Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Electric Customer Outages”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Evolution of the Preliminary Fault Management Architecture and Design for the Psyche Mission

The Psyche Mission presents the first opportunity toexplore the largest metal asteroid in the solar system, (16)Psyche, which is believed to be the exposed core of a largerplanetesimal that was stripped of its rocky mantle throughmultiple collisions during early solar system formation. Themission was selected in January 2017 for a 2022 launch as partof NASA’s Discovery Program and is uniquely enabled by theintegration of a Solar Electric Propulsion (SEP) Chassisdelivered by Maxar Space Solutions with JPL’s core deepspace avionics, flight software, and fault managementarchitectures. One of the key design tasks is the development ofa fault management system capable of being responsive to theunique elements of the combined JPL and Maxar spacecraftarchitecture. This new design leverages the strengths of eachorganization, with Maxar delivering its well-proven highvoltage power bus and low-thrust electric propulsionsubsystem from its GEO communications satellite product line,and JPL delivering its deep space mission expertise and thehardware and software most critical to deep space missiondesign. The development of a robust low-thrust mission andthe integration of design philosophies and hardware from twoorganizations is not without its challenges though.A key challenge in the development of the Psyche faultmanagement architecture and design is in the integration ofdesign philosophies and hardware from JPL and Maxar. Atthe architecture level, Maxar GEO communications satellitesare developed under the premise of highly responsive groundin the loop for the resolution of anomalies, and theimplementation takes a fail-operational approach to minimizedown time for its customers. In contrast, a deep space missionmust be able to maintain safety with long periods of groundcommunication outage. Additionally, with no time-criticalevents after launch, the Psyche spacecraft will generally failsafe in the presence of anomalous conditions; specialconsideration is being given to this approach, however, tominimize the loss of electric propulsion thrust time, which iscritical to low-thrust missions. At the hardware level, thedetailed definition of interfaces between JPL and Maxarhardware presents a unique challenge in the development andflowdown of fault management requirements, the developmentand implementation of fault monitors and responses, and thedevelopment and verification of fault containment boundaries.This paper describes the evolution of the Psyche faultmanagement architecture and design from the concept studyinto the preliminary design phase, with a focus on the uniquechallenges associated with flying GEO communicationssatellite hardware in deep space, implementing a robust lowthrust mission, and the integration of design philosophies andhardware from JPL and Maxar. Details regarding how thesechallenges are addressed in the fault management design inorder to maximize heritage, leverage the strengths of eachorganization, and minimize risk across the design are alsodiscussed.

Marsh, Danielle↗

Operating and Managing a Backup Control Center

Due to the criticality of continuous mission operations, some control centers must plan for alternate locations in the event an emergency shuts down the primary control center. Johnson Space Center (JSC) in Houston, Texas is the Mission Control Center (MCC) for the International Space Station (ISS). Due to Houston s proximity to the Gulf of Mexico, JSC is prone to threats from hurricanes which could cause flooding, wind damage, and electrical outages to the buildings supporting the MCC. Marshall Space Flight Center (MSFC) has the capability to be the Backup Control Center for the ISS if the situation is needed. While the MSFC Huntsville Operations Support Center (HOSC) does house the BCC, the prime customer and operator of the ISS is still the JSC flight operations team. To satisfy the customer and maintain continuous mission operations, the BCC has critical infrastructure that hosts ISS ground systems and flight operations equipment that mirrors the prime mission control facility. However, a complete duplicate of Mission Control Center in another remote location is very expensive to recreate. The HOSC has infrastructure and services that MCC utilized for its backup control center to reduce the costs of a somewhat redundant service. While labor talents are equivalent, experiences are not. Certain operations are maintained in a redundant mode, while others are simply maintained as single string with adequate sparing levels of equipment. Personnel at the BCC facility must be trained and certified to an adequate level on primary MCC systems. Negotiations with the customer were done to match requirements with existing capabilities, and to prioritize resources for appropriate level of service. Because some of these systems are shared, an activation of the backup control center will cause a suspension of scheduled HOSC activities that may share resources needed by the BCC. For example, the MCC is monitoring a hurricane in the Gulf of Mexico. As the threat to MCC increases, HOSC must begin a phased activation of the BCC, while working resource conflicts with normal HOSC activities. In a long duration outage to the MCC, this could cause serious impacts to the BCC host facility s primary mission support activities. This management of a BCC is worked based on customer expectations and negotiations done before emergencies occur. I.

Marsh, Angela L.↗

Lightning Detection

Lightning causes an estimated $50 million annually in damages to power lines, transformers and other electric utility equipment. Lightning strikes are not yet predictable, but U.S. East Coast Lightning Detection Network (LDN) is providing utilities and other clients data on lightning characteristics, flash frequency and location, and the general direction in which lightning associated storms are heading. Monitoring stations are equipped with direction finding antennas that detect lightning strikes reaching the ground by measuring fluctuations in the magnetic field. Stations relay strike information to SUNY-Albany-LDN operations center which is manned around the clock. Computers process data, count strikes, spot their locations, and note other characteristics of lightning, LDN's data is beamed to a satellite for broadcast to client's receiving stations. By utilizing real-time lightning strike information, managers are now more able to effectively manage their resources. This reduces outage time for utility customers.

Source record↗