Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EXHAUST SYSTEM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Exhaust system for use with a turbine and method of assembling same

An exhaust system for use with a steam turbine is provided. An exhaust hood includes an input and an output, the input receiving fluid from the steam turbine. The exhaust hood includes a first side wall that extends between the input and the output. The first side wall includes an aperture. An ejector is coupled to the exhaust hood. The ejector includes inlets and an outlet. At least one of the inlets receives fluid from the exhaust hood via the aperture.

42 ENGINEERING↗

Long-term oxidation of candidate cast iron and stainless steel exhaust system alloys from 650 to 800 °C in air with water vapor

Here, the oxidation behavior of SiMo cast iron, Ni-resist D 5 S cast iron, cast chromia-forming austenitic stainless steels of varying Cr/Ni content based on CF8C plus, HK, and HP, and a developmental cast alumina-forming austenitic (AFA) stainless steel of interest for diesel exhaust system components were studied for up to 5000 h at 650-800 °C in air with 10% H 2 O. At 650 °C, the Ni-resist D5S exhibited moderately better oxidation resistance than did the SiMo cast iron. However, the D5S suffered from oxide scale spallation issues at 700 °C and higher, whereas the oxide scales formed on SiMo cast iron remained adherent from 700-800 °C despite oxide scales hundreds of microns thick. The oxidation of the SiMo cast iron exhibited unusual temperature dependence, with periods of slower oxidation kinetics at 750-800 °C compared to 650-700 °C due to continuous silica-rich scale formation at the higher temperatures. The oxidation of the cast chromia-forming austenitics trended with the level of Cr and Ni additions, with small mass losses consistent with Cr oxy-hydroxide volatilization processes for the higher 25Cr/25-35Ni HK and HP type alloys, and transition to rapid Fe-base oxide formation and scale spallation in the lower 19Cr/12Ni CF8C plus type alloy. In contrast, small positive mass changes consistent with protective alumina scale formation were observed for the cast AFA alloy under all conditions studied. Implications of these findings for diesel exhaust system components are discussed.

36 MATERIALS SCIENCE↗

Method of controlling temperature of a thermoelectric generator in an exhaust system

A method of controlling the temperature of a thermoelectric generator (TEG) in an exhaust system of an engine is provided. The method includes determining the temperature of the heated side of the TEG, determining exhaust gas flow rate through the TEG, and determining the exhaust gas temperature through the TEG. A rate of change in temperature of the heated side of the TEG is predicted based on the determined temperature, the determined exhaust gas flow rate, and the determined exhaust gas temperature through the TEG. Using the predicted rate of change of temperature of the heated side, exhaust gas flow rate through the TEG is calculated that will result in a maximum temperature of the heated side of the TEG less than a predetermined critical temperature given the predicted rate of change in temperature of the heated side of the TEG. A corresponding apparatus is provided.

33 ADVANCED PROPULSION SYSTEMS↗

Treatment of radioactive liquid waste by the forced-air exhaust system - 15190

A Natural Evaporation Facility (NEF) was constructed to treat low level (LL) radioactive liquid waste arising from a Radioactive Waste Treatment Facility (RWTF) at the Korea Atomic Energy Research Institute (KAERI). In order to process LL radioactive liquid waste, we investigated the influence of climate condition, mainly atmospheric humidity and temperature, on the amount of evaporation in a forced-air exhaust system in KAERI. Evaporation media were made of cotton and polyester. Air exhaust in the facility was forced by exhaust fans. The evaporation rate and the decontamination factor were calculated and reported as shown in the results section. The evaporation and air supply flow increased at the same rate. In addition, the liquid waste feed rate and temperature of supplied air increased. Regarding the relative humidity of supplied air, the evaporation rate increased as the relative humidity decreased. As the result of this study, the operating conditions for the NEF were optimized in the following areas: The air temperature above 8 deg. C, the air relative humidity below 70%, the air flow rate 1.14-1.47 m/sec, and the liquid waste feed rate 4.6 l/hr.m{sup 2}. The decontamination factor was 1.1x10{sup 3}. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System for rebalancing a pressure differential in an anode exhaust system of a fuel cell with a relational water seal

