Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Value of Nuclear Energy to the Reliability of the North American Power System: Results for Western and Eastern Interconnections

This report documents the fulfillment of a milestone for the United States (U.S.) Department of Energy Office of Nuclear Energy Light Water Reactor Sustainability Program: completing a baseline study of regional impact of nuclear power plants and hydrogen production in maintaining grid services and power quality. Models have been comprehensively demonstrated for the Western Interconnection, or Western Electric Coordinating Council area, and in the Eastern Interconnection for scenarios representative of past extreme events (e.g., drought and heat waves). Understanding the impact on the reliability of the bulk electric system of any reduction in generation capacity from nuclear power, for any reason, is the motivation of this work. Factors that might lead to the premature or unplanned closure of nuclear plants, extended outages, or repurposing of nuclear power include: • Aging infrastructure: Many nuclear power plants in the U.S. are nearing the end of their designed operating lives. Upgrading aging infrastructure can be expensive, and some utilities may choose to retire plants rather than invest in costly upgrades. • Low wholesale electricity prices: The deregulation of the electricity market in many states has led to increased competition and driven down wholesale electricity prices, causing nuclear power operators to seek other revenue sources for their heat and power such as clean hydrogen production. • Renewables growth: The rapid growth of renewable energy sources like solar and wind power is posing a challenge to traditional generation sources like nuclear. While many see renewables as a key part of the clean energy transition, their intermittent nature requires additional grid solutions for reliable power supply. • The potential for regulatory decisions to be in conflict: In its 2021 rulemaking, EPA rule (86 FR 880), the Environmental Protection Agency (EPA) set a compliance date for the ban on processing and distribution in commerce of Decabromodiphenyl Ether (DecaBDE). Since DecaBDE is in many components, particularly wiring, of nuclear power plants which are deemed safety-related or important to safety, three plants would not have been able to restart after their 2023 spring outages, and numerous others would have faced issues in the near future. Fortunately, in this case, the EPA provided relief to the nuclear energy industry. The report provides a summary of the significant role nuclear energy plays in the United States’ power generation mix, supplying around 20% of the nation’s electricity generation, spread across 28 U.S. states. Nuclear power is reliable, mostly unaffected by weather and seasonal changes, and provides a consistent source of baseload power. In terms of capacity, nuclear power plants account for as much as 26% of balancing area power generation capacity. Nuclear power also provides a substantial contribution (e.g., 10% of the inertia in the Eastern Interconnection) of the synchronous spinning mass/inertia that buffers the rate at which frequency changes when a load and generation imbalance occurs (e.g., a large plant trips or a load is suddenly shed due to a transmission outage). This contribution is critical for maintaining grid stability during sudden changes in load or generation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Cloud-Based Demonstration of the Eastern Interconnection Situational Awareness Monitoring System (ESAMS)

This report describes a cloud-based implementation and field demonstration of the Eastern Interconnection Situational Awareness and Monitoring System (ESAMS). ESAMS was developed to support the detection and source localization of forced oscillations using synchrophasor measurements from tie-lines connecting areas served by different reliability coordinators (RCs), so that RCs could better coordinate their response to wide-area events. A previous effort had identified deployment barriers associated with hosting shared situational awareness tools at a single RC. To address these barriers, ESAMS was migrated to Amazon Web Services and evaluated in a six-month field demonstration. ISO New England (ISO-NE) and PJM streamed data to the platform using AWS Direct Connect and a site-to-site VPN, respectively. The resulting multi-utility measurement footprint enabled regional source localization across major portions of the U.S. Eastern Interconnection and supported routine identification of oscillation events. During the final three months of the trial, 24 events above 2 MW/MVAR were detected. The largest detected oscillation approached a 25 MW peak-to-peak amplitude, and the longest persisted intermittently for more than 11 hours. The demonstration also assessed operational considerations—including data transfer volumes, end-to-end latency, and cloud computing costs—and found that network and compute requirements were modest relative to typical cloud capabilities while providing performance comparable to prior on-premises deployments. Overall, the results indicate that cloud hosting can provide a practical path to shared interconnection-wide oscillation monitoring. The cloud ESAMS demonstration establishes a foundation for broader utility participation and for building future wide-area analytics that leverage measurements across organizational boundaries.

