At least 19 records

Multidisciplinary Design, Analysis, and Optimization (MDO) for Co-Designed Transmission & Distribution Electric Grid Planning

This paper describes early experiences and example use cases applying multi-disciplinary design analysis and optimization (MDO) to the integrated design of power grids. Adapted from aerospace, MDO enables combining multiple existing tools into a coordinated optimization. Here we use MDO to simultaneously capture integrated transmission-distribution and investment-engineering trade-offs in an automated framework. Example use cases showcase prototype interactions among existing grid models using MDO and hint at the types of integrated analyses enabled by this approach. In addition, we share experiences and thoughts on grid-specific challenges and opportunities to help advance further work in this area.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Opportunities for Efficiency Improvements in the U.S. Electricity Transmission and Distribution System

Since 2000, more than 172 quads of electricity have been transmitted on the US transmission and distribution (T&D) grid. Given this significant amount of energy flow, establishing and maintaining an efficient T&D grid is paramount. As shown in the figure below, the total percentage of overall losses in the US electric grid is approximately 6% (5.12% in 2012) (30% lower than the world average since 2000). While these efficiency losses appear to be relatively small from a percentage perspective, the total estimated electricity loss during this time is 10.8 quads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric utility transmission and distribution upgrade deferral benefits from modular electricity storage : a study for the DOE Energy Storage Systems Program.

The work documented in this report was undertaken as part of an ongoing investigation of innovative and potentially attractive value propositions for electricity storage by the United States Department of Energy (DOE) and Sandia National Laboratories (SNL) Electricity Storage Systems (ESS) Program. This study characterizes one especially attractive value proposition for modular electricity storage (MES): electric utility transmission and distribution (T&D) upgrade deferral. The T&D deferral benefit is characterized in detail. Also presented is a generalized framework for estimating the benefit. Other important and complementary (to T&D deferral) elements of possible value propositions involving MES are also characterized.

25 ENERGY STORAGE↗

Current Best Practices on Wildfire Risk Reduction for Electric Transmission and Distribution Systems

This report provides a set of best practices in response to Section 4(d) of Executive Order 14308, Empowering Commonsense Wildfire Prevention and Response. The information contained herein is expected to be used in conjunction with other materials at the Federal Energy Regulatory Commission Wildfire Risk Mitigation Technical Conference (Docket No. AD25-16-000), with possible direction to the North American Electric Reliability Corporation to take action. The objective of this report is to provide an overview of existing and emerging best practices currently employed or planned by utilities for wildfire mitigation, demonstrating how these efforts align with the executive order’s emphasis on reducing electric utility–caused wildfires while also balancing cost-effectiveness. Additionally, while most practices in utility-developed wildfire mitigation plans focus on risk reduction through robustness and operational reliability, this report also discusses best practices for resilience. The best practices are adopted from publicly available utility wildfire mitigation plans from the United States and Canada, recent findings from wildfire risk reduction research, and industry engagement.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Virginia Solar Pathways Project: Economic Study of Utility-Administered Solar Programs: Soft Costs, Community Solar, and Tax Normalization Considerations

This report presents economic considerations for solar development in support of the Virginia Solar Pathways Project (VSPP), an effort funded by the U.S. Department of Energy (DOE) SunShot Initiative that seeks to develop a collaborative utility-administered solar strategy for the Commonwealth of Virginia. The results presented are intended to be considered alongside the results of other studies conducted under the VSPP that evaluate the impacts of solar energy on the electric distribution, transmission, and generation systems in Virginia.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Colorado Technology Primer for Economists and Social Scientists: Cooperative Research and Development Final Report, CRADA Number CRD-19-00790

NLR will assist the Colorado School of Mines (Mines) in supporting a series of one-week training workshops. This proposed training program will be two, week-long summer school sessions in each of the next two years to help give early career economists and social scientists a solid introduction and grounding on the technical components of the electrical distribution, transmission, and generation systems as well as basic to advanced overview of clean energy and traditional generation systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Measurement placement in electric power transmission and distribution grids: Review of concepts, methods, and research needs