A fuel cell system includes at least one fuel cell module and at least one relational water seal configured to limit a magnitude of a pressure differential in the fuel cell system in an anode under-pressurization situation in which the second pressure exceeds the first pressure by at least a first predetermined amount. The fuel cell module includes a fuel cell assembly having one or more fuel cells arranged in a stack configuration, an anode inlet manifold, an anode outlet manifold having a first pressure, a cathode inlet manifold having a second pressure, and a cathode outlet manifold.

30 DIRECT ENERGY CONVERSION↗

H-Canyon Ventilation System Exhaust Tunnel Inspection at the Savannah River Site - 18052

The Department of Energy (DOE) H-Canyon Facility at the Savannah River Site (SRS) is operated by Savannah River Nuclear Solutions (SRNS). The Facility Structural Integrity Program (SIP) performs periodic visual inspections to confirm the component is capable of performing its safety function. This Program provides the process to document the conditions of safety related structural systems and components, their damage mechanisms, and recommend repairs if required before there is impact on the safety envelope. The H-Canyon Exhaust Tunnel is part of the H-Canyon Exhaust Ventilation System and is periodically inspected under the Structural Integrity Program. The Tunnel performs a Safety Class passive design feature function that is available 100% of the time. The Tunnel directs Canyon process air from the Canyon to the Sand Filter System. The radiological and chemical airborne activity coupled with the physical configuration of the tunnel precludes a manned entry into the tunnel. Tunnel inspections have been performed using cameras on a stick, referred to as pole cameras prior to CY2003. Since CY2003, five camera equipped crawlers have been used with varying levels of inspection success. With each successive crawler inspection, expectations have increased to perform tasks beyond visual examinations. The 2017 crawler performed the visual inspection but also included improvements on crawler performance, such as testing the use of wireless capability and remediation of crawler travel route, to the addition of stationary cameras and lighting at key locations. The latest 2017 crawler successfully traveled the entire length of the tunnel between the Canyon and Sand Filter System for the second time since development, thus providing key visual data for the integrity program [2]. In addition, several access ports were installed in 2017 following the removal of concrete core samples that allow for new visual inspection of the Canyon Crossover tunnel, thus providing information for an area that was generally inaccessible for monitoring. Planning for the 2019 crawler inspection is underway with the expectations to improve upon inspection cameras and also introduce mapping technologies such as LIDAR. The challenge to obtain meaningful data from the remote inspections of a 60+ year operating Canyon Exhaust tunnel continues to be a complex endeavor requiring close coordination of multiple organizations, adherence to Conduct of Operations, Radiological Safety, Worker Safety, etc. principles as well as alignment with Facility Safety Basis requirements. This paper discusses the continuing improvements in inspection techniques and the challenges associated these inspections. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tests of a High Temperature Sample Conditioner for the Waste Treatment Plant LV-S2, LV-S3, HV-S3A and HV-S3B Exhaust Systems

Tests were performed to evaluate a sample conditioning unit for stack monitoring at Hanford Tank Waste Treatment and Immobilization Plant (WTP) exhaust stacks with elevated air temperatures. The LV-S2, LV-S3, HV-S3A and HV-S3B exhaust stacks are expected to have elevated air temperature and dew point. At these emission points, exhaust temperatures are too high to deliver the air sample directly to the required stack monitoring equipment. As a result, a sample conditioning system is considered to cool and dry the air prior to its delivery to the stack monitoring system. The method proposed for the sample conditioning is a dilution system that will introduce cooler, dry air to the air sample stream. This method of sample conditioning is meant to reduce the sample temperature while avoiding condensation of moisture in the sample stream. An additional constraint is that the ANSI/HPS N13.1-1999 standard states that at least 50% of the 10 μm aerodynamic diameter (AD) particles present in the stack free stream must be delivered to the sample collector. In other words, depositional loss of particles should be limited to 50% in the sampling, transport, and conditioning systems. Based on estimates of particle penetration through the LV-S3 sampling system, the diluter should perform with about 80% penetration or better to ensure that the total sampling system passes the 50% or greater penetration criterion.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual Approach For Estimating Potential Air Toxics And Radionuclide Airborne Emissions From A Temporary Exhaust System For The 216-Z-9 Crib Removal Action