Follum, James D.↗

Event Screening Methods for the Eastern Interconnection Situational Awareness and Monitoring System (ESAMS)

The Eastern Interconnection Situational Awareness and Monitoring System (ESAMS) is a tool developed to explore the applications and advantages of sharing phasor measurement unit (PMU) data among operating entities. An initial conclusion from testing was that detected events required further screening before being reported to ensure that events would be of interest to system operators. The methods described in this report were integrated into ESAMS to meet this need. First, an event is screened for whether the change in voltage angle measurements indicates that the detected disturbance is sufficiently large. Next, an event is classified to determine if it was related to a loss of generation. Finally, a neural network is used to determine if the system’s response to the disturbance is normal or abnormal. These methods were tested with one month of field-measured PMU data. Results indicate that the additional information provided by these additional screening tools will improve selection of events for inclusion in the daily event reports automatically generated by ESAMS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Properties of the Inter-area Modes of the U.S. Eastern Interconnection System

With an increase in the oscillation events observed in the U.S. Eastern Interconnection (EI), it has become increasingly important to have a good understanding of the EI system oscillatory behavior. However, as compared to the Western Interconnection system (WI), not much work has been done in this regard for the EI system. Therefore, in this paper, a thorough analysis is carried out to identify inter-area modes and their properties for the EI system using model-based approach. Multi-channel Prony method is used in this paper for estimating system modes and mode-shapes.

Agrawal, Urmila↗

Statistical Analysis of Inter-Area Oscillations in the U.S. Eastern Interconnection: A 2017-2023 Perspective

Recent advancements and the accumulation of high-resolution, long-term phasor measurement unit (PMU) data have provided detailed insights into inter-area oscillations in power grids. This study conducts a comprehensive statistical analysis of inter-area oscillations within the United States Eastern Interconnection from 2017 to 2023. Utilizing data captured by the advanced wide-area Frequency Monitoring Network (FNET/GridEye), this investigation examines the occurrence patterns, dominant frequencies, damping ratios, and excitation mechanisms of these oscillations. Our analysis sheds light on the evolving statistical behaviors of inter-area oscillations, offering updated and critical information for grid operators and planners. The insights gained from this study can be instrumental in enhancing the operational resilience of the power network and guiding strategic developments in grid infrastructure to accommodate future challenges. Additionally, the study discusses emerging challenges associated with the modernization of the power grid, including increased renewable penetration, dynamic load variability, and cyber-physical vulnerabilities that complicate oscillation monitoring and control.

Inter-area oscillations↗

Modeling Power Plant Siting Opportunities and Constraints in the Eastern Interconnection

The electrical transmission grid is a critical part of the U.S. national infrastructure, and its modernization is a U.S. Department of Energy (DOE) priority. We describe the Energy Zones Mapping Tool (EZMT), a unique, powerful, and public web-based system with multi-criteria decision analysis (MCDA) models for more than 20 power plant technologies and many other capabilities. Through a case study on natural gas combined cycle (NGCC) power plants in the Eastern Interconnection (EI), we provide an example of incorporating an EZMT MCDA model into a larger planning context, with projections of interconnection-level capacity expansion, thermoelectric power plant retirements, and water availability. Our results provide insights on candidate NGCC site distributions and the criteria influencing them. The case study provides both an efficient methodology for performing similar analyses and hundreds of candidate NGCC power plant sites that can be studied in more detail as potential project sites.

20 FOSSIL-FUELED POWER PLANTS↗

Grid Strength Analysis for Integrating 30 GW of Offshore Wind Generation by 2030 in the U.S. Eastern Interconnection

Offshore wind is a key player in the transition to a decarbonized electric gird, and the United States has set ambitious goals of integrating 30 GW of offshore wind capacity by 2030 and 110 GW by 2050. To facilitate this integration, the National Renewable Energy Laboratory and the Pacific Northwest National Laboratory are conducting the Atlantic Offshore Wind Transmission Study to assess transmission solutions. To achieve the 110-GW target by 2050, meticulous planning for network expansion and resource allocation is essential; however, meeting the 2030 goals requires integrating offshore wind power with minimal system upgrades, thus necessitating a careful study of grid strength and stability. The study team developed the Automated System-wide Strength Evaluation Tool (ASSET) to assess system strength under various operating conditions and contingencies, focusing on the proposed integration of 30 GW of offshore wind power by 2030. In this paper, we provide a summary of key features of the ASSET software and results of the grid strength analysis for integrating 30 GW of offshore wind generation by 2030 in the U.S. Eastern Interconnection.