Sensing and measurement systems are quintessential to the safe and reliable operation of electric power grids. Their strategic placement is of ultimate importance because it is not economically viable to install measurement systems on every node and branch of a power grid, though they need to be monitored. An overwhelming number of strategies have been developed to meet oftentimes multiple conflicting objectives. The prime challenge in formulating the problem lies in developing a heuristic or an optimisation model that, though mathematically tractable and constrained in cost, leads to trustworthy technical solutions. Further, large-scale, long-term deployments pose additional challenges because the boundary conditions change as technologies evolve. For instance, the advent of new technologies in sensing and measurement, as well as in communications and networking, might impact the cost and performance of available solutions and shift initially set conditions. Also, the placement strategies developed for transmission grids might not be suitable for distribution grids, and vice versa, because of unique characteristics; therefore, the strategies need to be flexible, to a certain extent, because no two power grids are alike. Despite the extensive literature on the present topic, the focus of published works tends to be on a specific subject, such as the optimal placement of measurements to ensure observability in transmission grids. There is a dearth of work providing a comprehensive picture for developing optimal placement strategies. Because of the ongoing efforts on the modernisation of electric power grids, there is a need to consolidate the status quo while exposing its limitations to inform policymakers, industry stakeholders, and researchers on the research-and-development needs to push the boundaries for innovation. Accordingly, this paper first reviews the state-of-the-art considering both transmission and distribution grids. Then, it consolidates the key factors to be considered in the problem formulation. Finally, it provides a set of perspectives on the measurement placement problem, and it concludes with future research directions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy transport corridors: the potential role of Federal lands in states identified by the Energy Policy Act of 2005, section 368(b).

On August 8, 2005, the President signed the Energy Policy Act of 2005 (EPAct) into law. In Subtitle F of EPAct, Congress set forth various provisions that would change the way certain federal agencies (Agencies) coordinate to authorize the use of land for a variety of energy-related purposes. As part of Subtitle F of EPAct, Section 368 addresses the issue of energy transportation corridors on federal land for oil, gas, and hydrogen pipelines, as well as electricity transmission and distribution facilities. Because of the critical importance of improving the nation's electrical transmission grid, Congress recognized that electricity transmission issues should receive added attention when the Agencies address corridor location and analysis issues. In Section 368, Congress specifically directed the Agencies to consider the need for upgraded and new facilities to deliver electricity: In carrying out [Section 368], the Secretaries shall take into account the need for upgraded and new electricity transmission and distribution facilities to (1) improve reliability; (2) relieve congestion; and (3) enhance capability of the national grid to deliver electricity. Section 368 does not require the Agencies to consider or approve specific projects, applications for rights-of-way (ROWs), or other permits within designated energy corridors. Importantly, Section 368 does not direct, license, or otherwise permit any on-the-ground activity of any sort. If an applicant is interested in obtaining an authorization to develop a project within any corridor designated under Section 368, the applicant would have to apply for a ROW authorization and applicable permits. The Agencies would consider each application by applying appropriate project-specific reviews under requirements of laws and related regulations, including, but not limited to, the National Environmental Policy Act (NEPA), the Clean Water Act, the Clean Air Act, Section 7 of the Endangered Species Act (ESA), and Section 106 of the National Historic Preservation Act (NHPA). Under Section 368, Congress divided the United States into two groups of states: the 11 contiguous western states and the remaining states. Direction for energy transportation corridor analysis and selection in the 11 western states was addressed in Section 368(a) of EPAct, while direction for energy transportation corridor analysis and selection in all other states was addressed under Section 368(b) of EPAct. It was clearly the priority of Congress to conduct corridor location studies and designation first on federal lands in the western states. Under Section 368(a), the Agencies produced a programmatic environmental impact statement (EIS), Designation of Energy Corridors on Federal Land in the 11 Western States (DOE and DOI 2008), that was used in part as the basis for designating more than 6,000 mi (9,656 km) of energy transportation corridors on federal land in 11 western states. Under Section 368(a) of EPAct, Congress clearly stated the Agencies needed to (1) designate energy transportation corridors on federal land, (2) conduct the necessary environmental review of the designated corridors, and (3) incorporate the designated corridors into the appropriate land use plans. Congressional direction under Section 368(b) of EPAct differs from that provided under Section 368(a). Specifically, Section 368(b) requires the secretaries of the Agencies, in consultation with the Federal Energy Regulatory Commission (FERC), affected utility industries, and other interested persons, to jointly: (1) Identify corridors for oil, gas, and hydrogen pipelines and electricity transmission and distribution facilities on federal land in states other than the 11 western states identified under Section 368(a) of EPAct, and (2) Schedule prompt action to identify, designate, and incorporate the corridors into the applicable land use plans. While Section 368(a) clearly directs designation as a necessary first step for energy transportation corridors in the 11 western states, Section 368(b) directs the Agencies to first identify corridors and then schedule prompt action to identify, designate, and incorporate the corridors into applicable land use plans. To comply with the congressional direction provided in Section 368(b), the Agencies investigated corridor identification issues in the Section 368(b) states; this report to Congress provides information that could be relevant to possible future designation of energy corridors. Future designations, if appropriate and necessary, would occur when the Agencies undertake revisions and/or updates to land use plans that guide management decisions on lands located within individual administrative units, such as specific National Forests, National Parks, or Wildlife Refuges. At this time, the Agencies are not proposing any actions or decisions related directly or indirectly to designating energy corridors on federal land under Section 368(b) of EPAct.

