. The MOTB and its myriad systems would need to be designed and constructed.The first WEC test at the facility with the MOTB was completed within this project with the WET-NZ device in summer 2012. In summer 2013, the MOTB was deployed with load cells on its mooring lines to characterize forces on mooring systems in a variety of sea states. Throughout both testing seasons, studies were done to analyze environmental effects during testing operations. Test protocols and best management practices for open ocean operations were developed. As a result of this project, the non-grid connected fully energetic WEC test facility is operational, and the MOTB system developed provides a portable concept for WEC testing. The permitting process used provides a model for other wave energy projects, especially those in the Pacific Northwest that have similar environmental considerations. While the non-grid connected testing facility provides an option for WEC developers to prove their technology in a fully-energetic wave environment, the absence of grid connection is somewhat of a limitation. To prove that their technology is commercially viable, developers seek a multi-year grid connected testing option. To address this need, NNMREC is developing a companion grid connected test facility in Newport, Oregon, where small arrays of WECs can be tested as well.

16 TIDAL AND WAVE POWER↗

Shelter Island, New York, Energy Reliability Assessment and Local Generation Options

Shelter Island's Green Options Committee (GOC), an all-volunteer committee tasked with considering all environmental conservation issues, requested technical assistance under the U.S. Department of Energy (DOE)-funded Energy Technology Innovation Partnership Project (ETIPP). The primary goals of this technical assistance project included: 1. Informing the GOC about energy use trends within the community as well as distributed solar, wind and storage opportunities; 2. Providing additional resources and technical feasibility information for geothermal, agrivoltaics and tidal energy; 3. Supporting the development of a community engagement plan; and 4. Supporting collaboration between the GOC and PSEG in order to find mutually beneficial follow-on projects. Assistance from NLR to help the GOC meet these overall project goals was provided through the following primary tasks: 1. Collaborate with the local utility in order to collect energy use data and inform the community on energy use patterns through a baseline assessment; 2. Technical analysis of distributed renewable and resiliency opportunities (solar, wind and storage) that best align with the community's energy priorities; 3. Provide high level feasibility support for future renewable energy scenarios that include agrivoltaic solutions, tidal energy, and geothermal projects on Shelter Island, and 4. Integrate all findings into a Community Outreach presentation to help the GOC engage with community stakeholders to build support and awareness of chosen resilience strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Montana Community-Scale Solar Strategy Project (Final Technical Report)

Grid-tied solar photovoltaic (PV) development began gradually in Montana, initially taking root in the early 2000s, largely in the form of small residential systems, rarely larger than two kilowatts. Utility support for solar technology through public benefit funding triggered the installation of the state’s first solar PV installations on community-owned facilities including schools, libraries, fire stations and local government buildings in the mid-2000s. By 2016, solar PV installations totaled approximately 28 megawatts of installed capacity, generating less than 0.05% of electricity sold in Montana. Montana’s solar fleet in 2016 included 17 megawatts of utility-scale solar farms, and three shared solar projects developed by rural electric cooperatives that ranged from 25 to 50 kilowatts in size. However, with only 3,000 households utilizing solar PV, either through an on-site installation or participation in a shared solar project, the potential benefits and reach of solar technology was limited. The Montana Solar Community Project (MSCP) was developed by the Montana Energy Office (MEO) at the Department of Environmental Quality in order to implement a “community-scale” solar energy strategy for the state that would cost-effectively expand Montanans’ access to solar PV. This project defines three types of community-scale solar projects: shared solar, community-sited solar, and group purchasing programs. The MSCP project conducted research and stakeholder engagement that helped to inform and develop model community-scale initiatives and an overarching community-scale solar strategy for Montana. Specifically, the project included a solar market assessment, stakeholder meetings across Montana, development of a menu of community-scale solar options, a study of solar potential on schools, community solar market research, and community-scale project implementation support. MSCP activities were successful in implementing solar projects and supporting solar development in communities across Montana. Project activities realized 280 kW of newly installed solar from two solarize programs, a shared solar array at a rural electric cooperative, and a solar array atop a Bozeman high school. The community-scale project implementation support and Solar on Schools components of the project resulted directly in the analysis and design of nearly 2 MW of distributed solar systems across the state. The Solar on Schools analysis alone produced solar designs for 25 schools, representing 920.8 kW of solar potential. Many of the deliverables from this project provide guidance on future development of community-scale solar in Montana, and resulted in a number of important conclusions about community-scale solar in Montana. There is strong interest in community-scale solar in Montana, as noted during stakeholder meetings, in response to solar market research surveys, and as seen by applications for implementation support grants provided by MEO. Project activities also suggest that Montanans demonstrated a desire and need for more information about solar energy technology, solar financing options, and the state’s policy and regulatory framework. Additionally, the project found that schools will be key partners for future community-scale solar programs. In addition to being excellent hosts for solar arrays, schools have the opportunity to use the installation of a solar array to develop educational materials and curricula to educate Montana’s future leaders about these technologies, which can be shared and replicated across the state. Project activities laid a clear path forward for solar energy in Montana. Certain activities have concrete next steps. For example, numerous solar arrays were designed for schools and other public buildings around the state. Many of those designs will be used as soon as funding becomes available. Other activities have less developed next steps, though lay the foundation for future work. The solar market assessment, solar market research, and community stakeholder meetings are good examples. These documents can be used as stepping stones to increase renewable energy education, increase stakeholder outreach, and support communities as they seek to develop community-scale solar projects.