Automated System-wide Strength Evaluation Tool (AS↗

Grid Strength Analysis for Integrating 30 GW of Offshore Wind Generation by 2030 in the U.S. Eastern Interconnection: Preprint

Offshore wind is a key player in the transition to a decarbonized electric gird, and the United States has set ambitious goals of integrating 30 GW of offshore wind capacity by 2030 and 110 GW by 2050. To facilitate this integration, the National Renewable Energy Laboratory and the Pacific Northwest National Laboratory are conducting the Atlantic Offshore Wind Transmission Study to assess transmission solutions. To achieve the 110-GW target by 2050, meticulous planning for network expansion and resource allocation is essential; however, meeting the 2030 goals requires integrating offshore wind power with minimal system upgrades, thus necessitating a careful study of grid strength and stability. The study team developed the Grid Strength Analysis Tool (GSAT) to assess system strength under various operating conditions and contingencies, focusing on the proposed integration of 30 GW of offshore wind power by 2030. In this paper, we provide a summary of key features of the GSAT software and results of the grid strength analysis for integrating 30 GW of offshore wind generation by 2030 in the U.S. Eastern Interconnection.

Automated System-wide Strength Evaluation Tool (AS↗

Eastern Interconnection Wide-Area Oscillation Assessment and Study Report

To meet the government mandates such as Renewable Portfolio Standards (RPS), conventional synchronous generators with rotating mass are being displaced by inverter-based resources (IBRs), leading to high penetration of renewable energy sources (RES). As a result, the inherent properties and characteristics of the transformed generation mix may significantly impact the grid behaviour, and it is of paramount significance that the impact and the consequences of the resource mix change is thoroughly understood to adopt measures to maintain reliable grid operations. Of great concern is the inter-area low-frequency oscillation, which usually propagates through a large region and has a system-wide impact. Such oscillations may lead to unnecessary or inadvertent tripping of generators, that may be simply reacting to the oscillation originating from geographically remote sites. Such tripping of generators can lead to cascading outages, system split and load loss events. Over the years, several system-wide oscillation events have been observed across all three North American interconnections. This project titled Wide-area Oscillation Assessment and Trending Study, sponsored by the Office of Electricity (OE) of the Department of Energy (DOE), aims to conduct the required research to capture and investigate the potential changes in wide-area oscillatory performance of the system as a result of resource mix transition. The Pacific Northwest National Laboratory (PNNL) conducted this research and technical staff of Federal Energy Regulatory Commission (FERC) served as advisors to the project. The primary objective of this study is to assess whether there are significant trends in the power system wide-area oscillatory behaviours, as a result of the generation-mix changes due to the increased penetration of RES in the U.S. Eastern Interconnection (EI). The analysis presented in this report can serve as reference for future grid planning and operation of the EI system. This research conducted in this project evaluates the wide-area oscillatory behaviour of the EI, using a model-based approach for potential future resource mixes, and the measurement-based analysis with 21-month phasor measurement unit (PMU) time series. The oscillation modes in EI system along with the impact of the changes of the generation mix on the frequency and damping ratio (DR) of the oscillations have been studied.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Data-Driven Exploration of the Impact of Renewable Energy on Inter-Area Oscillations in the U.S. Eastern Interconnection

As increasing amounts of renewable energy (RE) resources are incorporated into the bulk-power grid, power system oscillations are expected to change. This work investigates how RE generation impacts the frequency and damping ratio (DR) of two dominant inter-area modes in the U.S. Eastern Interconnection (EI) using regularly updated estimates collected over a 12-month period. Quantile regression is used to derive the correlation between operating conditions and mode properties, and a bootstrap method is used to quantify the uncertainty associated with the correlation estimates. Results show that with an increase in system load, the frequency of a mode decreases and DR increases. Evidence that increasing RE generation results in an increase in frequency and decline in DR was found for one of the two modes studied. This work shows that increasing RE levels will impact the properties of inter-area oscillations in the EI, but it does not indicate the presence of immediate threats to grid stability. The outlined approach can be used to periodically assess changing mode properties as RE levels continue to grow and flag stability concerns before they become serious reliability threats.

Inter-area oscillation, mode meters, quantile regr↗

Estimation of Electromechanical Modes of Oscillation in the Eastern Interconnection from Ambient PMU Data

A power system's inter-area electromechanical modes of oscillation determine if the system is small-signal stable. Mode meters are tools that estimate the modes based on ambient synchrophasor measurements, allowing continuous monitoring of the system's stability margin. This paper reports on the application of mode meter algorithms to 21 months of synchrophasor measurements from the United States Eastern Interconnection (EI). Estimates for three modes were updated every minute, providing a much more comprehensive set of results than previous studies based on disturbance recordings. The detailed signal designs and mode meter configurations provided in this paper can be used to accelerate mode meter deployments in the EI. Analysis of the mode estimates reveal for the first time how seasonal load changes and system reconfiguration impact the EI system's dynamics.