08 HYDROGEN↗

CPUC Avoided Transmission and Distribution Cost Study to Support the Avoided Cost Calculator: Avoided Transmission Costs Draft Research Plan

Pacific Northwest National Laboratory (PNNL) and Lawrence Berkeley National Laboratory (LBNL) have been contracted by the California Public Utilities Commission (CPUC) Energy Division (ED) to perform a study which explores and selects an improved methodology to estimate avoided electricity transmission and distribution (T&D) infrastructure costs that can be attributed to the presence of distributed energy resources (DERs). PNNL is performing the study for avoided electricity transmission infrastructure costs and LBNL is performing the study for avoided electricity distribution infrastructure costs. This document summarizes CPUC’s research questions related to avoided transmission infrastructure costs and PNNL’s proposed technical approach to answer these questions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Small Hydropower Interconnections: State Interconnection Processes

Small hydropower projects with rated power output between 0 to 20 MW have been the predominant source of hydropower growth over the past decade in the United States (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier. Interconnection of an electricity generating unit is overseen by the distribution or transmission owner, who use interconnection standards and requirements that vary by state. The differences between standards in standards may affect the final cost, timeline, and success of a small hydropower project. Small hydropower project developers across the United States have found interconnection procedures to be fraught with cost surprises and schedule overruns. System operators have struggled to understand impacts to overburdened or rapidly evolving transmission and distribution grids. The results of these shortcomings have been stranded costs and unrealized small hydropower potential. Though regulatory actions and policy recommendations at the state level have increased the situational awareness of interconnection challenges, the remote locations of small hydropower resources and the relatively small revenues associated with energy production through small hydropower facilities continue to make interconnection processes and requirements confusing and costly. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. The second in a series, this paper investigates the interconnection process in each state in the U.S. to compare their attributes. Subsequent papers in the series will analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”) and present best practices (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development. The first paper in the series examined the state of small hydropower projects in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”) to understand the industry characteristics.

13 HYDRO ENERGY↗

Impact of Distributed Energy Resources on the Bulk Electric System: Combined Modeling of Transmission and Distribution Systems and Benchmark Case Studies

The high penetration of distributed energy resources (DERs) on modern distribution systems introduces intermittent power generation, stochastic system operating conditions, and bi-directional power flows that impact the system responses to various types of disturbances and may pose challenges to the operations and reliability of the Bulk Electric System (BES). In order to understand the impact of DERs on the planning and operation of the BES, the distribution system can no longer be represented as a single load at a node on the transmission system. At the same time, advanced control capabilities of DERs offer potential opportunities for improving BES reliability by transforming DERs from a passive “do no harm” resource to an active “support reliability” resource when applied in a planned and well-thought-out manner. This concept is often described as DER “flexibility.” With the persistent trend towards a high- penetration of DERs in distribution systems, regulators such as the North American Electric Reliability Corporation (NERC), planning coordinators and grid operators are in serious need of understanding the full-spectrum impact of DERs on the BES to ensure secure and reliable grid planning and operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilient distribution system leveraging distributed generation and microgrids: a review