14 SOLAR ENERGY↗

Techno-Economic Analysis and Market Potential of Geological Thermal Energy Storage (GeoTES) Charged With Solar Thermal and Heat Pumps

In this project, we developed a techno-economic analysis (TEA) model that can be used to evaluate the viability of a proposed Geological Thermal Energy Storage (GeoTES) design. This MATLAB-based model integrates distinct subsystem models for the reservoir, wells, power cycle, and solar field to capture their distinct characteristics. It applies this approach in simulating GeoTES storage and dispatch operations for durations ranging from hourly to seasonal. Using cases studies based on GeoTES designs provided by industry partners - Premier Resource Management (PRM) and EarthBridge Energy - we validated the TEA model estimations of system performance and costs (such as thermal and electrical power/energy inflow and outflow, capital costs, and levelized costs of energy and storage) for both concentrating solar thermal (CST) and Carnot Battery (CB) pairings with GeoTES (CST-GeoTES and CB-GeoTES). For the CST-GeoTES case, the model was validated against the proposed system designed by PRM. It showed good agreement with PRM's estimations when well and pump costs derived from PRM's estimations were used. When GETEM-based costs were used, there was a slight overprediction due to GETEM's project/site agnostic assumption of these costs. From a sensitivity analysis perspective, the levelized cost of electricity (LCOE) of the CST-GeoTES case was most sensitive to well flow rate and the charging temperature. An optimal design scenario resulted in an LCOE of 0.11 $\$$/kWhe. CST-GeoTES can also provide a source of heat to meet seasonal demands. With 12-hour and 24-hour levelized cost of heat (LCOH) of 0.018 $\$$/kWhth and 0.022 $\$$/kWhth, respectively, CST-GeoTES could be competitive in the California market with an average industrial price of natural gas in California between 0.041-0.047 $\$$/kWhth. The levelized cost of storage (LCOS) for CST-GeoTES depends on the energy storage duration. Although the LCOS is relatively higher for shorter durations (e.g., ~0.50 $\$$/kWhe for 1 hour of storage), it is an order of magnitude lower (0.06 $\$$/kWhe) for longer storage durations and competitive with lithium-ion batteries (beyond 12 hours of storage) and molten-salt thermal energy storage (beyond 32 hours). Energy. Three options were explored and applied to the EarthBridge case study: (1) A Carnot Battery design using R125 working fluid with both hot and cold storage; (2) A Carnot Battery design using R125 working fluid with only hot storage; (3) A Carnot Battery using a commercially available heat pump with carbon dioxide (CO2) working fluid and hot storage only. The CB-GeoTES with cold storage only had a slight (round-trip) efficiency advantage over the system without (43.4% vs. 42.8%). This is because the cold storage is limited by the freezing point of water, so the cold storage is not much colder than the environment. The system using commercially available technologies was the least efficient - partly because different cycles were used in the heat pump (CO2) and heat engine (binary cycle) which leads to some inefficiencies. Using the commercially available design, the levelized cost of energy (LCOS) from the model (0.10 $\$$/kWhe) was higher than that estimated by EarthBridge (0.068 $\$$/kWhe). This is because of the low round-trip (38.7%) efficiency of the commercially available design. Sensitivity analysis reveals that the model is most sensitive to electricity price. Including electricity price in the TEA for CB-GeoTES leads to an increase in LCOS from the base value to 0.25 $\$$/kWhe. To determine storage sites suitable for GeoTES, we gathered and analyzed geological, petrophysical, and geophysical data of oil and gas reservoir and aquifers in California and Texas. We down-selected possible sites based on cut-off values for site characteristics (e.g., reservoir temperature, formation thickness, permeability, porosity, depth, and brine salinity) and preliminary costs. Using this approach, the Carrizo-Wilcox, Yegua-Jackson, and Dockum brackish aquifers in Texas were identified as having the highest suitability. Similarly, in the central California region, the White Wolf, Belridge South Tulare, and Belridge South Reef Ridge were the most suitable. Going further, we assessed the storage potential in the selected sites. To do this we developed distributions of reservoir characteristic data and applied a Monte Carlo-based analysis to account for intrinsic uncertainty in the acquired data. The analysis revealed that the Carrizo-Wilcox aquifer had the highest storage potential with a mean capacity of 554 TWhth (i.e., 63 TWhe). The estimated capacity serves as an upper limit of storage potential given that not all fields in the basin will be developed. We participated in multiple outreach activities including conference presentations, panel session discussions, and the facilitation of a GeoTES workshop at the NREL Golden campus.