Follum, James D.↗

Online Tracking of Two Dominant Inter-Area Modes of Oscillation in the Eastern Interconnection

Reliable power system operation requires that small-signal stability be maintained at all times. Mode meters are measurement-based tools that provide operators with situational awareness of the system's stability margin. They operate by continually tracking the inter-area modes of oscillation that govern small-signal stability. This paper reports on the deployment of mode meters for online monitoring of two dominant modes of oscillation in the United States' Eastern Interconnection (EI). The use of measurements from system operators across the interconnection to provide continuous tracking is novel in the EI. Results from over four months of analysis reveal diurnal patterns in the modes and demonstrate that they can be tracked through a variety of system conditions. The results from this study continue to build an understanding of the EI's modes that will inform future modeling and monitoring efforts.

Follum, James D.↗

Transmission Value in 2023: Market Data Shows the Value of Transmission Remained High in Certain Locations Despite Overall Low Wholesale Electricity Prices

In 2023 additional electricity transmission would have provided the most value for links that crossed between grid interconnection regions in the United States (the Western Interconnection, the Eastern Interconnection, the Texas Interconnection) or crossed between system operator regions within the same interconnection. Many multi-interconnection or multi-region links had values of greater than $\$20$/MWh, or up to $\$175$ million/yr per 1 GW expanded transmission (subject to limits to the depth of the market at each side of the link). In contrast, many links within regions, or between regions in the northeast, had relatively low values in 2023, following the overall decline in wholesale electricity prices in 2023 compared with 2021-2022. The most valuable link in 2023, at $\$61$ /MWh, was between Texas and the Southwest. Multiple events in 2023 (high natural gas prices in the western U.S., and high summer temperatures in Texas and the Southwest) were observed to have driven this high value. Of particular note, high prices in Texas occurred at a largely distinct set of hours from high prices in the Southwest, helping to drive up the value of transmission in total and demonstrating significant value to both regions. This example demonstrates the unique value of transmission (compared to other solutions, such as building local generation resources) in delivering benefits to multiple regions given its ability to connect areas of the country that inevitably face differing circumstances.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Inertia Estimation and Trend Analysis of the United States Power Grid Interconnections

The transition from conventional to modern power systems is causing an increase in integration of inverter-based resources (IBRs). This generally leads to a decrease in total system inertia, which in-turn increases the system’s rate-of-change-of-frequency (RoCoF) during disturbances. This poses a threat to the frequency stability of the system and may falsely trigger protective devices. To monitor system status and plan for integrating renewable energy sources like photovoltaic, wind, and energy storage systems, a realistic study of inertia estimation and analysis in the United States (US) over the past decade is needed. This paper uses field-measured phasor measurement unit (PMU) data collected throughout the US from 2013 to 2023 via the Frequency Monitoring Network (FNET/GridEye) operated by the University of Tennessee, Knoxville (UTK) and Oak Ridge National Laboratory (ORNL). The collected PMU frequency data is utilized to estimate the system inertia of the three US interconnections: Eastern, Western, and Texas. Various RoCoF time windows are investigated for estimating the inertia of each interconnection by maximizing the correlation coefficient between the measured RoCoF and power mismatch. The resulting inertia trends over the past decade show approximately a 6% decline in inertia in the Eastern interconnection, a 15% decline in inertia in the Western interconnection, and a 16% increase in inertia in Texas. Key insights into how inertia is changing amidst the complex energy landscape are extracted using the fuel mix trend data. This provides valuable information for future energy strategies and planning.

30 DIRECT ENERGY CONVERSION↗

Near-Term Reliability and Resilience (NTRR) (Final Report)

The Near-Term Reliability and Resiliency (NTRR) was awarded in December 2020 as an inter-lab project to examine the reliability and resilience of the electricity grid and natural gas transportation availability. The project builds on studies conducted by The North American Electric Reliability Corporation (NERC), the U.S. Department of Energy (DOE), and other non-governmental research and operational focused on reliability and resilience analyses challenges. The research was conceived to address near-term scenarios (within 10 years), when many local and regional policy transitions could begin to impact grid reliability, resilience, and supporting infrastructure availability. To integrate the natural gas interdependency, the team began with the generating capacity and demand projections from the 2020 NERC Long-Term Reliability Assessment and the Bulk Electric System (BES) transmission topologies defined in the Western Electricity Coordinating Council (WECC) Anchor Data Set, Eastern Interconnection Reliability Assessment Group Multi-Regional Modeling Working Group (ERAG/MMWG) Data Set, the team calculated baseline regional power sector gas demands from present electricity delivery year through the end of delivery year 2030/31 by applying security constrained economic dispatch. This demand was compiled along with demand projections for regional residential, commercial, and industrial natural gas demands from the most recent Energy Information Administration (EIA) Annual Energy Outlook Reference Case into Deloitte’s MarketBuilder® North American Gas Model. Through the application of these demands, MarketBuilder® was projected the topology of natural gas flows in the natural gas pipeline network across the interconnected North American system along with regional natural gas prices that may be seen by market participants in future years Additionally, contingencies and sensitivities focused on the built models of the Eastern Interconnection (EI) and Western Interconnection (WI). They address challenges from the following with the outcomes being an identification of performance under the extreme conditions and an identification of potential grid weaknesses that should be addressed to mitigate the reduced performance and improve the resilience and reliability of the specific regions as well as the National Grid: • Weather events including extreme heat, extreme cold, high wind, no wind, wind and solar forecasting errors, and wildfires. • Gas availability, factoring in supply disruption (contractual and physical), seasonal availability constraints, and infrastructure limitations; and • Transmission availability and congestion.

