Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EXCAVATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Investigation of Hexavalent Chromium Flux to Groundwater at the 100-C-7:1 Excavation Site

Deep excavation of soil has been conducted at the 100-C-7 and 100-C-7:1 waste sites within the 100-BC Operable Unit at the Department of Energy (DOE) Hanford Site to remove hexavalent chromium (Cr(VI)) contamination with the excavations reaching to near the water table. Soil sampling showed that Cr(VI) contamination was still present at the bottom of the 100-C-7:1 excavation. In addition, Cr(VI) concentrations in a downgradient monitoring well have shown a transient spike of increased Cr(VI) concentration following initiation of excavation. Potentially, the increased Cr(VI) concentrations in the downgradient monitoring well are due to Cr(VI) from the excavation site. However, data were needed to evaluate this possibility and to quantify the overall impact of the 100-C-7:1 excavation site on groundwater. Data collected from a network of aquifer tubes installed across the floor of the 100-C-7:1 excavation and from temporary wells installed at the bottom of the entrance ramp to the excavation were used to evaluate Cr(VI) releases into the aquifer and to estimate local-scale hydraulic properties and groundwater flow velocity.

Chromium↗

SLOPE STABILITY EVALUATION AND EQUIPMENT SETBACK DISTANCES FOR BURIAL GROUND EXCAVATIONS

After 1970 Transuranic (TRU) and suspect TRU waste was buried in the ground with the intention that at some later date the waste would be retrieved and processed into a configuration for long term storage. To retrieve this waste the soil must be removed (excavated). Sloping the bank of the excavation is the method used to keep the excavation from collapsing and to provide protection for workers retrieving the waste. The purpose of this paper is to document the minimum distance (setback) that equipment must stay from the edge of the excavation to maintain a stable slope. This evaluation examines the equipment setback distance by dividing the equipment into two categories, (1) equipment used for excavation and (2) equipment used for retrieval. The section on excavation equipment will also discuss techniques used for excavation including the process of benching. Calculations 122633-C-004, 'Slope Stability Analysis' (Attachment A), and 300013-C-001, 'Crane Stability Analysis' (Attachment B), have been prepared to support this evaluation. As shown in the calculations the soil has the following properties: Unit weight 110 pounds per cubic foot; and Friction Angle (natural angle of repose) 38{sup o} or 1.28 horizontal to 1 vertical. Setback distances are measured from the top edge of the slope to the wheels/tracks of the vehicles and heavy equipment being utilized. The computer program utilized in the calculation uses the center of the wheel or track load for the analysis and this difference is accounted for in this evaluation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Development of an Automated Instrument for Measuring Radioactivity in an Excavator Bucket - 16246

Increasing interest and emphasis is being given to the presence of radioactive contamination in the environment and the methods by which this contamination can be remediated. Radioactive contamination may arise from industrial process including the operation of nuclear facilities. It may also arise from the enhancement of naturally occurring radioactive material by industrial processes. An area of particular concern is the remediation of soil and rubble with radioactive contamination. Traditional methods of soil remediation involve sampling followed by the excavation of areas where contamination is found. The soil removal process is normally very inefficient and can involve multiple handling of excessive quantities of soil and ultimately an over estimate of the quantity of soil with radioactive contamination. In order to both minimize material handling and to reduce the final volume of contaminated material, which must be handled for disposal, a sensitive instrument has been developed and tested which is designed to measure the radioactive content of an excavator bucket. The instrument detector is positioned automatically just above the open top of the bucket and the measurement employs a high efficiency sodium iodide crystal which has a graded shadow shield to reduce the effect of background radioactivity. The measurement efficiency is enhanced as the detector is located in close proximity to the soil in the bucket and the thick steel shell of the bucket acts as a shield to further reduce the effect of background from the ground below. The method has obvious advantages over methods, which attempt to measure the potentially radioactive soil through the shielding provided by the thick steel bucket shell. As the first stage of the bucket measurement the excavator operator fills the bucket and locates it in a designated position with the open top of the bucket facing upwards, close to the operator cab. A measurement technician, located outside the danger area of the excavator boom, begins the measurement using a tablet computer with a wireless connection to the instrument. The shielded detector is moved from a storage position above the operator cab to the measurement position close to the open surface of the excavator bucket. Once the measurement is completed in typically one to two minutes, the detector is repositioned in its storage location and the measurement data is transmitted to the tablet computer. At this point the measurement technician makes the decision based on the measurement results as to how to disposition the bucket contents. Typically contaminated material will be transferred to a vehicle for off-site disposal. Alternatively, and this is the great advantage of this technique, uncontaminated material may be returned directly to the site of the excavation without the need for further handling. The development, detailed design and preliminary testing of the instrument are described. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deployment of Rapid Assay Systems for Real-time Sorting of Excavation Spoil on Contaminated Land - 19258