The 216-Z-9 Crib, located at the Hanford Nuclear Reservation in southeastern Washington State, was the site of a successful mining effort to recover plutonium from the contaminated soils at the disposal site. A CERCLA Action Memorandum (AM) issued by the U.S. Department of Energy (DOE) requires the removal of the buildings associated with this mining effort to facilitate a remedial action planned for the near future. The decontamination and demolition of the 216 Z-9 Crib facilities is required under a consent order between the DOE, the U.S Environmental Protection Agency (EPA) and the Washington State Department of Ecology (Ecology). Removal of the buildings located on and near the concrete cover slab over the 216-Z-9 Crib will require removal of the large soil-packaging glovebox located inside the 216-Z- 9A Building. Prior to cleaning out the glovebox, it will be necessary to provide active filtered ventilation capability to ensure a negative pressure exists between the glovebox and the adjacent airspace while hands-on work proceeds within. The glovebox floor is open to the Z-9 crib cavern environment below. For this reason the crib and glovebox currently share a common airspace. The functional requirements for safely conducting work within the glovebox include provision of a negative pressure in the box of about 0.5 inches of water gage (nominal) less than the interior of the building. In addition, the building surrounding the glovebox will be maintained at a slight negative pressure with respect to outdoor ambient pressure. In order to assess the relevant and appropriate clean air requirements for the new temporary ventilation system and associated emissions monitoring, it was necessary to reliably predict the nature of the exhaust air stream. Factors used to predict the presence and concentrations of certain radionuclide particulates and certain gases considered to be air toxics, included reliability parameters, flow rates, radionuclide content, and off-gas compositions. Radionuclide content includes transuranic isotopes, primarily of plutonium and americium. Air toxics include carbon tetrachloride, butane, methanol, acetone and toluene. Flow rate prediction was based on available design and test data and considered equipment sizes, glovebox negative pressure requirements, and filter flow characteristics. The approach used to predict the off-gas composition from the crib required experience-based predictive analysis combined with crib head space analytical results. Input information for emission estimates included: (1) gas composition sample data obtained from recent samples taken within the crib head space during static conditions, and (2) air in-leakage/dilution estimates based on physical characteristics of both the crib and the new temporary ventilation system. The conceptual approach combined measurement-based data with conservative assumptions, and provides the estimates necessary to determine relevance and appropriateness of substantive requirements under federal and state laws and regulations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Exhaust system having a gold-platinum group metal catalyst

A method of providing an exhaust treatment device is disclosed. The method includes applying a catalyst including gold and a platinum group metal to a particulate filter. The concentration of the gold and the platinum group metal is sufficient to enable oxidation of carbon monoxide and nitric oxide.

33 ADVANCED PROPULSION SYSTEMS↗

Exhaust system having a gold-platinum group metal catalyst

A method of providing an exhaust treatment device is disclosed. The method includes applying a catalyst including gold and a platinum group metal to a particulate filter. The concentration of the gold and the platinum group metal is sufficient to enable oxidation of carbon monoxide and nitric oxide.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Tests of a High Temperature Sample Conditioner for the Waste Treatment Plant LV-S2, LV S3, HV S3A and HV-S3B Exhaust Systems