03 NATURAL GAS↗

Regional Oscillation Source Localization: Implementation in the ESAMS Tool

In recent years, utilities have made great strides in the use of high-speed wide-area measurements collected from within their footprints. However, it is increasingly clear that analyses at wider scales are needed. On January 11, 2019 an oscillation with significant amplitude observable across the Eastern Interconnection persisted for approximately 18 minutes. The generator responsible for the oscillation was only identified after it tripped itself offline. This event, along with several other similar events, demonstrated the need for increased coordination among utilities to effectively mitigate system-wide oscillations and avoid unnecessary or detrimental operator actions. In response to this need, the Eastern Interconnection Situational Awareness Monitoring System (ESAMS) was upgraded to allow the region where an oscillation is originating to be identified. This report documents the algorithms developed for this task and describes how they were integrated into the ESAMS tool. Results from simulation- and measurement-based tests demonstrate the reliability of the approaches.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A method for assessing economic, environmental, and reliability tradeoffs of interregional transmission connecting ERCOT (the Texas grid) to the eastern and western grids

Reliable development of the power grid is an evolving concern for humanity due to extreme weather that frequently threatens power sector infrastructure. The state of Texas is a uniquely structured testbed for grid planners to study when looking for solutions to development, innovation, and overcoming such challenges. Because of its size and islanded structure, Texas is small enough to model, but big enough to matter. Texas is a global leader in energy production, energy consumption, and maintains an unusually diverse fuel mix. In addition, the state has experienced winter freezes, heat waves, wind storms, droughts and floods that have threatened power sector infrastructure or caused recent blackouts and calls for demand side conservation. One of the most devastating of these events was the North American winter storm, dubbed “Winter Storm Uri” by the Weather Channel, that froze the region in February 2021 and led to an extended power outage event that put the majority of Texan residents in darkness for days. While preparing to avoid such outage events in the future, various tools have been proposed to improve grid reliability, including energy efficiency, demand response, and distributed energy resources. An additional option would be to develop interregional transmission that connects the Texas grid to other national grids. To assess the merits of this idea, we developed a novel, universally-applicable and internationally-relevant framework to study how the Texas grid would evolve alongside access to various interregional ties. This method allows us to stress the synthetic grid structure and analyze how it would respond to the shock of a simulated winter storm event. Our method leverages open-source modeling tools, such as PowerGenome, pyGRETA, and GenX to synthesize unique zonal grid data, construct a consolidated network of model regions, and simulate different developmental pathways of capacity expansion and operational dispatch. We demonstrate our method with an analysis connecting the Electric Reliability Council of Texas (ERCOT), the grid that serves most of Texas, the Western Electricity Coordinating Council (WECC), the grid that serves the western half of the contiguous U.S., and the Eastern Interconnect, the grid that serves the eastern half of the contiguous U.S. Our results indicate that the cost-optimal capacity of interregional transmission connecting the ERCOT grid to other grids lies between 9–13 GW assuming baseline conditions. Building this amount of connecting capacity in one or multiple directions lowers the costs and emissions of development and operation by up to $16 billion and 257 million metric tonnes (MMT) respectively. Additionally, our results show that the interregional connections between ERCOT and other national grids reduce the amount of total load shed required through mild winter storm events. However, our results also show that there is a threshold of very extreme winter storm conditions, spanning multiple service areas, above which the connections exacerbate resource adequacy problems. Therefore, the results indicate that the connections need to be carefully planned alongside the rest of the grid infrastructure to avoid over-reliance on specific resources or technology options.

24 POWER TRANSMISSION AND DISTRIBUTION↗