To optimise segregation at source, and hence minimise waste production, NUVIA have developed and utilised the Gamma Excavation Monitor (GEM) system. The GEM was designed for land remediation projects, to provide a rapid screening tool for excavator buckets of material. Following successful deployment in the UK, including the Olympic Park site in London, and two major Magnox land remediation projects, the first GEM unit was deployed to Canadian Nuclear Laboratories' (CNL) Chalk River Laboratory (CRL) in 2016. The GEM unit was fitted with a plastic scintillator detector; recent developments have included the utilisation of a sodium iodide. The system is initiated by the presence of an excavator bucket above the detector which triggers proximity switches that automatically start the counting routine. At the end of a short count time, typically 10 seconds, the materials category is indicated by means of a traffic light system, based on either the gross gamma activity or a photo-peak. Using this instrument, material determined not to be radioactive can be re-used on-site. In addition to the traffic light system, results are also transmitted wirelessly to a tablet device. These combined features allow operation of the system without the need to have operatives near the mechanical excavator bucket; therefore, eliminating a significant industrial hazard. Deployments of the GEM on the CRL site have included Storm Water Management project, within the CRL controlled area, and the Foundation Road Landfill Project. The use of the GEM in these projects enabled in-situ decisions to be made regarding the segregation and sentencing of soil rather than having to wait for the analysis of samples; saving time and cost to the project. The Building 492 project involved the excavation of soil within a supervised area to prepare for the installation of modular trailer units. For this specific job, the GEM was calibrated to ensure soil met clearance criteria as stipulated in the Nuclear Substances and Radiation Devices Regulations (Canadian Nuclear Safety Commission; SOR/2000-207). A total of 326 loads of soil were monitored during this project and re-assurance sampling conducted by CNL corroborated the results produced by the GEM system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling of Damage, Permeability Changes and Pressure Responses during Excavation of the TSX Tunnel in Granitic Rock at URL, Canada

This paper presents numerical modeling of excavation-induced damage, permeability changes, and fluid-pressure responses during excavation of the TSX tunnel at the underground research laboratory (URL) in Canada. Four different numerical models were applied, using a wide range of approaches to model damage and permeability changes in the excavation disturbed zone (EDZ) around the tunnel. Using in situ calibration of model parameters the modeling could reproduce observed spatial distribution of damage and permeability changes around the tunnel, as a combination of disturbance induced by stress redistribution around the tunnel and by the drill-and-blast operation. The modeling showed that stress-induced permeability increase above the tunnel is a result of micro and macrofracturing under high deviatoric (shear) stress, whereas permeability increases alongside the tunnel as a result of opening of existing microfractures under decreased mean stress. The remaining observed fracturing and permeability changes around the periphery of the tunnel were attributed to damage from the drill-and-blast operation. Moreover, a reasonably good agreement was achieved between simulated and observed excavation-induced pressure responses around the TSX tunnel for 1 year following its excavation. The simulations showed that these pressure responses are caused by poroelastic effects as a result of increasing or decreasing mean stress, with corresponding contraction or expansion of the pore volume. The simulation results for pressure evolution were consistent with previous studies, indicating that the observed pressure responses could be captured in a Biot model using a relatively low Biot-Willis coefficient, {alpha} {approx} 0.2, a porosity of n {approx} 0.007, and a relatively low permeability of k {approx} 2 x 10{sup -22} m{sup 2}, which is consistent with the very tight, unfractured granite at the site.

54 ENVIRONMENTAL SCIENCES↗

Excavated nanoframes with three-dimensional electrocatalytic surfaces

Described herein are metallic excavated nanoframes and methods for producing metallic excavated nanoframes. A method may include providing a solution including a plurality of excavated nanoparticles dispersed in a solvent, and exposing the solution to chemical corrosion to convert the plurality of excavated nanoparticles into a plurality of excavated nanoframes.