With the aging of electricity transmission and distribution infrastructures and increasing intensity of extreme weather events, the aggravated vulnerability of electric distribution systems to extreme weather events has motivated the study of resilient distribution systems. This study presents a review of the state-of-the-art research on distribution grid resilience. First, the definition and quantifying metrics of resilience in the electrical distribution system are summarised. Second, the long-term and short-term measures to enhance the distribution system resilience are discussed. In particular, the recent studies on distributed generation and microgrid-assisted resilience enhancements are reviewed. Finally, recommendations for future research are presented.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Architecture for Web-Based Visualization of Large-Scale Energy Domains: Preprint

With the growing penetration of inverter-based distributed energy resources and increased loads through electrification, power systems analyses are becoming more important and more complex. Moreover, these analyses increasingly involve the combination of interconnected energy domains with data that are spatially and temporally increasing in scale by orders of magnitude, surpassing the capabilities of many existing analysis and decision-support systems. We present the architectural design, development, and application of a high-resolution web-based visualization environment capable of cross-domain analysis of tens of millions of energy assets, focusing on scalability and performance. Our system supports the exploration, navigation, and analysis of large data from diverse domains such as electrical transmission and distribution systems, mobility and electric vehicle charging networks, communications networks, cyber assets, and other supporting infrastructure. We evaluate this system across multiple use cases, describing the capabilities and limitations of a web-based approach for high-resolution energy system visualizations.

grid modernization↗

Electricity Supply Infrastructure Improvements: Final Technical Status Report, December 2010

This report is about a work effort where the overall objectives were to establish a methodology and approach for selected transmission and distribution (T&D) grid modernization; monitor the results; and report on the findings, recommendations, and lessons learned. The work reported addressed T&D problems and solutions, related reliability issues, equipment and operation upgrades, and respectivefield testing.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Empirical Investigations of the Opportunity Limits of Automatic Residential Electric Load Shaping

Residential electric load shaping is often modeled as infrequent, utility-initiated, short-duration deferral of peak demand through direct load control. In contrast, modeled herein is the potential for frequent, transactive, intraday, consumer-configurable load shaping for storage-capable thermostatically controlled electric loads (TCLs), including refrigerators, freezers, and hot water heaters. Unique to this study are 28 months of 15-minute-interval observations of usage in 101 homes in the Pacific Northwest United States that specify exact start, duration, and usage patterns of approximately 25 submetered loads per home. The magnitudes of the load shift from voluntarily-participating TCL appliances are aggregated to form hourly upper and lower load-shaping limits for the coordination of electrical generation, transmission, distribution, storage, and demand. Empirical data are statistically analyzed to define metrics that help quantify load-shaping opportunities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Technical Impacts of Light-Duty and Heavy-Duty Transportation Electrification on a Coordinated Transmission and Distribution System

In this study, we propose a strategy to model the required spatiotemporal charging demand from light-duty (LD) and medium- and heavy-duty (MHD) electric vehicles (EVs) using actual transportation data by mapping the demand for the required EV charging to a realistic and coordinated distribution and transmission electric grid at the predicted times of the day to study their impact on the power system in a variety of load, weather, and EV penetration scenarios. This work is the first study that includes the actual weather data and transportation data with realistic and coordinated distribution and transmission grid data in a large industry-scale level study. The main goal of this study is to identify possible issues and required upgrades in the electric grid, caused by an increase in EV integration. The transmission case study is a large grid with 6717 buses over a Texas footprint, and the distribution grid is over Houston, a city in Texas, covering over three million customers. The resulting overloads and voltage violations experienced in the system are discussed, and required planning upgrades to avoid these issues are suggested.

AC optimal power flow (AC-OPF)↗