Tests were performed to evaluate a sample conditioning unit for stack monitoring at Hanford Tank Waste Treatment and Immobilization Plant (WTP) exhaust stacks with elevated air temperatures. The LV-S2, LV-S3, HV-S3A and HV-S3B exhaust stacks are expected to have elevated air temperature and dew point. At these emission points, exhaust temperatures are too high to deliver the air sample directly to the required stack monitoring equipment. As a result, a sample conditioning system is considered to cool and dry the air prior to its delivery to the stack monitoring system. The method proposed for the sample conditioning is a dilution system that will introduce cooler, dry air to the air sample stream. This method of sample conditioning is meant to reduce the sample temperature while avoiding condensation of moisture in the sample stream. An additional constraint is that the ANSI/HPS N13.1-1999 standard states that at least 50% of the 10 µm aerodynamic diameter (AD) particles present in the stack free stream must be delivered to the sample collector. In other words, depositional loss of particles should be limited to 50% in the sampling, transport, and conditioning systems. Based on estimates of particle penetration through the LV-S3 sampling system, the diluter should perform with about 80% penetration or better to ensure that the total sampling system passes the 50% or greater penetration criterion.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Passive and no-loss weather cap for protection of wind induced downdraft in sensitive exhaust systems

The invention provides a device for removing heat from a building, the device having: a first tubular member defining a first cavity; a second tubular member defining a second cavity, whereby said second tubular member resides within the first cavity and is coaxial to the first tubular member; and a double conic body coaxially residing in the first cavity and coaxially positioned with the second tubular member.Also provided is a method for removing heat from a building, the method having the steps of: directing heat-containing exhaust emanating from a flue, defining a first diameter, to a passageway received by the flue, whereby the passageway defines a longitudinal axis and a periphery circumscribing the axis; forming the directed exhaust into a slipstream, wherein the slipstream generally travels along the longitudinal axis; and routing precipitation entering the passageway to the periphery.

Lisowski, Darius D.↗

Passive and no-loss weather cap for protection of wind induced downdraft in sensitive exhaust system

The invention provides a device for removing heat from a building, the device having: a first tubular member defining a first cavity; a second tubular member defining a second cavity, whereby said second tubular member resides within the first cavity and is coaxial to the first tubular member; a double conic body coaxially residing in the first cavity and coaxially positioned with the second tubular member; and a flange dimensioned to extend over at least a portion of the periphery of the existing flue so as to aid in supporting the device on the flue.

Lisowski, Darius D.↗

System interfaces control document for the Tokamak exhaust processing system PBS 3.2.1

The Tokamak Exhaust Processing System (TEP) removes tritium from highly tritiated gas streams and returns it back to the fuel system. The largest feed streams originate from the torus, but others arrive from systems throughout the tritium plant. Tritium in the form of free hydrogen (i.e., DT, HT) is separated by Pd-Ag permeators or by cryoadsorption and directed to the Isotope Separation System (ISS). Tritium present in impurities (such as CD{sub 2}T{sub 2} and DTO) is chemically converted to free hydrogen, separated by Pd-Ag membranes, and then sent to ISS. All waste streams are processed by the Detritiation System (DS) prior to venting to the atmosphere. The stream received from Helium Glow Discharge Cleaning (GDC) is returned to GDC after processing. TEP is also designed to accommodate a Tritium Plant (TP) standby mode of operation whereby gases received from fuelling are processed by TEP and returned to SDS. This S-ICD describes all process interfaces for TEP and contains tables to control their progressive definition.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Systems and methods to reduce reductant consumption in exhaust aftertreament systems

Systems, apparatus and methods are provided for reducing reductant consumption in an exhaust aftertreatment system that includes a first SCR device and a downstream second SCR device, a first reductant injector upstream of the first SCR device, and a second reductant injector between the first and second SCR devices. NOx conversion occurs with reductant injection by the first reductant injector to the first SCR device in a first temperature range and with reductant injection by the second reductant injector to the second SCR device when the temperature of the first SCR device is above a reductant oxidation conversion threshold.

33 ADVANCED PROPULSION SYSTEMS↗