36 MATERIALS SCIENCE↗

Excavation and Repackaging of Retrievably-Stored, Remote-Handled Transuranic Waste at Oak Ridge National Laboratory

Between 1972 and 1981, remote-handled transuranic (RH-TRU) wastes generated at Oak Ridge National Laboratory (ORNL) were retrievably stored through shallow land burial in a series of 22 earthen trenches in the northern portion of Solid Waste Storage Area 5 in ORNL's Melton Valley. A Dispute Resolution Agreement signed by the Tennessee Department of Environment and Conservation and DOE specified removal of the buried (stored) waste to allow for repackaging, processing, and offsite disposal at an appropriate facility. A total of 204 concrete casks were successfully retrieved and over-packed from the 22-trench area between November 2004 and June 2006. Wastes originally stored in boxes, drums or placed without packaging was also recovered and repackaged. The repackaged wastes were transported to a nearby temporary storage facility at ORNL pending processing at DOE's Transuranic Waste Processing Center. In summary: The objective of the MVTRU Waste Retrieval Project was to satisfy conditions of the Dispute Resolution Agreement. This remedial action consisted of removal of all buried waste containers and loose items from the 22-trench area. The TRU waste casks were placed in steel overpacks, while other waste boxes, drums, and loose items were placed in steel drums or boxes. The over-packed waste was placed in an approved staging area until it can be accepted for treatment at the ORNL TRU Waste Processing Facility and ultimately disposed. A total of 204 casks were indicated by historical records to have been buried in the 22-Trench area, and 204 casks were found and over-packed during the retrieval operations. The historical records also indicated that some 18 steel or wood boxes, 12 steel drums, and approximately 15 m{sup 3} of loose waste were buried in the trenches. The contents of approximately 12 boxes, 3 drums, and approximately the expected 15 m{sup 3} quantity of loose waste were retrieved and over-packed. One significant deviation from the actions described in the Dispute Resolution Agreement occurred during the excavation of Trench 13. Pyrophoric material was encountered and a reaction occurred, causing a brief flame in the excavator bucket. No personnel contamination or radioactive material release occurred. The waste buried in Trench 13, consisting of approximately eight 208-liter (55-gal) drums and one 114-liter (30-gal) drum, was stabilized in-place due to risks associated with the retrieval and handling of this pyrophoric material. The Dispute Resolution Agreement completion date was revised to allow this material to remain stabilized in place as interim storage until a disposition path is established. The baseline schedule called for site mobilization and preparation to begin in November 2003, soil excavation and waste retrieval to be completed by March 2006, and site restoration and demobilization to be complete by April 2006, with the draft letter of completion submitted in May 2006. Soil excavation and waste retrieval were completed in March 2006 as planned, and no significant deviations to the baseline schedule were encountered. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford site excavation permit application automation project - 15187

Mission Support Alliance, LLC (MSA), on behalf of the Department of Energy's Richland Operations Office (DOE-RL), recently implemented the Site Excavation Permit Application (SEPA) at Hanford. The SEPA automation replaced a 20-year-old manual excavation permit process that governed all Hanford Site excavation activities. The manual process required time consuming interaction between numerous resources for submitting an excavation permit to 15 separate permit organizations for approvals and signature. The process involved numerous information exchanges - usually by phone or E-mails, and substantial vehicle travel. It also generated large amounts of paper, lengthy wait periods and the need for continual status updates to permit reviewers until all approvals were obtained. The new SEPA automated system is an entirely paperless application that streamlines over 25 separate manual permit activities into five Web-based processes. The new application provides sizable environmental sustainability benefits in terms of avoiding: paper waste, air pollution and bio-fuel consumption. SEPA also deploys automated innovations that produce an approximate 50 percent operational cost reduction when compared to the manual permit process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Excavation Volume Growth Factors at Environmental Remediation Sites - 20318