15 GEOTHERMAL ENERGY↗

The Gandalf Staff: A Mobile Tool for Lunar Exploration (2nd year of development)

The Gandalf Staff is a mobile tool designed to be a flexible device supporting crewed and uncrewed operations on the lunar surface. The core of the device is a 24v battery with communications and data storage systems. Initial optional components supporting crewed Extra-Vehicular Activity (EVA) include a LiDAR and 360˚ camera. These provide 3D mapping of the traverse for documentation, and to aid future planning. The mapping also creates outreach opportunities for the public to “stand beside” the astronaut in Virtual Reality (VR). The staff provides external lighting for field site illumination in the south polar region low sun angle environment. Navigation instruments for crew position determination with Lunar Search and Rescue (LunaSAR) are also included. The staff itself can be used as a walking aid or as a splint for Incapacitated Crew Rescue (ICR). As a stand-alone device, the staff operates as a long duration untended science platform collecting environmental data and sending it to a lunar base station. The stand-alone mode requires connection to an auxiliary power source (e.g. solar array) and energy storage system (e.g. battery), so it could become an electrical recharging station. To make rapid progress in the 1st year, and also to demonstrate innovative project management techniques, NASA guided a private industry partner, T STAR, in leading Capstone Engineering student teams at Texas A&M University (TAMU) for proof-of-concept development and testing. These teams developed the power system and demonstrated successful integration of LiDAR, WiFi communications, and external lighting subsystems. Another industry team at Jacobs Technology prototyped a tripod to hold the staff upright. For the 2nd year (FY’22), NASA will again collaborate with partners to prototype enhanced power and lighting concepts. Year 2 will also add new capability for LunaSAR and geophysical science instrumentation using a heat probe. The heat probe is based upon Apollo heritage but modified to measure subsurface volatile ice regimes at the Artemis landing site. Components of the Gandalf Staff can be developed, tested, and deployed independently, or on the integrated staff, rovers, or utility trailers. The project supports crew safety, lunar sample curation, mission science, and public outreach goals of NASA. PLAIN TEST SUMMARY: Gandalf Staff is a 24v battery powered mobile tool for the lunar surface supporting crewed geologic field site exploration, or as a stand-alone science platform. As a tool assisting astronauts conducting field geology, the Gandalf Staff provides external lighting to illuminate shadowed regions on the surface. It also documents the process of collecting rocks and dust samples using a LiDAR (laser range instrument) and cameras. The staff provides a beacon for emergency location of astronauts and augments communications when the astronauts are blocked by large boulders. As a standalone science platform, the Gandalf Staff provides a power system for instruments and sensors to measure the lunar environment over long periods of time. The staff gathers data and sends the results to a lunar base station for analysis.

External Lighting↗

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