The U.S. Army Corps of Engineers (USACE) manages numerous environmental remediation projects in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, otherwise known as CERCLA. These include projects for the Formerly Utilized Sites Remedial Action Program (FUSRAP). Utilizing the CERCLA framework to address these projects requires detailed cost estimates and a significant portion of costs are associated with the volume of material to be excavated and that material's final disposition. Accordingly, understanding the expected volumes and uncertainty associated with those volumes is vital to project cost estimating. These estimates are completed at various stages of the CERCLA process, thus the project team has varying degrees of information available from which to develop these estimates depending on how far along the project is. Understanding the factors contributing to volume growth (increase in volume of material from that originally estimated) is a crucial element to determining volume and cost uncertainty. This paper presents a case study of a FUSRAP site which involves excavation and offsite disposal of contaminated soils from complex commercial, industrial, and residential properties. Original volume estimates were compared to post excavation volumes on a property by property basis. Reasons for differences are determined along with magnitude of impacts to cost estimating. For both residential and commercial property types, volume estimating factors, uncertainty considerations, and methods to account for each are discussed with emphasis on volume growth considerations. Cost estimating model input considerations are discussed with specific emphasis on accounting for volume uncertainty at the Feasibility Study (FS) phase of CERCLA. Underestimating or overestimating costs at the FS phase has repercussions under CERCLA that may impact project close out or completion schedule. Discussions presented will be helpful to both reviewers and preparers of cost estimates involving excavations. Additionally, project planners may be able to use the information to plan for volume growth contingencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Determination of permeability for hydrocarbon release due to excavation-induced stress redistribution in rock salt

Due to a stress redistribution after the excavation of an underground tunnel for radioactive waste disposal, an Ed/DZ (excavation disturbed/damaged zone) will be generated in the near field of the opening, resulting in significant changes in the hydraulic and mechanical properties of the rock mass in the zone. Initially more or less randomly distributed hydrocarbons at grain boundaries in rock salt, which sometimes can only be observed with ultraviolet light, can then be mobilised and migrate at a potentially significant rate towards the excavation. Within the international cooperative project DECOVALEX 2019, the migration mechanism of such fluid inclusions in rock salt is being studied intensively. Specifically, a multi-scale modelling strategy has been developed. A macroscale coupled hydro-mechanical modelling of an underground excavation was performed to determine hydraulic and time-dependent deviatoric stress conditions, by taking into account the rock salt creep behaviour. Under the obtained macro-scale constraints, micro-scale modelling of a pathway dilation along halite grain boundaries was performed using different model strategies: a) coupled hydromechanical modelling with a consideration of hydraulic pressure-induced dilatant deformation, b) nonlinear dynamic model taking account of fluid migration, stress-dependent grain boundary wetting and shear-induced dilatancy of salt, and c) phase-field modelling of flow pathway propagation. The permeability increase resulting from the pathway dilation is estimated to be as high as two orders of magnitude. Based on the permeability determined, a series of pressure buildups measured from a borehole with a high hydrocarbon release rate, a total of 430 build-ups within a monitoring time of 938 days, can be simulated with a macro-scale compressible flow model accounting for different zones around the opening.

58 GEOSCIENCES↗

A study experiment of auto idle application in the excavator engine performance

The purpose of this study was to analyze the effect of applying auto idle to excavator engine performance, such as machine unitization and fuel consumption in Excavator. Steps to be done are to modify the system JA 44 and 67 in Vehicle Electronic Control Unit (V-ECU). The modifications will be obtained from the pattern of the engine speed. If the excavator attachment is not operated, the engine speed will return to the idle speed automatically. From the experiment results the auto idle reduces fuel consumption in excavator engine.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Challenges in Making Metal Large-scale Complex Parts for Additive Manufacturing: A Case Study Based on the Additive Manufacturing Excavator (AME)

The Additive Manufacturing Excavator (AME) contained several key components that were 3D printed at The Manufacturing Demonstration Facility (MDF) of Oak Ridge National Laboratory (ORNL); it was presented at and performed a live demonstration for the CONEXPO 2017 exhibition in Las Vegas, Nevada in March of 2017. This paper presents challenges in building functional, large-scale metal parts based on a case study of the excavator. The excavator’s metal arm was 3D printed using a modified Wolf Robotics automated metal inert gas (MIG) welding cell. Tasks included designing a new type of slicer for the metal additive manufacturing (AM) process, integrating the slicing software with the Wolf Robotics system, developing the deposition process, characterizing geometric features and material properties, managing heat, designing mechanical components for metal AM, and developing a machining approach to achieve the final part. Two fully functional excavator arms were printed and machined. Integrated hydraulics passageways that also served as structural stiffeners were included in the build for demonstration purposes. As a direct result of this project, Wolf Robotics is now working towards a commercially available large-scale metal AM system.

Nycz, Andrzej↗

A Gamma Assay System for Characterizing Excavated Soil with High {sup 137}Cs and {sup 90}Sr Contamination - 19460

We report on the recent development of a remote gamma-assay system for the measurement and characterization of high-activity soil excavated as part of an ongoing remediation project. The soil below a hot cell in our customer's facility has been contaminated with high concentrations of radionuclides {sup 137}Cs and {sup 90}Sr over the past several decades. The contaminated soil is to be remotely excavated from beneath the hot cell floor, to a depth of several feet, and placed in steel-walled waste bins for assay and disposition. The project requires measuring the {sup 137}Cs activity to a minimum detectable concentration (MDC) of 1 micro curie per gram. The high dose-rate of the material and the expectation of high Bremsstrahlung background, due to an unknown ratio of {sup 90}Sr admixture with the {sup 137}Cs, present unique measurement challenges. A novel assay system was designed to make measurements through a small access port in a 4-foot thick concrete wall isolating operators from the high-dose excavation area. Waste bins filled with soil are placed by a remotely operated crane onto an automated turntable, and initial dose measurements are taken for all bins. When excavation has proceeded to the point that dose rates below 20 Rad/hr on contact are reached, gamma spectroscopy will be used to characterize the {sup 137}Cs content. Gamma assay is performed with a 1 cm{sup 3} CZT detector in a collimated tungsten shield, which is extended through the access port toward the side of the bin by means of a seven foot long aluminum pipe. Each of the four sides of the bin is assayed in a discrete measurement, and the individual segments and summed result are reported. Canberra's NDA2000 software is used to collect and analyze the spectroscopic data and to control the turntable movement during the assay. The system is expected to meet the required MDC limits within a forty minute assay time under the most adverse conditions anticipated, with total measurement uncertainty of less than 25%. We describe in this paper the design and construction of the assay system, its calibration using the ISOCS software, and the evaluation of performance estimates. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterising and modelling the excavation damaged zone (EDZ) in crystalline rock in the context of radioactive waste disposal

This paper describes current knowledge about the nature of and potential for thermo-hydro-mechanical-chemical modelling of the Excavation Damaged Zone (EDZ) around the excavations for an underground radioactive waste repository. In the first part of the paper, the disturbances associated with excavation are explained, together with reviews of Workshops that have been held on the subject. In the second part of the paper, the results of a DECOVALEX research programme on modelling the EDZ are presented. Four research teams used four different models to simulate the complete stress-strain curve for Avro granite from the Swedish Aespoe Hard Rock Laboratory. Subsequent research extended the work to computer simulation of the evolution of the repository using a 'wall block model' and a 'near-field model'. This included assessing the evolution of stress, failure and permeability and time dependent effects during repository evolution. As discussed, all the computer models are well suited to sensitivity studies for evaluating the influence of their respective supporting parameters on the complete stress-strain curve for rock and for modelling the EDZ.

54 ENVIRONMENTAL SCIENCES↗

Lattice modeling of excavation damage in argillaceous clay formations: Influence of deformation and strength anisotropy

This paper presents modeling of mechanical anisotropy in argillaceous rocks using an irregular lattice modeling approach, namely the rigid-body-spring network. To represent the mechanical anisotropy, new schemes are implemented in the modeling framework. The directionality of elastic deformation is resolved by modifying the element formulation with anisotropic elastic properties. The anisotropy of strength and failure characteristics is facilitated by adopting orientation-dependent failure criteria into the failure model. The verification of the improved modeling procedures is performed against theoretical model predictions for unconfined compression tests with various bedding orientations. Furthermore, excavation damage and fracturing processes in rock formations are simulated for different geomechanical configurations, such as rock anisotropy and tectonic heterogeneity. The simulated excavation damage characteristics are realistic and comparable with the actual field observation at a tunnel located in an argillaceous clay formation. The simulation results provide insights into the excavation damage zone phenomena with an explicit representation of fracturing processes.

58 GEOSCIENCES↗

Multirobot Lunar Excavation and ISRU Using Artificial-Neural-Tissue Controllers

Automation of site preparation and resource utilization on the Moon with teams of autonomous robots holds considerable promise for establishing a lunar base. Such multirobot autonomous systems would require limited human support infrastructure, complement necessary manned operations and reduce overall mission risk. We present an Artificial Neural Tissue (ANT) architecture as a control system for autonomous multirobot excavation tasks. An ANT approach requires much less human supervision and pre-programmed human expertise than previous techniques. Only a single global fitness function and a set of allowable basis behaviors need be specified. An evolutionary (Darwinian) selection process is used to 'breed' controllers for the task at hand in simulation and the fittest controllers are transferred onto hardware for further validation and testing. ANT facilitates 'machine creativity', with the emergence of novel functionality through a process of self-organized task decomposition of mission goals. ANT based controllers are shown to exhibit self-organization, employ stigmergy (communication mediated through the environment) and make use of templates (unlabeled environmental cues). With lunar in-situ resource utilization (ISRU) efforts in mind, ANT controllers have been tested on a multirobot excavation task in which teams of robots with no explicit supervision can successfully avoid obstacles, interpret excavation blueprints, perform layered digging, avoid burying or trapping other robots and clear/maintain digging routes.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Planning large-scale excavation and construction activities within an aerially constrained site for construction of a repository for low and short-lived intermediate level radioactive waste at the Bulgarian national disposal facility - 15372

The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is planning the construction of a near-surface repository for low and short-lived intermediate level radioactive waste, the National Disposal Facility (NDF), at the Radiana Site adjacent to the Kozloduy Nuclear Power Plant (KNPP). The Site, a rectangular area approximately 1.2 km east-west by 0.4 north-south, is located on a slopping area between the second and sixth loess terraces above the River Danube with elevations ranging from approximately +40 m to elevation +95 m. Construction of the NDF will be divided into three phases separated by approximately 20 years each. The first phase will see the construction of the primary support facilities, referred to as the Auxiliary Buildings and including the Waste Reception and Buffer Storage (WRBS) Building, and the first set of 22 reinforced concrete disposal cells and supporting infrastructure, including a network of subsurface observation galleries, the Infiltration Network Control (ICN) Galleries. Each disposal cell will be 20.15 m long by 17.05 m wide by 9.45 m in height. The disposal cells will be arranged in two parallel rows. Disposal activities will be conducted using overhead cranes installed inside of track mounted mobile roofs. Each row of disposal cells will be serviced by one mobile roof. The mobile roofs will be supported by massive concrete foundations. Construction at the site will present several logistical challenges that will need to be overcome to fully realize the NDF. First in order to begin construction of these facilities nearly 1 million 3 of soil will require excavation and handling. Consistent with requirements to minimize potential environmental impacts identified in the site Environmental Safety Assessment (EIA) excavated soil will, to the extent possible, remain onsite. Approximately three quarters of the soil can be accommodated within the site boundaries. Another challenge results from requirements imposed by the ground conditions. The sub-grade at the site, which consists primarily of loess, will require considerable improvement. To this end a 5 m thick loess-cement cushion will be constructed across much of the site. Specifically, the cushion will be required beneath the disposal cells and the WRBS Building. Construction of the loess-cement cushion in the disposal area will require detailed planning and coordination, particularly as the cushion beneath the disposal cells also contains embedded structures, including the ICN Galleries as well as massive concrete foundation beams required for the two mobile roofs. Construction of these structures will require planned interruptions in the construction of the loess-cement cushion. Specific cement types and strict quality requirements will be required for completion of the loess-cement cushion as well as for completion of the ICN Galleries. The construction planning will need to account for the large volumes of soil to be excavated as well as ensuring sufficient material supplies in terms of both quality as well as quantity. Large quantities of materials including both dry cement for mixing with the loess, and wet concrete for pouring of the mobile roof foundations are accounted for by the plan. However, even after completion of these activities additional challenges are addressed by the plan related to the contemporaneous construction management of the auxiliary buildings and the disposal cells. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MARSAME Radiological Release Report for Archaeological Artifacts Excavated from Area L

In 1991 Los Alamos National Laboratory’s (LANL’s) cultural resources team excavated archaeological site LA 4618 located at Technical Area 54, within Material Disposal Area L (MDA L). MDA L received non-radioactive chemical waste from the early 1960s until 1985. Further development of the MDA required excavation of several cultural sites under National Historic Preservation Act requirements; artifacts from these sites have been subsequently stored at LANL. The LANL cultural resources group would now like to release these artifacts to the Museum of Indian Arts and Culture in Santa Fe for curation. The history of disposal at Area L suggests that the artifact pool is unlikely to be chemically contaminated and LANL staff washed each artifact at least once following excavation. Thus, it is unlikely that the artifacts present a chemical hazard. LANL’s Environmental Stewardship group (EPC-ES) has evaluated the radiological survey results for the Area L artifact pool and found that the items described in this report meet the criteria for unrestricted radiological release under Department of Energy (DOE) Order 458.1 Radiation Protection of the Public and the Environment and are candidates for release without restriction from LANL control. This conclusion is based on the known history of MDA L and on radiation survey data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